Risk Assessment Report Template (ISO/IEC 27001 8.2)
One cycle: scope, method refs, participants, results by band, current and residual heat maps, top risks, changes since last cycle, treatment hand-off
Cómo usar: Use it once per planned assessment cycle and for each significant targeted assessment. Fill the scope and method references first, then export counts from the dated risk register snapshot so every total matches. The main pitfall is a report whose band totals, heat map and top risk table disagree with each other or with the register.
Vista previa
Information Security Risk Assessment Report: [Organization name], [Cycle YYYY-N]
The report of one information security risk assessment cycle: what was assessed, how, by whom, what the results are by risk band, which risks matter most, what changed since the last cycle, and which treatment and acceptance decisions are handed on. It is the dated record of risk assessment results that ISO/IEC 27001:2022 + Amd 1:2024 clause 8.2 expects the organization to retain, produced with the method in DOC-ISMS-010 (clause 6.1.2) and feeding the risk treatment plan DOC-ISMS-013 (clauses 6.1.3 and 8.3). Guidance from ISO/IEC 27005:2022. Replace every
[bracketed]value and every row marked Example.
Document control
| Field | Value |
|---|---|
| Document ID | DOC-ISMS-017 |
| Version | [1.0] |
| Status | [Draft / In review / Approved / Superseded] |
| Owner | [@isms-manager] |
| Approvers/reviewers | [@ceo], [@ciso], [@risk-owners], [@internal-audit] |
| Last updated | YYYY-MM-DD |
| Classification | [Confidential] |
| Standard and edition | ISO/IEC 27001:2022 + Amd 1:2024 (clauses 6.1.2, 8.2); ISO/IEC 27005:2022 |
| Assessment cycle | [2027-1, annual cycle] |
| Assessment period | [YYYY-MM-DD to YYYY-MM-DD] |
| Method | DOC-ISMS-010 version [x.y] |
| Criteria | DOC-ISMS-015 version [x.y] |
| Catalogue | DOC-ISMS-018 version [x.y] |
| Register snapshot | DOC-ISMS-016 exported YYYY-MM-DD |
| Previous report | DOC-ISMS-017 version [x.y], cycle [2026-1] |
| Next scheduled review | YYYY-MM-DD |
Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| ISMS manager (author) | [@isms-manager] | [Prepared] | YYYY-MM-DD |
| CISO or security lead | [@ciso] | [Reviewed] | YYYY-MM-DD |
| Top management | [@ceo] | [Approved; residual risks in section 11 referred to acceptance] | YYYY-MM-DD |
Revision history
| Version | Date | Author | Change |
|---|---|---|---|
| 0.9 (Example) | 2027-03-03 | [@isms-manager] | Draft for risk owner validation |
| 1.0 (Example) | 2027-03-15 | [@isms-manager] | Approved by top management |
| [x.y] | YYYY-MM-DD | [@author] | [Change summary] |
Contents
- 1. Executive summary
- 2. Scope and context of this cycle
- 3. Method and criteria
- 4. Participants and schedule
- 5. Assets and scenarios assessed
- 6. Results summary by band
- 7. Heat maps
- 8. Top risks
- 9. Changes since the last cycle
- 10. Treatment decisions handed to the risk treatment plan
- 11. Risks referred for acceptance
- 12. Limitations and assumptions
- 13. Size tiers
- 14. Records and evidence
- 15. References
- Standard and licence note
1. Executive summary
Example (Quillmere Health Systems, cycle 2027-1): The 2027 annual assessment covered the whole ISMS scope: clinical scheduling software, the managed scheduling service, two offices and the colocation suite. Forty-two risks were assessed against the approved criteria. With existing controls, 3 risks are Critical, 14 High, 17 Medium and 8 Low. Twenty-four risks are outside appetite: all Critical and High risks and 7 Medium risks in Averse categories. The three Critical risks are ransomware affecting the managed service (R-006), credential phishing leading to access to the scheduling database (R-001) and exploitation of the new hospital integration interface (R-039). Treatment is planned for 26 risks, which would leave no Critical risk and 4 High risks once the plan is complete. Top management is asked to approve the treatment plan and to decide on the acceptance of the 4 High residual risks and the 2 Medium residual risks in Averse categories listed in section 11.
