Software Maintenance Plan Template (ISO/IEC/IEEE 14764)
Maintenance concept, types, organisation, request process, metrics (backlog, MTTR), SLAs, CM, transition, budget, retirement
Cómo usar: Use it before a product moves from development to maintenance. Fill the maintenance concept first (scope, maintainer, support levels, planned life), then process, service levels and budget. The main pitfall is leaving retirement unplanned or letting corrective work crowd out preventive work.
Vista previa
Software Maintenance Plan: [System or product name]
Software Maintenance Plan describing how a software product will be kept useful after delivery: the maintenance concept, types of maintenance, organisation, process from request to release, resources, metrics and service levels, configuration management, transition from development, budget and eventual retirement. The structure is aligned with the maintenance process of ISO/IEC/IEEE 14764:2022 (process implementation, problem and modification analysis, modification implementation, maintenance review and acceptance, migration and retirement). Replace every
[bracketed]value and every row marked Example.
Document control
| Field | Value |
|---|---|
| Document ID | [SMP-PRODUCT-001] |
| Product / system | [Name], versions [2.x] |
| Version | [0.1] |
| Status | [Draft / In review / Approved / Superseded] |
| Owner | [@maintenance-manager] |
| Maintainer organisation | [Team or contractor] |
| Effective period | YYYY-MM-DD to YYYY-MM-DD |
| Classification | [Internal] |
| Last updated | YYYY-MM-DD |
| Related | [Software transition plan], [SCM plan], [SLA], [Architecture description], [Retirement plan] |
Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| Maintenance manager | [@name] | [Approved] | YYYY-MM-DD |
| Product owner | [@name] | [Approved] | YYYY-MM-DD |
| Operations / service owner | [@name] | [Approved] | YYYY-MM-DD |
| Acquirer or budget holder | [@name] | [Approved] | YYYY-MM-DD |
Revision history
| Version | Date | Author | Change summary |
|---|---|---|---|
| 0.1 | YYYY-MM-DD | [@name] | Initial draft during transition |
| 1.0 | YYYY-MM-DD | [@name] | Example: Approved at transition acceptance |
| 1.1 | YYYY-MM-DD | [@name] | Example: SLA for priority 2 changed from 5 to 3 working days |
Contents
- Introduction
- Maintenance concept
- Maintenance types
- Organisation and responsibilities
- Maintenance process
- Resources
- Metrics and service levels
- Configuration management
- Tools and environments
- Training and knowledge management
- Transition from development
- Budget
- Retirement plan
- Risks
- Appendices
- Standard and licence note
1. Introduction
1.1 Purpose
This plan defines how [Product] will be maintained from [date] to [date or "retirement"]: who does the work, how requests are handled, what service levels apply, what it costs and how the product will eventually be retired.
1.2 Product overview
[Product] [purpose in two sentences]. It is used by [users, number] at [sites] and depends on [key platforms and external systems].
Example: A web-based crew planning system used by 420 dispatchers in nine centres. It runs on the acquirer's private cloud and exchanges data with the national incident system through a message gateway.
1.3 Scope
| In scope | Out of scope |
|---|---|
| Example: Server, web client and gateway, versions 2.x | Example: Hosting platform (operated by infrastructure team) |
| Example: Database schema and reference data | Example: National incident system (other contractor) |
| Example: User and support documentation | Example: New major features (funded as projects) |
1.4 References
| Document | Version | Use in this plan |
|---|---|---|
| Example: Software transition plan STrP-01 | 1.0 | Inputs for sections 6 and 11 |
| Example: Service level agreement SLA-07 | 2.0 | Targets in section 7 |
| ISO/IEC/IEEE 14764:2022 | 2022 | Process structure (cited, not reproduced) |
| [Document] | [Version] | [Use] |
2. Maintenance concept
| Element | Decision |
|---|---|
| Scope of maintenance | Example: All four maintenance types in section 3, for the items in 1.3 |
| Maintainer | Example: Internal platform applications team (6 FTE) |
| Support levels | Example: Level 1 service desk, level 2 application support, level 3 maintenance team, level 4 vendors |
| Support hours | Example: Business hours 08:00-18:00 for changes; 24x7 on-call for priority 1 incidents |
| Release cadence | Example: Monthly maintenance release; emergency fixes as needed |
| Supported versions | Example: Current minor version and the previous one; security fixes only for the previous one |
| Planned life | Example: Until replacement by the national system, expected YYYY |
| Funding model | Example: Fixed annual maintenance budget plus change requests above 10 days funded separately |
3. Maintenance types
Every request is classified into one of the following types. Corrective work is reactive; the other three types are planned.
| Type | Meaning in this plan | Example | Budget share target |
|---|---|---|---|
| Corrective | Fixing faults that users or monitoring have found in the delivered software | Shift report omits crews on leave | [30%] |
| Preventive | Finding and removing latent faults or weaknesses before they cause failures | Upgrading a library approaching end of support; fixing a race condition found in code review | [20%] |
| Adaptive | Keeping the software working in a changed environment | New browser version, operating system upgrade, new interface schema from a partner | [25%] |
| Perfective | Improving performance, maintainability, usability or other attributes, or small enhancements requested by users | Faster search, clearer error messages, a new report filter | [25%] |
The current edition of ISO/IEC/IEEE 14764 may define further categories or sub-categories (for example for emergency changes); check the standard if you need to align classification exactly. Requests that exceed [10 person days] are treated as projects, not maintenance.
