Markdown Editor

Finance Formula Sheet Template (KaTeX)

KaTeX formulas for TVM, returns, statistics, portfolio and performance ratios, VaR and ES, bonds and duration, equity valuation, WACC and ratios, derivatives, 26 worked checks

वित्त, निवेश और लेखांकनपूर्णformulasheetmath
एडिटर में खोलें.md डाउनलोड करें

उपयोग कैसे करें: Use it when you study for a finance exam or keep a desk reference of core formulas. Fill the notation and conventions first, then rewrite blocks in your own notation and reproduce every worked check on your calculator. The main pitfall is a mismatch of conventions, such as an annual rate used with monthly periods or Macaulay duration used as a price sensitivity.

प्रीव्यू

Finance Formula Sheet: [Course, exam or desk]

A personal formula reference for core finance mathematics, written in KaTeX: time value of money, returns, statistics and risk, portfolio and performance measures, risk measures, fixed income, equity valuation, corporate finance and ratios, and derivatives basics. Each block gives the formula, the notation, when to use it and the most common mistake, followed by a table of worked checks you can reproduce on a calculator. The formulas are general financial mathematics found in many textbooks; the notation, wording and examples here are original, and no exam curriculum text is used. Replace every [bracketed] value and every row marked Example. This is a document format, not financial, investment, tax or accounting advice.

Document control

FieldValue
Document ID[FORM-001]
Course, exam or desk[Course code / exam and level / desk]
Notation convention[This sheet / course notation]
Rate convention[Decimal rates, annual unless stated]
Compounding default[Annual / semi-annual / continuous]
Day count default[30/360 / Actual/365 / Actual/360 / Actual/Actual]
Calculator[Model]
Version[0.1]
Status[Draft / In use / Archived]
Owner[@owner]
Approvers/reviewers[@study-partner or @desk-head]
Last updatedYYYY-MM-DD
Classification[Personal / Internal]

Approvals

RoleNameDecisionDate
Owner[@owner]Checked all worked examplesYYYY-MM-DD
Reviewer (optional)[@name][Reviewed / Corrections requested]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@owner]First draft
1.0YYYY-MM-DD[@owner]Example: All worked checks reproduced on calculator
1.1YYYY-MM-DD[@owner]Example: Added continuous compounding variants for derivatives

Contents

1. Notation and conventions

SymbolMeaning
PVPV, FVFVPresent value, future value
CtC_t or CFtCF_tCash flow at the end of period tt
rrDiscount rate or required return per period (decimal)
nn, TTNumber of periods; time in years
mmCompounding periods per year
ggConstant growth rate
RpR_p, RfR_f, RmR_m, RbR_bPortfolio, risk-free, market and benchmark returns
σ\sigma, σ2\sigma^2Standard deviation, variance
ρ\rhoCorrelation coefficient
β\betaBeta (sensitivity to the market or a factor)
wiw_iPortfolio weight of asset ii
yyYield to maturity per period
tct_cCorporate tax rate
SS, KKSpot price of the underlying, strike or delivery price
cc, ppEuropean call and put prices
qqContinuous dividend or income yield (forward pricing)
π\pi, πu\pi_uInflation rate; risk-neutral probability of the up move (binomial model)
rlog⁡r^{\log}Log (continuously compounded) return
DtD_t; DD; DMacD_{\text{Mac}}, DmodD_{\text{mod}}, DeffD_{\text{eff}}Dividend in period tt; market value of debt; Macaulay, modified and effective duration
EEMarket value of equity

Conventions used throughout unless a block says otherwise:

  • Rates are decimals: 5% is written 0.05.
  • Cash flows occur at the end of each period (ordinary annuity).
  • The rate and the period must match: with monthly periods, use the monthly rate.
  • Money amounts are written with the currency code, for example USD 1,000 or EUR 1,000.
  • Bond prices are per 100 of face value.
  • Continuous compounding uses ee, the base of natural logarithms.

2. Time value of money

Future and present value of a single sum. Use for one cash flow moved through time.

FV=PV×(1+r)nPV=FV(1+r)nFV = PV \times (1 + r)^n \qquad PV = \frac{FV}{(1 + r)^n}

Effective annual rate. Use to compare rates quoted with different compounding. A stated annual rate rsr_s compounded mm times a year, or continuously:

EAR=(1+rsm)m−1EARcont=ers−1EAR = \left(1 + \frac{r_s}{m}\right)^m - 1 \qquad EAR_{\text{cont}} = e^{r_s} - 1

Pitfall: comparing a monthly-compounded loan rate with an annually compounded deposit rate without converting both to an effective rate.

