Finance Case Analysis Template (Case Method, Teaching Note)
Decision maker and question, situation and issue diagnosis, WACC and NPV/IRR analysis, valuation, alternatives scoring, recommendation, implementation, teaching note
Cómo usar: Use it when you write up a business-school corporate finance, valuation or investment case for class, an exam or a case competition. Fill the decision question and the financial analysis first, building your own exhibits from the case, then write the one-page summary last. The main pitfall is ranking alternatives by IRR or payback when they differ in size; compare NPV and capital at risk instead.
Vista previa
Finance Case Analysis: [Case title]
Written analysis of a business-school finance case for class submission, a case exam or a case competition: corporate finance (capital budgeting, cost of capital, financing and payout), valuation (DCF, multiples, transactions) and investment cases. It follows the case method used at business schools such as Harvard Business School and Ivey Business School (named for orientation only): identify the decision maker and the decision, analyse the situation with your own exhibits, compare alternatives against stated criteria, and recommend an action with an implementation plan. An optional teaching-note section supports instructors and competition coaches. Replace every
[bracketed]value and every row marked Example. This is a document format, not financial, investment, tax, legal or accounting advice.
Document control
| Field | Value |
|---|---|
| Document ID | [CASE-001] |
| Case title | [Case title] |
| Case reference | [Author(s), publisher, product number, year] |
| Case type | [Capital budgeting / Cost of capital / Financing / Payout / Valuation / M&A / Investment] |
| Course or competition | [Course code and name / Competition name and round] |
| Instructor or judge panel | [Name] |
| Authors | [@student-1], [@student-2], [@student-3] |
| Submission limits | [N pages plus N pages of exhibits; font; file format] |
| Due date | YYYY-MM-DD HH:MM |
| Version | [0.1] |
| Status | [Draft / Team review / Submitted / Graded] |
| Owner | [@student-1] |
| Approvers/reviewers | [@team-members], [@faculty-advisor] |
| Last updated | YYYY-MM-DD |
| Classification | [Course use only] |
Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| Team lead | [@student-1] | [Approved for submission] | YYYY-MM-DD |
| Team member | [@student-2] | [Approved] | YYYY-MM-DD |
| Faculty advisor (competitions) | [@faculty-advisor] | [Reviewed] | YYYY-MM-DD |
Revision history
| Version | Date | Author | Change |
|---|---|---|---|
| 0.1 | YYYY-MM-DD | [@student-1] | Decision question, situation analysis |
| 0.2 | YYYY-MM-DD | [@student-2] | Financial analysis and exhibits |
| 1.0 | YYYY-MM-DD | [@student-1] | Submitted version |
Contents
- 1. Case identification and decision maker
- 2. Executive summary and recommendation
- 3. Decision question and scope
- 4. Situation analysis
- 5. Issue diagnosis
- 6. Financial analysis
- 7. Alternatives
- 8. Evaluation criteria and scoring
- 9. Recommendation
- 10. Implementation, risks and contingencies
- 11. Assumptions log
- 12. Class discussion and competition preparation
- 13. Optional teaching note
- 14. Appendix: calculations and exhibits
- 15. Glossary and references
- Standard and licence note
1. Case identification and decision maker
| Item | Value |
|---|---|
| Organisation | Lunaris Home Goods (fictional online home goods retailer, IFRS reporter, functional currency EUR, financial year = calendar year) (Example) |
| Decision maker | [Name], Chief Financial Officer (Example) |
| Decision deadline | Board meeting, [month year] (Example) |
| Authority | CFO recommends; board approves capital expenditure above EUR 2.5m (Example) |
| Case date | [Month year in which the case is set] |
| Currency and units | EUR millions unless stated (Example) |
| Other stakeholders | Head of operations, Vietnam country manager, lenders, shareholders (Example) |
Summarise the case in three sentences: who, what is at stake, why now.
Example: Lunaris Home Goods sells furniture, kitchenware and home textiles online to consumers in Europe and Southeast Asia. Order growth in Vietnam has outrun the third-party warehouse it uses, causing late deliveries and rising refunds. The CFO must recommend to the board how to add fulfilment capacity in Ho Chi Minh City within budget and without breaching the group's leverage covenant.
2. Executive summary and recommendation
Recommendation: [one sentence: what to do, how much, by when].
