Markdown Editor

Architecture Process Plan and Records Template (ISO/IEC/IEEE 42020)

Collection scope, tailoring, six processes (governance, management, conceptualization, evaluation, elaboration, enablement), RACI, registers, metrics

ArchitekturVollständigISO/IEC/IEEE 42020:2019 (structure only)practice42020

Anleitung: Use it when setting up or auditing an architecture practice that governs a collection of architectures. Fill the collection scope, conformance case and process owners first, then keep the per-process registers current. The main pitfall is managing documents instead of architectures, so track governance decisions and compliance, not just approvals.

Vorschau

Architecture Process Plan and Records: [Organisation or architecture collection]

Plan and working records for an architecture practice, organised on the six architecture processes of ISO/IEC/IEEE 42020:2019 (Software, systems and enterprise: Architecture processes): Governance, Management, Conceptualization, Evaluation, Elaboration and Enablement. The 2019 edition is current; ISO lists it as "to be revised" (stage 90.92 since 2026-01-08), and a second edition, Enterprise, systems and software: Architecture processes, is registered as work item AWI 42020 since 2026-05-22 (IEEE project P42020, PAR approved 2026-09-25). Use it to set up how a team or enterprise governs its collection of architectures and how each architecture effort is conceptualised, evaluated, elaborated and supported. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document ID[ARCH-PROC-001]
Organisation unit[Enterprise / Business unit / Programme / Product line]
Architecture collection[Name of the set of architectures governed, for example "Group digital architectures"]
Process standardISO/IEC/IEEE 42020:2019
Conformance case[Full conformance / Tailored conformance]
Version[0.1]
Status[Draft / Approved / In use / Superseded]
Owner[@chief-architect]
Approvers / reviewers[@cio], [@architecture-board-chair], [@head-of-portfolio]
Review cycle[Yearly, and after each major reorganisation]
Last updatedYYYY-MM-DD
Classification[Internal]

Approvals

RoleNameDecisionDate
Executive sponsor (CIO or CTO)[@name][Approved / Approved with conditions]YYYY-MM-DD
Architecture board chair[@name][Approved]YYYY-MM-DD
Portfolio management lead[@name][Reviewed]YYYY-MM-DD
Quality or process owner[@name][Reviewed]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]First draft of the process plan
1.0YYYY-MM-DD[@name]Example: Approved by the executive sponsor; tailoring record agreed
1.1YYYY-MM-DD[@name]Example: Evaluation process now requires ATAM for platform decisions (EVL-POL-02)

Contents

1. Purpose, scope and context

1.1 Purpose

[Example: "This plan defines how the Group Architecture Office governs and manages the group's collection of enterprise, segment and solution architectures, and how each architecture effort is conceptualised, evaluated and elaborated. It aims to make investment decisions faster and better informed, reduce duplicate platforms, and keep architectures current enough to be used."]

1.2 Architecture collection in scope

IDArchitectureLevelEntity of interestOwnerStatus
ARC-001 (Example)Group enterprise architectureEnterpriseRetail group[@chief-architect]Current, reviewed yearly
ARC-002 (Example)Customer and commerce segment architectureSegmentOnline and store commerce capabilities[@domain-architect-commerce]Current
ARC-003 (Example)Order Management Platform solution architectureSolutionOrder capture and fulfilment system[@solution-architect-omp]In conceptualization
ARC-004 (Example)Data platform reference architectureReferenceAnalytical data platform[@data-architect]Elaboration
[ARC-nnn][Architecture][Enterprise / Segment / Solution / Reference / Product line][Entity][@owner][Status]

1.3 Context and relationship to other life cycle processes

Architecture processes do not replace life cycle processes; they inform them. Clause 5.2 relates architecture to other processes and information elements, and clause 5.6 separates architecture (fundamental concepts and properties) from design (realisation detail). Record the life cycle standards and internal processes this practice connects to.

