Intended outcomes, PESTLE and threat landscape issues, internal issues, climate change determination (Amd 1:2024), interested parties, requirements adopted, interfaces, triggers

SGSI e ISO/IEC 27001CompletaISO/IEC 27001:2022 + Amd 1:2024 clauses 4.1, 4.2, 4.3 (cited only)contextinterestedparties

Cómo usar: Use it before you write the ISMS scope and before each risk assessment cycle. Fill the intended outcomes first, then run one workshop for issues, parties, requirements and interfaces. The main pitfall is a generic issue list that never leads to a scope, risk or objective decision.

Vista previa

Context and Interested Parties Analysis: [Organization name]

Analysis of the internal and external issues and of the interested parties that shape an information security management system (ISMS). It supports ISO/IEC 27001:2022 + Amd 1:2024 clause 4.1 (issues, including the determination of whether climate change is a relevant issue), clause 4.2 (interested parties, their requirements and which of them the ISMS will address, with the Amd 1 note that parties can have climate-related requirements) and clause 4.3 (interfaces and dependencies that the scope must take into account). Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document IDDOC-ISMS-003
Version[1.0]
Status[Draft / In review / Approved / Superseded]
Owner[@isms-manager]
Approvers/reviewers[@ciso], [@coo], [@legal-counsel], [@dpo]
Last updatedYYYY-MM-DD
Classification[Internal]
Standard and editionISO/IEC 27001:2022 + Amd 1:2024, clauses 4.1, 4.2, 4.3
Scope referenceDOC-ISMS-002 (ISMS scope)
Legal register referenceDOC-ISMS-014
Climate change determination[Relevant / Not relevant], decided YYYY-MM-DD
Workshop date and participantsYYYY-MM-DD, [roles]
Next scheduled reviewYYYY-MM-DD

Approvals

RoleNameDecisionDate
ISMS manager[@isms-manager][Prepared]YYYY-MM-DD
Chief operating officer[@coo][Approved / Approved with changes]YYYY-MM-DD
Top management representative[@ceo][Approved]YYYY-MM-DD

Revision history

VersionDateAuthorChange
1.0 (Example)2027-01-20[@isms-manager]First analysis for the certification project
1.1 (Example)2027-07-05[@isms-manager]New hospital framework contract added (IP-03), climate review after colocation heat event

Contents

  1. Purpose and scope
  2. Method
  3. Intended outcomes of the ISMS
  4. External issues
  5. Internal issues
  6. Climate change determination
  7. Interested parties and their requirements
  8. Requirements addressed through the ISMS
  9. Interfaces and dependencies
  10. Traceability to scope, risks and objectives
  11. Monitoring, review and triggers
  12. Size tiers
  13. Records and evidence
  14. References

1. Purpose and scope

This document records how [Organization name] understands its situation for the purposes of the ISMS. It lists:

  • the outside and inside factors that could help or hinder the ISMS in delivering what we want from it (clause 4.1);
  • our yes-or-no decision on climate change as an issue for the ISMS, with the reasoning (clause 4.1 as amended in 2024);
  • the interested parties relevant to the ISMS, their relevant requirements, and which of those requirements we address through the ISMS (clause 4.2);
  • the interfaces and dependencies between our activities and activities performed by others, as input to the scope (clause 4.3).

The analysis covers [the whole organisation / the business units and sites listed in DOC-ISMS-002]. Its results feed the ISMS scope (DOC-ISMS-002), the risk assessment (DOC-ISMS-010 method, DOC-ISMS-016 register), the objectives register (DOC-ISMS-024), the legal, regulatory and contractual register (DOC-ISMS-014) and the management review inputs (DOC-ISMS-085).