Example: Lease and fit out a fulfilment centre in phases (Alternative C), at an initial outlay of EUR 5.0m, with a pre-agreed trigger to expand if Vietnamese order volume exceeds [N] orders a day for two consecutive quarters.
| Point | Summary (Example) |
|---|---|
| Value | Positive NPV of EUR 3.29m at a 10.16% project discount rate; IRR 24.6% |
| Risk | Lowest capital at risk among the options that give operational control; NPV stays positive under every sensitivity tested |
| Strategy | Keeps control of service quality, which is the cause of refunds, while preserving the option to build later |
| Main risk | Lease terms in the second phase; mitigated by negotiating an option on adjacent space now |
| What we gave up | Alternative A has the highest NPV (EUR 4.81m) but puts EUR 12.0m at risk before demand is proven |
3. Decision question and scope
Decision question: [Should / how should] [decision maker] [action] given [binding constraint]?
Example: How should Lunaris add fulfilment capacity in Vietnam over the next eight years to fix delivery performance, while keeping net debt to EBITDA below the 2.5x covenant?
| In scope | Out of scope |
|---|---|
| Options for fulfilment capacity in Vietnam (Example) | Expansion into new countries (Example) |
| Financing of the chosen option within the existing facility (Example) | Refinancing the group capital structure (Example) |
| Eight-year evaluation horizon (Example) | Product pricing decisions (Example) |
4. Situation analysis
4.1 Business and industry
[Business model, revenue drivers, cost structure, competitors, market growth, regulation. Cite case exhibits by number.]
4.2 Financial position
Build a short exhibit from the case financials. Show the ratios that bear on the decision.
| Metric (Example) | FY2025 | Calculation | Comment |
|---|---|---|---|
| Revenue | 240.0 | Case Exhibit [N] | Growing 18% a year |
| EBITDA | 31.2 | Case Exhibit [N] | |
| EBITDA margin | 13.0% | 31.2 / 240.0 | Below listed peers |
| Net debt | 54.6 | Borrowings less cash | |
| Net debt / EBITDA | 1.75x | 54.6 / 31.2 | Covenant maximum 2.5x |
| EBIT | 19.2 | Case Exhibit [N] | |
| Interest cover | 6.0x | 19.2 / 3.2 | Interest expense 3.2 |
Headroom check: at the covenant maximum of 2.5x, net debt could reach 2.5 x 31.2 = EUR 78.0m, so the debt-funded headroom is 78.0 - 54.6 = EUR 23.4m before any EBITDA change. A EUR 12.0m build fits, but uses more than half of it.
4.3 Constraints and stakeholder positions
| Stakeholder | Position | Evidence in the case | Implication |
|---|---|---|---|
| Head of operations (Example) | Wants own building | Interview, case p. [N] | Values control over cost |
| Vietnam country manager (Example) | Wants speed | Refund trend exhibit | Values time to capacity |
| Lenders (Example) | Covenant 2.5x | Facility summary | Limits debt funding |
5. Issue diagnosis
| ID | Issue | Symptom or cause | Evidence | Priority |
|---|---|---|---|---|
| ISS-001 (Example) | Capacity shortfall | Cause | Utilisation above 95% for 6 months | High |
| ISS-002 (Example) | Picking accuracy | Cause | Error rate trend | High |
| ISS-003 (Example) | Late deliveries | Symptom | Customer complaints | Follows from 001 and 002 |
| ISS-004 (Example) | Forecast error | Contributing | Variance to plan | Medium |
6. Financial analysis
6.1 Cash flow rules
- Use incremental, after-tax cash flows: include opportunity costs and working capital; exclude sunk costs and allocated overheads that do not change.
- Discount nominal cash flows at a nominal rate, real at real.
- Keep financing out of project cash flows when you discount at WACC; financing effects are in the rate.
- State the timing convention (end of year unless stated) and the terminal or salvage value.