Related process or standardRelationship
ISO/IEC/IEEE 15288 and 12207 Architecture Definition process (Example)Solution efforts in the delivery life cycle call Conceptualization, Evaluation and Elaboration for their architecture work
ISO/IEC/IEEE 42010:2022 (Example)Elaboration produces architecture descriptions conforming to 42010
ISO/IEC/IEEE 42030:2019 (Example)Evaluation uses the 42030 framework for objectives, factors and results
Investment and portfolio process (Example)Governance decisions feed stage gates; portfolio priorities set collection objectives
[Process][Relationship]

2. Conformance and tailoring

2.1 Conformance claim

[Example: "The Group Architecture Office claims tailored conformance to ISO/IEC/IEEE 42020:2019 for the six architecture processes. Tailoring is listed in section 2.2. Conformance is reviewed at the yearly process review (section 13)."]

2.2 Tailoring record

IDProcessTailoring decisionRationaleAffected outcomesApproved by
TLR-01 (Example)ConceptualizationSmall changes (below USD 250,000 and no new platform) skip tradespace characterisationProportionate effort; the architecture board handles exceptionsCandidate architectures limited to one plus "do nothing"[@board-chair]
TLR-02 (Example)EvaluationLightweight checklist review allowed for solution architectures without new platformsATAM is reserved for platform and high-risk decisionsEvaluation depth[@board-chair]
TLR-03 (Example)EnablementTool acquisition handled by the group IT procurement process, not by this practiceAvoid duplicate procurementAcquisition activity[@cio]
[TLR-nn][Process][Decision][Rationale][Outcomes][@name]

3. Process overview and responsibilities

3.1 Process map

The map shows which processes act on the whole collection, which act on one architecture effort, and how Enablement supports all of them. Arrows show the main information flows.

3.2 Process summary

Process42020:2019 clausePurpose in this organisation (original wording)Process owner
Architecture Governance6Set direction for the collection, make governance decisions, and check that directives are followed[@architecture-board-chair]
Architecture Management7Plan, resource and run the architecture work, keep the collection current, and measure how well architecting works[@head-of-architecture-office]
Architecture Conceptualization8Understand the problem, set architecture objectives, and form candidate architectures[@lead-architect per effort]
Architecture Evaluation9Judge architectures against objectives and stakeholder value and report findings[@evaluation-lead, independent of the effort]
Architecture Elaboration10Describe the chosen architecture in viewpoints, models and views fit for its users[@lead-architect per effort]
Architecture Enablement11Provide and improve the methods, tools, repository, skills and services the other processes need[@architecture-practice-lead]

3.3 Mapping of local methods to processes

Local method or frameworkGovernanceManagementConceptualizationEvaluationElaborationEnablement
Architecture board and principles (Example)YesPartly
TOGAF ADM phases A to H (Example)Phase GPreliminary, HA, B to D (options)CheckpointsB to D, FPreliminary
ATAM (Example)Yes
arc42 and C4 (Example)YesTemplates
Architecture repository (Example)YesYes
[Method]

3.4 Responsibility matrix

ActivityBoardArchitecture officeLead architectEvaluation leadDelivery teamPortfolio
Set collection objectivesARCIIC
Approve governance decisionsARCCII
Plan architecture workIARCCC
Conceptualize an architectureICACCI
Evaluate an architectureIACRCI
Elaborate an architectureICAIRI
Provide tools and skillsIACCCI

R responsible, A accountable, C consulted, I informed.

4. Architecture Governance

4.1 Governance plan

ItemValue
Governance body[Example: Group Architecture Board, monthly, chaired by the CTO]
Decision rights[Example: Approve new platforms, principles, standards and exceptions; recommend investments]
Escalation path[Example: Board to CIO; CIO to executive committee for decisions above USD 5 million]
Charter[Link to Architecture Governance Charter (architecture/architecture-governance-charter)]
Activities coveredPlan and monitor governance (6.4.1, 6.4.2); set collection objectives (6.4.3); make decisions (6.4.4); monitor compliance (6.4.5); review implementation of directives (6.4.6)

