EMBA Strategic Project Plan Template
In-company EMBA strategic project: decision-focused scope, value at stake, stakeholder map, hypothesis-driven analysis plan, deliverables, RACI, confidentiality
Cómo usar: Use it when you plan the in-company strategic or action-learning project of an Executive MBA. Fill the strategic question, charter and confidentiality agreement first, then the stakeholder map and hypotheses. The main pitfall is choosing a topic instead of a decision.
Vista previa
EMBA Strategic Project Plan: [Project title]
A plan for the in-company strategic project that many Executive MBA programmes include: a credit-bearing piece of work in which a participant applies the core curriculum to a real strategic question in their own organisation, supervised by faculty and sponsored by a senior executive. It covers scope, stakeholder map, analysis plan, deliverables, governance and confidentiality, with a worked example. Source basis: stakeholder theory (Freeman 1984; Mendelow 1981; Mitchell, Agle and Wood 1997), hypothesis-driven problem solving, and project governance practice; the text is original. Names, credit weight and rules of these projects differ by programme, so follow your school's handbook first. Replace every
[bracketed]value and every row marked Example.
Document control
| Field | Value |
|---|---|
| Document ID | [ESP-001] |
| Project title | [Project title] |
| Participant(s) | [Name, role, organisation] |
| Programme and course | [School, EMBA programme, course code, credits] |
| Faculty adviser | [Name] |
| Company sponsor | [Name, title] |
| Project period | YYYY-MM-DD to YYYY-MM-DD |
| Version | [0.1] |
| Status | [Proposal / Approved / In progress / Final submitted / Graded] |
| Owner | [Participant name] |
| Approvers/reviewers | [Company sponsor], [Faculty adviser], [Legal or data protection contact] |
| Last updated | YYYY-MM-DD |
| Classification | [Company confidential] |
Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| Company sponsor | [Name] | [Approves scope and data access] | YYYY-MM-DD |
| Faculty adviser | [Name] | [Approves academic scope] | YYYY-MM-DD |
| Legal or data protection | [Name] | [Approves confidentiality terms] | YYYY-MM-DD |
1. What the strategic project is
Many EMBA programmes ask participants to complete a substantial project inside their own organisation, sometimes called a strategic project, an action-learning project or an in-company project. The common features are: a real question that matters to the company's strategy or performance; the participant as the analyst and change agent, often with a small team; a faculty adviser who judges the academic quality; a company sponsor who owns the outcome; and a final report and presentation graded against academic criteria. Some programmes run it across the second year; others attach it to a single course or make it optional. Participants from the same company sometimes work as a team, and some programmes allow a project on a different organisation when the employer cannot agree.
The project is where much of the employer's return on sponsorship comes from (see mba/emba-sponsorship-proposal, section 5) and it is the best evidence you will have of applying the curriculum. It also creates two tensions you must manage from the start. The first is between academic and business goals: the school grades rigour, frameworks and reflection; the sponsor wants a decision and results. The second is between openness and confidentiality: graders need to see your analysis; the company needs to protect its data. Sections 7 and 8 deal with both.
| Programme rule | Value for my programme | Source |
|---|---|---|
| Credit weight and grading | [Credits, grading scale, pass mark] | [Handbook section] |
| Individual or team | [Rule] | [Handbook section] |
| Proposal deadline | YYYY-MM-DD | [Handbook section] |
| Interim review | YYYY-MM-DD | [Handbook section] |
| Final report length and format | [Words or pages, appendix rules] | [Handbook section] |
| Final presentation | [Format, audience, length] | [Handbook section] |
| Confidentiality options | [NDA with school, restricted access to report, no library deposit] | [Handbook section] |
| AI and academic integrity rules | [Programme policy] | [Handbook section] |
2. Process
The flow below runs from question to handover. Confidentiality comes before any analysis, and the interim review is a real gate: if the hypotheses fail, go back to the analysis plan rather than forcing the original answer.
3. Scope
3.1 The strategic question
Write the question so that it names a decision, a decision maker, a criterion and a time frame. A useful test is that a yes or no, or a choice among options, would answer it. Vague topics ("improve our supply chain") produce reports that describe and do not decide.
- Weak (topic): "Analyse inventory management at Northfield."
- Strong (decision): "Should Northfield's VP Supply Chain roll out weekly, model-based store replenishment to the 22 stores of the Western region by Q3 [year], and on what conditions, given a target of 9 weeks of inventory without a fall in in-stock rate below 95%?"