2. Method

The analysis is repeated at each review using the same steps:

  1. Collect inputs. Strategy and business plan, customer contracts and tenders, the legal register, previous risk assessments, incident and audit results, supplier register, customer complaints and security questionnaires, threat intelligence summaries, and facilities and sustainability information.
  2. Run a workshop. Use the PESTLE headings (political, economic, social, technological, legal, environmental) for external issues, extended with a separate threat landscape heading. Use governance, organisation, people, information, technology, processes and contractual relations for internal issues.
  3. Rate each issue. Effect on the intended outcomes of the ISMS: High (could prevent an outcome), Medium (makes an outcome harder), Low (minor effect). Mark each issue as a threat, an opportunity or both. The rating is a filter for attention, not a risk score; the risk scoring uses the 5 x 5 scale in DOC-ISMS-010.
  4. Decide the handling. For each High or Medium issue, record where it is handled: scope decision, risk scenario, objective, control, project or "monitor only" with a reason.
  5. Identify parties and requirements. List each interested party, their needs and expectations, which needs are requirements for us (legal, contractual, or adopted voluntarily) and whether the ISMS addresses them.
  6. Map interfaces and dependencies. List activities performed by others that our in-scope activities depend on, and the information that crosses each interface.
  7. Approve and publish. Approval by top management, communication to risk and control owners, entry into the documented information register (DOC-ISMS-028).

3. Intended outcomes of the ISMS

IDIntended outcomeLinked objective
OUT-01 (Example)Patient scheduling data entrusted by hospital customers stays confidential and accurateOBJ-ISMS-01, OBJ-ISMS-02
OUT-02 (Example)The managed scheduling service stays available within contracted service levelsOBJ-ISMS-03
OUT-03 (Example)Legal, regulatory and contractual information security and privacy obligations are metOBJ-ISMS-04
OUT-04 (Example)Customers can rely on independent evidence of our security (certification to ISO/IEC 27001)OBJ-ISMS-05
[OUT-nn][Outcome][Objective ID]

4. External issues

IDCategoryIssueThreat or opportunityEffect on outcomesRatingHandled in
EXT-01 (Example)PoliticalPublic health systems tighten procurement rules for software suppliers, including security attestationsBothOUT-03, OUT-04HighObjective OBJ-ISMS-05, tender response library (isms/security-questionnaire-answer-library)
EXT-02 (Example)EconomicHospital budget pressure delays contract renewals and increases price competitionThreatOUT-02 (resources)MediumBudget plan (DOC-ISMS-031), monitor only
EXT-03 (Example)SocialPatients and staff expect clear information about how scheduling data is usedBothOUT-01, OUT-03MediumPrivacy notices, PIMS plan for next year (DOC-ISMS-100)
EXT-04 (Example)TechnologicalCustomers move to cloud-hosted electronic health record platforms with API integrationOpportunityOUT-02HighScope interface IF-04, secure development policy (DOC-ISMS-065)
EXT-05 (Example)TechnologicalDependence on one colocation provider and one cloud provider for disaster recoveryThreatOUT-02HighRisk RISK-014, ICT readiness plan (DOC-ISMS-047)
EXT-06 (Example)LegalData protection law in customer jurisdictions (for example GDPR in the EU) and health data rulesThreatOUT-03HighLegal register (DOC-ISMS-014), DPIA process
EXT-07 (Example)LegalHospital customers fall under cybersecurity laws for essential entities (for example NIS2 in the EU) and pass duties down the supply chainThreatOUT-03HighCustomer security addendum (DOC-ISMS-117), supplier obligations
EXT-08 (Example)EnvironmentalHeat waves and power grid strain in the colocation regionThreatOUT-02MediumSection 6, risk RISK-021
EXT-09 (Example)Threat landscapeRansomware groups targeting healthcare suppliers as a route into hospitalsThreatOUT-01, OUT-02HighRisks RISK-003 and RISK-004, threat intelligence procedure (DOC-ISMS-045)
EXT-10 (Example)Threat landscapePhishing and credential theft against support staff with customer system accessThreatOUT-01HighRisk RISK-007, phishing simulation plan (DOC-ISMS-074)
EXT-11 (Example)Threat landscapeExploitation of known vulnerabilities in internet-facing components within days of disclosureThreatOUT-01, OUT-02HighVulnerability remediation tracker (DOC-ISMS-072)
[EXT-nn][Category][Issue][Threat / Opportunity / Both][OUT-nn][High / Medium / Low][Where handled]

