Kit de revisión de diseño para staff engineers
Revisiones rigurosas: documento de diseño, estimación, diseño técnico, ADR, elección tecnológica, TCO, checklist de revisión, ATAM, AMFE y preparación operativa.
Método y patrones
System Design Document Template
CompletaSystem design at scale – requirements, capacity estimates (KaTeX), API, data model, HLD, deep dives, reliability, cost, trade-offs
Back-of-Envelope Estimation and Capacity Model Template
CompletaReference latency and unit tables, assumptions register, QPS, storage, bandwidth, cache, server and cost formulas, worked example, sensitivity, traceability
Jeff Dean latency numbers (LADIS 2009)Technical Design Document Template
CompletaIn-depth design doc – context, goals and non-goals, APIs, data, flows, alternatives matrix, cross-cutting concerns, testing, rollout, cost
Decisiones
Architecture Decision Record Template (Tyree-Akerman, Y-Statement)
EstándarDetailed ADR – Tyree & Akerman fields (assumptions, constraints, positions, argument, implications, related items) plus Y-statement
Tyree & Akerman decision template; Y-statement (Zimmermann)Technology Selection and Build vs Buy Template
EstándarBuild, buy, open source or managed service evaluation with weighted decision matrix, PoC results, risks, cost and decision
Total Cost of Ownership (TCO) Analysis Template
EstándarMulti-year TCO comparison of options by cost category, with NPV discounting, sensitivity, break-even and recommendation
Verificación
System Design Review Checklist and Scoring Rubric Template
CompletaDesign review checklist in 13 areas, evidence-based scoring rubric, weighted score, red flags, findings register, decision record, 45-minute interview rubric
Architecture Evaluation Report Template (ATAM)
CompletaATAM evaluation report – business drivers, approaches, utility tree, voted scenarios, sensitivity and trade-off points, risks, risk themes
SEI ATAMArchitecture Review Board Request Template
EstándarARB submission: context, scope, proposed architecture, alternatives, principles compliance, risk flags, decisions and outcome
Software FMEA Template (IEC 60812)
CompletaSoftware failure modes, effects, causes, controls, S/O/D scales, RPN and action priority, actions and re-scoring
IEC 60812:2018Production Readiness Review Template
CompletaProduction readiness review: SLOs, load test evidence, observability, on-call, rollback, backups, security, failure modes, sign-off
Google SRE PRR conventions