Ordinary annuity. Equal payments PMTPMT at the end of each of nn periods:

PV=PMT×1−(1+r)−nrFV=PMT×(1+r)n−1rPV = PMT \times \frac{1 - (1 + r)^{-n}}{r} \qquad FV = PMT \times \frac{(1 + r)^n - 1}{r}

Annuity due. Payments at the start of each period: multiply the ordinary annuity value by (1+r)(1 + r).

Loan payment. Solve the annuity formula for the payment; use for mortgages and amortising loans:

PMT=PV×r1−(1+r)−nPMT = \frac{PV \times r}{1 - (1 + r)^{-n}}

Perpetuity and growing perpetuity. First payment at the end of period 1, growth g<rg < r:

PV=CrPV=C1r−gPV = \frac{C}{r} \qquad PV = \frac{C_1}{r - g}

Growing annuity. nn payments starting with C1C_1 and growing at gg, with g≠rg \neq r:

PV=C1r−g[1−(1+g1+r)n]PV = \frac{C_1}{r - g}\left[1 - \left(\frac{1 + g}{1 + r}\right)^n\right]

Net present value and internal rate of return. NPV discounts every cash flow, including the initial outlay at t=0t = 0. IRR is the rate that sets NPV to zero; it has no closed form and is solved by iteration or a calculator.

NPV=∑t=0nCt(1+r)t0=∑t=0nCt(1+IRR)tNPV = \sum_{t=0}^{n} \frac{C_t}{(1 + r)^t} \qquad 0 = \sum_{t=0}^{n} \frac{C_t}{(1 + IRR)^t}

Pitfalls: a project with sign changes in its cash flows after the start can have more than one IRR or none; when two projects are mutually exclusive, choose by NPV, not IRR, because IRR ignores scale.

3. Returns

Holding period return. Price change plus income, divided by the starting price:

HPR=P1−P0+D1P0HPR = \frac{P_1 - P_0 + D_1}{P_0}

Arithmetic and geometric mean. For returns R1,…,RnR_1, \dots, R_n:

RˉA=1n∑t=1nRtRˉG=[∏t=1n(1+Rt)]1/n−1\bar{R}_A = \frac{1}{n}\sum_{t=1}^{n} R_t \qquad \bar{R}_G = \left[\prod_{t=1}^{n}(1 + R_t)\right]^{1/n} - 1

The geometric mean is never above the arithmetic mean; the gap grows with volatility. Use the arithmetic mean as an estimate of a single future period's expected return, and the geometric mean to describe past compound growth.

Annualising. A return RR earned over nn years, or over dd days of a 365-day year:

Rannual=(1+R)1/n−1Rannual=(1+R)365/d−1R_{\text{annual}} = (1 + R)^{1/n} - 1 \qquad R_{\text{annual}} = (1 + R)^{365/d} - 1

Pitfall: annualising a return over a few days or weeks produces misleading numbers; many performance reports do not annualise periods shorter than one year.

Log (continuously compounded) return. Written rlog⁡r^{\log} so that it is not confused with the discount rate rr. Log returns add up over time:

rlog⁡=ln⁡(1+R)=ln⁡P1+D1P0r^{\log} = \ln(1 + R) = \ln\frac{P_1 + D_1}{P_0}

Real return (Fisher relation). Nominal return RR, inflation π\pi:

1+Rreal=1+R1+πRreal≈R−π1 + R_{\text{real}} = \frac{1 + R}{1 + \pi} \qquad R_{\text{real}} \approx R - \pi

Time-weighted return (TWR). Split the period at each external cash flow, compute each sub-period return RiR_i (ending value before the flow divided by starting value after the previous flow, minus one) and chain-link them. TWR removes the effect of the timing of client contributions and withdrawals, so it is the standard measure of a manager's skill.