| Key figure (Example) | Value |
|---|---|
| Risks assessed | 42 (38 last cycle) |
| Outside appetite (current) | 24 (3 Critical, 14 High, 7 Medium in Averse categories) |
| Risks to be treated | 26 (23 modify, 2 share, 1 avoid) |
| Expected residual after treatment | 0 Critical, 4 High, 20 Medium, 18 Low |
| Decisions requested | Approve DOC-ISMS-013 update; decide on 6 residual acceptances (4 High, 2 Medium in Averse categories) |
2. Scope and context of this cycle
| Item | Value (Example) |
|---|---|
| ISMS scope | DOC-ISMS-002 version 1.2: development and operation of clinical scheduling software and the managed scheduling service |
| Covered in this cycle | Whole ISMS scope |
| Not covered | None; the planned ISO/IEC 27701 privacy extension will be assessed in a separate privacy risk cycle |
| Type | Planned annual cycle (clause 8.2 planned interval) |
| Context changes considered | New hospital integration interface (go-live 2027-02); second office opened; colocation contract renewed; new data protection obligations recorded in DOC-ISMS-014 |
| Climate consideration | Flood exposure of the colocation suite reviewed per DOC-ISMS-003 (clause 4.1 as amended in 2024) |
| Interested party requirements | Hospital customer contracts (security schedules, breach notification), regulator guidance recorded in DOC-ISMS-003 |
3. Method and criteria
| Element | Reference | Notes (Example) |
|---|---|---|
| Method | DOC-ISMS-010 version 3.0 | Event-based approach for the whole scope; asset-based for the scheduling platform and the integration interface |
| Risk criteria and appetite | DOC-ISMS-015 version 1.0 | 5 x 5 scale; bands Low 1 to 4, Medium 5 to 9, High 10 to 16, Critical 17 to 25 (in practice 20 and 25) |
| Scenario source | DOC-ISMS-018 version 1.1 | 36 scenarios built from catalogue entries; 6 needed new entries |
| Existing controls | DOC-ISMS-011 version 1.3 | Current scores take existing controls into account |
| Deviations from method | None | [Describe any deviation and its approval] |
Scoring conventions used in this report:
- Current score: likelihood x impact with existing controls, as defined in DOC-ISMS-010 (called inherent in the register).
- Target residual score: expected score once the treatment in DOC-ISMS-013 is implemented.
- Ranking: by current score, then by impact for ties.
4. Participants and schedule
| Participant | Role in the assessment (Example) | Sessions |
|---|---|---|
| ISMS manager | Facilitator, method owner, author | All |
| Security team (3) | Technical analysis, threat input | All |
| Head of Engineering | Risk owner: platform and integration | Workshops 1, 2 |
| Head of Service Operations | Risk owner: managed service and colocation | Workshops 2, 3 |
| Chief Financial Officer | Risk owner: finance and suppliers | Workshop 3 |
| HR Director | Risk owner: people risks | Workshop 3 |
| Data Protection Officer | Privacy and legal input | Workshops 1, 3 |
| Clinical safety officer | Patient safety impact | Workshop 1 |
| Internal audit | Observer for method consistency | Workshop 2 |
5. Assets and scenarios assessed
| Asset or process group (Example) | Assets in DOC-ISMS-012 | Scenarios |
|---|---|---|
| Clinical scheduling platform (production) | 9 | 11 |
| Hospital integration interface | 3 | 5 |
| Corporate IT and SaaS suite | 6 | 8 |
| Colocation suite and offices | 4 | 6 |
| Suppliers and cloud services | 5 | 6 |
| People and processes | 3 | 6 |
| Total | 30 | 42 |
| Risks by category (DOC-ISMS-015 section 3) (Example) | Appetite | Count |
|---|---|---|
| Confidentiality of customer and personal data | Averse | 11 |
| Integrity of customer-facing data and results (including patient safety impact) | Averse | 6 |
| Availability of core services | Cautious | 7 |
| Supplier and cloud dependency | Cautious | 8 |
| People and insider risk | Cautious | 3 |
| Physical and environmental, including climate-related disruption | Cautious | 4 |
