Request for Architecture Work Template (TOGAF 10)

Sponsor request that starts an ADM cycle: problem, goals and drivers, constraints, scope, budget, stakeholders, outputs, intake scoring and decision

आर्किटेक्चरपूर्णTOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1): Request for Architecture Workrequestforwork
एडिटर में खोलें.md डाउनलोड करें

उपयोग कैसे करें: Use it when a sponsor asks the architecture function to start an engagement, before Phase A. Fill the problem, goals, constraints, budget and the questions the sponsor needs answered first; the architecture function then scores the request and records the decision. The main pitfall is a request that names a product instead of an outcome.

प्रीव्यू

Request for Architecture Work: [Request title]

A Request for Architecture Work is the formal ask from a sponsor that starts an architecture engagement. In The TOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1), it is the trigger for a cycle of the Architecture Development Method (ADM), usually raised after the Preliminary Phase has set up the architecture capability and before Phase A (Architecture Vision) begins. This template captures the sponsor, the problem, the goals and drivers, constraints, budget, timeline, stakeholders and expected outputs, then records the intake assessment and the decision of the architecture function. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document ID[RAW-YYYY-NN]
Request title[Request title]
Version[0.1]
Status[Draft / Submitted / In assessment / Accepted / Accepted with changes / Deferred / Merged / Declined / Withdrawn]
Sponsor[@sponsor, title, business unit]
Requester (author)[@requester]
Intake owner (architecture function)[@chief-architect or delegate]
Approvers / reviewers[Sponsor, Architecture Board chair, portfolio office]
Date submittedYYYY-MM-DD
Decision required byYYYY-MM-DD
Classification[Internal / Confidential]
Repository location[Architecture Repository path or ID]
Last updatedYYYY-MM-DD

Approvals

RoleNameDecisionConditionsDate
Sponsor (submits)[@sponsor][Submitted][None]YYYY-MM-DD
Business unit finance partner[@finance][Funding confirmed / Indicative only][Conditions]YYYY-MM-DD
Intake owner[@chief-architect][Recommendation][Conditions]YYYY-MM-DD
Architecture Board chair[@chair][Accepted / Deferred / Merged / Declined][Conditions]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@requester]First draft of problem, goals and constraints
0.2YYYY-MM-DD[@requester]Example: Budget envelope and timeline confirmed with finance; stakeholders added
1.0YYYY-MM-DD[@chief-architect]Example: Accepted with changes by the Architecture Board (outcome record ARB-2026-024); scope narrowed to retail lines

Contents

1. Request summary

FieldValue
Request ID[RAW-YYYY-NN]
One-line askExample: Define a target architecture and roadmap that lets the retail claims business decide simple claims within 48 hours and hold one trusted record per customer
Type of request[New capability / Transformation / Rationalisation / Regulatory response / Technology refresh / Merger or divestment / Other]
Architecture level expected[Strategic / Segment / Capability / Solution]
Requested startYYYY-MM-DD
Requested end of architecture workYYYY-MM-DD
Budget envelope for the resulting changeExample: Up to USD 2.5 million capital over two financial years
Budget for the architecture work itselfExample: Up to USD 320,000 from the claims transformation cost centre

Example summary: Retail claims customers wait 11 days on average for a decision, while competitors settle simple claims in under two days. Customer details are held in three policy systems and a legacy CRM that loses vendor support next year, so handlers re-key data and decisions are made on conflicting records. The Chief Operating Officer asks the architecture function to define a target architecture and a funded roadmap within four months, so that the programme can start delivery in the next financial year inside a USD 2.5 million capital envelope.

2. Sponsor and requesting organisation

FieldValue
Sponsor name and titleExample: [@coo], Chief Operating Officer
Business unitExample: Retail Insurance Operations
Sponsor's authorityExample: Budget holder for claims operations; chairs the claims transformation steering group
Business owner (day to day)Example: [@head-of-claims], Head of Claims
Requester and contact[@requester, e-mail or chat handle]
Funding sourceExample: Claims transformation cost centre CC-4410 (architecture work); capital plan line CAP-27-12 (delivery)
Portfolio or programme linkExample: Strategic theme "Customer first" in the three-year plan

2.1 Sponsor commitments

By submitting this request the sponsor agrees to:

  1. Attend the Phase A kick-off and each Architecture Board gate where the engagement is reviewed.
  2. Nominate business subject-matter experts and release them for the time stated in section 8.2.
  3. Make scope and priority decisions within five working days when the lead architect escalates them.
  4. Accept or reject the resulting Statement of Architecture Work and the final deliverables in writing.

