Cómo usar: Use it for the periodic review of one supplier and as the ISO 9001 external provider re-evaluation record. Fill the KPI formulas, bands and weights once per category, then the period data, and share the data before the meeting. The main pitfall is closing actions when they are done rather than when the KPI has recovered.

Vista previa

Supplier Performance Review: [Supplier name], [Period]

Periodic review of one supplier: weighted KPI scorecard, trend, corrective actions, relationship plan and the re-evaluation decision required for external providers. The re-evaluation record supports ISO 9001:2026 clause 8.4 (control of externally provided processes, products and services), and the relationship plan follows the collaborative relationship life cycle of ISO 44001:2017 (with Amd 1:2024). Both standards are cited by name and clause number only. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Review ID[SPR-YYYY-QN-NNN] Example: SPR-2026-Q3-007
Supplier[Legal name, supplier number] Example: Ostrelby Castings Ltd, SUP-10233
Contract[Contract ID] Example: CTR-001
Risk tier and cadence[Tier, frequency] Example: Tier 1, quarterly
Period[Start to end] Example: 2026-07-01 to 2026-09-30
Review meetingYYYY-MM-DD Example: 2026-10-21
Buyer participants[@category-manager], [@quality-engineer], [@contract-owner]
Supplier participants[Names, roles]
Status[Draft / Agreed with supplier / Closed]

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]Data pack sent to supplier
1.0YYYY-MM-DD[@name]Example: Agreed actions recorded after meeting

1. Summary

Example: Weighted score 3.00 of 5 (60%), down from 3.45 in Q2. Delivery held at band 3, quality fell to band 2 after a porosity defect on HSG-310 castings. Ostrelby stays approved (band B) with a supplier corrective action request (SCAR) and a quality improvement plan; next review in January 2027.

2. KPI definitions, bands and weights

KPIFormulaData source54321Weight
Delivery (OTIF)Order lines delivered on time and in full / order lines dueERP goods receipts98% or more95.0 to 97.9%90.0 to 94.9%85.0 to 89.9%below 85%30%
Quality (PPM)Parts rejected / parts received x 1,000,000Incoming inspection250 or less251 to 750751 to 1,5001,501 to 3,000above 3,00030%
ResponsivenessPanel score: quote turnaround, query response, SCAR timelinessBuyer and quality panelExcellentGoodAcceptableWeakPoor15%
CommercialPanel score: price adherence, cost-down ideas, invoice accuracyBuyer and APExcellentGoodAcceptableWeakPoor15%
Sustainability and compliancePanel score: code of conduct conditions, certificates, emissions dataSustainability leadExcellentGoodAcceptableWeakPoor10%

Weighted score = sum of (score x weight). Overall bands:

BandWeighted scoreMeaning
A4.00 to 5.00Preferred: first choice for new business
B3.00 to 3.99Approved
C2.00 to 2.99Conditional: improvement plan, no new business without approval
Dbelow 2.00Exit review

Any single KPI scored 2 or lower triggers a SCAR, whatever the overall band.

3. Scorecard for the period

KPIRaw resultScoreWeightWeightedPrevious period score
Delivery (OTIF)Example: 1,089 of 1,184 lines = 92.0%330%0.904
Quality (PPM)Example: 386 rejected of 214,500 received = 1,800 PPM230%0.603
ResponsivenessExample: Quotes in 4 days on average, SCARs answered on time415%0.604
CommercialExample: Index-linked price applied correctly, two cost-down proposals415%0.603
Sustainability and complianceExample: Certificates valid, Scope 1 and 2 data supplied, Scope 3 not yet310%0.303
Total100%3.00 (60%)3.45

Example note: the Q4 2025 score of 3.60 and the Q1 2026 score of 3.45 come from earlier reviews SPR-2025-Q4-007 and SPR-2026-Q1-007.

4. Issues and corrective actions

Action IDIssueRoot cause (supplier's analysis)ActionOwnerDueVerification
SCAR-2026-014 (Example)Porosity on HSG-310 castings, 312 of the 386 rejectsDegassing step skipped on night shift after a staff changeDegassing added to the shift checklist with sign-off; operator retrainingOstrelby quality manager2026-11-15PPM below 750 for two consecutive months
ACT-2026-031 (Example)Late deliveries clustered in AugustMachine outage during planned holiday periodHoliday capacity plan shared with Corvanna by end of May each yearOstrelby operations2027-05-31OTIF at or above 95% in August 2027
ACT-2026-032 (Example)Scope 3 emissions data missingNo data collection from metal suppliersSupply estimated Scope 3 category 1 data using spend-based factorsOstrelby sustainability lead2027-03-31Data received and reviewed

The SCAR is tracked in compliance/capa-nonconformity; the root cause method is in business/root-cause-analysis.

5. Relationship plan

AreaPlan for the next 12 months
Joint objectivesExample: Reduce HSG-310 cost 4% through a design change to wall thickness, keep OTIF at or above 95%
GovernanceExample: Quarterly business review with operations directors, monthly quality call
Value creationExample: Joint design-to-value workshop in Q1 2027 (see procurement/category-strategy)
Risk and continuityExample: Second tooling set for HSG-220 held at Ostrelby's second site
Staying togetherExample: Annual relationship survey both ways
Exit strategyExample: Exit plan in contract file: 6-month tool transfer, last-time buy quantities

6. Re-evaluation decision

FieldValue
Decision[Remain approved / Conditional / Exit review] Example: Remain approved, band B, SCAR open
New business allowed[Yes / With approval / No] Example: Yes, except new cast parts until SCAR-2026-014 is verified
Decided byExample: [@category-manager], [@quality-manager]
DateExample: 2026-10-21
Next reviewExample: January 2027

7. References

ReferenceVersionOfficial source
ISO 9001, Quality management systems, Requirements, clause 8.42026 (sixth edition, published September 2026)Official text: ISO, purchase or licensed access: https://www.iso.org/standard/88464.html
ISO 44001, Collaborative business relationship management systems, Requirements and framework2017 with Amd 1:2024; a revision (ISO/DIS 44001) is in progressOfficial text: ISO and national standards bodies, purchase or licensed access: https://www.iso.org/standard/72798.html

Standard and licence note

Structure aligned with ISO 9001:2026 clause 8.4 and the ISO 44001:2017 relationship life cycle, cited by name, edition and clause number only; no standard text is reproduced. Official text: ISO and national standards bodies, purchase or licensed access via the links above. Corvanna Instruments, Ostrelby Castings and all figures are fictional. The text is original. Template licence: MIT.

Plantillas relacionadas