6.2 Cost of capital
| Input (Example) | Value | Source |
|---|---|---|
| Risk-free rate | 3.0% | Assumption A-01 |
| Equity beta | 1.20 | Assumption A-02 (peer median, relevered) |
| Equity risk premium | 5.5% | Assumption A-03 |
| Cost of equity | 3.0% + 1.20 x 5.5% = 9.6% | Computed |
| Pre-tax cost of debt | 6.0% | Facility margin plus base rate |
| Tax rate | 20% | Assumption A-04 |
| After-tax cost of debt | 6.0% x (1 - 0.20) = 4.8% | Computed |
| Target weights E/V, D/V | 70% / 30% | Assumption A-05 |
| WACC | 0.70 x 9.6% + 0.30 x 4.8% = 6.72% + 1.44% = 8.16% | Computed |
| Country risk premium for the project | 2.0% | Assumption A-06 |
| Project discount rate | 10.16% | Computed |
Say whether you add a country risk premium to the rate or adjust the cash flows instead, and why. Do not do both. Adding the premium to the whole WACC, as here, is a simplification; many practitioners add it to the cost of equity only, often scaled by the project's exposure to the country. Match currencies: discount EUR cash flows at a EUR rate, or convert VND cash flows at forecast forward rates before discounting.
6.3 Capital budgeting results
Incremental cash flows, EUR millions, end of year, year 8 includes salvage value (A: 1.5, C: 0.5):
| Year (Example) | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|---|
| A Build own centre | -12.0 | 2.0 | 2.8 | 3.2 | 3.4 | 3.4 | 3.4 | 3.4 | 4.9 |
| B Expand third-party contract | -1.5 | 0.85 | 0.85 | 0.85 | 0.85 | 0.85 | 0.85 | 0.85 | 0.85 |
| C Phased lease and fit-out | -5.0 | 1.0 | 1.4 | 1.6 | 1.7 | 1.7 | 1.7 | 1.7 | 2.2 |
| Measure at 10.16% (Example) | A Build | B Third party | C Phased lease |
|---|---|---|---|
| Initial outlay | 12.0 | 1.5 | 5.0 |
| PV of inflows | 16.81 | 4.51 | 8.29 |
| NPV | 4.81 | 3.01 | 3.29 |
| IRR | 19.2% | 55.0% | 24.6% |
| Profitability index (PV inflows / outlay) | 1.40 | 3.01 | 1.66 |
| Simple payback (years) | 4.2 | 1.8 | 3.6 |
| Undiscounted net cash flow | 14.5 | 5.3 | 8.0 |
Read the results with care. B has the highest IRR and profitability index because its outlay is small; IRR and payback rank projects of different size badly. NPV measures value added, so A ranks first on value, C second and B third. The question is whether the extra EUR 1.52m of NPV in A over C justifies EUR 7.0m more capital at risk.
6.4 Sensitivity and scenarios
| NPV, EUR m (Example) | A Build | B Third party | C Phased lease |
|---|---|---|---|
| Base case (10.16%) | 4.81 | 3.01 | 3.29 |
| Discount rate +2 pp (12.16%) | 3.53 | 2.70 | 2.66 |
| Discount rate -2 pp (8.16%) | 6.26 | 3.36 | 4.00 |
| Operating cash flows -10% (years 1 to 8, salvage unchanged) | 3.20 | 2.56 | 2.48 |
| Break-even: cut in operating cash flows that sets NPV to zero | 29.8% | 66.7% | 40.8% |
All three options keep a positive NPV in every case tested. The break-even line divides each NPV by the present value of operating inflows (excluding salvage): A loses all its value if operating cash flows fall by about 30%, C only at about 41%. Compare these margins with the forecast error in the case history: if past forecasts missed by 25%, A has little room left. Where the case gives probabilities, show scenario-weighted NPV; otherwise state the scenarios and their triggers without inventing probabilities.
6.5 Valuation cases
When the case asks what a company or stake is worth, show at least two methods and reconcile them.
| Method | Key inputs | Value range | Weight | Why this weight |
|---|---|---|---|---|
| DCF (free cash flow to firm) | Forecast, WACC, terminal growth or exit multiple | [Range] | [%] | [Reason] |
| Trading comparables | Peer set, EV/EBITDA, P/E | [Range] | [%] | [Reason] |
| Precedent transactions | Deal set, control premium | [Range] | [%] | [Reason] |
| Total | [Point estimate] | 100% |
Check that the terminal growth rate is below long-run nominal GDP growth and that terminal value is not an implausible share of the total. For a full valuation deliverable, use Valuation Report (finance/valuation-report); for one method in depth, Comparable Companies Analysis (finance/comparable-companies-analysis).