TWR=∏i=1k(1+Ri)−1TWR = \prod_{i=1}^{k}(1 + R_i) - 1

Money-weighted return (MWR). The internal rate of return of the investor's cash flows, with the ending value as the final inflow. It reflects the investor's timing decisions, so it can differ a lot from TWR when large flows happen before strong or weak periods. From the investor's side, contributions (including the starting value) are negative and withdrawals and the ending value are positive:

0=∑t=0nCFt(1+MWR)t0 = \sum_{t=0}^{n}\frac{CF_t}{(1 + MWR)^t}

4. Statistics and regression

Sample variance and standard deviation. For nn observations with mean Xˉ\bar{X}:

s2=1n−1∑i=1n(Xi−Xˉ)2s=s2s^2 = \frac{1}{n - 1}\sum_{i=1}^{n}(X_i - \bar{X})^2 \qquad s = \sqrt{s^2}

Covariance and correlation.

Cov⁡(X,Y)=1n−1∑i=1n(Xi−Xˉ)(Yi−Yˉ)ρXY=Cov⁡(X,Y)σXσY\operatorname{Cov}(X, Y) = \frac{1}{n - 1}\sum_{i=1}^{n}(X_i - \bar{X})(Y_i - \bar{Y}) \qquad \rho_{XY} = \frac{\operatorname{Cov}(X, Y)}{\sigma_X \sigma_Y}

Annualising volatility. If returns are independent over time, variance scales with time, so standard deviation scales with the square root of time:

σannual=σmonthly12σannual=σdaily252\sigma_{\text{annual}} = \sigma_{\text{monthly}}\sqrt{12} \qquad \sigma_{\text{annual}} = \sigma_{\text{daily}}\sqrt{252}

Use the number of trading days your source uses (252 is common for equities).

Simple linear regression (ordinary least squares). For Yi=b0+b1Xi+εiY_i = b_0 + b_1 X_i + \varepsilon_i:

b^1=Cov⁡(X,Y)Var⁡(X)b^0=Yˉ−b^1Xˉ\hat{b}_1 = \frac{\operatorname{Cov}(X, Y)}{\operatorname{Var}(X)} \qquad \hat{b}_0 = \bar{Y} - \hat{b}_1\bar{X}

Coefficient of determination and t-statistic.

R2=1−SSESSTt=b^1−b1H0sb^1R^2 = 1 - \frac{SSE}{SST} \qquad t = \frac{\hat{b}_1 - b_1^{H_0}}{s_{\hat{b}_1}}

where SSESSE is the sum of squared residuals and SSTSST the total sum of squares around the mean of YY. In a simple regression, R2R^2 equals the squared correlation between XX and YY.

Standardised value (z-score). Distance from the mean in standard deviations: z=(X−μ)/σz = (X - \mu)/\sigma.

5. Portfolio and performance measures

Two-asset portfolio. Expected return and variance:

E(Rp)=w1E(R1)+w2E(R2)E(R_p) = w_1 E(R_1) + w_2 E(R_2)
σp2=w12σ12+w22σ22+2w1w2ρ12σ1σ2\sigma_p^2 = w_1^2\sigma_1^2 + w_2^2\sigma_2^2 + 2 w_1 w_2 \rho_{12}\sigma_1\sigma_2

Many assets (matrix form). With weight vector w\mathbf{w} and covariance matrix Σ\Sigma: σp2=w⊤Σ w\sigma_p^2 = \mathbf{w}^\top \Sigma\, \mathbf{w}.

Beta. Sensitivity of an asset to the market:

βi=Cov⁡(Ri,Rm)σm2=ρimσiσm\beta_i = \frac{\operatorname{Cov}(R_i, R_m)}{\sigma_m^2} = \rho_{im}\frac{\sigma_i}{\sigma_m}

Capital asset pricing model (CAPM). Required return given beta:

E(Ri)=Rf+βi[E(Rm)−Rf]E(R_i) = R_f + \beta_i\left[E(R_m) - R_f\right]

Sharpe ratio and Treynor ratio. Excess return per unit of total risk and per unit of systematic risk:

Sp=Rp−RfσpTp=Rp−RfβpS_p = \frac{R_p - R_f}{\sigma_p} \qquad T_p = \frac{R_p - R_f}{\beta_p}

Jensen's alpha. Return above the CAPM prediction:

αp=Rp−[Rf+βp(Rm−Rf)]\alpha_p = R_p - \left[R_f + \beta_p(R_m - R_f)\right]

Tracking error and information ratio. Active return over its volatility:

TE=σ(Rp−Rb)IR=Rˉp−RˉbTETE = \sigma(R_p - R_b) \qquad IR = \frac{\bar{R}_p - \bar{R}_b}{TE}

Sortino ratio. Excess return over a target RtargetR_{\text{target}} per unit of downside deviation σd\sigma_d (volatility of returns below the target only):

Sortino=Rp−Rtargetσd\text{Sortino} = \frac{R_p - R_{\text{target}}}{\sigma_d}

M-squared. Portfolio return scaled to the market's volatility, comparable directly with the market return:

M2=Rf+Sp σmM^2 = R_f + S_p\,\sigma_m

Pitfall: a high Sharpe ratio built on strategies with rare large losses (selling options, for example) can hide tail risk that standard deviation does not capture; pair it with the measures in section 6.

6. Risk measures

Parametric (variance-covariance) VaR. For a position of value VV, return volatility σ\sigma over the horizon, expected return assumed zero, and the standard normal quantile zαz_\alpha (1.645 at 95%, 2.326 at 99%):

VaRα=zα σ V\text{VaR}_\alpha = z_\alpha \,\sigma\, V

Scaling to a longer horizon. Under independent, identically distributed returns:

VaRh-day=VaR1-dayh\text{VaR}_{h\text{-day}} = \text{VaR}_{1\text{-day}}\sqrt{h}

Expected shortfall (normal distribution). The average loss in the tail beyond the VaR level, with ϕ\phi the standard normal density:

ESα=σVϕ(zα)1−αES_\alpha = \sigma V \frac{\phi(z_\alpha)}{1 - \alpha}

Historical simulation VaR. Sort past portfolio profit and loss outcomes and read the loss at the chosen percentile. It needs no distribution assumption but depends entirely on the chosen look-back window.

Maximum drawdown. The largest fall from a running peak to a later trough, as a percentage of the peak:

MDD=max⁡t(max⁡s≤tVs−Vtmax⁡s≤tVs)MDD = \max_{t}\left(\frac{\max_{s \le t} V_s - V_t}{\max_{s \le t} V_s}\right)

Backtesting VaR (counting days when the loss exceeded VaR) is covered in VaR Backtesting Report (finance/var-backtesting-report).

7. Fixed income

Bond price. Coupon CC per period, face value FF, nn periods, yield yy per period:

P=∑t=1nC(1+y)t+F(1+y)n=C 1−(1+y)−ny+F(1+y)nP = \sum_{t=1}^{n}\frac{C}{(1 + y)^t} + \frac{F}{(1 + y)^n} = C\,\frac{1 - (1 + y)^{-n}}{y} + \frac{F}{(1 + y)^n}

For semi-annual coupons, use half the annual coupon, half the annual yield and twice the number of years.

Current yield. Annual coupon divided by clean price. It ignores the pull to par and is not a total return measure.

Accrued interest and full price. Accrued interest is the coupon times the fraction of the coupon period elapsed, using the bond's day count convention. The full (dirty) price is the clean price plus accrued interest.

Macaulay and modified duration. Weighted average time to the cash flows, then converted to price sensitivity:

DMac=1P∑t=1nt⋅CFt(1+y)tDmod=DMac1+yD_{\text{Mac}} = \frac{1}{P}\sum_{t=1}^{n}\frac{t \cdot CF_t}{(1 + y)^t} \qquad D_{\text{mod}} = \frac{D_{\text{Mac}}}{1 + y}

With semi-annual periods, DMacD_{\text{Mac}} comes out in half-years; divide by 2 for years.

Effective duration. For bonds with embedded options or when cash flows change with rates, reprice with yields down and up by Δy\Delta y:

Deff=P−−P+2P0 ΔyD_{\text{eff}} = \frac{P_{-} - P_{+}}{2 P_0 \,\Delta y}

Convexity. For annual periods:

Convexity=1P(1+y)2∑t=1nt(t+1) CFt(1+y)t\text{Convexity} = \frac{1}{P(1 + y)^2}\sum_{t=1}^{n}\frac{t(t + 1)\,CF_t}{(1 + y)^t}

With semi-annual periods (yy the semi-annual yield, tt in half-years), divide the result by 4 (m2m^2) to express convexity in years.

Price change approximation.