4.2 Collection objectives

IDObjectiveMeasureTargetBusiness driverReview date
GOV-OBJ-01 (Example)Reduce overlapping commerce platformsNumber of order management systemsFrom 4 to 1 within three yearsCost and customer experienceYYYY-MM-DD
GOV-OBJ-02 (Example)Make every new solution cloud-hosted on the group landing zoneShare of new solutions on landing zone100%Security and run costYYYY-MM-DD
GOV-OBJ-03 (Example)Keep architectures usableShare of current architectures reviewed in the last 12 months>= 90%Decision qualityYYYY-MM-DD
[GOV-OBJ-nn][Objective][Measure][Target][Driver]YYYY-MM-DD

4.3 Governance directives

IDDirectiveTypeApplies toSource
GOV-DIR-01 (Example)Reuse an existing platform before building a new onePrincipleAll solution architecturesArchitecture Principles (architecture/architecture-principles)
GOV-DIR-02 (Example)All public APIs follow the group API guidelinesStandardSolution architectures with external APIsAPI Design Guidelines (architecture/api-design-guidelines)
GOV-DIR-03 (Example)Platform decisions require an independent evaluationPolicyNew or replaced platformsEVL-POL-02
[GOV-DIR-nn][Directive][Principle / Standard / Policy / Guidance][Scope][Source]

4.4 Governance decision log

IDDateDecisionArchitectureBasisConditionsStatus
GOV-DEC-001 (Example)YYYY-MM-DDApprove candidate A as target for the Order Management PlatformARC-003Evaluation EVL-001Regional failover rehearsed before go-liveApproved with conditions
GOV-DEC-002 (Example)YYYY-MM-DDGrant a 12-month exception to GOV-DIR-02 for the legacy loyalty APIARC-002Exception requestRetire API by YYYY-MM-DDException granted
[GOV-DEC-nnn]YYYY-MM-DD[Decision][ARC-nnn][Basis][Conditions][Status]

4.5 Compliance monitoring

IDArchitecture or projectDirectiveCheck methodResultAction
GOV-CMP-01 (Example)Order Management Platform buildGOV-DIR-02Automated API lint in pipelineCompliantNone
GOV-CMP-02 (Example)Store inventory serviceGOV-DIR-01Architecture compliance reviewNon-compliant: new search engine introducedRaise exception request or migrate by YYYY-MM-DD
[GOV-CMP-nn][Scope][GOV-DIR-nn][Method][Result][Action]

Use Architecture Compliance Assessment (architecture/architecture-compliance-assessment) for the detailed review record and Architecture Contract (architecture/architecture-contract) where delivery teams sign up to conditions.

5. Architecture Management

5.1 Management approach

ItemValue
Planning horizon[Example: Rolling 12 months, reviewed quarterly with the portfolio]
Intake[Example: Requests via Request for Architecture Work (architecture/request-for-architecture-work)]
Prioritisation[Example: Business value, risk, and dependency on collection objectives]
Configuration control[Example: Architectures versioned in the repository; baselines approved by the board]
Activities coveredPlan and monitor management (7.4.1, 7.4.2); develop approach (7.4.3); manage the collection (7.4.4); monitor architecting effectiveness (7.4.5); prepare completion of the plan (7.4.6)

5.2 Architecture work plan

IDEffortArchitectureProcesses invokedStartEndLeadStatus
MGT-WRK-01 (Example)Order Management Platform target architectureARC-003Conceptualization, Evaluation, ElaborationYYYY-MM-DDYYYY-MM-DD[@solution-architect-omp]In progress
MGT-WRK-02 (Example)Yearly refresh of group enterprise architectureARC-001Conceptualization, Elaboration, EvaluationYYYY-MM-DDYYYY-MM-DD[@chief-architect]Planned
MGT-WRK-03 (Example)Data platform reference architecture v2ARC-004Elaboration, EvaluationYYYY-MM-DDYYYY-MM-DD[@data-architect]In progress
[MGT-WRK-nn][Effort][ARC-nnn][Processes]YYYY-MM-DDYYYY-MM-DD[@lead][Status]

