Markdown Editor

DORA ICT Risk Management Framework Template

DORA ICT risk management framework: Article 5 governance, Article 6(8) strategy, risk tolerance, RTS 2024/1774 policy map, review report, traceability

ISO & ConformitéCompletDORA (EU) 2022/2554 Arts 5-16; Delegated Reg (EU) 2024/1774doraictriskmanagementframework

Mode d'emploi: Use it when a financial entity must document its ICT risk management framework under DORA Chapter II. Fill the full or simplified decision, the strategy and the risk tolerance first, then map every RTS policy to an owner. The main pitfall is a framework that lists policies but never shows the management body approving the tolerance or the yearly review report.

Aperçu

DORA ICT Risk Management Framework: [Financial entity name]

The framework document that sets out how a financial entity governs, identifies, protects against, detects, responds to, recovers from and learns from ICT risk under Chapter II of the Digital Operational Resilience Act (Regulation (EU) 2022/2554, DORA, Articles 5 to 16), with the policies, procedures and review report that Commission Delegated Regulation (EU) 2024/1774 (the RTS on the ICT risk management framework) specifies. It holds the digital operational resilience strategy, the ICT risk tolerance, the risk assessment method, the policy map, the yearly review and the traceability from each legal requirement to the document and evidence that meets it. DORA has applied since 17 January 2025; check the consolidated texts on EUR-Lex and your competent authority's expectations before use. Replace every [bracketed] value and every row marked Example. This is a documentation format, not legal advice; check the current official text and a qualified professional.

Document control

FieldValue
Document ID[DORA-RMF-001]
Financial entity[Legal name], LEI [20-character LEI]
DORA entity type (Article 2(1))[Credit institution / Investment firm / Payment institution / Insurance undertaking / Other]
Framework applied[Full framework (Articles 5 to 15) / Simplified framework (Article 16)]
Group scope[Solo / Sub-consolidated / Consolidated, list of entities in section 1.4]
Competent authority[Name, Member State]
ICT risk control function[Name of function, head]
Version[0.1]
Status[Draft / In review / Approved by management body / Superseded]
Owner[@head-of-ict-risk]
Approvers/reviewers[@management-body], [@cro], [@ciso], [@cio], [@head-of-internal-audit] (review only), [@compliance]
Management body approval dateYYYY-MM-DD
Next scheduled reviewYYYY-MM-DD (at least yearly, Article 6(5))
Last updatedYYYY-MM-DD
Classification[Confidential]

Approvals

RoleNameDecisionDate
Management body (resolution reference)[@chair][Approve / Approve with conditions / Return]YYYY-MM-DD
Chief risk officer[@name][Recommend for approval]YYYY-MM-DD
Head of ICT risk control function[@name][Author sign-off]YYYY-MM-DD
Chief information officer[@name][Acknowledge first-line duties]YYYY-MM-DD
Head of internal audit[@name][Reviewed for audit planning, no approval role]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]First draft from gap assessment
1.0YYYY-MM-DD[@name]Example: Approved by management body, resolution MB-2025-014
1.1YYYY-MM-DD[@name]Example: Unscheduled review after major ICT-related incident INC-2026-007; tolerance for card authorisation tightened

Contents

1. Purpose, scope and legal basis

1.1 Purpose

This document establishes the ICT risk management framework of [Entity]. It describes how the entity keeps a high level of digital operational resilience: how ICT risk is governed, measured and kept within the tolerance the management body has set, and how the entity continues to deliver its critical or important functions when ICT systems fail or are attacked. It is part of the entity's overall risk management system and uses the same risk taxonomy, committees and reporting lines.

1.2 Legal basis

ProvisionWhat it requires (paraphrase)Where handled
DORA Article 5Internal governance and control framework for ICT risk; management body defines, approves, oversees and is accountable for the frameworkSection 2
DORA Article 6(1) to (3)Sound, comprehensive, documented framework that protects information and ICT assets and physical components; complete and current information to the competent authority on requestSections 1, 6, 7
DORA Article 6(4)Independent control function for ICT risk; segregation of risk management, control and internal audit (three lines of defence or equivalent)Section 2.3
DORA Article 6(5)Review at least yearly and after major ICT-related incidents, supervisory instructions or testing and audit conclusions; review report on requestSection 13
DORA Article 6(6), (7)Regular internal audit by qualified, independent auditors; formal follow-up of findingsSection 12
DORA Article 6(8)Digital operational resilience strategy with eight elements, points (a) to (h)Section 3
DORA Article 6(9), (10)Optional multi-vendor strategy; option to outsource verification tasks while staying responsibleSections 3.3, 12.3
DORA Articles 7 to 14ICT systems and tools, identification, protection and prevention, detection, response and recovery, backup and restoration, learning and evolving, communicationSections 6 to 9
DORA Article 16Simplified framework for the entities listed in Article 16(1)Section 1.3
Delegated Regulation (EU) 2024/1774, Title IIICT security policies, procedures, protocols and tools (Articles 2 to 26) and the review report (Article 27)Sections 5, 7, 8, 13
Delegated Regulation (EU) 2024/1774, Title IIISimplified framework content (Articles 28 to 41)Section 1.3