| Legal, regulatory and contractual compliance | Averse | 2 |
| Fraud (optional category added to DOC-ISMS-015) | Averse | 1 |
| Total | 42 |
New catalogue entries proposed in this cycle (sent to DOC-ISMS-018): abuse of the integration interface by a compromised hospital account, misrouting of appointment messages, and dependence on one interface engine supplier. (Example)
6. Results summary by band
| Band | Score | Current (Example) | Target residual (Example) | Previous cycle current (Example) |
|---|---|---|---|---|
| Critical | 17 to 25 (in practice 20 and 25) | 3 | 0 | 5 |
| High | 10 to 16 | 14 | 4 | 15 |
| Medium | 5 to 9 | 17 | 20 | 12 |
| Low | 1 to 4 | 8 | 18 | 6 |
| Total | 42 | 42 | 38 |
Outside appetite: 24 risks. All 3 Critical and 14 High risks are outside appetite because their categories are Averse or Cautious in DOC-ISMS-015 (no High risk falls in an Open category this cycle). In addition, 7 Medium risks sit in Averse categories (confidentiality of customer and personal data, integrity of customer-facing data, legal compliance, fraud); all 7 are treated (Modify row in section 10). One Cautious Medium risk (R-004, support supplier outage) is also modified to improve resilience, one Cautious Medium risk (R-002) is shared, and the 8 retained Medium risks are in Cautious categories and within tolerance. (Example)
7. Heat maps
7.1 Current (with existing controls) (Example)
| Likelihood / Impact | 1 | 2 | 3 | 4 | 5 | Row total |
|---|---|---|---|---|---|---|
| 5 | 0 | 0 | 0 | 1 | 0 | 1 |
| 4 | 0 | 0 | 3 | 2 | 2 | 7 |
| 3 | 0 | 2 | 5 | 6 | 1 | 14 |
| 2 | 0 | 3 | 4 | 6 | 2 | 15 |
| 1 | 0 | 0 | 2 | 3 | 0 | 5 |
| Total | 0 | 5 | 14 | 18 | 5 | 42 |
Check: Critical cells (L4 I5 = 2, L5 I4 = 1) give 3; High cells (L4 I3 = 3, L4 I4 = 2, L3 I4 = 6, L3 I5 = 1, L2 I5 = 2) give 14; Medium cells (L3 I2 = 2, L3 I3 = 5, L2 I3 = 4, L2 I4 = 6) give 17; Low cells (L2 I2 = 3, L1 I3 = 2, L1 I4 = 3) give 8.
7.2 Target residual (after planned treatment) (Example)
| Likelihood / Impact | 1 | 2 | 3 | 4 | 5 | Row total |
|---|---|---|---|---|---|---|
| 5 | 0 | 0 | 0 | 0 | 0 | 0 |
| 4 | 0 | 0 | 0 | 0 | 0 | 0 |
| 3 | 0 | 0 | 3 | 2 | 0 | 5 |
| 2 | 0 | 6 | 5 | 9 | 2 | 22 |
| 1 | 0 | 0 | 4 | 8 | 3 | 15 |
| Total | 0 | 6 | 12 | 19 | 5 | 42 |
Check: High cells (L3 I4 = 2, L2 I5 = 2) give 4; Medium cells (L3 I3 = 3, L2 I3 = 5, L2 I4 = 9, L1 I5 = 3) give 20; Low cells (L2 I2 = 6, L1 I3 = 4, L1 I4 = 8) give 18.
8. Top risks
| Rank | Risk ID | Scenario (cause, event, consequence) | Catalogue refs | Current L x I | Current | Treatment | Target residual | Owner |
|---|---|---|---|---|---|---|---|---|
| 1 (Example) | R-006 | Unpatched systems and reachable backups let ransomware stop the managed service for days | THR-002, VUL-002, VUL-006 | 4 x 5 | 20 Critical | Modify | 2 x 4 = 8 Medium | [@head-of-service-operations] |
| 2 (Example) | R-001 | Phishing captures staff credentials that reach the scheduling database, exposing patient appointment data | THR-001, VUL-001, VUL-003 | 4 x 5 | 20 Critical | Modify | 1 x 4 = 4 Low | [@head-of-engineering] |
| 3 (Example) | R-039 | A flaw in the new hospital integration interface is exploited, altering or exposing schedules | THR-004, VUL-002 | 5 x 4 | 20 Critical | Modify | 2 x 4 = 8 Medium | [@head-of-engineering] |
| 4 (Example) | R-003 | Loss of laptops holding local exports of patient schedules | THR-015, VUL-005 | 4 x 4 | 16 High | Modify | 2 x 2 = 4 Low | [@it-manager] |
| 5 (Example) | R-022 | A departing administrator exports customer data | THR-006, VUL-013 | 4 x 4 | 16 High | Modify | 2 x 4 = 8 Medium | [@hr-director] |
| 6 (Example) | R-010 | Compromise of the managed hosting supplier with administrative access | THR-009, VUL-010 | 3 x 5 | 15 High | Modify and share | 2 x 5 = 10 High | [@cfo] |
| 7 (Example) | R-008 | Power failure at the colocation suite stops the managed service | THR-018, VUL-011 | 3 x 4 | 12 High | Modify | 2 x 4 = 8 Medium | [@head-of-service-operations] |