6.6 Financing and payout cases
When the decision is how to fund or how much to return, show the effect on leverage, coverage, earnings per share and rating headroom for each option, and the covenant test after the transaction.
| Measure (Example) | Before | After A (debt funded) | After C (debt funded) |
|---|---|---|---|
| Net debt, EUR m | 54.6 | 66.6 | 59.6 |
| Net debt / EBITDA (FY2025 EBITDA 31.2) | 1.75x | 2.13x | 1.91x |
| Headroom to 2.5x covenant, EUR m | 23.4 | 11.4 | 18.4 |
7. Alternatives
| ID | Alternative | Description | Main advantage | Main drawback |
|---|---|---|---|---|
| ALT-0 (Example) | Status quo | Stay with current third-party warehouse at current capacity | No outlay | Refunds keep rising; does not answer the question |
| ALT-A (Example) | Build own centre | Purchase land use rights and build a 20,000 m2 centre | Highest NPV; full control | EUR 12.0m at risk; 18-month build |
| ALT-B (Example) | Expand third-party contract | Larger space with the current provider, with service-level penalties | Fast, low outlay | Control over accuracy stays limited |
| ALT-C (Example) | Phased lease and fit-out | Lease a building, fit out half now, half on a demand trigger | Control plus flexibility | Lease renewal risk |
8. Evaluation criteria and scoring
Scores from 1 (poor) to 5 (strong). Weighted score = sum of weight x score.
| Criterion | Weight | A Build | B Third party | C Phased lease |
|---|---|---|---|---|
| Value created (NPV) | 35% | 5 | 3 | 4 |
| Downside risk and capital at risk | 25% | 2 | 4 | 4 |
| Control of service quality | 20% | 5 | 2 | 4 |
| Flexibility (options to expand or exit) | 10% | 2 | 4 | 5 |
| Execution speed and complexity | 10% | 2 | 5 | 3 |
| Weighted score (Example) | 100% | 3.65 | 3.35 | 4.00 |
Working for C: 0.35 x 4 + 0.25 x 4 + 0.20 x 4 + 0.10 x 5 + 0.10 x 3 = 1.40 + 1.00 + 0.80 + 0.50 + 0.30 = 4.00. Test whether the ranking holds if the value weight rises to 50% (taking 15 points from downside risk); if it flips, say so and explain why you keep or change the answer.
Example: with value at 50% and downside risk at 10%, A scores 0.50 x 5 + 0.10 x 2 + 0.20 x 5 + 0.10 x 2 + 0.10 x 2 = 4.10 and C scores 4.00, so the ranking flips. We keep C because the board has signalled that capital at risk before demand is proven is its main concern (case p. [N]); say this openly in the presentation rather than hiding the flip.
9. Recommendation
[Recommendation in two or three paragraphs: the action, the amount, the timing, the reasons and the conditions that would change it.]
Example: Recommend Alternative C. It creates EUR 3.29m of value at the project discount rate, keeps net debt to EBITDA at 1.91x after funding, and fixes the root cause of refunds by bringing picking operations in house. It gives up EUR 1.52m of base-case NPV relative to building, but avoids committing EUR 12.0m before demand in Vietnam is proven. Revisit the build option if daily orders exceed the expansion trigger for two consecutive quarters, or if the lease cannot be renewed on terms within [N]% of the current rent.