5.3 Collection health

ArchitectureLast baselineLast reviewNext reviewOpen evaluation findingsHealth
ARC-001 (Example)v4.0, YYYY-MM-DDYYYY-MM-DDYYYY-MM-DD2Green
ARC-002 (Example)v2.3, YYYY-MM-DDYYYY-MM-DDYYYY-MM-DD5Amber: review overdue by two months
ARC-003 (Example)DraftNot yetYYYY-MM-DD3In progress
[ARC-nnn][Version, date]YYYY-MM-DDYYYY-MM-DD[n][Green / Amber / Red]

5.4 Management risks and issues

IDRisk or issueImpactResponseOwner
MGT-RSK-01 (Example)Two senior architects leave in the same quarterEffort MGT-WRK-02 slipsPair junior architects now; contract interim support[@head-of-architecture-office]
MGT-RSK-02 (Example)Delivery teams bypass intake for urgent workArchitectures diverge from decisionsFast-track intake with a five-day decision target[@head-of-architecture-office]
[MGT-RSK-nn][Risk][Impact][Response][@owner]

6. Architecture Conceptualization records

6.1 Activity record for effort MGT-WRK-01 (Example)

42020 activity (clause)RecordEvidence
Plan and monitor the effort (8.4.1, 8.4.2)Two-month effort, three architects, weekly checkpointEffort plan
Characterize problem space (8.4.3)Four order systems, inconsistent stock, 9 s checkout at peakCurrent State Assessment (architecture/current-state-assessment)
Establish objectives and critical success criteria (8.4.4)CON-OBJ-01 to CON-OBJ-04 belowSection 6.2
Synthesize potential solutions (8.4.5)Five options from workshop, including package and buildSolution Options Analysis (architecture/solution-options-analysis)
Characterize solutions and tradespace (8.4.6)Cost, time to market, availability and change effort plotted per optionSection 6.3
Formulate candidate architectures (8.4.7)Candidates A and B carried forwardSection 6.3
Capture concepts and properties (8.4.8)Key concepts and properties per candidate recordedConcept notes, decision log
Relate to other architectures and affected entities (8.4.9)Depends on ARC-004 data platform and the landing zoneSection 6.4
Coordinate use by intended users (8.4.10)Candidates presented to product, operations and securityWorkshop minutes

6.2 Architecture objectives and critical success criteria

IDObjectiveCritical success criterionStakeholder
CON-OBJ-01 (Example)One order platform for all channelsAll channels on one order model by YYYY-MMHead of e-commerce
CON-OBJ-02 (Example)Peak-season resilienceOrder capture availability >= 99.95% in peak monthsOperations director
CON-OBJ-03 (Example)Faster channel onboardingNew channel in <= 6 person-weeksChief digital officer
CON-OBJ-04 (Example)Contained run costThree-year run cost <= USD 4.2 millionChief financial officer
[CON-OBJ-nn][Objective][Criterion][Stakeholder]

6.3 Tradespace and candidates

CandidateSummaryCON-OBJ-01CON-OBJ-02CON-OBJ-03CON-OBJ-04Carried forward
A (Example)Event-driven modular monolithStrongLikelyLikelyStrongYes
B (Example)Microservices on managed KubernetesStrongUncertainStrongUncertainYes
C (Example)Commercial order management packageStrongLikelyWeak (vendor roadmap)Weak (licences)No
D (Example)Keep four systems, add integration layerWeakUncertainWeakStrongNo (baseline only)
[Candidate][Summary][Rating][Rating][Rating][Rating][Yes / No]

6.4 Relationships to other architectures

FromToRelationshipConsequence
ARC-003 (Example)ARC-004Publishes order events consumed by the data platformEvent contract must follow the data platform's schema policy
ARC-003 (Example)ARC-002Realises the order capabilities of the segment architectureCapability map updated when candidate is chosen
[ARC-nnn][ARC-nnn][Relationship][Consequence]

7. Architecture Evaluation records

7.1 Evaluation policy

IDPolicyApplies to
EVL-POL-01 (Example)Every architecture is evaluated before a governance decision on itAll
EVL-POL-02 (Example)New or replaced platforms use ATAM as the analysis methodPlatform decisions
EVL-POL-03 (Example)Evaluation results and open findings are reported to the board each quarterAll
[EVL-POL-nn][Policy][Scope]

