Architecture Requirements Specification Template (TOGAF 10)

Measurable criteria to realise a target: success measures, requirements per domain, interoperability, service contracts, standards, traceability, verification

ArquitecturaCompletaTOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1): Architecture Requirements Specificationrequirementsspecification

Cómo usar: Use it alongside the Architecture Definition Document in Phases B to D to state what any implementation must meet. Fill success measures and the per-domain requirements with fit criteria and verification methods first, then service contracts and traceability. The main pitfall is copying project functional requirements or quality goals without numbers.

Vista previa

Architecture Requirements Specification: [Architecture engagement name]

The Architecture Requirements Specification sets out the measurable criteria that implementation must meet for the target architecture to be realised: success measures, architecture requirements per domain, interoperability requirements, business and application service contracts, implementation guidelines and specifications, standards, constraints and assumptions. It is a deliverable of The TOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1), developed alongside the Architecture Definition Document in Phases B to D of the Architecture Development Method (ADM), refined in Phases E and F, and maintained through Requirements Management. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document ID[ARS-ENG-001]
Engagement[Architecture engagement name]
Accompanies[ADD-ENG-001], Architecture Vision [AV-ENG-001]
Statement of Architecture Work[SAW-YYYY-NN]
ADM phasesPhases B to D (developed), E and F (refined), Requirements Management (maintained)
Version[0.1]
Status[Draft / In review / Baselined / Superseded]
Requirements baseline[ARS baseline B1, date]
Owner[@lead-architect]
Requirements manager[@requirements-owner]
Approvers / reviewers[Architecture Board, sponsor, security architect, domain architects]
Classification[Internal / Confidential]
Repository location[Architecture Repository path or ID]
Last updatedYYYY-MM-DD

Approvals

RoleNameDecisionConditionsDate
Lead architect[@lead-architect][Approved][Conditions]YYYY-MM-DD
Security architect[@security-architect][Approved / Approved with conditions][Conditions]YYYY-MM-DD
Data protection officer[@dpo][Decision][Conditions]YYYY-MM-DD
Business owner[@business-owner][Decision][Conditions]YYYY-MM-DD
Architecture Board chair[@chair][Baselined][Board outcome record]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@lead-architect]Success measures and first requirements from the outline pass
0.6YYYY-MM-DD[@data-architect]Example: Service contracts, standards and traceability added after the detailed pass
1.0YYYY-MM-DD[@lead-architect]Example: Baseline B1 approved at gate 2 with the Architecture Definition Document
1.1YYYY-MM-DD[@requirements-owner]Example: ARS-INT-04 added under change request ACR-2027-03 (interim change data capture)

Contents

1. Introduction

1.1 Purpose and audience

This specification states what delivery teams, suppliers and platform owners must achieve for their work to count as realising the target architecture for [engagement]. It is written for solution architects and designers who turn it into designs, for testers who verify it, for the Architecture Board that checks compliance, and for procurement teams who copy relevant requirements into supplier contracts.

1.2 Scope

Example: the target architecture for retail motor and home claims and the customer domain, at the depth agreed in the Statement of Architecture Work (architecture/statement-of-architecture-work) section 3: logical level for all domains, physical level for integration and hosting.

1.3 Conventions

ItemConvention
Requirement IDsARS-BUS-nn (business), ARS-DAT-nn (data), ARS-APP-nn (application), ARS-TEC-nn (technology), ARS-SEC-nn (security and privacy), ARS-INT-nn (interoperability)
Other IDsSM-nn success measures, BSC-nn business service contracts, ASC-nn application service contracts, IG-nn guidelines, IS-nn specifications, STD-nn standards
PriorityMust (target not realised without it), Should (expected; deviation needs a dispensation), Could (desirable; may be deferred by the delivery team)
StatusProposed, Agreed, Baselined, Implemented, Verified, Deferred, Withdrawn (section 15)
Verification methodsInspection, Analysis, Demonstration, Test (section 14)
RationaleOne or more of BG-nn, DRV-nn, CNS-nn, principle IDs (BP, DP, AP, TP, SP), or a stakeholder concern CON-nn

The same six prefixes are used in the Architecture Definition Document (architecture/architecture-definition-document) section 9.

