Kit de seguridad funcional en automoción
Análisis de seguridad y ciberseguridad del vehículo: HARA ISO 26262, SOTIF, TARA ISO/SAE 21434 y AMFE, solo como estructura citada.
8 plantillas en 3 pasos, en el orden en que se usan. Abre cualquier plantilla en el editor, complétala y expórtala a PDF, DOCX o HTML.
Evaluaciones
Hazard Analysis and Risk Assessment (HARA) Template (ISO 26262)
EstándarAutomotive HARA: item definition, hazard identification, hazardous events with S/E/C rationale, ASIL, safety goals with safe state and FTTI, SOTIF/PAS 8800/TARA pointers
ISO 26262-3:2018; ISO 21448:2022; ISO/PAS 8800:2024SOTIF Analysis Template (ISO 21448)
CompletaISO 21448 SOTIF file: ODD, acceptance criteria, functional insufficiencies, triggering conditions, V&V targets, known and unknown scenarios
ISO 21448:2022Software Requirements Specification Template (ISO/IEC/IEEE 29148)
CompletaFull SRS per ISO/IEC/IEEE 29148:2018 for contract or multi-team work: interfaces, functions, quality attributes, verification matrix, traceability
ISO/IEC/IEEE 29148:2018 (Edition 3 at DIS)
Seguridad
Automotive TARA Template (ISO/SAE 21434, UN R155)
CompletaVehicle cybersecurity TARA: item definition, assets, damage scenarios, SFOP impact, attack paths, feasibility, risk values, treatment, goals, R155 Annex 5 check
ISO/SAE 21434:2021 (cite-only); UN R155, R156PSIRT Vulnerability Handling Procedure Template (ISO/IEC 30111, CVSS v4)
CompletaProducer-side PSIRT procedure: intake, verification, CVSS v4.0, EPSS, KEV and SSVC triage, remediation targets, advisory and VEX, CVE/CNA, CRA Art. 14, metrics
ISO/IEC 30111:2019 (structure); CVSS v4.0; CISA SSVC; CNA Rules 4.2.0; EU CRA Art. 14SBOM and VEX Policy Template (CISA 2026, CycloneDX, SPDX)
CompletaSBOM production, signing, VEX rules, distribution, supplier SBOMs, retention, exceptions, metrics, CISA 2026 to CycloneDX and SPDX field map
CISA 2026 SBOM Minimum Elements; CycloneDX 1.7; SPDX 3.0.1; CISA VEX
Verificación
Software FMEA Template (IEC 60812)
CompletaSoftware failure modes, effects, causes, controls, S/O/D scales, RPN and action priority, actions and re-scoring
IEC 60812:2018Verification and Validation Plan Template (IEEE 1012)
CompletaV&V plan: integrity level scheme, tasks per life-cycle phase, minimum tasks by level, independence, anomalies, reporting, schedule
IEEE 1012-2024