Delegated Regulation (EU) 2024/1774 was adopted on 13 March 2024 and published in the Official Journal on 25 June 2024. It applies from the DORA application date. Check the consolidated texts and any later amendments before relying on article numbers.

1.3 Full or simplified framework

QuestionAnswerEvidence
Is the entity a small and non-interconnected investment firm, an exempted payment institution, an institution exempted under Directive 2013/36/EU that the Member State has kept in DORA scope (it has decided not to use the Article 2(4) exclusion option), an exempted electronic money institution, or a small institution for occupational retirement provision?[Yes / No][Licence, legal opinion reference]
If yes, framework applied[Simplified, RTS Title III, Articles 28 to 41][Reference]
If no, is the entity a microenterprise?[Yes / No][Headcount and turnover figures]
Proportionality factors considered (RTS Article 1)[Size, overall risk profile, nature, scale and complexity of services, activities and operations][Section 3.1]

Example: Corvellan Bank AG is a credit institution with about 1,400 staff. It is not in the Article 16(1) list and is not a microenterprise, so it applies the full framework.

1.4 Entities and perimeter

EntityLEIRole in groupFramework ownerNotes
Corvellan Bank AG (Example)[LEI]Parent, credit institutionHead of ICT riskFull framework
Corvellan Payments GmbH (Example)[LEI]Payment institution subsidiaryGroup framework adopted by board resolutionLocal addendum for card scheme rules
[Entity][LEI][Role][Owner][Notes]

1.5 Other jurisdictions

Groups with operations outside the EU map this framework to local regimes rather than run parallel documents. Two common examples, named for orientation only: in the United Kingdom, the PRA's supervisory statement SS1/21 on operational resilience and impact tolerances for important business services, with the FCA's matching rules; in the United States, the interagency paper on sound practices to strengthen operational resilience (Federal Reserve SR 20-24, issued 2 November 2020 and revised 2 June 2026). Check each regulator's current text.

2. Governance and organisation

2.1 Management body responsibilities (Article 5(2))

PointDuty (paraphrase)How it is metEvidence
(a)Ultimate responsibility for managing ICT riskFramework approved by management body; ICT risk standing item at risk committee[Minutes reference]
(b)Policies that keep data available, authentic, intact and confidentialApproves ICT security policy set (section 7)[Approval records]
(c)Clear roles and responsibilities for ICT functions, with governance for communication and coordinationApproves section 2.2 RACI[This document, version]
(d)Sets and approves the digital operational resilience strategy, including ICT risk toleranceSections 3 and 4[Resolution reference]
(e)Approves, oversees and reviews the ICT business continuity policy and response and recovery plansYearly approval cycle[Approval records]
(f)Approves and reviews ICT internal audit plans and material changesAudit committee, then management body[Audit plan approval]
(g)Allocates and reviews budget for digital operational resilience, including awareness and trainingAnnual budget line, reviewed mid-year[Budget paper]
(h)Approves and reviews the policy on use of ICT services from third-party providersSection 10[Policy approval]
(i)Reporting channels on third-party arrangements, material changes and at least major ICT-related incidentsQuarterly ICT risk report; ad hoc incident briefings[Report pack]

Article 5(4) requires management body members to keep sufficient knowledge and skills to understand and assess ICT risk, including through regular, specific training. Record the training plan here: [training provider, topics, dates, attendance].

Article 5(3) requires entities other than microenterprises either to establish a role to monitor arrangements with ICT third-party service providers or to designate a senior manager for that exposure. Name the holder: [role, person].

2.2 Roles and responsibilities

ActivityManagement bodyICT risk control function (2nd line)CIO and ICT operations (1st line)CISOBusiness function ownersInternal audit (3rd line)
Approve strategy and toleranceARCCCI
Maintain risk methodologyIACCCI
Identify and assess ICT riskIARRRI
Implement controlsICARRI
Monitor KRIs and toleranceIARRCI
Yearly review and reportARCCCC
Independent audit of frameworkIIIIIA

R responsible, A accountable, C consulted, I informed.