Strike any commitment the sponsor cannot make and explain why in a note under this list; the intake assessment in section 12 will weigh it.

3. Problem, opportunity and mission alignment

3.1 Problem or opportunity statement

[Describe the problem or opportunity in two or three paragraphs. Quote measurements where you have them and say where they come from.]

Example: The retail claims operation handles about 140,000 motor and home claims a year. Average time to a decision is 11 days; customer research shows that most policyholders expect a decision on a simple claim within two days. Handlers use five systems per claim and re-key customer details between them, which causes about one claim in twelve to be reopened because of wrong contact or bank details.

The legacy CRM that holds the customer contact history reaches the end of vendor support in [month YYYY]. The three policy systems each keep their own customer records, synchronised by nightly files, so there is no single answer to "who is this customer and what cover do they hold".

3.2 Alignment with mission and strategy

Strategy elementHow this request supports itSource
Example: Mission: "Help customers recover quickly after a loss"Faster decisions on simple claims are the most visible proof of the missionCorporate mission statement
Example: Three-year plan theme "Customer first"One trusted customer view is a stated prerequisite of the themeStrategic plan YYYY to YYYY, section 4
Example: Cost programme target of 15% lower operating costLess re-keying and fewer reopened claims lower cost per claimFinance plan YYYY
[Strategy element][Contribution][Document and section]

3.3 Stated preferences and prior ideas

Record any solution ideas the sponsor already holds, so that Phase A can test them openly instead of discovering them late.

Example: The Head of Claims has seen a demonstration of a cloud claims package and would like it assessed. The IT department has a draft proposal to replace the legacy CRM like for like. Neither is a decision; both will be considered as options in Phase E.

3.4 Consequence of doing nothing

Example: Decision times stay above competitors and complaint volumes keep rising by an estimated 8% a year; the legacy CRM runs unsupported after [month YYYY], which the risk function rates as a high operational risk; and the cost programme target is missed by the claims operation.

4. Business goals and drivers

4.1 Drivers

IDDriverTypeEvidence
DRV-01 (Example)Competitors settle simple claims in under 48 hoursMarketCustomer research YYYY
DRV-02 (Example)Supervisory expectations on operational resilience of outsourced ITRegulatoryRegulator letter YYYY-MM-DD
DRV-03 (Example)End of vendor support for the legacy CRMTechnologyVendor notice
DRV-04 (Example)Operating cost per claim above industry medianFinancialBenchmark study YYYY
[DRV-nn][Driver][Market / Regulatory / Financial / Technology / Social / Environmental][Evidence]

4.2 Goals

IDGoalIndicative measureTarget known?Driver
BG-01 (Example)Faster claims decisionsShare of simple claims decided within 48 hoursDirection only; Phase A to set the targetDRV-01
BG-02 (Example)One trusted view of the customerCustomers with one golden record across policy linesDirection onlyDRV-01, DRV-03
BG-03 (Example)Lower cost to serveOperating cost per claimYes: 20% lower than the YYYY baselineDRV-04
BG-04 (Example)Resilient outsourced servicesCritical third-party services with tested exit plansYes: all of themDRV-02
[BG-nn][Goal][Measure][Yes / Direction only][DRV-nn]

5. Constraints and assumptions

5.1 Constraints

IDConstraintTypeSource
CNS-01 (Example)Capital for the resulting change is capped at USD 2.5 millionFinancialCapital plan line CAP-27-12
CNS-02 (Example)Customer personal data must remain in the EULegalGroup data protection policy
CNS-03 (Example)Policy administration contract renews on YYYY-MM-DDContractualVendor contract schedule
CNS-04 (Example)No cut-overs during the year-end claims peakOperationalClaims operations calendar
[CNS-nn][Constraint][Financial / Legal / Contractual / Operational / Technical / Organisational][Source]

5.2 Assumptions

IDAssumptionOwnerCheck by
ASM-01 (Example)The existing cloud landing zone is approved for confidential data[@platform-lead]YYYY-MM-DD
ASM-02 (Example)Claims subject-matter experts can be released two days per week during Phase B[@head-of-claims]YYYY-MM-DD
[ASM-nn][Assumption][@owner]YYYY-MM-DD

5.3 Principles and policies that apply

List enterprise principles and policies the requester already knows will shape the answer. The full catalogue is maintained in the Architecture Principles Catalogue (architecture/architecture-principles).