3.2 Charter
| Element | Content |
|---|---|
| Strategic question | [One sentence, as in 3.1] |
| Decision maker | [Name, title] |
| Why now | [Trigger: plan, problem, opportunity] |
| Link to strategy | [Strategy document, objective] |
| In scope | [Units, geographies, processes, period] |
| Out of scope | [What you will not touch, and why] |
| Success criteria | [Measurable outcomes for the company] |
| Academic criteria | [What the school grades] |
| Constraints | [Budget, systems, people, time] |
| Assumptions | [What you take as given] |
| Effort | [Hours per week x weeks, team members] |
Example (Northfield, Western region). In scope: 22 stores, apparel and footwear categories, replenishment rules, the weekly ordering process, from week 1 to week 16 of the project. Out of scope: distribution centre operations, supplier lead-time negotiations and pricing. Effort: 10 hours a week for 16 weeks, 160 hours for the participant, plus about 40 hours from two analysts.
3.3 Value at stake (Example)
Size the prize early, at order-of-magnitude level, so the sponsor knows why the project deserves time. Inventory value is weeks of inventory times weekly cost of goods sold (COGS); the annual saving is the inventory released times the carrying-cost rate (capital, storage, shrinkage and obsolescence).
| Item | Value | Excel |
|---|---|---|
| Annual COGS, Western region | USD 15,600,000 | input |
| Weekly COGS | USD 300,000 | =15600000/52 |
| Weeks of inventory now / target | 11 / 9 | input |
| Inventory now | USD 3,300,000 | =11*300000 |
| Inventory at target | USD 2,700,000 | =9*300000 |
| Inventory released (one-off cash) | USD 600,000 | =3300000-2700000 |
| Carrying-cost rate | 20% a year | Finance assumption |
| Annual carrying-cost saving | USD 120,000 | =600000*0.2 |
| Weeks of inventory reduced | Cash released (USD) | Annual saving at 20% (USD) |
|---|---|---|
| 1 | 300,000 | 60,000 |
| 2 (target) | 600,000 | 120,000 |
| 3 | 900,000 | 180,000 |
This USD 120,000 is the gross saving that the sponsorship case credits partly to the programme (mba/emba-sponsorship-proposal, assumption A-09). For the inventory theory behind it, see mba/mba-inventory-card.
4. Stakeholder map
Freeman (1984) defined stakeholders as any group or individual who can affect or is affected by the achievement of the organisation's objectives. For a project, narrow that to the people who can affect or are affected by your recommendation. Two classic tools help:
- Power and interest grid (Mendelow 1981): place each stakeholder by their power over the decision and their interest in it. High power, high interest: manage closely. High power, low interest: keep satisfied. Low power, high interest: keep informed. Low power, low interest: monitor.
- Salience (Mitchell, Agle and Wood 1997): power, legitimacy and urgency. Stakeholders with all three demand attention first.
| ID | Stakeholder | Role in decision | Power (H/M/L) | Interest (H/M/L) | Current position | What they need | Engagement |
|---|---|---|---|---|---|---|---|
| STK-01 (Example) | VP Supply Chain | Decision maker | H | H | Supportive, wants proof | Business case, risk to in-stock rate | Manage closely: fortnightly 1:1 |
| STK-02 (Example) | Regional store managers (22) | Execute ordering | M | H | Sceptical, fear of stock-outs | Simple rules, a fallback, training | Keep informed: pilot workshop, weekly note |
| STK-03 (Example) | CFO | Funds system changes | H | M | Neutral | Cash release, cost of change | Keep satisfied: two briefings |
| STK-04 (Example) | IT planning systems lead | Builds the model in the system | M | M | Capacity constrained | Clear requirements, timing | Monthly check-in |
| STK-05 (Example) | Faculty adviser | Grades academic quality | H (for the grade) | M | Supportive | Rigour, frameworks, reflection | Milestone meetings |
| STK-06 | [Stakeholder] | [Role] | [H/M/L] | [H/M/L] | [Position] | [Needs] | [Plan] |
5. Analysis plan
5.1 Issue tree and hypotheses
Break the strategic question into sub-questions that are mutually exclusive and together exhaustive, then state a hypothesis for each that your analysis can support or reject. Hypothesis-driven work keeps a part-time project focused: you collect only the data that can change the answer.