2.3 Control function and lines of defence (Article 6(4))

The ICT risk control function sits in the risk management division and reports to the chief risk officer. It does not operate ICT systems and does not approve its own changes. Internal audit is separate from both the first and second lines. Describe the model in one paragraph and attach the organisation chart: [reference].

Independence test: [state how conflicts are avoided, for example the head of the function has direct access to the risk committee and cannot be dismissed without management body approval].

3. Digital operational resilience strategy

3.1 Strategy elements

PointElement (paraphrase)Content for [Entity]
(a)How the framework supports the business strategy and objectivesExample: Growth in SME lending depends on the digital onboarding channel; the framework prioritises its availability and fraud resistance
(b)ICT risk tolerance level in line with risk appetite, and impact tolerance for ICT disruptionsSection 4
(c)Information security objectives, with key performance indicators and key risk metricsSection 3.2
(d)ICT reference architecture and changes needed to reach business objectivesExample: Move from one primary data centre to an active-active design across two sites by Q4 2027
(e)Mechanisms to detect ICT-related incidents, prevent their impact and protect against itSections 7 and 8
(f)Current digital operational resilience position, based on major ICT-related incidents reported and the effectiveness of preventive measuresSection 3.4
(g)Digital operational resilience testing under DORA Chapter IVSection 11
(h)Communication strategy for ICT-related incidents whose disclosure Article 14 requiresSection 9.2

3.2 Objectives and indicators

IDObjectiveIndicator (KPI or KRI)TargetCurrentStatus
OBJ-01 (Example)Close exposure to known exploited vulnerabilities quicklyShare of critical patches applied within 14 days (KPI)95%91%Amber
OBJ-02 (Example)Keep critical services within impact toleranceNumber of tolerance breaches in 12 months (KRI)01Red
OBJ-03 (Example)Restrict privileged accessPrivileged accounts reviewed each quarter (KPI)100%100%Green
OBJ-04 (Example)Prove recoverabilityCritical services with a successful restore test in 12 months (KPI)100%8 of 9 (89%)Amber
[OBJ-NN][Objective][Indicator][Target][Value][Status]

3.3 Multi-vendor strategy (optional, Article 6(9))

If the entity adopts a multi-vendor ICT strategy, state the key dependencies on ICT third-party service providers and the reasons for the mix of providers. Example: Corvellan Bank AG uses two cloud providers for customer-facing workloads so that the mobile app can run in either; the core banking platform stays with one provider and is covered by the exit plan in the register of information.

3.4 Current resilience position

MeasureLast 12 monthsPrevious 12 monthsComment
Major ICT-related incidents reported to the competent authorityExample: 2Example: 3Classification under Delegated Regulation (EU) 2024/1772
Significant cyber threats notified voluntarily[n][n][Comment]
Preventive control effectiveness (controls tested effective / tested)Example: 46 of 50 (92%)Example: 41 of 48 (85%)Section 12
Open high-severity audit findingsExample: 3Example: 5Section 12.2

4. ICT risk tolerance and impact tolerances

4.1 ICT risk tolerance statements

IDTolerance statementMetric and limitEscalation when breached
TOL-01 (Example)The bank does not accept residual ICT risks rated 10 or higher (on the 5 by 5 scale in section 5.2) without management body acceptanceResidual score of 10 or more needs management body acceptanceRisk committee within 10 business days
TOL-02 (Example)No critical or important function is unavailable longer than its impact toleranceSee section 4.2Immediate incident escalation
TOL-03 (Example)No loss of committed customer transactionsRecovery point objective 0 for payment ledgerCIO and CRO
[TOL-NN][Statement][Limit][Route]

4.2 Impact tolerances for critical or important functions

FunctionCritical or importantMaximum tolerable disruptionRecovery time objectiveRecovery point objectiveBasis
Card authorisation (Example)Yes2 hours1 hour0Scheme rules, customer harm analysis
Retail payments (SEPA credit transfer) (Example)Yes4 hours2 hours0Settlement deadlines
Mobile and online banking (Example)Yes8 hours4 hours15 minutesCustomer impact and complaint volume
Regulatory reporting (Example)Yes3 business days1 business day24 hoursReporting deadlines
[Function][Yes / No][Duration][Duration][Duration][Rationale]

The recovery time objective is shorter than the maximum tolerable disruption so that there is time to detect, decide and invoke before the tolerance is breached. Link each function to its business impact analysis in compliance/business-continuity.