10. Implementation, risks and contingencies
| ID | Risk | Likelihood | Impact | Mitigation | Owner |
|---|---|---|---|---|---|
| RSK-001 (Example) | Lease renewal on worse terms | Medium | High | Negotiate renewal option and adjacent-space option now | [@cfo] |
| RSK-002 (Example) | Order growth slower than forecast | Medium | Medium | Phase 2 only on trigger | [@country-manager] |
| RSK-003 (Example) | FX: EUR-funded outlay, VND operating costs | Medium | Low | Natural hedge from local revenue; review with the treasury policy | [@treasurer] |
| RSK-004 (Example) | Staffing and training delay | Low | Medium | Hire supervisors before fit-out completes | [@head-of-operations] |
| KPI (Example) | Baseline | Target after 12 months |
|---|---|---|
| On-time delivery | [%] | [%] |
| Refund rate | [%] | [%] |
| Cost per order, EUR | [Value] | [Value] |
11. Assumptions log
| ID | Assumption | Value | Basis | Sensitivity tested |
|---|---|---|---|---|
| A-01 (Example) | Risk-free rate | 3.0% | [Government bond yield as of case date, source] | Rate +/- 2 pp |
| A-02 (Example) | Equity beta | 1.20 | Peer median, relevered at target D/E | Rate +/- 2 pp |
| A-03 (Example) | Equity risk premium | 5.5% | [Survey or textbook source] | Rate +/- 2 pp |
| A-04 (Example) | Tax rate | 20% | [Case statement or statutory rate as of case date] | Not tested |
| A-05 (Example) | Target capital structure | 70% equity, 30% debt | Case Exhibit [N] and management target | Not tested |
| A-06 (Example) | Country risk premium | 2.0% | [Source] | Included in rate tests |
| A-07 (Example) | Salvage values | A 1.5, C 0.5 | Depreciated fit-out and resale estimates | [Test] |
| A-08 (Example) | Cash flows nominal, end of year | Convention | Not applicable |
12. Class discussion and competition preparation
| Likely question | Our answer in one line | Supporting exhibit |
|---|---|---|
| Why not build if NPV is highest? (Example) | Capital at risk and covenant headroom; build stays open as a phase 3 | 6.3, 6.6 |
| Is the 2% country premium double counting? (Example) | Cash flows are base-case expectations, not haircut, so the premium is in the rate only | 6.2 |
| What would change your mind? (Example) | Order volume above trigger or lease terms outside range | 9 |
Rehearse answers aloud and time them: a good reply to a cold call or a judge's question takes under 30 seconds, gives the number first and points to the exhibit. When a questioner attacks an assumption you cannot defend, concede it, show the sensitivity that covers it (section 6.4) and explain why the recommendation still holds. Assign each team member the questions on the sections they wrote, and keep one person responsible for the numbers so the team never gives two different figures for the same NPV.
Numbers to know without notes: [NPV of the recommendation, IRR, covenant ratio after funding, the break-even assumption].
For case competitions, add: the time limit for the presentation, the slide count, the judging criteria as published by the organiser, and a rehearsal log with timings. Keep the same structure as this document so the deck and the written analysis tell one story.
13. Optional teaching note
13.1 Learning objectives
| ID | After the session, participants can | Evidence |
|---|---|---|
| LO-01 (Example) | Separate incremental from non-incremental cash flows | Cash flow exhibit |
| LO-02 (Example) | Build a project discount rate and justify a country risk adjustment | WACC exhibit |
| LO-03 (Example) | Explain why IRR and payback can rank projects of different size wrongly | Ranking discussion |
| LO-04 (Example) | Weigh value against flexibility and capital at risk | Scoring matrix |
13.2 Audience and placement
[Course, level (MBA core, master's elective, executive education), prerequisite topics, position in the syllabus and session length.]
13.3 Assignment questions
- [Question that forces the decision.]
- [Question that requires the main calculation.]
- [Question about a qualitative trade-off.]
13.4 Session plan
| Block | Minutes | Activity | Board plan |
|---|---|---|---|
| Opening (Example) | 10 | Vote: build, outsource or lease? | Vote tally |
| Analysis (Example) | 30 | Cash flows and WACC built from the class | NPV table |
| Debate (Example) | 25 | Value versus flexibility | Scoring matrix |
| Wrap-up (Example) | 10 | What the CFO did (if known) and lessons | Three takeaways |
| Total | 75 |
13.5 Expected analysis and common mistakes
| Mistake (Example) | Why it is wrong | How to redirect |
|---|---|---|
| Ranking by IRR | Ignores scale of investment | Ask for NPV per euro of capital and the incremental IRR of A over C |
| Including allocated head-office costs | Not incremental | Ask which costs change if the project is rejected |
| Discounting interest payments | Double counts financing | Ask what the WACC already contains |
13.6 Epilogue
[What happened after the case date, if public and if the case is based on a real organisation; otherwise state that the case is fictional.]