| ID | Sub-question | Hypothesis | Test that could reject it | Data | Method or framework | Owner | Due |
|---|---|---|---|---|---|---|---|
| H-01 (Example) | Is excess inventory driven by ordering rules? | Manual orders overshoot demand by more than 15% on average | Compare 52 weeks of orders with sales by store and category | ERP orders, POS sales | Variance analysis, regression (mba/mba-regression-for-managers-card) | Participant | Week 5 |
| H-02 (Example) | Can a model hold in-stock at 95% with 9 weeks of cover? | A reorder-point rule with safety stock meets 95% in simulation | Back-test on last year's demand | POS sales, lead times | Inventory model (mba/mba-inventory-card) | Analyst 1 | Week 8 |
| H-03 (Example) | Will store managers adopt it? | Adoption is above 80% if overrides are allowed with a reason | Pilot in 4 stores for 6 weeks | Override log, interviews | Change management (mba/mba-change-management-card) | Participant | Week 13 |
| H-04 (Example) | Is it worth the cost? | Annual saving exceeds the one-off cost within two years | Business case | Finance data | NPV (mba/mba-npv-irr-card) | Participant | Week 14 |
| H-05 | [Sub-question] | [Hypothesis] | [Test] | [Data] | [Method] | [Owner] | [Week] |
5.2 Frameworks: use them to think, not to decorate
Choose frameworks that answer a sub-question. External analysis (Porter's five forces, mba/mba-five-forces-card) fits a market-entry question; internal analysis (value chain, mba/mba-value-chain-card; resources and capabilities, mba/mba-resource-based-view-card) fits a question about where the company creates value; operations and change frameworks fit an implementation question like the example. Graders reward a framework that is applied with data and changes the conclusion. They penalise a framework drawn for its own sake.
5.3 Data request
| ID | Data | System and owner | Period | Granularity | Personal data? | Approval needed | Received |
|---|---|---|---|---|---|---|---|
| DAT-01 (Example) | Store orders | ERP, Planning | Last 52 weeks | Store x SKU x week | No | Sponsor | YYYY-MM-DD |
| DAT-02 (Example) | Sales | POS, Finance | Last 52 weeks | Store x SKU x week | No | Sponsor | YYYY-MM-DD |
| DAT-03 (Example) | Interview notes with store managers | Participant | Weeks 3 to 6 | Per interview | Yes (names, opinions) | Data protection contact | YYYY-MM-DD |
| DAT-04 | [Data] | [System, owner] | [Period] | [Grain] | [Yes / No] | [Approver] | YYYY-MM-DD |
6. Deliverables
| ID | Deliverable | Audience | Format | Due | Acceptance criteria |
|---|---|---|---|---|---|
| DEL-01 | Project proposal | Sponsor, adviser | This document, sections 1 to 8 | YYYY-MM-DD | Both approve |
| DEL-02 | Interim review | Adviser, steering committee | 10 slides | YYYY-MM-DD | Hypotheses tested, plan for the rest |
| DEL-03 | Recommendation and business case | Steering committee | Board-style memo, 5 pages | YYYY-MM-DD | Decision taken |
| DEL-04 | Implementation plan | VP Supply Chain, stores | Plan with owners and milestones | YYYY-MM-DD | Owners accept |
| DEL-05 | Academic report | School | [Word limit] report with appendices | YYYY-MM-DD | Programme rubric (section 9) |
| DEL-06 | Final presentation | School panel, sponsor | [Minutes] | YYYY-MM-DD | Programme rubric |
| DEL-07 | Personal reflection | Adviser | [Words] | YYYY-MM-DD | Programme rubric |
The company version and the academic version can share most of the analysis. The company version leads with the decision and the numbers; the academic version also shows the reasoning, the alternatives you rejected, the limits of your evidence and what you learned.