5. ICT risk management policy and methodology

5.1 Policy content (RTS Article 3(1))

PointRequired content (paraphrase)Where in this framework
(a)Indication that the ICT risk tolerance has been approvedSection 4, approval in Document control
(b)Procedure and method for ICT risk assessment: identify vulnerabilities and threats to business functions, ICT systems and assets; quantitative or qualitative indicators for impact and likelihoodSection 5.2
(c)Procedure to identify, implement and document treatment measures, including those to bring risk within toleranceSection 5.3
(d)Residual risk: identify it, assign who may accept risks above tolerance, keep an inventory with justification, review accepted risks at least yearlySection 5.4
(e)Monitor changes in the ICT risk and cyber threat landscape, internal and external vulnerabilities and threats, and ICT risk so changes to the risk profile are detected promptlySections 5.5, 8
(f)Process to take account of changes to the business strategy and the resilience strategySection 13.1

RTS Article 3(2) adds that the treatment procedure monitors the effectiveness of measures, checks whether tolerance levels have been reached, and checks whether corrective or improving actions were taken where needed. Section 5.3 covers these three checks.

5.2 Assessment method

Likelihood and impact are each rated from 1 to 5. The risk score is likelihood multiplied by impact (range 1 to 25). Bands: 1 to 9 within tolerance, 10 to 14 elevated (treat, or accept at management body level under TOL-01), 15 to 25 outside tolerance (treat as a priority).

RatingLikelihood (12-month horizon)Impact (worst credible of financial, customer, regulatory, operational)
1Rare: not expected, under 5%Negligible: no customer impact, loss under EUR 50,000
2Unlikely: 5% to 20%Minor: short disruption inside impact tolerance
3Possible: 20% to 50%Moderate: disruption near tolerance, limited data exposure
4Likely: 50% to 80%Major: tolerance breach for one function, reportable incident
5Almost certain: over 80%Severe: several functions down, large data breach, supervisory action

Example thresholds above are illustrative; calibrate them to the entity's risk appetite and the group risk taxonomy in compliance/risk-methodology.

5.3 Risk assessment and treatment extract

Risk IDRisk (cause, event, consequence)FunctionInherent L x IInherent scoreTreatmentResidual L x IResidual scoreOwnerStatus
ICT-R-001 (Example)Single primary data centre; site loss stops card authorisation beyond toleranceCard authorisation3 x 515Active-active second site (project PRJ-021)2 x 48CIOIn progress
ICT-R-002 (Example)Internet-facing VPN appliance with known exploited vulnerability; intrusion into internal networkAll4 x 416Emergency patch, MFA, appliance replacement2 x 48CISODone
ICT-R-003 (Example)Legacy payment gateway past vendor support; unpatched flaws and no expert staffRetail payments3 x 412Compensating controls (segmentation, extra monitoring); replacement in 20273 x 412Head of paymentsAccepted, see 5.4
ICT-R-004 (Example)Misuse of privileged database accounts; data altered or exfiltratedAll2 x 510Privileged access management, session recording1 x 55CISODone

For each treatment, record the three RTS Article 3(2) checks: is the measure effective (test result), is the risk now within tolerance (residual score), and were further actions taken where needed.

5.4 Accepted residual risk inventory (RTS Article 3(1)(d))

Risk IDResidual scoreAbove tolerance?JustificationAccepted byAcceptance dateNext review
ICT-R-003 (Example)12Yes (TOL-01)Replacement contracted for Q2 2027; compensating controls tested effective; earlier migration would add change risk during peak seasonManagement body, resolution MB-2026-031YYYY-MM-DDYYYY-MM-DD (12 months or earlier on change)
[ICT-R-NNN][n][Yes / No][Reason][Body or role]YYYY-MM-DDYYYY-MM-DD

At each yearly review, confirm for each accepted risk: what has changed, which new mitigations are available, and whether the reasons for acceptance still hold.