4. Organisation and responsibilities
| Role | Name / team | Responsibilities |
|---|---|---|
| Maintenance manager | [@name] | Owns this plan, budget, priorities with product owner, reporting |
| Product owner | [@name] | Approves perfective and adaptive changes, sets priorities |
| Change advisory / control board | [Members] | Approves modifications and releases; meets weekly |
| Maintenance engineers | [Team] | Analysis, implementation, testing, documentation |
| Test lead | [@name] | Regression suite, acceptance testing |
| Configuration manager | [@name] | Baselines, releases, status accounting |
| Service desk | [Team] | Logs requests, first-line triage |
| Operations | [Team] | Deploys releases, monitors production |
| Vendors | [Vendor names] | Support for commercial components under contract |
The RACI below shows responsibilities per process activity (R = responsible, A = accountable, C = consulted, I = informed).
| Activity | Maintenance manager | Product owner | Engineers | CCB | Operations |
|---|---|---|---|---|---|
| Request analysis | A | C | R | I | C |
| Approve modification | C | R | I | A | I |
| Implement and test | A | I | R | I | C |
| Acceptance | C | A | C | R | C |
| Release to production | A | I | C | C | R |
5. Maintenance process
The lifecycle of a request is shown below.
5.1 Process implementation
The maintainer sets up the procedures, tools and records needed before taking over: request intake in [tracker], classification rules (section 3), priority scheme (section 7.3), CCB terms of reference and the link to configuration management (section 8).
5.2 Problem and modification analysis
| Step | Description | Output |
|---|---|---|
| Log | Example: Service desk records the request with reporter, product version, symptoms, impact | Request MR-NNNN |
| Triage | Example: Engineer confirms or reproduces, classifies type and priority within the response time | Classified request |
| Analyse | Example: Identify affected items, options, effort, risk, impact on interfaces and documents | Impact analysis |
| Decide | Example: Priority 1 and 2 decided by maintenance manager; others by CCB or product owner | Approved or rejected |
5.3 Modification implementation
Approved modifications are implemented on a branch, with code review, unit and regression tests, documentation updates and an updated traceability record. Design changes that affect architecture are recorded as decision records.
5.4 Maintenance review and acceptance
Before release, the test lead confirms the regression suite passes and the requester or product owner accepts the change against its acceptance criteria. The CCB approves the release contents. Records: test report, acceptance sign-off, release notes.
5.5 Migration
When the product must move to a new environment (for example a new database version, operating system or cloud platform) the maintainer prepares a migration plan covering: analysis of what changes, parallel operation if needed, data conversion and verification, user notification, rollback, and a post-migration review. Example: migration from PostgreSQL 14 to 16 planned for Q[n], with two weeks of parallel run in staging.
5.6 Retirement
Retirement of the product or a component follows section 13.
6. Resources
| Resource | Quantity / capacity | Source |
|---|---|---|
| Example: Maintenance engineers | 4 FTE | Platform applications team |
| Example: Test engineer | 1 FTE | Shared QA pool |
| Example: Release / configuration engineer | 0.5 FTE | Platform team |
| Example: On-call allowance | 1 engineer per week | Rotation of maintenance engineers |
| Example: Vendor support | Map SDK premium support | Annual contract |
| [Resource] | [Quantity] | [Source] |
7. Metrics and service levels
7.1 Metrics
| Metric ID | Metric | Definition | Target | Source |
|---|---|---|---|---|
| M-01 | Backlog size | Open requests at period end (see formula below) | Stable or falling | Tracker |
| M-02 | Mean time to repair (MTTR) | Mean time from logging to fix released, per priority | P1 under 8 h | Tracker |
| M-03 | Backlog age | Share of open requests older than 90 days | Under 10% | Tracker |
| M-04 | Change failure rate | Share of releases causing a production incident | Under 10% | Release log |
| M-05 | Maintenance type mix | Effort share by type in section 3 | Within 10 points of targets | Timesheets |
| M-06 | Escaped defects | Corrective requests caused by previous maintenance releases | Under 2 per quarter | Tracker |
Backlog at the end of period :
where is requests arriving and requests closed in the period. Example: , , gives .
Mean time to repair over requests of a given priority:
Example: five priority 2 fixes released after 30, 46, 52, 70 and 42 hours give hours.
7.2 Service levels
| Priority | Definition | Response time | Resolution or workaround | Fix released |
|---|---|---|---|---|
| P1 Critical | Core function unavailable or data at risk, no workaround | 30 min, 24x7 | 4 h | Emergency release within 24 h |
| P2 High | Core function degraded or workaround costly | 4 business hours | 2 business days | Within 5 business days |
| P3 Medium | Non-core function affected; workaround exists | 1 business day | Next monthly release | Next monthly release |
| P4 Low | Cosmetic, minor improvement | 3 business days | Planned by product owner | As scheduled |
7.3 Reporting
A monthly maintenance report to [audience] shows metrics M-01 to M-06, SLA performance per priority, top requests by impact, and budget used.