7. Governance
7.1 Roles and RACI
R = responsible, A = accountable, C = consulted, I = informed.
| Activity | Participant | Sponsor | Faculty adviser | Steering committee | Analysts |
|---|---|---|---|---|---|
| Scope and charter | R | A | C | I | I |
| Data access and confidentiality | R | A | C | I | I |
| Analysis | A | I | C | I | R |
| Recommendation | R | A | C | C | C |
| Implementation decision | C | R | I | A | I |
| Academic report | A, R | C | C | I | I |
7.2 Cadence
| Forum | Members | Frequency | Purpose |
|---|---|---|---|
| Sponsor 1:1 | Participant, sponsor | Fortnightly, 30 minutes | Progress, obstacles, decisions needed |
| Steering committee | Sponsor, CFO delegate, IT lead, participant | Weeks 4, 10 and 15 | Approve scope, review findings, decide |
| Adviser meeting | Participant, faculty adviser | At each school milestone | Academic quality |
| Working session | Participant, analysts | Weekly | Analysis |
7.3 Risk and decision logs
| ID | Risk | Likelihood | Impact | Mitigation | Owner |
|---|---|---|---|---|---|
| RSK-01 (Example) | Data extraction delayed by IT capacity | M | H | Agree extract in week 1; use exported reports as fallback | Participant |
| RSK-02 (Example) | Sponsor changes role | L | H | Name a deputy sponsor in the charter | Sponsor |
| RSK-03 (Example) | Day job peak in weeks 10 to 12 | H | M | Front-load analysis; agree reduced scope option | Participant |
| RSK-04 | [Risk] | [L/M/H] | [L/M/H] | [Mitigation] | [Owner] |
| ID | Date | Decision | Made by | Rationale |
|---|---|---|---|---|
| DEC-01 (Example) | YYYY-MM-DD | Pilot limited to 4 stores | Steering committee | Contain stock-out risk |
| DEC-02 | YYYY-MM-DD | [Decision] | [Who] | [Why] |
8. Confidentiality and data protection
The academic report will be read by people outside your company: faculty, sometimes external examiners, and possibly classmates in a presentation. Plan for that from the start rather than redacting at the end.
- Agreement. Find out what the school offers: many programmes have a standard confidentiality agreement for company projects, restricted circulation of reports, or the option not to deposit the report in a library. Your employer may require its own non-disclosure agreement. Record what applies and who signed it.
- Data classification. Classify each data item with your company's scheme before it leaves company systems; keep restricted data on company devices.
- Disguise. Present indexed or scaled figures (for example, sales indexed to 100) or disguised names where graders do not need the real values, and say in the report that you have done so.
- Personal data. Interviews and employee data may be personal data. Where EU or UK data protection law applies, the General Data Protection Regulation (Regulation (EU) 2016/679, and the UK version) sets duties on purpose, minimisation and security; other countries have their own laws. Ask your company's data protection contact before collecting, and anonymise quotes.
- Trade secrets. Information with commercial value that the company keeps secret may be protected as a trade secret (in the EU, Directive (EU) 2016/943). Treat pricing, cost, supplier and customer data as restricted unless the sponsor clears it.
- Generative AI tools. Do not paste company data into an AI tool that your employer has not approved, and follow your programme's academic integrity and AI policy for the report itself; disclose AI use where the programme asks.
- Publication and reuse. Agree in advance whether you may describe the project in a CV, an interview or an article, and in what level of detail.
| ID | Item | Classification | Shared with school as | Approved by | Date |
|---|---|---|---|---|---|
| CNF-01 (Example) | Store sales and orders | Confidential | Indexed, region disguised | Sponsor | YYYY-MM-DD |
| CNF-02 (Example) | Interview notes | Personal data | Anonymised quotes only | Data protection contact | YYYY-MM-DD |
| CNF-03 | [Item] | [Class] | [Form] | [Approver] | YYYY-MM-DD |
This section is a checklist for planning, not legal advice. The company's legal or data protection team decides what may be shared.
9. Assessment and reflection
A typical academic rubric for an in-company project weighs these criteria; use your programme's own weights.
| Criterion | What strong work shows | Weight |
|---|---|---|
| Problem definition | A decision-focused question, clear scope, link to strategy | [ %] |
| Use of theory | Frameworks chosen for the question and applied with data | [ %] |
| Analysis and evidence | Hypotheses tested, sound data, limits acknowledged | [ %] |
| Recommendation | Options compared on stated criteria, risks and implementation | [ %] |
| Impact | Decision taken or a credible path to one, measured results | [ %] |
| Communication | Report and presentation clear, executive-ready | [ %] |
| Reflection | Honest learning about leading change in your own organisation | [ %] |
Reflection prompts, drawing on the reflective-practice tradition (Schön 1983):
- What did I assume about my organisation at the start that turned out to be wrong?
- Where did my position in the hierarchy help or hinder the analysis?
- Which stakeholder conversation changed my recommendation, and why?
- What would I do differently if I led this project again?
- Which course concepts did I actually use, and which did not survive contact with reality?