5.5 Threat and vulnerability monitoring

SourceFrequencyOwnerFeeds
Threat intelligence feeds and sector information sharing (DORA Article 45 arrangements)ContinuousCISORisk reassessment, detection rules
Vulnerability scans, internal and externalWeeklyICT operationsPatch management, ICT-R entries
Supplier security notificationsOn receiptThird-party riskRegister of information, risk register
Changes in the network or infrastructure (DORA Article 8(3))Each major changeChange advisory boardRisk assessment before change
[Source][Frequency][Owner][Feeds]

6. Identification of functions, assets and dependencies

6.1 What is identified

Under DORA Article 8, the entity identifies, classifies and documents its ICT-supported business functions, roles and responsibilities, the information assets and ICT assets that support them, and their roles and dependencies with respect to ICT risk. It reviews this at least yearly. It identifies all sources of ICT risk, including exposure to and from other financial entities, and assesses the cyber threats and vulnerabilities relevant to its functions and assets. It performs a risk assessment on each major change in network and information system infrastructure and in processes or procedures (Article 8(3)). It runs a specific ICT risk assessment on all legacy ICT systems at least yearly and before and after connecting new technologies, applications or systems (Article 8(7)). Both duties apply to entities other than microenterprises.

6.2 Asset management policy and procedure (RTS Articles 4 and 5)

Required element (paraphrase)Where documentedOwner
Monitoring of ICT assets across their lifecycle[Asset management policy, section][Owner]
Record per asset: unique identifier, location, classification, owner, business functions supported, continuity requirements, external network exposure, links to other assets and functions, end-of-support dates for third-party assets[CMDB field list][Owner]
Risk assessment of legacy ICT systems[Procedure][Owner]
Asset management procedure covering the criteria for criticality of information and ICT assets supporting business functions[Procedure][Owner]

6.3 Function to asset mapping extract

FunctionCritical or importantSupporting ICT assetsThird-party providersInventory reference
Card authorisation (Example)YesCard switch, HSM cluster, fraud scoring serviceCard processor, HSM vendorCMDB-SVC-004
Mobile banking (Example)YesMobile API gateway, identity provider, core banking APIsCloud provider ACMDB-SVC-011
[Function][Yes / No][Assets][Providers][Reference]

Keep this mapping consistent with function identifiers in the register of information (compliance/dora-ict-third-party-register, template B_06.01).

7. Policy and procedure map

7.1 General elements of ICT security policies (RTS Article 2)

Each ICT security policy, procedure, protocol and tool listed below must show: approval by the management body or delegated authority, alignment with the entity's information security objectives, roles and responsibilities, the measures that apply to staff and providers, the exception process, and the review cycle. Check that every row in 7.2 meets these elements before the yearly review.

7.2 Map

AreaRTS articleDocumentOwnerLast approvedNext review
ICT risk management policy and procedures3This framework, section 5Head of ICT riskYYYY-MM-DDYYYY-MM-DD
ICT asset management policy and procedure4, 5[Policy ID]CIOYYYY-MM-DDYYYY-MM-DD
Encryption, cryptographic controls and key management6, 7[Policy ID]CISOYYYY-MM-DDYYYY-MM-DD
ICT operations, capacity and performance8, 9[Policy ID]Head of ICT operationsYYYY-MM-DDYYYY-MM-DD
Vulnerability and patch management10ops/patch-management-policyCISOYYYY-MM-DDYYYY-MM-DD
Data and system security11[Policy ID]CISOYYYY-MM-DDYYYY-MM-DD
Logging12[Policy ID]CISOYYYY-MM-DDYYYY-MM-DD
Network security and information in transit13, 14[Policy ID]Head of networkYYYY-MM-DDYYYY-MM-DD
ICT project management15[Policy ID]PMOYYYY-MM-DDYYYY-MM-DD
Acquisition, development and maintenance16[Policy ID]CIOYYYY-MM-DDYYYY-MM-DD
ICT change management17[Policy ID]Change managerYYYY-MM-DDYYYY-MM-DD
Physical and environmental security18[Policy ID]FacilitiesYYYY-MM-DDYYYY-MM-DD
Human resources policy (ICT aspects)19[Policy ID]HRYYYY-MM-DDYYYY-MM-DD
Identity management and access control20, 21[Policy ID]CISOYYYY-MM-DDYYYY-MM-DD
ICT-related incident management policy22compliance/incident-response-planCISOYYYY-MM-DDYYYY-MM-DD
Anomaly detection and incident detection criteria23[Procedure ID]SOC leadYYYY-MM-DDYYYY-MM-DD
ICT business continuity policy24compliance/business-continuityHead of BCMYYYY-MM-DDYYYY-MM-DD
Testing of ICT business continuity plans25[Test plan ID]Head of BCMYYYY-MM-DDYYYY-MM-DD
ICT response and recovery plans26ops/disaster-recovery-planCIOYYYY-MM-DDYYYY-MM-DD
Backup policy and restoration (DORA Article 12)11, 24ops/backup-policyHead of ICT operationsYYYY-MM-DDYYYY-MM-DD

