Kit sécurité fonctionnelle automobile
Analyses de sûreté et de cybersécurité véhicule : HARA ISO 26262, SOTIF, TARA ISO/SAE 21434 et AMDE, structure citée uniquement.
8 modèles en 3 étapes, dans l'ordre d'utilisation. Ouvrez un modèle dans l'éditeur, complétez-le et exportez-le en PDF, DOCX ou HTML.
Évaluations
Hazard Analysis and Risk Assessment (HARA) Template (ISO 26262)
StandardAutomotive HARA: item definition, hazard identification, hazardous events with S/E/C rationale, ASIL, safety goals with safe state and FTTI, SOTIF/PAS 8800/TARA pointers
ISO 26262-3:2018; ISO 21448:2022; ISO/PAS 8800:2024SOTIF Analysis Template (ISO 21448)
CompletISO 21448 SOTIF file: ODD, acceptance criteria, functional insufficiencies, triggering conditions, V&V targets, known and unknown scenarios
ISO 21448:2022Software Requirements Specification Template (ISO/IEC/IEEE 29148)
CompletFull SRS per ISO/IEC/IEEE 29148:2018 for contract or multi-team work: interfaces, functions, quality attributes, verification matrix, traceability
ISO/IEC/IEEE 29148:2018 (Edition 3 at DIS)
Sécurité
Automotive TARA Template (ISO/SAE 21434, UN R155)
CompletVehicle cybersecurity TARA: item definition, assets, damage scenarios, SFOP impact, attack paths, feasibility, risk values, treatment, goals, R155 Annex 5 check
ISO/SAE 21434:2021 (cite-only); UN R155, R156PSIRT Vulnerability Handling Procedure Template (ISO/IEC 30111, CVSS v4)
CompletProducer-side PSIRT procedure: intake, verification, CVSS v4.0, EPSS, KEV and SSVC triage, remediation targets, advisory and VEX, CVE/CNA, CRA Art. 14, metrics
ISO/IEC 30111:2019 (structure); CVSS v4.0; CISA SSVC; CNA Rules 4.2.0; EU CRA Art. 14SBOM and VEX Policy Template (CISA 2026, CycloneDX, SPDX)
CompletSBOM production, signing, VEX rules, distribution, supplier SBOMs, retention, exceptions, metrics, CISA 2026 to CycloneDX and SPDX field map
CISA 2026 SBOM Minimum Elements; CycloneDX 1.7; SPDX 3.0.1; CISA VEX
Vérification
Software FMEA Template (IEC 60812)
CompletSoftware failure modes, effects, causes, controls, S/O/D scales, RPN and action priority, actions and re-scoring
IEC 60812:2018Verification and Validation Plan Template (IEEE 1012)
CompletV&V plan: integrity level scheme, tasks per life-cycle phase, minimum tasks by level, independence, anomalies, reporting, schedule
IEEE 1012-2024