1.4 What makes a good architecture requirement

  1. It states an outcome or property, not a product or a design choice.
  2. It is measurable: a fit criterion with a number, a threshold or a yes-or-no test.
  3. It traces to at least one goal, driver, constraint, principle or concern; a requirement with no rationale is a candidate for removal.
  4. It applies to a named scope (all target applications, the customer data hub, every partner interface) so a delivery team knows whether it is bound by it.
  5. It is independent of the delivery method and stays valid if the supplier changes.
  6. It is written once. Other documents reference the ID rather than copying the text.

2. Success measures

SM IDMeasureKPI (vision 7.2)Target at TA-1Target at TA-2Target at completionMeasurement methodOwner
SM-01 (Example)Share of simple claims decided within 48 hoursKPI-01Not measured50%70%Claims platform decision events, monthly[@head-of-claims]
SM-02 (Example)Customer records with a single golden IDKPI-0260%80%98%Hub data quality dashboard[@data-owner]
SM-03 (Example)Operating cost per claim against the YYYY baselineKPI-03No change12% lower20% lowerFinance cost model, quarterly[@finance]
SM-04 (Example)Critical third-party services with a tested exit planKPI-042 of 64 of 66 of 6Third-party register[@risk-owner]
SM-05 (Example)Point-to-point file transfers in the claims domainNone (architecture health)1450Integration inventory[@integration-lead]
[SM-nn][Measure][KPI-nn][Value][Value][Value][Method][@owner]

Targets at each plateau come from the Architecture Roadmap (architecture/architecture-roadmap-transition) section 5.2. If the roadmap changes, update this table in the same change.

3. Architecture requirements by domain

3.1 Business architecture requirements

Req IDRequirementApplies toRationaleFit criterionVerificationPriority
ARS-BUS-01 (Example)Simple claims must be decidable without human touch when triage rules passClaims decision processBG-01, GAP-B-01In a sample of 500 simple claims, every claim that passes all rules is decided with no manual stepTest with sample claimsMust
ARS-BUS-02 (Example)A handler can override any automated decision, and every override records a reason codeClaims decision processBG-01, CON-01, SH-06 concern100% of overrides in the test set carry a reason code; overrides reported monthlyDemonstration and inspection of reportsMust
ARS-BUS-03 (Example)Approval limits follow the delegated authority matrix, not system defaultsClaims settlementGAP-B-04Each limit in the matrix is enforced in a test case at, below and above the limitTestMust
ARS-BUS-04 (Example)Partners can submit claims with structured loss data through a single channelPartner claim intakeGAP-B-03, GAP-D-02Three pilot partners submit claims end to end without e-mail attachmentsDemonstrationShould
[ARS-BUS-nn][Requirement][Scope][Rationale][Fit criterion][Method][Must / Should / Could]

3.2 Data architecture requirements

Req IDRequirementApplies toRationaleFit criterionVerificationPriority
ARS-DAT-01 (Example)Each customer has exactly one golden identifier used by all target applicationsAll target applicationsBG-02, DP-01, GAP-D-01Zero target applications hold a customer key not mapped to the golden ID; duplicate rate below 2% in the monthly reportAnalysis of data quality reportMust
ARS-DAT-02 (Example)Customer and claim data stored and processed only in EU regionsAll components holding customer or claim dataCNS-02, DP-02Configuration of every data store and processing service shows an EU region; no replication outside the EUInspection of configurationMust
ARS-DAT-03 (Example)Matching of customer records reaches at least 95% precision before a source is mastered by the hubCustomer data hubBG-02, architecture risk ARK-01Precision measured on a reviewed sample of 2,000 matched pairs per sourceAnalysisMust
ARS-DAT-04 (Example)Consent and its history are recorded for each customer and purposeCustomer data hubGAP-D-03, DP-03Every consent change in the test set has purpose, timestamp, channel and actorTestMust
ARS-DAT-05 (Example)Every data entity in the target has a named data owner and a retention periodData catalogueDP-01, DP-02Catalogue report shows zero entities without owner or retentionInspectionShould
[ARS-DAT-nn][Requirement][Scope][Rationale][Fit criterion][Method][Priority]