7.3 Exceptions

Exception IDPolicy and requirementReasonCompensating controlRisk IDApproved byExpiry
EXC-007 (Example)Patch policy, critical patches within 14 daysLegacy payment gateway cannot be patched by vendorNetwork isolation, enhanced monitoringICT-R-003CROYYYY-MM-DD
[EXC-NNN][Policy, clause][Reason][Control][ICT-R-NNN][Role]YYYY-MM-DD

8. Detection, response and recovery

8.1 Detection (DORA Article 10, RTS Article 23)

The entity has mechanisms to detect anomalous activities promptly, including network performance issues and ICT-related incidents, with several layers of control, alert thresholds and criteria that trigger incident response. Describe: monitoring coverage (which systems, which logs), the alert thresholds, the criteria used to escalate an anomaly to an incident, and the link to incident classification under Delegated Regulation (EU) 2024/1772.

Detection layerCoverageTool or serviceOwnerTested
Security monitoring (SOC) (Example)All production systems, identity, cloud control planeSIEM with 24x7 managed serviceSOC leadQuarterly purple-team exercise
Application performance (Example)Customer channels, paymentsAPM and synthetic transactionsHead of ICT operationsMonthly threshold review
[Layer][Coverage][Tool][Owner][Test]

8.2 Response and recovery (DORA Articles 11 and 12, RTS Articles 24 to 26)

ElementRequirement (paraphrase)DocumentLast testResult
ICT business continuity policyDedicated policy, part of the overall business continuity policy, approved by the management bodycompliance/business-continuityn/an/a
Business impact analysisAssess exposure to severe disruption, quantitatively and qualitatively[BIA reference]YYYY-MM-DD[Result]
ICT response and recovery plansPlans per critical or important function, with scenariosops/disaster-recovery-planYYYY-MM-DD[Result]
Testing of plansTested at least yearly and after substantive changes, including cyber-attack scenarios and switchover to redundant capacity (DORA Article 11(6))[Test report]YYYY-MM-DDExample: Card authorisation switchover met 1-hour RTO (52 minutes)
Backup and restorationBackup policies, restoration and recovery methods, segregated backups, restore testsops/backup-policyYYYY-MM-DDExample: 8 of 9 critical services restored within RTO
Crisis management functionActivation criteria, decision rights, communication[Crisis plan]YYYY-MM-DD[Result]

9. Learning, evolving and communication

9.1 Learning and evolving (DORA Article 13)

InputProcessOutputOwner
Major ICT-related incidentsPost-incident review with root cause, within [n] business days of closureLessons log, risk register updates, framework change requestsHead of ICT risk
Resilience testing resultsFindings triageRemediation plan, KRI updatesCISO
Technology and threat developmentsHorizon scanningStrategy update inputCIO, CISO
Staff awareness and trainingYearly programme for all staff, specific training for ICT staff and management bodyCompletion recordsHR, CISO

Senior ICT staff report the lessons learned, with recommendations, to the management body at least yearly (DORA Article 13(5)). ICT security awareness and digital operational resilience training are compulsory modules for all staff and senior management (Article 13(6)).

9.2 Communication (DORA Article 14)

ElementContentOwner
Crisis communication planResponsible disclosure of major ICT-related incidents or significant vulnerabilities to clients, counterparts and the publicHead of communications
Internal communicationWho informs staff, what they are told, by which channelHead of ICT risk
Designated personAt least one person tasked with the communication strategy for ICT-related incidents and public and media relations[Name, role]
Regulatory reportingMajor incident notifications on the DORA clockscompliance/dora-major-incident-report

10. ICT third-party risk link

ItemWhere it livesOwner
Strategy on ICT third-party risk, including the policy on services supporting critical or important functions[Policy ID]Senior manager under Article 5(3)
Register of informationcompliance/dora-ict-third-party-registerHead of third-party risk
Pre-contract assessment and due diligencecompliance/supplier-security-assessmentProcurement
Concentration risk assessment (Article 29)Register of information, section on concentrationHead of third-party risk
Exit strategies for services supporting critical or important functions[Exit plan references]Function owners

Third-party risks appear in the ICT risk register with the provider identifier from the register of information so that both views stay reconciled.