7.2 Evaluation register

IDArchitectureObjectives (summary)MethodEvaluation leadDateResultReport
EVL-001 (Example)ARC-003 candidates A and BAvailability, cost, card data scope, channel onboarding, skillsATAM plus cost model and value scoring[@evaluation-lead]YYYY-MM-DDA recommended with conditionsArchitecture Evaluation Plan and Report (architecture/architecture-evaluation-42030), AE-YYYY-001
EVL-002 (Example)ARC-004 v2Scalability, data governance, costChecklist review and fitness functions[@evaluation-lead]YYYY-MM-DDFit for purpose, 4 findingsAE-YYYY-002
[EVL-nnn][ARC-nnn][Objectives][Method][@lead]YYYY-MM-DD[Result][Link]

7.3 Activity coverage

42020 activity (clause)Where performed
Plan and monitor the evaluation (9.4.1, 9.4.2)42030 template, sections 6 and 12
Determine objectives and criteria (9.4.3)42030 template, sections 3 and 4
Determine methods and integrate with objectives (9.4.4)42030 template, section 5; ATAM record in Architecture Evaluation Report (ATAM) (architecture/atam-evaluation)
Establish measurement techniques and tools (9.4.5)Load test harness, cost model, Architecture Fitness Functions (architecture/fitness-functions)
Collect and review information (9.4.6)42030 template, evidence register
Analyze concepts and properties, assess value (9.4.7)42030 template, sections 7 and 8
Characterize architectures from results (9.4.8)42030 template, section 9
Formulate findings and recommendations (9.4.9)42030 template, section 10
Capture and communicate results (9.4.10)Board pack; register above

8. Architecture Elaboration records

8.1 Elaboration record for ARC-003 (Example)

42020 activity (clause)RecordEvidence
Plan and monitor the effort (10.4.1, 10.4.2)Six weeks after GOV-DEC-001Effort plan
Identify or develop viewpoints (10.4.3)Context, container, deployment, data and security viewpoints chosen from the concern mapArchitecture description section 4
Develop models and views (10.4.4)Five views, C4 notation for structureArchitecture description section 5
Relate to other architectures and affected entities (10.4.5)Correspondences to ARC-002 capability map and ARC-004 event catalogueArchitecture description section 6
Assess the elaboration (10.4.6)Peer review of views against concerns; two gaps fixedReview notes
Coordinate use by intended users (10.4.7)Walk-through with delivery teams; views published in the repositoryRepository link

8.2 Architecture descriptions produced

IDArchitectureDescriptionTemplateVersionUsers
ELB-AD-01 (Example)ARC-003Order Management Platform architecture descriptionArchitecture Description (architecture/architecture-description-42010)v1.0Delivery teams, operations, security
ELB-AD-02 (Example)ARC-003C4 modelC4 Architecture (architecture/c4-architecture)v1.0Developers
ELB-AD-03 (Example)ARC-004Reference architectureReference Architecture (architecture/reference-architecture)v2.0-draftData product teams
[ELB-AD-nn][ARC-nnn][Description][Template][Version][Users]

9. Architecture Enablement

9.1 Enabler inventory

IDEnablerTypeSupportsOwnerState
ENB-01 (Example)Architecture repository and modelling toolToolManagement, Elaboration[@practice-lead]In use
ENB-02 (Example)Template set (this plan, 42010, 42030, ATAM, ADR)MethodAll[@practice-lead]In use
ENB-03 (Example)Architecture principles and standards catalogueGuidanceGovernance[@chief-architect]In use
ENB-04 (Example)Evaluation facilitator pool (four trained leads)SkillEvaluation[@practice-lead]Building
ENB-05 (Example)Architect competency framework and training pathSkillAll[@practice-lead]Planned
[ENB-nn][Enabler][Tool / Method / Guidance / Skill / Service / Data][Processes][@owner][Planned / Building / In use / Retiring]