3.3 Application architecture requirements

Req IDRequirementApplies toRationaleFit criterionVerificationPriority
ARS-APP-01 (Example)Target applications expose functions only through published APIsAll target applicationsAP-01Every integration in the inventory uses an interface listed in the API catalogueArchitecture compliance reviewMust
ARS-APP-02 (Example)A handler completes a simple claim in one workspaceHandler workspaceBG-01, GAP-A-03, CON-04In usability testing, a simple claim is completed without opening another applicationDemonstrationShould
ARS-APP-03 (Example)Retired applications leave a read-only, searchable archive for the retention periodLegacy CRM, old claims systemGAP-A-04, GAP-D-04Archive returns records for 20 sample customers within 10 seconds eachTestMust
ARS-APP-04 (Example)Each target application can be released independently of the othersClaims platform, portal, workspace, hubAP-02A release of one component in pre-production needs no coordinated release of anotherDemonstrationShould
[ARS-APP-nn][Requirement][Scope][Rationale][Fit criterion][Method][Priority]

3.4 Technology architecture requirements

Req IDRequirementApplies toRationaleFit criterionVerificationPriority
ARS-TEC-01 (Example)Claims platform recovers within 4 hours with at most 15 minutes of data lossClaims platformBG-04Recovery test restores service in 4 hours or less with data loss of 15 minutes or lessTest (recovery exercise)Must
ARS-TEC-02 (Example)Target components are deployed on the approved cloud platform through the platform pipelineAll new componentsTP-01, TP-02, GAP-T-02Deployment records show the platform pipeline for every production releaseInspectionMust
ARS-TEC-03 (Example)Every target service sends logs, metrics and traces to central observabilityAll target servicesTP-03, GAP-T-04Each service appears in the observability catalogue with all three signal typesInspectionShould
ARS-TEC-04 (Example)Connectivity between cloud and data centre has no single point of failurePrivate connectivityGAP-T-03, BG-04Failover test drops one link with no loss of claims transactionsTestMust
[ARS-TEC-nn][Requirement][Scope][Rationale][Fit criterion][Method][Priority]

3.5 Security and privacy requirements

Req IDRequirementApplies toRationaleFit criterionVerificationPriority
ARS-SEC-01 (Example)Staff and partner users authenticate through the enterprise identity provider with multi-factor authenticationAll user-facing componentsSP-01, SP-02No local user stores in production; MFA enforced in the identity provider policyInspection and testMust
ARS-SEC-02 (Example)Personal data is encrypted in transit and at rest with keys held in the platform key serviceAll components holding personal dataSP-01, DP-02Configuration review shows encryption and platform-managed keys for every store and linkInspectionMust
ARS-SEC-03 (Example)Each critical third-party service has a documented exit plan and a tested recoveryClaims package, hub serviceBG-04, DRV-02Exit plan approved and recovery tested within the last 12 monthsInspection of evidenceMust
ARS-SEC-04 (Example)Access to customer data is logged and the logs are retained for [n] monthsHub, claims platform, workspaceCON-02Sample of 50 access events retrievable with user, purpose and timeTestShould
[ARS-SEC-nn][Requirement][Scope][Rationale][Fit criterion][Method][Priority]

Detail quality attribute scenarios (stimulus, environment, response, measure) with the quality attributes template (requirements/quality-attributes) when a requirement needs more than one line to be testable.