5. Internal issues

IDCategoryIssueThreat or opportunityEffect on outcomesRatingHandled in
INT-01 (Example)GovernanceBoard approved the certification project and a dedicated security budgetOpportunityOUT-04HighProject charter (DOC-ISMS-009)
INT-02 (Example)OrganisationTwo offices with different IT practices after an earlier acquisitionThreatOUT-01, OUT-02MediumSecure configuration baseline (DOC-ISMS-060), change plan (DOC-ISMS-025)
INT-03 (Example)PeopleSmall security team (ISMS manager plus 3) relative to 320 staffThreatAllMediumRoles and RACI (DOC-ISMS-006), competence matrix (DOC-ISMS-026)
INT-04 (Example)PeopleStrong engineering culture of peer reviewOpportunityOUT-01MediumSecure development policy (DOC-ISMS-065)
INT-05 (Example)InformationHealth-related personal data processed for hospitals, plus own staff and marketing data as controllerThreatOUT-01, OUT-03HighAsset inventory (DOC-ISMS-012), classification policy
INT-06 (Example)TechnologyLegacy on-premises scheduling module still used by four customersThreatOUT-02HighRisk RISK-011, decommission objective OBJ-ISMS-06
INT-07 (Example)ProcessesChange management exists for production but not for internal ITThreatOUT-02MediumChange enablement (ops/change-enablement-policy)
INT-08 (Example)ContractualStandard hospital contracts require breach notice within 24 hoursThreatOUT-03HighIncident response plan (DOC-ISMS-020)
[INT-nn][Category][Issue][Threat / Opportunity / Both][OUT-nn][High / Medium / Low][Where handled]

6. Climate change determination

6.1 How to decide

Answer these questions with facts, not opinions:

  1. Physical effects. Could heat, flooding, storms, wildfire, drought or power and cooling stress affect sites, data centres, network routes or key suppliers that support in-scope services?
  2. Dependency effects. Could climate events disrupt suppliers, logistics or staff availability in ways that affect confidentiality, integrity or availability of information?
  3. Transition effects. Could climate-related regulation, customer procurement criteria or energy pricing change how we run or source IT (for example data centre selection, hardware refresh, cloud regions)?
  4. Interested party requirements. Do customers, investors, regulators or insurers place climate-related requirements on us that touch the ISMS (section 7, note on climate requirements)?

If any answer is yes with a plausible effect on the outcomes in section 3, record climate change as relevant and say where the effect is handled. If all answers are no, record it as not relevant with the reasons and the evidence checked. Both are acceptable outcomes.

6.2 Determination record

FieldValue
DeterminationRelevant (Example)
Decided by and date[@coo], 2027-01-20 (Example)
Evidence consideredColocation provider resilience report, cloud provider region information, two cooling incidents at the colocation suite in the last summer, hospital tender criteria (Example)
ReasoningHeat events have twice reduced cooling capacity at the colocation suite that hosts the legacy module (EXT-08). Two hospital tenders asked for supplier climate resilience statements (IP-03). The cloud provider regions are assessed by the provider as low physical risk (Example)
Effects on the ISMSAvailability risk RISK-021, data centre assessment (DOC-ISMS-079), ICT readiness exercise including a cooling failure scenario, tender response text (Example)
Next reviewAt the next context review or after a climate-related incident

6.3 Example of a "not relevant" determination

For contrast, a determination of "not relevant" could read (Example): "All production runs in two cloud regions chosen by the provider for low physical risk, with automatic failover. Staff work remotely, so no single office affects service. No customer, regulator or insurer has placed climate-related requirements on our information security. We found no plausible effect on the ISMS outcomes. We will revisit this determination at each annual context review, after any climate-related incident at a supplier, and when a customer or tender raises the topic."