9.2 Enablement backlog

IDItemActivity (clause)BenefitPriorityDue
ENB-BL-01 (Example)Train two more ATAM evaluation leadsAcquire and develop capabilities (11.4.4)Removes evaluation bottleneckHighYYYY-MM-DD
ENB-BL-02 (Example)Publish the repository to delivery teams with read accessDeploy capabilities (11.4.5)Architectures used, not just storedHighYYYY-MM-DD
ENB-BL-03 (Example)Retire the old drawing tool and migrate diagramsImprove capabilities (11.4.6)One source of truthMediumYYYY-MM-DD
ENB-BL-04 (Example)Review enabler inventory against process needsManage enablers (11.4.3)Gaps visibleMediumYYYY-MM-DD
[ENB-BL-nn][Item][Activity][Benefit][H / M / L]YYYY-MM-DD

10. Work products register

IDWork productProcessTemplate or locationOwnerRetention
WP-01Governance charter and collection objectivesGovernanceArchitecture Governance Charter (architecture/architecture-governance-charter); section 4.2[@board-chair]Current plus 5 years
WP-02Governance decision logGovernanceSection 4.4; Architecture Decision Log (architecture/architecture-decision-log)[@board-secretary]Permanent
WP-03Architecture work plan and collection healthManagementSections 5.2 and 5.3[@head-of-architecture-office]Current plus 3 years
WP-04Problem statement, objectives, candidate architecturesConceptualizationSection 6; Solution Options Analysis (architecture/solution-options-analysis)[@lead-architect]Life of the entity
WP-05Evaluation plans and reportsEvaluationArchitecture Evaluation Plan and Report (architecture/architecture-evaluation-42030)[@evaluation-lead]Life of the entity
WP-06Architecture descriptions and decision recordsElaborationArchitecture Description (architecture/architecture-description-42010); ADR (architecture/adr-full)[@lead-architect]Life of the entity
WP-07Enabler inventory and backlogEnablementSection 9[@practice-lead]Current
[WP-nn][Work product][Process][Template][@owner][Retention]

11. Process metrics

IDProcessMetricDefinitionTarget (Example)CurrentTrend
MET-01GovernanceDecision lead timeMedian days from complete request to board decision<= 15 days[n][Up / Down / Flat]
MET-02GovernanceDirective complianceShare of compliance checks rated compliant>= 85%[n%][Trend]
MET-03ManagementCollection currencyShare of current architectures reviewed in the last 12 months>= 90%[n%][Trend]
MET-04ConceptualizationOptions consideredMedian number of candidate architectures per effort above the tailoring threshold>= 2 plus baseline[n][Trend]
MET-05EvaluationFinding closureShare of evaluation recommendations closed by their due date>= 80%[n%][Trend]
MET-06ElaborationDescription useShare of delivery teams that consulted the architecture description in the last quarter>= 75%[n%][Trend]
MET-07EnablementEnabler satisfactionAverage rating by architects and delivery teams, scale 1 to 5>= 3.5[n][Trend]
[MET-nn][Process][Metric][Definition][Target][Current][Trend]

12. Interfaces with other processes

Other processInput to architectureOutput from architectureInterface owner
Strategy and portfolio (Example)Strategic goals, investment prioritiesCollection objectives, roadmaps, investment recommendations[@head-of-portfolio]
Requirements engineering (Example)Stakeholder needs, quality attribute scenarios (Quality Attribute Workshop Report, architecture/qaw-workshop-report)Architecture objectives, derived requirements[@lead-business-analyst]
Design and implementation (Example)Design constraints discovered, technical debtArchitecture descriptions, decisions, guardrails[@engineering-lead]
Risk management (Example)Enterprise risk appetiteArchitecture risks and risk themes from evaluations[@risk-manager]
Configuration management (Example)Baseline policyBaselined architectures and descriptions[@configuration-manager]
Operations (Example)Incident trends, capacity dataOperability requirements and runbook inputs[@operations-lead]
[Process][Input][Output][@owner]

