ऑटोमोटिव फ़ंक्शनल सेफ़्टी किट
वाहन सुरक्षा और साइबर सुरक्षा विश्लेषण: ISO 26262 HARA, SOTIF, ISO/SAE 21434 TARA और FMEA, केवल उद्धृत संरचना।
3 चरणों में 8 टेम्पलेट, उपयोग के क्रम में। किसी भी टेम्पलेट को एडिटर में खोलें, भरें और PDF, DOCX या HTML में एक्सपोर्ट करें।
आकलन
Hazard Analysis and Risk Assessment (HARA) Template (ISO 26262)
मानकAutomotive HARA: item definition, hazard identification, hazardous events with S/E/C rationale, ASIL, safety goals with safe state and FTTI, SOTIF/PAS 8800/TARA pointers
ISO 26262-3:2018; ISO 21448:2022; ISO/PAS 8800:2024SOTIF Analysis Template (ISO 21448)
पूर्णISO 21448 SOTIF file: ODD, acceptance criteria, functional insufficiencies, triggering conditions, V&V targets, known and unknown scenarios
ISO 21448:2022Software Requirements Specification Template (ISO/IEC/IEEE 29148)
पूर्णFull SRS per ISO/IEC/IEEE 29148:2018 for contract or multi-team work: interfaces, functions, quality attributes, verification matrix, traceability
ISO/IEC/IEEE 29148:2018 (Edition 3 at DIS)
सुरक्षा
Automotive TARA Template (ISO/SAE 21434, UN R155)
पूर्णVehicle cybersecurity TARA: item definition, assets, damage scenarios, SFOP impact, attack paths, feasibility, risk values, treatment, goals, R155 Annex 5 check
ISO/SAE 21434:2021 (cite-only); UN R155, R156PSIRT Vulnerability Handling Procedure Template (ISO/IEC 30111, CVSS v4)
पूर्णProducer-side PSIRT procedure: intake, verification, CVSS v4.0, EPSS, KEV and SSVC triage, remediation targets, advisory and VEX, CVE/CNA, CRA Art. 14, metrics
ISO/IEC 30111:2019 (structure); CVSS v4.0; CISA SSVC; CNA Rules 4.2.0; EU CRA Art. 14SBOM and VEX Policy Template (CISA 2026, CycloneDX, SPDX)
पूर्णSBOM production, signing, VEX rules, distribution, supplier SBOMs, retention, exceptions, metrics, CISA 2026 to CycloneDX and SPDX field map
CISA 2026 SBOM Minimum Elements; CycloneDX 1.7; SPDX 3.0.1; CISA VEX
सत्यापन
Software FMEA Template (IEC 60812)
पूर्णSoftware failure modes, effects, causes, controls, S/O/D scales, RPN and action priority, actions and re-scoring
IEC 60812:2018Verification and Validation Plan Template (IEEE 1012)
पूर्णV&V plan: integrity level scheme, tasks per life-cycle phase, minimum tasks by level, independence, anomalies, reporting, schedule
IEEE 1012-2024