4. Interoperability requirements

Req IDLevelRequirementRationaleFit criterionVerificationPriority
ARS-INT-01 (Example)InformationAll events carry the golden customer ID and a schema versionBG-02Contract tests reject events without either fieldTest (contract)Should
ARS-INT-02 (Example)TechnicalNo new point-to-point file transfer is introduced in the claims domainAP-01, SM-05Integration inventory shows no new file interface after TA-1InspectionMust
ARS-INT-03 (Example)TechnicalPublished APIs are versioned and a breaking change is announced at least [6] months aheadAP-02Each API in the catalogue has a version and a deprecation date policyInspectionMust
ARS-INT-04 (Example)InformationDuring the interim period, changes captured from policy system A are published as the same customer events as the target API would produceACR-2027-03Consumers pass the same contract tests against both sourcesTest (contract)Must
ARS-INT-05 (Example)BusinessEach partner interface is covered by a signed partner agreement that names service levels and data useGAP-B-03Agreement on file for every live partnerInspectionMust
[ARS-INT-nn][Business / Information / Technical][Requirement][Rationale][Fit criterion][Method][Priority]

4.1 Interface inventory

InterfaceProviderConsumersStyleSpecificationRequirements
Example: Customer APICustomer data hubClaims platform, portal, workspaceRESTIS-01ARS-APP-01, ARS-INT-03
Example: Customer changed eventCustomer data hubClaims platform, distribution segmentEventsIS-02ARS-INT-01
Example: Claim decided eventClaims platformFinance, portalEventsIS-03ARS-INT-01
Example: Partner claim submissionAPI gatewayRepair partnersRESTIS-04ARS-BUS-04, ARS-INT-05
[Interface][Provider][Consumers][Style][IS-nn][ARS IDs]

5. Business service contracts

BSC IDBusiness serviceProviderConsumersOutcome deliveredService levelsHoursMeasure and owner
BSC-01 (Example)Simple claim decisionClaims operationsPolicyholders, partnersDecision and payment instruction on a simple claim70% within 48 hours; 95% within 5 days24x7 intake; decisions on business daysSM-01, [@head-of-claims]
BSC-02 (Example)Customer identity resolutionCustomer operationsAll business unitsOne trusted customer record and contact detailsNew customer resolved within 1 hour; merge disputes resolved within 5 daysBusiness hoursSM-02, [@data-owner]
BSC-03 (Example)Partner claim intakePartner managementRepair partnersAcknowledged submission with claim referenceAcknowledgement within 15 minutes24x7[@partner-manager]
[BSC-nn][Service][Provider][Consumers][Outcome][Levels][Hours][Measure, @owner]

6. Application service contracts

ASC IDApplication serviceProviderInterfaceAvailabilityLatency (p95)ThroughputRTO / RPOSupport hoursSupports
ASC-01 (Example)Customer lookupCustomer data hubIS-0199.9% monthly300 ms50 requests per second peak2 h / 5 min24x7BSC-01, BSC-02
ASC-02 (Example)Claim triage and decisionClaims platformInternal99.9% monthly5 s per decision2,000 claims per hour peak4 h / 15 min24x7BSC-01
ASC-03 (Example)Customer change eventsCustomer data hubIS-0299.5% monthlyPublished within 60 s of change20 events per second4 h / 15 minBusiness hours, on call out of hoursBSC-02
ASC-04 (Example)Partner submissionAPI gatewayIS-0499.5% monthly2 s10 requests per second8 h / 1 hBusiness hoursBSC-03
[ASC-nn][Service][Provider][IS-nn][%][Time][Rate][RTO / RPO][Hours][BSC-nn]

Example check: 140,000 claims a year over roughly 2,000 business hours is about 70 claims per hour on average. A winter storm can bring about 15 times that rate, roughly 1,050 per hour, so the 2,000 per hour in ASC-02 leaves close to double the expected peak. Keep the margin explicit so the capacity tests in section 14 have a target, and revisit it if ASM-05 fails.