11. Digital operational resilience testing

11.1 Testing programme

Test typeScopeFrequencyLast runNext runReport
Vulnerability assessments and scansAll internet-facing and critical systems[Weekly / Monthly]YYYY-MM-DDYYYY-MM-DD[Ref]
Network security assessmentsCore network, segmentation[Yearly]YYYY-MM-DDYYYY-MM-DD[Ref]
Penetration testsSystems supporting critical or important functionsRisk-based; every system supporting a critical or important function gets appropriate tests at least yearly (Article 24(6))YYYY-MM-DDYYYY-MM-DDsecurity/pentest-report
Scenario-based and switchover testsCritical or important functionsYearlyYYYY-MM-DDYYYY-MM-DD[Ref]
Source code reviewIn-house critical applicationsPer releaseYYYY-MM-DDYYYY-MM-DD[Ref]
Threat-led penetration testing (DORA Article 26)Critical or important functions as scoped with the TLPT authorityAt least every three years, if requiredYYYY-MM-DDYYYY-MM-DDsecurity/red-team-engagement-plan

The DORA Article 25 list of test types includes vulnerability assessments and scans, open source analyses, network security assessments, gap analyses, physical security reviews, questionnaires and scanning software solutions, source code reviews where feasible, scenario-based tests, compatibility testing, performance testing, end-to-end testing and penetration testing. Choose a risk-based mix and explain omissions.

11.2 Independence of testers

Record whether each test is internal or external and how independence is assured (DORA Article 24(4) and, for TLPT, Article 27). [Describe.]

12. Internal audit and follow-up of findings

12.1 Audit coverage

Audit areaLast auditRatingNext auditAuditor qualifications
ICT risk management framework (whole) (Example)2026-03Needs improvement2027-03CISA, two staff with cloud security certification
Business continuity and recovery (Example)2025-11Satisfactory2026-11[Qualifications]
[Area]YYYY-MM[Rating]YYYY-MM[Qualifications]

12.2 Findings follow-up

Finding IDSourceSeverityDescriptionActionOwnerDueVerified closed
AUD-2026-04 (Example)Internal auditHighRestore tests not run for one critical serviceAdd service to quarterly restore scheduleHead of ICT operations2026-09-30[Date, by whom]
AUD-2026-05 (Example)Internal auditHighAccepted residual risks not reviewed in 12 monthsAdd review step to yearly cycle (section 5.4)Head of ICT risk2026-06-30YYYY-MM-DD, internal audit
[ID][Source][Severity][Description][Action][Owner]YYYY-MM-DD[Evidence]

Critical ICT audit findings are verified and remediated on a timeline set in the audit follow-up procedure: [state rule, for example remediation plan within 30 days and closure verified by internal audit].

12.3 Outsourced verification (Article 6(10))

If compliance verification is outsourced to an intra-group or external undertaking, name it, the scope and the contract reference. The entity remains fully responsible.

13. Framework review and review report

13.1 Review triggers and cycle

TriggerResponse
Yearly cycleFull review, report to management body in [month]
Major ICT-related incidentUnscheduled review within [n] business days of the final report; report lists the incidents with root cause analysis
Supervisory instructionReview of the scope instructed; report references the instruction
Testing or audit conclusionsReview of affected sections; report references the conclusions
Change in business strategy or resilience strategy (RTS Article 3(1)(f))Strategy and tolerance review

13.2 Review report outline (RTS Article 27(2))

PointContent (paraphrase)Entry
(a)Introduction: entity and group structure; context of services, organisation, critical functions, strategy, major projects and dependence on ICT; summary of major changes since the previous report; executive summary of current and near-term ICT risk profile, threat landscape, control effectiveness and security posture[Text]
(b)Date the management body approved the reportYYYY-MM-DD
(c)Reason for the review under DORA Article 6(5)[Yearly / Incident / Instruction / Testing or audit]
(d)Start and end dates of the review periodYYYY-MM-DD to YYYY-MM-DD
(e)Function responsible for the review[Function]
(f)Major changes and improvements since the previous review, with their impact on the resilience strategy, the ICT internal control framework and ICT risk governance (Article 27(4))[Text]
(g)Summary of findings, with detailed analysis of the severity of weaknesses, deficiencies and gaps[Table reference]
(h)Measures to address them: remediation summary; expected implementation dates and progress, flagging risk of delay; tools and responsible function (internal or external); impact on budget, staff and resources; how the competent authority is informed where appropriate; where no measure is taken, the criteria used to assess impact, evaluate residual risk and accept it[Table reference]
(i)Planned further developments of the framework[Text]
(j)Conclusions from the review[Text]
(k)Past reviews: list; status of measures from the last report; where past measures were ineffective, how to improve them[Table reference]
(l)Sources: internal audit results; compliance assessments; resilience testing results, including TLPT where applicable; external sources[List]

13.3 Worked summary (Example)

Review period 2025-10-01 to 2026-09-30, yearly cycle plus one unscheduled review after INC-2026-007 (card authorisation outage of 2 hours 40 minutes, against a 2-hour tolerance). Findings: 7 (2 high, 3 medium, 2 low). Measures: 5 completed, 2 in progress, none overdue. Residual risks above tolerance: 1 accepted (ICT-R-003, score 12). Control effectiveness: 46 of 50 controls tested effective (92%).