Example: BP-02 Reuse before buy before build; DP-01 Data has one accountable owner and one master source; TP-01 Prefer managed services on approved platforms; the group outsourcing policy for critical services.

6. Requested scope

DimensionRequested in scopeRequested out of scopeNotes
Enterprise breadthExample: Retail and commercial claims, all EU marketsLife productsIntake may narrow this
Business capabilitiesExample: Claims intake, assessment, settlement; customer managementUnderwriting, reinsurance
Architecture domainsExample: Business, data, application, technologyPhysical facilities
DepthExample: Enough to fund and plan projectsDetailed solution design
Time horizonExample: Target state 24 months from approvalBeyond 36 months
External partiesExample: Repair network and loss adjusters at interface levelPartner internal systems
[Dimension][In scope][Out of scope][Notes]

6.1 Questions the sponsor needs answered

List the decisions the sponsor must be able to make at the end of the architecture work. These become the backbone of the Statement of Architecture Work.

  1. Example: Should the claims platform be replaced, extended or bought as a service, and in what order relative to the customer data work?
  2. Example: Where should the master customer record live, and which systems must change to use it?
  3. Example: Can the legacy CRM be retired before its support ends, and what does that require?
  4. Example: What is the realistic cost and sequence of the change within the capital envelope?
  5. [Question]

7. Stakeholders

IDStakeholderInterest in the requestExpected involvement
SH-01 (Example)Chief Operating OfficerSponsor; owns claims cycle time and costSteering, approvals
SH-02 (Example)Head of ClaimsBusiness owner; staff and process impactWeekly working sessions
SH-03 (Example)Chief Information Security OfficerData protection and third-party riskReview at each gate
SH-04 (Example)Data Protection OfficerLawful basis, retention, data subject rightsPrivacy checkpoints
SH-05 (Example)Head of IT OperationsSupportability, run cost, skillsArchitecture reviews
SH-06 (Example)Claims handlersDaily users of the changeUser research and demos
[SH-nn][Stakeholder][Interest][Involvement]

Use the stakeholder register (project/stakeholder-register) when the list grows beyond a dozen entries.

8. Budget, resources and timeline

8.1 Funding

ItemAmountStatusSource
Architecture work (Phases A to F)Example: Up to USD 320,000ApprovedCost centre CC-4410
Resulting change (delivery)Example: Up to USD 2.5 million capitalIndicative; final approval after the roadmapCapital plan line CAP-27-12
Contingency for the architecture workExample: About 10%, included in the USD 320,000 and released by the sponsorApprovedCost centre CC-4410
[Item][Amount][Approved / Indicative][Source]

8.2 People the business will provide

RolePerson or teamTime availablePeriod
Example: Claims process expertsTwo senior handlersTwo days per week eachWeeks 1 to 10
Example: Finance analystClaims finance teamHalf a day per weekWeeks 1 to 15
Example: Data steward for customer dataCustomer operationsOne day per weekWeeks 3 to 12
[Role][Name or team][Time][Period]

8.3 Timeline

MilestoneRequested dateDriving event
Architecture work startsExample: YYYY-MM-DDBudget available from the new quarter
Target architecture and roadmap ready for investment decisionExample: YYYY-MM-DDCapital committee meets on this date
Legacy CRM retiredExample: YYYY-MM-DDEnd of vendor support
[Milestone]YYYY-MM-DD[Event]

9. Existing architecture and related work

ItemTypeLocationRelevance
Example: Group strategic architecture SA-2026Strategic architecture[Repository path]This work must conform to it
Example: Claims capability map, version 2.1Business architecture[Repository path]Starting point for Phase B (architecture/business-capability-map)
Example: Customer data study (YYYY)Prior study[Link]Profiling of duplicate records in policy systems
Example: Distribution segment architecture engagementParallel engagement[Link]Shares the customer domain; agree ownership early
Example: Cloud landing zone designPlatform[Link]Target hosting option (architecture/landing-zone-design)
[Item][Type][Location][Relevance]

9.1 Decisions already taken

Record decisions that the engagement must treat as fixed, with their reference. Example: the group has decided that all new customer-facing services run on the approved cloud platform (decision record ADR-004). If the sponsor wants any of these reopened, say so here so the board can decide whether that is in scope.