7. Implementation guidelines

IG IDGuidelineReasonApplies to
IG-01 (Example)Migrate customers source by source, starting with the cleanest, and master a source only after ARS-DAT-03 is metLimits the blast radius of matching errorsWP-02
IG-02 (Example)Configure the claims package before customising it; record each customisation as an ADRKeeps upgrade cost low (BP-02)WP-03
IG-03 (Example)Run old and new claims decisions in parallel for four weeks before switchingBuilds handler trust in automated decisionsWP-03, WP-06
IG-04 (Example)Retire each file transfer in the same release that introduces its API or event replacementAvoids dual running costs and driftWP-01 to WP-04
IG-05 (Example)Use the platform golden path for new services (architecture/platform-golden-path)Meets ARS-TEC-02 and ARS-TEC-03 by defaultAll new services
[IG-nn][Guideline][Reason][Scope]

8. Implementation specifications

IS IDSpecificationTypeOwnerVersionLocationLinked requirements
IS-01 (Example)Customer APIREST API specification (architecture/rest-api-specification)[@data-architect][x.y][Path]ARS-APP-01, ARS-INT-03
IS-02 (Example)Customer changed eventEvent API specification (architecture/event-api-specification)[@data-architect][x.y][Path]ARS-INT-01, ARS-INT-04
IS-03 (Example)Claim decided eventEvent API specification[@application-architect][x.y][Path]ARS-INT-01
IS-04 (Example)Partner claim submissionREST API specification[@application-architect][x.y][Path]ARS-BUS-04
IS-05 (Example)Customer canonical data modelLogical data model (architecture/data-dictionary)[@data-architect][x.y][Path]ARS-DAT-01, ARS-DAT-05
IS-06 (Example)Cloud hosting baseline for the claims domainConfiguration baseline (architecture/landing-zone-design)[@technology-architect][x.y][Path]ARS-DAT-02, ARS-TEC-02, ARS-SEC-02
[IS-nn][Specification][Type][@owner][x.y][Path][ARS IDs]

For interfaces with external parties, use an interface control document (architecture/interface-control-document).

9. Standards

STD IDStandardVersionStatusApplies toSource
STD-01 (Example)Enterprise API design guidelines (architecture/api-design-guidelines)[x.y]MandatoryAll published APIsEnterprise standards base
STD-02 (Example)OpenAPI Specification for REST interface descriptions[Version set in STD-01]MandatoryIS-01, IS-04Enterprise standards base
STD-03 (Example)AsyncAPI for event interface descriptions3.1.0MandatoryIS-02, IS-03Enterprise standards base
STD-04 (Example)CloudEvents envelope for events1.0.2MandatoryAll eventsEnterprise standards base
STD-05 (Example)TLS for all network traffic1.2 minimum, 1.3 preferredMandatoryAll linksSecurity standard
STD-06 (Example)ISO 8601 dates and times in UTC on interfacesCurrentMandatoryAll interfacesEnterprise standards base
STD-07 (Example)API deprecation policy (architecture/api-deprecation-policy)[x.y]MandatoryAll published APIsEnterprise standards base
[STD-nn][Standard][Version][Mandatory / Recommended / Emerging / Retiring][Scope][Source]

Check external standard versions against their publishers before each baseline; the versions above are examples.

10. Constraints

IDConstraintSourceResulting requirementsReview date
CNS-01 (Example)Capital for the change is capped at USD 2.5 millionVision 3.3IG-02 (configure before customise)Each funding gate
CNS-02 (Example)Customer personal data must remain in the EUVision 3.3ARS-DAT-02, IS-06Annually
CNS-03 (Example)Policy administration contract renews on YYYY-MM-DDVision 3.3ARS-INT-04 (interim path)Contract date
CNS-04 (Example)No cut-overs during the year-end claims peakVision 3.3Release calendar in the roadmapAnnually
[CNS-nn][Constraint][Source][ARS IDs]YYYY-MM-DD