ΔPP≈−Dmod Δy+12 Convexity (Δy)2\frac{\Delta P}{P} \approx -D_{\text{mod}}\,\Delta y + \frac{1}{2}\,\text{Convexity}\,(\Delta y)^2

Price value of a basis point (PVBP or DV01). The price change for a one basis point change in yield: PVBP≈Dmod×P×0.0001\text{PVBP} \approx D_{\text{mod}} \times P \times 0.0001.

Spot and forward rates. With annual spot rates z1z_1 and z2z_2, the one-year rate one year forward, f1,1f_{1,1}, satisfies:

(1+z2)2=(1+z1)(1+f1,1)(1 + z_2)^2 = (1 + z_1)(1 + f_{1,1})

Bootstrapping derives spot rates one maturity at a time from coupon bond prices, using the spot rates already found for earlier cash flows.

Credit analysis of bond issuers is covered in Bond Credit Analysis (finance/bond-credit-analysis).

8. Equity valuation

Dividend discount model (constant growth). Next year's dividend D1D_1, required return rr, growth g<rg < r:

V0=D1r−gV_0 = \frac{D_1}{r - g}

Two-stage dividend discount model. High growth for nn years, then constant growth gLg_L:

V0=∑t=1nDt(1+r)t+1(1+r)n⋅Dn+1r−gLV_0 = \sum_{t=1}^{n}\frac{D_t}{(1 + r)^t} + \frac{1}{(1 + r)^n}\cdot\frac{D_{n+1}}{r - g_L}

Sustainable growth rate. Retention ratio bb times return on equity:

g=b×ROEg = b \times ROE

Justified price to earnings ratio. From the constant growth model, with payout ratio (1−b)(1 - b):

P0E1=1−br−gP0E0=(1−b)(1+g)r−g\frac{P_0}{E_1} = \frac{1 - b}{r - g} \qquad \frac{P_0}{E_0} = \frac{(1 - b)(1 + g)}{r - g}

Free cash flow to the firm (FCFF) and to equity (FCFE).

FCFF=EBIT(1−tc)+D&A−Capex−ΔNWCFCFF = EBIT(1 - t_c) + D\&A - \text{Capex} - \Delta NWC
FCFE=FCFF−Interest(1−tc)+Net borrowingFCFE = FCFF - \text{Interest}(1 - t_c) + \text{Net borrowing}

Firm value and terminal value. Discount FCFF at the weighted average cost of capital; the terminal value uses the constant growth form at the end of the explicit forecast:

Vfirm=∑t=1nFCFFt(1+WACC)t+TVn(1+WACC)nTVn=FCFFn+1WACC−gV_{\text{firm}} = \sum_{t=1}^{n}\frac{FCFF_t}{(1 + WACC)^t} + \frac{TV_n}{(1 + WACC)^n} \qquad TV_n = \frac{FCFF_{n+1}}{WACC - g}

Equity value is firm value minus net debt and other non-equity claims (preferred stock, minority interests, pension deficits where treated as debt).

Enterprise value. Market capitalisation plus net debt and other claims; enterprise value multiples (EV/EBITDA, EV/Sales) are compared with capital-structure-neutral earnings.

Residual income model. Book value plus the present value of earnings above the equity charge:

V0=B0+∑t=1∞Et−rBt−1(1+r)tV_0 = B_0 + \sum_{t=1}^{\infty}\frac{E_t - r B_{t-1}}{(1 + r)^t}

Pitfall: the terminal value often makes up most of a discounted cash flow value; always show the share it represents and a sensitivity to WACCWACC and gg. A full valuation write-up belongs in Valuation Report (finance/valuation-report).

9. Corporate finance and ratios

Weighted average cost of capital. Market-value weights of equity EE and debt DD, cost of equity rEr_E, pre-tax cost of debt rDr_D:

WACC=ED+ErE+DD+ErD(1−tc)WACC = \frac{E}{D + E} r_E + \frac{D}{D + E} r_D (1 - t_c)

Unlevering and relevering beta. Assuming debt carries no market risk:

βU=βL1+(1−tc)DEβL=βU[1+(1−tc)DE]\beta_U = \frac{\beta_L}{1 + (1 - t_c)\dfrac{D}{E}} \qquad \beta_L = \beta_U\left[1 + (1 - t_c)\frac{D}{E}\right]

DuPont analysis. Three-step and five-step decomposition of return on equity:

ROE=NISales×SalesAssets×AssetsEquityROE = \frac{NI}{\text{Sales}} \times \frac{\text{Sales}}{\text{Assets}} \times \frac{\text{Assets}}{\text{Equity}}
ROE=NIEBT×EBTEBIT×EBITSales×SalesAssets×AssetsEquityROE = \frac{NI}{EBT} \times \frac{EBT}{EBIT} \times \frac{EBIT}{\text{Sales}} \times \frac{\text{Sales}}{\text{Assets}} \times \frac{\text{Assets}}{\text{Equity}}

Liquidity, leverage and coverage.