7. Interested parties and their requirements

IDInterested partyInternal or externalNeeds and expectationsRequirements for usClimate-related requirementOwner
IP-01 (Example)Top management and boardInternalProtected revenue, certification for tenders, no regulatory sanctionsSecurity budget governance, reporting to the boardNone identified[@ceo]
IP-02 (Example)Employees and contractorsInternalClear rules, usable tools, privacy of staff dataEmployment law duties as controller of staff dataNone identified[@hr-lead]
IP-03 (Example)Hospital customersExternalConfidential and available scheduling, prompt breach notice, evidence of securityContract security schedules, 24-hour breach notice, right to audit, ISO/IEC 27001 certificate within 12 monthsTwo tenders ask for a supplier climate resilience statement[@account-director]
IP-04 (Example)Patients (data subjects)ExternalTheir scheduling data is used lawfully and kept safeData subject rights handled through hospital controllersNone identified[@dpo]
IP-05 (Example)Data protection authoritiesExternalLawful processing, notified breachesData protection law in customer jurisdictions (for example GDPR)None identified[@dpo]
IP-06 (Example)Health sector regulators and national cybersecurity authoritiesExternalSecure supply chain for essential entitiesObligations passed down by customers under cybersecurity laws (for example NIS2)None identified[@legal-counsel]
IP-07 (Example)Cloud provider and colocation providerExternalCorrect use of services, payment, notice of incidentsShared responsibility model, acceptable use termsColocation provider publishes a climate adaptation plan we rely on[@it-ops-lead]
IP-08 (Example)Cyber insurerExternalBaseline controls in placePolicy conditions: MFA, offline backups, EDR, incident reporting within policy deadlineNone identified[@cfo]
IP-09 (Example)Certification bodyExternalAccess to evidence and people during auditsCertification agreement and scheme rulesNone identified[@isms-manager]
IP-10 (Example)InvestorsExternalRisk transparency, resilienceAnnual risk reportingRequest for climate risk disclosure in the annual report[@cfo]
[IP-nn][Party][Internal / External][Needs][Requirements][Climate requirement or "None identified"][@owner]

8. Requirements addressed through the ISMS

Req IDFrom partyRequirementAddressed through the ISMSHow and whereReason if not or partly
REQ-01 (Example)IP-03Breach notice to customer within 24 hoursYesIncident response plan DOC-ISMS-020, A.5.24 to A.5.26
REQ-02 (Example)IP-03ISO/IEC 27001 certificate within 12 months of contract startYesProject charter DOC-ISMS-009, objective OBJ-ISMS-05
REQ-03 (Example)IP-03Right to audit our security controlsYesCustomer security addendum DOC-ISMS-117
REQ-04 (Example)IP-05Processor duty to notify the hospital controller of a personal data breach without undue delay, and controller duty to notify the authority for our own staff and marketing data (for example GDPR)YesLegal register DOC-ISMS-014, breach assessment (compliance/personal-data-breach-assessment)
REQ-05 (Example)IP-06Supply chain security duties passed down by essential-entity customersYesCustomer security addendum, supplier security agreement DOC-ISMS-068
REQ-06 (Example)IP-08Insurer baseline controls (MFA, EDR, offline backups, incident reporting)YesSoA DOC-ISMS-011 (A.8.5 secure authentication, A.8.7 malware protection, A.8.13 backup, A.5.24 incident management planning)
REQ-07 (Example)IP-03Supplier climate resilience statement in tendersPartlyAvailability aspects in RISK-021 and the ICT readiness planThe emissions part of the statement belongs to the sustainability function
REQ-08 (Example)IP-10Climate risk disclosure in the annual reportNoHandled by finance and sustainability reporting; the ISMS supplies availability risk data on request
REQ-09 (Example)IP-02Employment law duties for staff recordsPartlyAccess control and retention of HR records (A.5.15, A.5.33)Wider employment duties are an HR process
[REQ-nn][IP-nn][Requirement][Yes / Partly / No][Where][Reason]

Requirements marked "Yes" or "Partly" are entered in the legal, regulatory and contractual register (DOC-ISMS-014) with their source, owner and review date. Contractual security clauses are tracked per customer there, not in this document.