14. Appendix: calculations and exhibits
14.1 Exhibit list
| Exhibit | Title | Source | Referred to in |
|---|---|---|---|
| EX-01 (Example) | Financial position and covenant headroom | Built from case financials | 4.2 |
| EX-02 (Example) | Cost of capital build | Assumptions A-01 to A-06 | 6.2 |
| EX-03 (Example) | Cash flows and NPV by alternative | Built | 6.3 |
| EX-04 (Example) | Sensitivity table | Built | 6.4 |
| EX-05 (Example) | Scoring matrix | Built | 8 |
14.2 Present value working for Alternative A
Discount factor at 10.16% for year is . Values in EUR millions, rounded to three decimals.
| Year (Example) | Cash flow | Present value | Cumulative PV |
|---|---|---|---|
| 0 | -12.0 | -12.000 | -12.000 |
| 1 | 2.0 | 1.816 | -10.184 |
| 2 | 2.8 | 2.307 | -7.877 |
| 3 | 3.2 | 2.394 | -5.483 |
| 4 | 3.4 | 2.309 | -3.175 |
| 5 | 3.4 | 2.096 | -1.079 |
| 6 | 3.4 | 1.903 | 0.824 |
| 7 | 3.4 | 1.727 | 2.551 |
| 8 | 4.9 | 2.259 | 4.810 |
The discounted payback falls in year 6 (5 + 1.079 / 1.903 = 5.6 years). Simple payback: cumulative undiscounted cash flow is -0.6 after year 4, so payback is 4 + 0.6 / 3.4 = 4.2 years.
14.3 Model hygiene checklist
- Inputs in one place, separated from calculations and outputs.
- Every hard-coded number traced to the case or the assumptions log.
- Signs consistent: outflows negative, inflows positive.
- Units and currency labelled on every exhibit.
- Totals cross-checked; scoring weights sum to 100%.
- Spreadsheet file name and version recorded in Document control.
15. Glossary and references
15.1 Glossary
| Term | Meaning |
|---|---|
| Case method | Teaching by discussion of a real or realistic decision, where participants analyse and recommend before the class |
| Decision maker | The protagonist who must act, and whose constraints frame the analysis |
| Incremental cash flow | The change in the firm's cash flows caused by the decision |
| NPV | Net present value: the sum of discounted cash flows, including the outlay |
| IRR | Internal rate of return: the discount rate at which NPV is zero |
| Profitability index | Present value of inflows divided by the initial outlay |
| WACC | Weighted average cost of capital: the blended required return of debt and equity holders |
| CAPM | Capital asset pricing model: cost of equity as risk-free rate plus beta times the equity risk premium |
| Country risk premium | An extra return required for exposure to a country's economic and political risk |
| Covenant | A financial condition in a loan agreement, such as a maximum net debt to EBITDA |
| Teaching note | The instructor's plan for a case: objectives, questions, session plan and analysis |
15.2 References
| Reference | Use |
|---|---|
| [Case: author(s), title, publisher, product number, year] | The case analysed (cited, not reproduced) |
| [Corporate finance textbook: author(s), title, edition, publisher, year] | Methods (cited, not reproduced) |
| [Data source for risk-free rate, ERP, peer betas, with date] | Assumptions A-01 to A-03 |
| Harvard Business Publishing and Ivey Publishing (case publishers, named for orientation) | Source of licensed cases; obtain cases and teaching notes through your institution |
Investment Appraisal (finance/investment-appraisal) and Valuation Report (finance/valuation-report) | Practitioner versions of the same analysis |
Standard and licence note
Structure aligned with the case method as practised in business-school finance teaching and case competitions, and with standard corporate finance techniques (incremental cash flow analysis, NPV and IRR, CAPM and WACC, sensitivity analysis and multi-criteria scoring), which are general methods and are explained here in original wording. Harvard Business School, Harvard Business Publishing, Ivey Business School and Ivey Publishing are named only to identify the method and the usual case sources; no case text, exhibit, teaching note or publisher material is reproduced, and this template is not affiliated with or endorsed by them. Published cases are copyrighted: obtain them through your institution and cite them. Lunaris Home Goods and all figures in the examples are fictional. This template is original text written for this collection. Check your course or competition rules for the current submission requirements before use. Template licence: MIT.
Plantillas relacionadas
Empirical Finance Paper Template
Finance manuscript: title page and abstract, disclosure page, hypotheses, data and attrition, identification, results, robustness, Internet Appendix, data and AI statement
AcadémicasPre-Analysis Plan Template (Economics and Finance, AEA RCT Registry, OSF)
Registry fields, hypotheses, design, randomisation, power and MDE, outcomes, estimation, multiple testing, heterogeneity, exclusions, ethics, deviations log
AcadémicasDissertation Proposal Template
Proposal: rationale, research questions, literature summary, conceptual framework diagram, methods, analysis, ethics, timeline, budget