10. Timeline
| Week | Company milestone | School milestone | Deliverable |
|---|---|---|---|
| 0 | Sponsor agreed, confidentiality signed | Proposal submitted | DEL-01 |
| 1 to 3 | Data extracted; stakeholder interviews | Adviser kick-off | Interview notes |
| 4 | Steering committee 1: scope confirmed | Charter v1.0 | |
| 5 to 9 | Analysis H-01 and H-02 | Working files | |
| 10 | Steering committee 2: findings | Interim review | DEL-02 |
| 11 to 13 | Pilot in 4 stores (H-03) | Pilot results | |
| 14 | Business case (H-04) | DEL-03 draft | |
| 15 | Steering committee 3: decision | DEL-03, DEL-04 | |
| 16 | Handover | Final report and presentation | DEL-05, DEL-06, DEL-07 |
Week 0 is [YYYY-MM-DD].
11. Quality checklist
- The question names a decision, a decision maker, a criterion and a time frame.
- Sponsor and faculty adviser have approved scope in writing.
- Confidentiality and data protection are agreed before data moves.
- Value at stake is sized with traceable numbers and formulas.
- Every hypothesis has a test that could reject it.
- Stakeholders with high power and high interest have a named engagement plan.
- Governance cadence and decision rights are set.
- Company and academic deliverables are both planned.
- Figures in the academic report are disguised where required, and the report says so.
- Reflection notes are kept throughout, not written at the end.
12. Common mistakes
- Choosing a topic instead of a decision.
- A scope too large for a part-time project of three to six months.
- No senior sponsor, or a sponsor who is not the decision maker.
- Collecting data before stating hypotheses.
- Frameworks drawn for decoration, not used to reach the conclusion.
- Ignoring the sceptical stakeholders who must implement the result.
- Moving company data to personal devices or unapproved AI tools.
- Redacting at the last minute instead of planning disguise from the start.
- Writing one report for two audiences, so it satisfies neither the sponsor nor the grader.
- Treating the project as consulting on someone else's area, without reflecting on your own role as a leader inside the organisation.
- Letting the day job absorb the project weeks with no reduced-scope option agreed.
Sources and further reading
- Freeman, R. E. (1984). Strategic Management: A Stakeholder Approach. Pitman.
- Mendelow, A. L. (1981). Environmental scanning: the impact of the stakeholder concept. ICIS 1981 Proceedings, 20. aisel.aisnet.org.
- Mitchell, R. K., Agle, B. R. and Wood, D. J. (1997). Toward a theory of stakeholder identification and salience: defining the principle of who and what really counts. Academy of Management Review, 22(4), 853-886.
- Schön, D. A. (1983). The Reflective Practitioner: How Professionals Think in Action. Basic Books.
- Kotter, J. P. (1995). Leading change: why transformation efforts fail. Harvard Business Review, 73(2), 59-67.
- Regulation (EU) 2016/679 (General Data Protection Regulation) and Directive (EU) 2016/943 (trade secrets), on EUR-Lex; check the consolidated text.
- Further reading on structured problem solving: Minto, B., The Pyramid Principle (Pearson, any recent edition).
- Your programme handbook for the project course.
Revision history
| Version | Date | Author | Change |
|---|---|---|---|
| 0.1 | YYYY-MM-DD | [Participant name] | Proposal draft |
| [1.0] | YYYY-MM-DD | [Participant name] | [Approved by sponsor and adviser] |
Standard and licence note
Structure aligned with common practice for in-company and action-learning projects in executive education, stakeholder theory (Freeman 1984; Mendelow 1981; Mitchell, Agle and Wood 1997) and project governance practice. The text, worksheets and example are original; Northfield Outdoor Co. and the people named are fictional. No school is affiliated with this template; follow your programme's handbook and check the current official text of any law named. Template licence: MIT.
Plantillas relacionadas
EMBA Sponsorship Proposal Template
Employer sponsorship business case for an Executive MBA: alignment, costs, NPV, IRR and break-even attribution, cover plan, retention and repayment terms
MBA y escuelas de negociosMBA Capstone Project Report Template
Capstone report: research question, literature, method, survey CI and chi-square, NPV analysis, recommendations, limits, reflection, rubric
MBA y escuelas de negociosMBA Field Project Report Template
Field project final report: summary, situation, approach, findings with exhibits, options, NPV/IRR business case, roadmap, client sign-off