9. Interfaces and dependencies

IF IDActivity performed by othersPerformed byOur in-scope activity that depends on itInformation crossing the interfaceIn or out of scopeControl at the interface
IF-01 (Example)Cloud infrastructure for production and disaster recoveryPublic cloud providerManaged scheduling serviceCustomer and patient scheduling data (encrypted)Out (supplier)A.5.23 cloud services, supplier register DOC-ISMS-066, cloud services policy DOC-ISMS-044
IF-02 (Example)Colocation facility, power and coolingColocation providerLegacy on-premises module hostingCustomer data on our own serversOut (supplier); our racks in scopeData centre assessment DOC-ISMS-079, A.7 physical controls for our cage
IF-03 (Example)Payroll and HR platformSaaS providerHR records managementStaff personal dataOut (supplier)Supplier assessment DOC-ISMS-067
IF-04 (Example)Electronic health record platformsHospital customers and their vendorsAPI integration of appointmentsAppointment data via authenticated APIsOut (customer)Interface agreement, API security standard in DOC-ISMS-065
IF-05 (Example)Out-of-hours monitoringManaged security service providerSecurity monitoringSecurity logs and alertsOut (supplier); our response in scopeSupplier security agreement DOC-ISMS-068, monitoring procedure DOC-ISMS-064
IF-06 (Example)Finance and accounts payableInternal finance team (outside the ISMS scope)Supplier paymentsSupplier and contract dataOut (other part of organisation)Internal service agreement, access via named accounts
[IF-nn][Activity][Who][Our activity][Information][In / Out][Control]

The diagram shows the dependencies of the in-scope activities from the table above (IF-02 supports the legacy module, which is part of the managed scheduling service); IF-06 is omitted because it supports payments, not an in-scope service.

10. Traceability to scope, risks and objectives

Source itemScope decision (DOC-ISMS-002)Risk (DOC-ISMS-016)Objective (DOC-ISMS-024)Control or plan
EXT-05 (Example)DR region inside scopeRISK-014 single provider dependencyOBJ-ISMS-03 availabilityDOC-ISMS-047 ICT readiness plan
EXT-08 and climate determination (Example)Colocation cage in scopeRISK-021 cooling failureOBJ-ISMS-03DOC-ISMS-079 assessment
EXT-09 (Example)Whole service in scopeRISK-003 ransomware, RISK-004 supplier compromiseOBJ-ISMS-02 integrityDOC-ISMS-061 backup policy, DOC-ISMS-064 monitoring
INT-06 (Example)Legacy module in scope until decommissionRISK-011 unsupported softwareOBJ-ISMS-06 decommission by Q4Change plan DOC-ISMS-025
REQ-01 (Example)Support team in scopeRISK-009 late breach noticeOBJ-ISMS-04DOC-ISMS-020 incident response plan
[ID][Decision][Risk ID][Objective ID][Control or plan]

11. Monitoring, review and triggers

Review cadence: the ISMS manager reviews this analysis at least once a year, before the risk assessment cycle and before management review. Owners of interested party rows confirm their rows at the same time.

Review earlier when one of these triggers occurs:

TriggerExampleAction
New or changed law or regulationA customer jurisdiction adopts a new cybersecurity lawUpdate EXT and REQ rows, legal register
New major customer, market or tender requirementFirst customer in a new regionUpdate IP-03 and REQ rows
Change to scope, sites or servicesColocation exit, new officeUpdate interfaces, then the scope (DOC-ISMS-002)
Merger, acquisition or reorganisationAcquisition of a smaller software companyFull re-run of sections 4 to 9
Major incident or near missRansomware at a key supplierUpdate threat landscape, risks
Climate-related event affecting a site or supplierCooling failure during a heat waveRevisit section 6
Audit finding or management review decisionFinding that interfaces are not documentedCorrect and record
New supplier for an in-scope activityNew monitoring providerAdd interface row

Changes are recorded in the revision history and reported to the next management review (compliance/management-review).