8. Configuration management
| Topic | Approach |
|---|---|
| Configuration items | Example: Source, build scripts, database migrations, reference data, documentation, infrastructure code |
| Baselines | Example: Tagged release per maintenance release; production baseline recorded in the CMDB |
| Change control | Example: All modifications approved per section 5.2; emergency changes approved retrospectively within 2 business days |
| Versioning | Example: Semantic versioning; patch number for maintenance releases |
| Status accounting | Example: Release notes and version description generated from the tracker per release |
| Audits | Example: Quarterly check that production matches the recorded baseline |
9. Tools and environments
| Tool / environment | Purpose | Owner | Licence / renewal |
|---|---|---|---|
| Example: Issue tracker | Requests, analysis, approvals | Platform team | Enterprise licence, renews YYYY-MM-DD |
| Example: Source repository and CI | Code, review, build, test | Platform team | Enterprise licence |
| Example: Staging environment | Acceptance testing on production-like data | Operations | Cloud budget |
| Example: Monitoring and logging | Detect issues, verify fixes | Operations | Shared service |
| [Tool] | [Purpose] | [Owner] | [Licence] |
10. Training and knowledge management
| Item | Approach |
|---|---|
| Onboarding | Example: Two-week onboarding with architecture walkthrough, paired fixes and runbook reading |
| Knowledge base | Example: Runbooks, decision records and known-issue articles in [wiki]; updated with every P1 and P2 fix |
| Cross-training | Example: Each component has at least two engineers able to change it |
| Vendor training | Example: Map SDK course for one engineer per year |
11. Transition from development
| Item | Detail |
|---|---|
| Transition plan | Example: Software transition plan STrP-01 |
| Joint support period | Example: 8 weeks with 2 developer engineers available |
| Handover items | Example: Source and build environment, as-built design, test suites, open problem reports with analysis, runbooks |
| Entry criteria for take-over | Example: Build reproduced by maintainers; regression suite passes in maintainers' environment; three fixes delivered by maintainers |
| Warranty | Example: Developer fixes defects in delivered code for 6 months at no cost |
12. Budget
| Category | Basis | Annual estimate |
|---|---|---|
| Example: Staff | 5.5 FTE at [rate] | [Amount] |
| Example: Tools and licences | Tracker, CI, map SDK | [Amount] |
| Example: Environments | Staging and test cloud costs | [Amount] |
| Example: Vendor support | Map SDK premium support | [Amount] |
| Example: Contingency | 10% of the above | [Amount] |
| Total | [Amount] |
Changes above [10 person days] or outside the maintenance types are funded through change requests or projects.
13. Retirement plan
| Item | Plan |
|---|---|
| Retirement triggers | Example: Replacement system in production at all centres; or platform end of support without funded migration |
| Notification | Example: Users and dependent systems told at least 6 months before end of support |
| Parallel operation | Example: 3 months of read-only access after cut-over |
| Data | Example: Records exported to the replacement system; full archive retained for 7 years per records policy; personal data deleted when retention expires |
| Archive | Example: Final source, build tools, documentation and data schema archived with checksums |
| Decommissioning | Example: Remove servers, DNS, credentials, firewall rules and licences; confirm in CMDB |
| Post-retirement support | Example: None after archive; data queries handled by records team |
14. Risks
| Risk ID | Risk | Likelihood | Impact | Mitigation | Owner |
|---|---|---|---|---|---|
| MR-01 | Example: Key knowledge held by one engineer for the gateway | Medium | High | Cross-training; documented runbooks | [@name] |
| MR-02 | Example: Map SDK end of support before replacement | Medium | Medium | Budget adaptive upgrade in year 2 | [@name] |
| MR-03 | Example: Corrective work crowds out preventive work | High | Medium | Reserve 20% capacity; monitor M-05 | [@name] |
| [MR-NN] | [Risk] | [L] | [I] | [Mitigation] | [@owner] |
15. Appendices
| Term | Meaning |
|---|---|
| CCB | Change control board |
| MR | Modification request, the record for any maintenance request |
| MTTR | Mean time to repair |
| SLA | Service level agreement |
Standard and licence note
Structure aligned with ISO/IEC/IEEE 14764:2022 (Software engineering, Software life cycle processes, Maintenance), for the maintenance process activities and the maintenance concept and plan. Maintenance type definitions, metrics, service levels and examples are written for this collection. This template is original text written for this collection and reproduces no text from the standard; obtain the standard for its normative requirements. Template licence: MIT.
Plantillas relacionadas
Migration Plan Template
System or data migration: strategy, phases, data mapping, reconciliation, cutover runbook, rollback, decommissioning
Software e ingenieríaSoftware Development Plan Template (MIL-STD-498 SDP)
SDP per DI-IPSC-81427: process, methods, standards, reuse, critical requirements, per-activity plans, schedule, organisation
Software e ingenieríaSoftware Transition Plan Template (MIL-STD-498 STrP)