14. Traceability matrix

Req IDSourceRequirement (short)Framework sectionPolicy or procedureEvidenceStatus
REQ-01DORA Art. 5(2)(d)Management body approves strategy and tolerance3, 4This documentResolution MB-2025-014 (Example)Met
REQ-02DORA Art. 6(4)Independent ICT risk control function2.3Risk function charterCharter, org chartMet
REQ-03DORA Art. 6(5)Yearly review and report13This documentReview report 2026Met
REQ-04DORA Art. 6(8)(c)Security objectives with KPIs and KRIs3.2ICT risk reportQuarterly report packMet
REQ-05RTS Art. 3(1)(d)(iv)Accepted residual risks reviewed yearly5.4This documentInventory review logPartly met (AUD-2026-05)
REQ-06RTS Art. 4Asset records with required attributes6.2Asset policyCMDB field audit[Status]
REQ-07RTS Art. 10Vulnerability and patch management7.2Patch management policyKPI OBJ-01Partly met
REQ-08DORA Art. 11(6) and RTS Art. 25Business continuity plans tested at least yearly8.2BC test planTest reportsPartly met (AUD-2026-04)
REQ-09DORA Art. 6(6), (7)Internal audit and follow-up12Audit charterAudit reports, trackerMet
REQ-10DORA Art. 14Communication strategy and designated person9.2Crisis communication planPlan, appointment letter[Status]
[REQ-NN][Source][Requirement][Section][Document][Evidence][Status]

15. Glossary and references

15.1 Glossary

TermMeaning in this document
ICT riskAny reasonably identifiable circumstance in relation to network and information systems that, if materialised, may compromise their security or the services they support (paraphrase of the DORA definition)
Critical or important functionA function whose disruption would materially impair financial performance, the soundness or continuity of services and activities, or regulatory compliance
ICT risk toleranceThe level of ICT risk the management body is willing to accept, expressed as limits in section 4
Impact toleranceMaximum tolerable disruption of a critical or important function
Major ICT-related incidentAn ICT-related incident with high adverse impact, classified under Delegated Regulation (EU) 2024/1772
Residual riskRisk remaining after treatment measures
TLPTThreat-led penetration testing under DORA Article 26
Three lines of defenceModel separating operational management (first line), risk control (second line) and internal audit (third line)

15.2 References

ReferenceVersion or dateUse
Regulation (EU) 2022/2554 (DORA), OJ L 333, 27.12.2022Applies from 17 January 2025; check the consolidated textArticles 5 to 16, 24 to 30
Commission Delegated Regulation (EU) 2024/1774 (RTS on ICT risk management tools, methods, processes and policies and the simplified framework)Adopted 13 March 2024, OJ L of 25 June 2024Sections 5, 7, 8, 13
Commission Delegated Regulation (EU) 2024/1772 (classification of ICT-related incidents and cyber threats)Check the consolidated textSections 3.4, 8.1
PRA SS1/21, Operational resilience: impact tolerances for important business services (UK)Current version on the Bank of England siteSection 1.5
Federal Reserve SR 20-24, Interagency Paper on Sound Practices to Strengthen Operational Resilience (US)Issued 2 November 2020, revised 2 June 2026Section 1.5

Standard and licence note

Based on Regulation (EU) 2022/2554 (DORA) and Commission Delegated Regulations (EU) 2024/1774 and (EU) 2024/1772, as published in the Official Journal of the European Union, with UK and US operational resilience texts named for orientation only. EU legislative texts are free to reuse. Article and point numbers are cited and requirements are summarised in original wording; no legal text is reproduced. Official text: EUR-Lex, https://eur-lex.europa.eu/eli/reg/2022/2554/oj and https://eur-lex.europa.eu/eli/reg_del/2024/1774/oj. Check the consolidated texts and your competent authority's guidance before use. All organisations, figures and identifiers in the examples are fictional. This is a documentation format, not legal advice. Template licence: MIT.

Modèles associés