11. Assumptions

IDAssumptionRequirements affectedOwnerConfirm byIf false
ASM-01 (Example)The cloud landing zone is approved for confidential dataARS-TEC-02, ARS-DAT-02[@platform-lead]YYYY-MM-DDAdd a hosting option; revisit IS-06
ASM-04 (Example)The claims package supports external rules for triageARS-BUS-01, ARS-BUS-03[@application-architect]Proof of concept endBuild triage as a separate service
ASM-05 (Example)Peak volume stays below 1,500 claims per hourASC-02[@head-of-claims]AnnuallyRe-size ASC-02 and repeat capacity tests
[ASM-nn][Assumption][ARS IDs][@owner]YYYY-MM-DD[Consequence]

12. Gap analysis results

Gap IDGap (from the definition document)TypeRequirements that verify closure
GAP-B-01 (Example)Single claims path to triage with simple and complex pathsReplacedARS-BUS-01, ARS-BUS-02
GAP-B-03 (Example)Partner claim submissionNewARS-BUS-04, ARS-INT-05
GAP-B-04 (Example)Two manual approvals to risk-based approvalEnhancedARS-BUS-03
GAP-D-01 (Example)Four customer stores to hub as masterReplacedARS-DAT-01, ARS-DAT-03
GAP-D-03 (Example)Consent entity in the hubNewARS-DAT-04
GAP-A-03 (Example)Handler workspaceNewARS-APP-02
GAP-A-04 (Example)Legacy CRM eliminatedEliminatedARS-APP-03
GAP-T-01 (Example)File transfer to API gateway and eventsReplacedARS-APP-01, ARS-INT-01, ARS-INT-02
GAP-T-02 (Example)Hosting move to cloud container platformReplacedARS-TEC-02, ARS-DAT-02
GAP-T-03 (Example)Private connectivityNewARS-TEC-04
GAP-T-04 (Example)Central observabilityEnhancedARS-TEC-03
[GAP-x-nn][Gap][Type][ARS IDs]

Gaps without a row (in the example GAP-B-02, GAP-B-05, GAP-D-02, GAP-D-04, GAP-A-01, GAP-A-02, GAP-A-05) must either receive a requirement before the baseline or be marked "verified by work package acceptance only" with the board's agreement.

13. Traceability

Req IDGoal / driver / constraintGapsWork packageContractGate or plateauStatus
ARS-BUS-01 (Example)BG-01GAP-B-01WP-03AC-03Pre-production, TA-2Baselined
ARS-DAT-01 (Example)BG-02GAP-D-01WP-02AC-02TA-1Baselined
ARS-DAT-02 (Example)CNS-02GAP-T-02WP-01AC-01Design, pre-productionBaselined
ARS-APP-01 (Example)BG-01 (via AP-01)GAP-T-01WP-03AC-03Design, TA-2Baselined
ARS-TEC-01 (Example)BG-04GAP-T-02WP-01AC-01Pre-productionBaselined
ARS-INT-01 (Example)BG-02GAP-T-01WP-02AC-02TA-1Baselined
ARS-INT-04 (Example)CNS-03, vision risk RSK-01GAP-D-01WP-02AC-02 (amended)TA-1Agreed
ARS-SEC-03 (Example)BG-04, DRV-02NoneWP-02, WP-03AC-02, AC-03Before go-live of eachBaselined
[ARS-xxx-nn][BG / DRV / CNS][GAP IDs][WP-nn][AC-nn][Gate][Status]

The requirement-level matrix for projects lives in the requirements traceability matrix (requirements/traceability-matrix); this table covers architecture requirements only.