13. Review and improvement

13.1 Review schedule and inputs

ReviewFrequencyInputsChaired by
Process reviewYearlyMetrics (section 11), tailoring record, compliance results, feedback survey[@chief-architect]
Collection reviewQuarterlyCollection health (section 5.3), evaluation register (section 7.2)[@head-of-architecture-office]
Health checkAs neededArchitecture Health Check (architecture/architecture-health-check)[@practice-lead]

13.2 Improvement log

IDObservationDecisionOwnerDueStatus
IMP-01 (Example)Decision lead time 28 days, target 15Delegate standard exceptions to the architecture office[@board-chair]YYYY-MM-DDOpen
IMP-02 (Example)Evaluation findings closed late (62%)Add findings to programme risk registers automatically[@head-of-architecture-office]YYYY-MM-DDOpen
[IMP-nn][Observation][Decision][@owner]YYYY-MM-DD[Status]

13.3 Readiness checklist for a new architecture practice

  • Collection scope and owners are listed (section 1.2).
  • Conformance case and tailoring are approved (section 2).
  • Each of the six processes has an owner and a local method mapping (sections 3.2 and 3.3).
  • Governance decision rights and escalation path are written down (section 4.1).
  • At least one evaluation lead is independent of delivery (section 7).
  • The repository and templates are available to delivery teams (section 9).
  • Three to seven metrics have baselines (section 11).

14. Glossary and references

TermMeaning in this document
Architecture collectionThe set of architectures an organisation governs and manages together
Entity of interestThe thing whose architecture is considered: enterprise, system, software, service, product line
Architecture effortA bounded piece of work that conceptualises, evaluates or elaborates one architecture
Governance directiveA principle, standard, policy or guidance that architectures must follow
TradespaceThe set of possible solutions and the tradeoffs among them on the objectives that matter
Critical success criterionA measurable condition an architecture must satisfy to meet an objective
EnablerA method, tool, repository, skill, service or data source that supports the architecture processes
Tailored conformanceConformance in which some outcomes or activities are modified or omitted with recorded justification
IDReferenceVersionUse
REF-01ISO/IEC/IEEE 42020, Software, systems and enterprise: Architecture processes2019, first edition (stage 90.92, to be revised since 2026-01-08; AWI 42020 Enterprise, systems and software: Architecture processes registered 2026-05-22)Process structure (clauses 4 to 11, Annexes A to C; informative Annexes D to H not used, except Annex H as a check in section 3.3)
REF-02ISO/IEC/IEEE 42010, Software, systems and enterprise: Architecture description2022Elaboration work products
REF-03ISO/IEC/IEEE 42030, Software, systems and enterprise: Architecture evaluation framework2019, first edition (stage 90.92, to be revised since 2026-01-08; AWI 42030 registered 2026-05-22)Evaluation work products
REF-04IEEE P42020 project (active PAR approved 2026-09-25), standards.ieee.org2026Status of the revision
REF-05INCOSE, Guidance to ISO/IEC/IEEE 42020: Architecture ProcessesReleased March 2025Background reading on applying the standard
[REF-nn][Title][Version][Use]

Standard and licence note

Structure aligned with ISO/IEC/IEEE 42020:2019, Software, systems and enterprise: Architecture processes (clause 4 conformance, clause 5 process overview, clauses 6 to 11 for the Governance, Management, Conceptualization, Evaluation, Elaboration and Enablement processes, Annex A tailoring, Annex B metrics and Annex C interactions). Only clause numbers, process names and short activity labels are used; all explanations, tables and examples are original text written for this collection, and no text, definition or table of the standard is reproduced. ISO lists the 2019 edition as "to be revised" (stage 90.92 since 2026-01-08), and a second edition is registered as work item AWI 42020 (2026-05-22, reordered title Enterprise, systems and software: Architecture processes; IEEE P42020); check the current edition in the ISO catalogue before claiming conformance. TOGAF is a registered trademark of The Open Group; this template uses only the names of TOGAF ADM phases, and all text is original. Template licence: MIT.

Ähnliche Vorlagen