10. Expected outputs and success

10.1 Expected outputs

OutputPurpose for the sponsorExpected by
Example: Architecture Vision and Statement of Architecture WorkAgree direction, scope, plan and acceptanceWeek 3
Example: Architecture Definition DocumentBaseline, target and gaps per domainWeek 11
Example: Architecture Requirements SpecificationMeasurable requirements for delivery projectsWeek 11
Example: Architecture Roadmap with Transition ArchitecturesSequence, cost and value per incrementWeek 15
Example: Investment paper inputFigures for the capital committeeWeek 15
[Output][Purpose][Week or date]

10.2 What success looks like

Example: The capital committee can approve the first two work packages with confidence in cost and sequence; the claims, data and IT leaders agree on where the customer master lives; and the legacy CRM retirement has a dated plan that the risk function accepts.

11. Risks and urgency

11.1 Urgency

FactorRatingReason
Regulatory or legal deadlineExample: MediumSupervisory review of outsourcing planned for next year
Contract or support deadlineExample: HighLegacy CRM support ends and policy contract renews within 18 months
Financial impact of delayExample: MediumCost target slips by one year for each year of delay
Customer or reputational impactExample: HighComplaint volumes rising
[Factor][High / Medium / Low][Reason]

11.2 Known risks to the architecture work

IDRiskLikelihoodImpactSuggested response
RRK-01 (Example)Business experts unavailable during the regulatory remediationMediumHighAgree release dates with the Head of Claims before Phase A
RRK-02 (Example)Ownership of the customer domain disputed with the distribution segmentHighMediumBoard to rule on ownership at intake
RRK-03 (Example)Data needed for the baseline is held by a vendor and slow to obtainMediumMediumRequest data extracts in week 1
[RRK-nn][Risk][H / M / L][H / M / L][Response]

12. Intake assessment and decision

12.1 Completeness check

CheckResultComment
Sponsor with budget authority named and committed[Yes / No]
Problem stated with evidence[Yes / No]
Goals and drivers listed with IDs[Yes / No]
Constraints and their sources recorded[Yes / No]
Funding for the architecture work approved[Yes / No]
Business people and their time identified[Yes / No]
Related work and prior decisions listed[Yes / No]
Questions the sponsor needs answered listed[Yes / No]

A request with two or more "No" answers is returned to the requester before scoring.

12.2 Assessment criteria and score

Score each criterion from 1 (low) to 5 (high). The criteria, weights and bands are set in section 5.4 of the Architecture Board charter (architecture/architecture-governance-charter), with a description of what a top score looks like for each; do not change them per request.

CriterionWeight (Example)ScoreWeightedEvidence
Strategic alignment25%Example: 51.25Section 3.2
Business value at stake20%Example: 40.80Sections 3.1, 4.2
Urgency15%Example: 40.60Section 11.1
Architecture significance (cross-domain, cross-unit, long life)20%Example: 51.00Sections 6, 9
Readiness (sponsor, funding, people)20%Example: 30.60Sections 2, 8
Total100%4.25 of 5

Example interpretation: a total of 4.0 or more is a candidate for a full engagement; 2.5 to 3.9 suggests a lighter engagement or a solution-level review; below 2.5 is usually declined or handled outside the architecture function. These are the bands in charter section 5.4; change them there, not here.