14. Verification and acceptance

14.1 Verification methods

MethodMeaning in this specificationTypical evidence
InspectionExamine a design, configuration or document against the fit criterionReview record, configuration export
AnalysisDerive the result from data, models or calculationData quality report, capacity model
DemonstrationShow the behaviour in a controlled run without detailed measurementRecorded demo, witness sign-off
TestExecute defined cases and measure the resultTest report with pass or fail per case

14.2 Verification points

PointRequirements checkedEvidence ownerAccepted by
Design review of each work packageAll Must requirements by inspection or analysisDelivery team architectDomain architect
Pre-productionTest and demonstration requirements in the contractDelivery team test leadLead architect
Plateau exitSuccess measures SM-01 to SM-05 for that plateauMeasure ownersArchitecture Board
Compliance reviewFull evidence pack for the contractDelivery teamArchitecture Board (architecture/architecture-compliance-assessment)

A Must requirement that fails verification blocks acceptance unless the board grants a time-limited dispensation under its charter. A Should requirement that fails needs a dispensation or a recorded reason accepted by the lead architect.

15. Requirements change management

  1. Anyone may propose a new or changed requirement to the requirements manager, with the reason and the affected IDs.
  2. The requirements manager assesses impact on gaps, work packages, contracts, specifications and success measures within [five] working days.
  3. Changes to Proposed or Agreed requirements are decided by the lead architect.
  4. Changes to Baselined requirements go to the Architecture Board through an Architecture Change Request (architecture/architecture-change-request); the board classifies the change and decides.
  5. Approved changes produce a new minor version of this specification, an updated traceability table and, where a contract is affected, a contract amendment.

The wider requirements process (elicitation, prioritisation, tooling) can be set out in a requirements management plan (requirements/requirements-management-plan).

16. Glossary and references

16.1 Glossary

TermMeaning in this document
Architecture requirementA measurable condition that any implementation must satisfy to realise the target architecture
Fit criterionThe test that decides whether a requirement is met
Success measureA measurable indicator that the realised architecture delivers the intended value
Business service contractAn agreement on the outcome and service levels a business service delivers to its consumers
Application service contractAn agreement on the interface, capacity, availability, recovery and support of an application service
InteroperabilityThe ability of organisations and systems to exchange and use information and services correctly
Implementation guidelineAdvice on how to implement in line with the architecture, departures from which need a recorded reason
Implementation specificationA binding detailed description, such as an interface or schema, that implementers build against
Baseline (of requirements)An approved, versioned set of requirements that contracts reference
[Term][Meaning]

16.2 References

IDReferenceVersion / date
REF-01The TOGAF Standard, 10th Edition (The Open Group, catalogue C220), incorporating Technical Corrigendum 1 (U254, 15 May 2025)19 May 2025
REF-02Architecture Definition Document (architecture/architecture-definition-document)[x.y]
REF-03Architecture Vision (architecture/togaf-architecture-vision)[x.y]
REF-04Architecture Roadmap and Transition Architectures (architecture/architecture-roadmap-transition)[x.y]
REF-05Architecture Principles Catalogue (architecture/architecture-principles)[x.y]
REF-06Architecture Contract (architecture/architecture-contract)[AC-nn]
REF-07Non-functional requirements catalogue (requirements/nfr-catalogue)[x.y]
REF-08AsyncAPI Specification 3.1.0; CloudEvents 1.0.2 (examples in section 9)Check current versions at asyncapi.com and cloudevents.io

Standard and licence note

Structure aligned with The TOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1), published by The Open Group: the Architecture Requirements Specification deliverable, developed with the Architecture Definition Document in Phases B to D of the Architecture Development Method, refined in Phases E and F and maintained through Requirements Management. TOGAF and ArchiMate are registered trademarks of The Open Group. This template uses only the names of phases and deliverables; all text is original. It was written from general professional practice, without reading, quoting, paraphrasing or summarising the text of the standard. It uses the deliverable's content headings by name only and reproduces no definitions, tables or descriptive text from it. The ID scheme, priority scale, verification methods, status lifecycle and example values are suggestions of this template, not requirements of the standard. Check the current edition and any technical corrigenda at opengroup.org, and the versions of any external standards you list, before each baseline. Template licence: MIT.