12. Size tiers

AspectSmall: Quillmere Analytics Ltd (Example)Medium: Quillmere Health Systems (Example)Large: Quillmere Group (Example)
Profile46 staff (38 employees, 8 contractors), B2B SaaS analytics, one office plus remote staff, one public cloud in two regions, processor of customer personal data320 staff, clinical scheduling software and managed service, two offices and a colocation suite, processor and controller2,400 staff, 6 sites in 4 countries (HQ, 3 plants, service centre, data centre), OT and IT, ISO 9001 and ISO 22301 certified
Who runs itPart-time ISMS manager (0.5 FTE) with the CEO and CTO in one workshopISMS manager with security team, legal, DPO, operations and salesCISO office with site security coordinators; group workshop plus one per site
Typical issue count8 to 12 issues, 6 to 8 parties15 to 25 issues, 10 to 15 partiesGroup list plus site lists; 40 or more items in total
Key issuesCustomer security questionnaires, cloud dependency, small teamHealth data, hospital contracts, colocation legacy, supply chain dutiesOT safety and availability, four legal systems, integration with existing ISO 9001 and ISO 22301 context analysis
Climate determinationLikely "not relevant" if all production is in cloud regions with failover and no party requires it, with a short reasoned record"Relevant" in the worked example because of colocation cooling and tender criteriaUsually "relevant": plants and the data centre have physical exposure, and the group already analyses climate under its other ISO systems
InterfacesCloud provider, a few SaaS toolsCloud, colocation, EHR platforms, monitoring providerIntra-group interfaces between sites and shared services, OT vendors, many suppliers
Document formThis template, short tablesThis template in fullOne group document reusing the integrated management system context analysis, with an ISMS-specific annex per site

13. Records and evidence

RecordWhat it provesOwnerWhere keptRetention
Approved version of this documentIssues, parties and requirements determined and approved[@isms-manager][Document system]Current plus superseded versions for one certification cycle (3 years)
Workshop attendance and notesAnalysis based on real inputs and the right people[@isms-manager][Project folder]3 years
Climate change determination record (section 6.2)Amd 1:2024 determination made with reasons[@coo]This documentLife of the ISMS
Legal, regulatory and contractual register entriesRequirements adopted are tracked[@legal-counsel]DOC-ISMS-014Per register rules
Management review minutes referencing changesChanges in issues and parties reviewed (9.3.2)[@isms-manager]DOC-ISMS-0853 years

Map these records in the control evidence matrix (DOC-ISMS-033, isms/control-evidence-matrix) under clauses 4.1 to 4.3 and list the document in the documented information register (DOC-ISMS-028).

14. References

ReferenceEditionUse
ISO/IEC 27001:2022, ISMS requirements2022, https://www.iso.org/standard/82875.htmlClauses 4.1 to 4.3, 6.1.1, 9.3.2
ISO/IEC 27001:2022/Amd 1:2024, climate action changes2024-02-23, https://www.iso.org/standard/88435.htmlClimate change in 4.1 and note in 4.2
ISO/IEC 27000:2026, overview2026, https://www.iso.org/standard/84257.htmlConcepts
ISO/IEC 27003:2017, ISMS guidance2017, https://www.iso.org/standard/63417.htmlExplanation of clause 4; a revision is in progress, check for a newer edition
ISO 31000:2018, risk management2018, https://www.iso.org/standard/65694.htmlEstablishing the context in enterprise risk
Regulation (EU) 2016/679 (GDPR)2016, check the consolidated text on EUR-LexInternational example of data protection law
Directive (EU) 2022/2555 (NIS2)2022International example of a cybersecurity law with supply chain duties

Related templates: compliance/ms-scope, compliance/legal-register, compliance/risk-methodology, compliance/risk-register, compliance/objectives-register, isms/isms-process-map, isms/supplier-register, isms/data-centre-colocation-assessment, compliance/management-review, isms/control-evidence-matrix.

Standard and licence note

Structure aligned with ISO/IEC 27001:2022 + Amd 1:2024, clauses 4.1, 4.2 and 4.3, including the 2024 climate action changes. The method, tables, questions, worked examples and guidance are original text. No ISO or IEC text is reproduced; read the official standard, sold by ISO, IEC and national standards bodies, for the exact requirements. Check the current edition and any further amendments before use. This is a documentation format, not certification or legal advice. Template licence: MIT.

Plantillas relacionadas