12.3 Decision outcomes

OutcomeUse whenWhat happens next
AcceptComplete, significant and readyLead architect assigned; Phase A starts
Accept with changesWorth doing but scope, timing or level must changeChanges recorded in section 12.4; requester confirms
MergeOverlaps an engagement already under wayRequest folded into that engagement's scope through its change procedure
DeferWorth doing but capacity or readiness is missing nowNew intake date set; conditions to meet listed
RedirectDoes not need enterprise or segment architectureRouted to a solution architecture review (architecture/architecture-review-request) or to the project
DeclineNot aligned or not justifiedReasons given in writing to the sponsor

12.4 Decision record

FieldValue
DecisionExample: Accept with changes
Decided byExample: Architecture Board, outcome record ARB-2026-024
Decision dateYYYY-MM-DD
Changes to the requestExample: Breadth narrowed to retail motor and home claims; commercial claims to follow as a separate request after the target is approved
ConditionsExample: C1: the board rules that the customer domain model is owned by this engagement and reused by the distribution segment. C2: the Head of Claims confirms expert release dates before kick-off
Assigned lead architect[@lead-architect]
Architecture capability usedExample: Enterprise architecture team, claims and customer domain
ReasonsExample: Score 4.25; high strategic alignment and a hard support deadline; readiness lowered by the parallel regulatory remediation

13. Next steps and hand-off

StepOwnerDueOutput
1. Confirm the lead architect and core team[@chief-architect]Example: Decision date plus 5 working daysNamed team
2. Meet the sponsor to confirm changes and conditions[@lead-architect]Decision date plus 10 working daysConfirmed scope position
3. Hold the Phase A kick-off with key stakeholders[@lead-architect]YYYY-MM-DDStakeholder map, concerns
4. Draft the Architecture Vision[@lead-architect]YYYY-MM-DDarchitecture/togaf-architecture-vision
5. Draft and agree the Statement of Architecture Work[@lead-architect]YYYY-MM-DDarchitecture/statement-of-architecture-work
6. Register the engagement in the architecture portfolio[@ea-office]YYYY-MM-DDPortfolio entry
[Step][@owner]YYYY-MM-DD[Output]

Each later deliverable cites this request ID in its Document control so that the chain from request to vision, statement of work, definition and roadmap can be followed in the repository. If the scope changes materially after acceptance, raise an Architecture Change Request (architecture/architecture-change-request) rather than editing this request.

13.1 Intake checklist for the architecture function

  • Request ID allocated and stored in the repository
  • Overlap with running engagements checked in the portfolio
  • Applicable principles, standards and reference architectures listed
  • Decision recorded with reasons and conditions
  • Sponsor informed in writing within two working days of the decision
  • Lead architect named, or a deferral date set

14. Glossary and references

14.1 Glossary

TermMeaning in this document
ADMArchitecture Development Method, the iterative cycle of phases at the centre of the TOGAF Standard
Architecture engagementA bounded piece of architecture work with its own sponsor, scope, plan and deliverables
Architecture BoardThe governance body that decides on architecture work, compliance and exceptions
IntakeThe assessment of a new request before any architecture work is committed
Preliminary PhaseThe ADM phase that prepares the organisation's architecture capability, principles and governance
SponsorThe accountable executive who funds the work and accepts its results
Statement of Architecture WorkThe agreement that sets scope, approach, plan and acceptance for an accepted request
[Term][Meaning]

14.2 References

IDReferenceVersion / date
REF-01The TOGAF Standard, 10th Edition (The Open Group, catalogue C220), incorporating Technical Corrigendum 1 (U254, 15 May 2025)19 May 2025
REF-02Architecture Vision (architecture/togaf-architecture-vision)[x.y]
REF-03Statement of Architecture Work (architecture/statement-of-architecture-work)[x.y]
REF-04Architecture Board Charter (architecture/architecture-governance-charter)[x.y]
REF-05Architecture Principles Catalogue (architecture/architecture-principles)[x.y]
REF-06Business case for the resulting change (business/business-case)[x.y]
REF-07[Corporate strategy or business plan][x.y]

Standard and licence note

Structure aligned with The TOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1), published by The Open Group: the Request for Architecture Work that triggers a cycle of the Architecture Development Method, following the Preliminary Phase and leading into Phase A. TOGAF and ArchiMate are registered trademarks of The Open Group. This template uses only the names of phases and deliverables; all text is original. It was written from general professional practice, without reading, quoting, paraphrasing or summarising the text of the standard, and it reproduces no definitions, tables or lists from it. The intake criteria, weights and decision outcomes are suggestions of this template, not requirements of the standard. Check the current edition and any technical corrigenda at opengroup.org and obtain the standard for its own guidance. Template licence: MIT.