| 8 (Example) | R-017 | Corrupted schedules lead to missed clinical appointments | THR-020, VUL-015 | 2 x 5 | 10 High | Modify (detection and manual fallback; score unchanged) | 2 x 5 = 10 High | [@clinical-safety-officer] |
9. Changes since the last cycle
| Movement (Example) | Count | Detail |
|---|---|---|
| Risks in previous cycle | 38 | Cycle 2026-1 baseline |
| Closed or merged | 2 | R-012 retired (legacy fax referral process decommissioned); R-027 merged into R-005 |
| Continuing risks | 36 | |
| of which score decreased | 9 | Treatment completed: MFA for remote access, disk encryption on 90% of laptops, backup isolation phase 1 |
| of which score increased | 4 | R-008 (more customers on the managed service), R-010 (supplier given wider access), R-022, R-031 |
| of which unchanged | 23 | |
| New risks | 6 | R-039 to R-044, mainly from the integration interface and the second office |
| Risks in this cycle | 42 | 36 continuing plus 6 new |
Critical risks fell from 5 to 3: three former Critical risks moved to High after the remote access MFA rollout, laptop encryption and backup isolation phase 1, and R-039 is new. (Example)
10. Treatment decisions handed to the risk treatment plan
| Option | Count (Example) | Bands | Recorded in |
|---|---|---|---|
| Modify (reduce) | 23 | 3 Critical, 12 High, 8 Medium | DOC-ISMS-013, new or updated RTP entries |
| Share (transfer) | 2 | 1 High (with modify), 1 Medium | DOC-ISMS-013 with insurance or contract reference |
| Avoid | 1 | 1 High | Decision to keep the legacy reporting export disabled |
| Retain (accept within criteria) | 16 | 8 Medium, 8 Low | Risk register acceptance fields |
| Total | 42 | 3 Critical, 14 High, 17 Medium, 8 Low |
Note: R-010 is counted once, under Share, because its main decision is to share part of the consequence through a contract and insurance, combined with technical measures.
Statement of Applicability changes proposed: A.8.12 data leakage prevention moves from Partial to Planned implementation for the integration interface; A.5.21 ICT supply chain evidence to be updated. (Example)
11. Risks referred for acceptance
| Risk ID | Target residual | Approval level required | Reason treatment stops here (Example) | Acceptance record |
|---|---|---|---|---|
| R-010 (Example) | 2 x 5 = 10 High | Top management | Supplier access is necessary for the managed service; impact remains severe if the supplier is breached | ACC-011 |
| R-017 (Example) | 2 x 5 = 10 High | Top management | Clinical impact of corrupted schedules cannot be reduced further by software alone; hospitals keep manual fallback | ACC-012 |
| R-029 (Example) | 3 x 4 = 12 High | Top management | Legacy component replacement scheduled in 2028; compensating monitoring until then | ACC-013 |
| R-033 (Example) | 3 x 4 = 12 High | Top management | Single interface engine supplier; exit plan in progress | ACC-014 |
| R-022 (Example) | 2 x 4 = 8 Medium | Top management (Medium in an Averse category, DOC-ISMS-015 section 9 rule 1) | Administrators need bulk export for customer support; approval workflow and export alerts reduce but do not remove the risk | ACC-015 |
| R-039 (Example) | 2 x 4 = 8 Medium | Top management (Medium in an Averse category, DOC-ISMS-015 section 9 rule 1) | Likelihood rests on the pre-go-live test; reassess after three months of operation (section 12) | ACC-016 |
12. Limitations and assumptions
- Likelihood ratings for the integration interface rely on the pre-go-live penetration test; reassess after three months of operation. (Example)
- Financial impact thresholds use the revenue forecast of [YYYY]; if revenue changes by more than [20]%, recalibrate.
- Supplier risks rely on supplier self-assessments for 2 of 5 critical suppliers; independent evidence is requested.
- The privacy extension (ISO/IEC 27701:2025) is out of this cycle and assessed separately.
13. Size tiers
| Aspect | Small: Quillmere Analytics Ltd (Example) | Medium: Quillmere Health Systems (Example) | Large or multi-site: Quillmere Group (Example) |
|---|---|---|---|
| Typical number of risks | 20 to 30 | 40 to 60 | Group report of 60 to 100 risks plus one annex per site |
| Workshops | Two half-day sessions led by the part-time ISMS manager | Three workshops over three weeks | Site workshops at each of 6 sites, then a group consolidation workshop |
| Participants | CEO, Head of Engineering Operations, two engineers | Risk owners, security team, DPO, clinical safety | Site managers, OT engineers, CISO's security office, divisional risk owners |
| Report length | 6 to 10 pages | 15 to 25 pages | Group summary of about 20 pages plus site annexes |
| Approval | CEO | CEO with steering committee | Group executive committee; site annexes approved by site directors |
| Frequency | Annual plus targeted assessments | Annual plus targeted assessments | Annual group cycle; site cycles phased as sites join the scope |
14. Records and evidence
| Record | Proves | Owner | Location (Example) | Retention (Example) |
|---|---|---|---|---|
| This approved report | Risk assessment results retained (8.2) | ISMS manager | Document management system, DOC-ISMS-017 | 3 cycles minimum |
| Register snapshot at the report date | Counts are reproducible | ISMS manager | DOC-ISMS-016 export | Same as report |
| Workshop attendance and notes | Risk owners took part (6.1.2 c) | ISMS manager | ISMS working folder | 3 years |
| Risk owner validation e-mails or tickets | Owners agreed scores | Risk owners | Ticketing system | 3 years |
| Updated treatment plan | Results handed to treatment (6.1.3, 8.3) | ISMS manager | DOC-ISMS-013 | 3 years |
| Acceptance records | Residual risks above the risk owner's authority accepted at the right level | Top management | DOC-ISMS-019 | Life of risk plus 3 years |
| Management review minute | Results reported (9.3) | Steering committee secretary | DOC-ISMS-085 | 6 years |
15. References
| Reference | Edition | Use |
|---|---|---|
| ISO/IEC 27001:2022 + Amd 1:2024 | 3rd edition 2022; Amd 1 2024-02-23 | Clauses 4.1, 6.1.2, 6.1.3, 8.2, 8.3 |
| ISO/IEC 27005:2022 | 4th edition | Approaches and reporting guidance |
| ISO 31000:2018 | Current; a revision is in progress | Risk treatment options |
Internal documents: DOC-ISMS-002 scope, DOC-ISMS-003 context, DOC-ISMS-010 method, DOC-ISMS-011 SoA, DOC-ISMS-012 asset inventory, DOC-ISMS-013 treatment plan, DOC-ISMS-015 criteria, DOC-ISMS-016 register, DOC-ISMS-018 catalogue, DOC-ISMS-019 acceptance records.
Related templates: compliance/risk-methodology,
isms/isms-risk-appetite-criteria, compliance/risk-register,
isms/isms-threat-vulnerability-catalogue,
compliance/risk-treatment-plan, isms/isms-risk-acceptance-record,
compliance/statement-of-applicability, compliance/asset-inventory,
compliance/management-review.
Official text: https://www.iso.org/standard/82875.html, https://www.iso.org/standard/88435.html, https://www.iso.org/standard/80585.html.
Standard and licence note
Structure aligned with ISO/IEC 27001:2022 + Amd 1:2024 (clauses 6.1.2, 6.1.3, 8.2 and 8.3) and ISO/IEC 27005:2022. Clause numbers are cited only; the report structure, conventions, figures and examples are original text written for this template, and all figures are worked examples. No ISO or IEC text is reproduced, and you need the official standards to interpret the requirements. Check the current editions before use. This template does not promise certification; certification decisions belong to the accredited certification body.
Template licence: MIT.
Plantillas relacionadas
Data Centre and Colocation Assessment Template (ISO/IEC 27001)
Facility profile, shared responsibility, evidence pack, weighted checklist (access, power, cooling, fire, contract, audit rights, climate), scoring, decision
SGSI e ISO/IEC 27001ISMS Internal Audit Report Template (ISO/IEC 27001 clause 9.2)
Report for one ISMS audit: scope, criteria, team and independence, sampling, findings with evidence and clause references, conclusions, distribution, follow-up
SGSI e ISO/IEC 27001ISMS Performance Report Template (ISO/IEC 27001 9.1, 9.3)
Periodic ISMS report to management: KPI table with trend, objectives, risk by band, incidents, audits, actions, decisions, one-page dashboard