RatioDefinition
Current ratioCurrent assets / current liabilities
Quick ratio(Cash + short-term investments + receivables) / current liabilities
Debt to equityTotal debt / total equity
Net debt to EBITDA(Debt - cash) / EBITDA
Interest coverageEBIT / interest expense
Debt service coverage ratio (DSCR)Cash flow available for debt service / (interest + scheduled principal)

Working capital cycle. With days in the year NN (365 unless stated):

DSO=ReceivablesRevenueNDIO=InventoryCOGSNDPO=PayablesCOGSNDSO = \frac{\text{Receivables}}{\text{Revenue}} N \qquad DIO = \frac{\text{Inventory}}{\text{COGS}} N \qquad DPO = \frac{\text{Payables}}{\text{COGS}} N
CCC=DSO+DIO−DPOCCC = DSO + DIO - DPO

Degree of operating leverage. Percentage change in EBIT per percentage change in sales, equal to contribution margin over EBIT at a given level of sales:

DOL=%ΔEBIT%ΔSales=Sales−Variable costsEBITDOL = \frac{\%\Delta EBIT}{\%\Delta \text{Sales}} = \frac{\text{Sales} - \text{Variable costs}}{EBIT}

Capital budgeting extras. Profitability index (PI) is the present value of future cash flows divided by the initial investment; accept when PI is above 1, which matches a positive NPV. Payback is the time until cumulative undiscounted cash flows turn positive; discounted payback uses discounted cash flows. The equivalent annual annuity compares projects with different lives:

EAA=NPV×r1−(1+r)−nEAA = NPV \times \frac{r}{1 - (1 + r)^{-n}}

Covenant definitions in loan agreements often differ from textbook ratios; use the agreement's definitions in Covenant Compliance Certificate (finance/covenant-compliance-certificate).

10. Derivatives basics

Forward price (cost of carry). Continuous compounding, risk-free rate rr, continuous income or dividend yield qq:

F0=S0 e(r−q)TF_0 = S_0\, e^{(r - q)T}

With discrete compounding and no income: F0=S0(1+r)TF_0 = S_0 (1 + r)^T. With known cash income, subtract its present value from S0S_0 first.

Value of an existing long forward with delivery price KK at time tt:

Vt=(Ft−K) e−r(T−t)V_t = (F_t - K)\,e^{-r(T - t)}

Option payoffs at expiry.

Call=max⁡(ST−K,0)Put=max⁡(K−ST,0)\text{Call} = \max(S_T - K, 0) \qquad \text{Put} = \max(K - S_T, 0)

Profit equals payoff minus the premium paid (for the buyer).

Put-call parity (European options, no dividends).

c+Ke−rT=p+S0c + K e^{-rT} = p + S_0

One-period binomial model. Up factor uu, down factor dd, risk-neutral probability πu\pi_u of the up move (not the dividend yield qq), discrete rate rr per period:

πu=(1+r)−du−dc0=πu cu+(1−πu) cd1+r\pi_u = \frac{(1 + r) - d}{u - d} \qquad c_0 = \frac{\pi_u\,c_u + (1 - \pi_u)\,c_d}{1 + r}

Black-Scholes-Merton (European options, no dividends). With N(⋅)N(\cdot) the standard normal cumulative distribution:

c=S0N(d1)−Ke−rTN(d2)p=Ke−rTN(−d2)−S0N(−d1)c = S_0 N(d_1) - K e^{-rT} N(d_2) \qquad p = K e^{-rT} N(-d_2) - S_0 N(-d_1)
d1=ln⁡(S0/K)+(r+σ2/2) TσTd2=d1−σTd_1 = \frac{\ln(S_0/K) + (r + \sigma^2/2)\,T}{\sigma\sqrt{T}} \qquad d_2 = d_1 - \sigma\sqrt{T}

Covered interest rate parity. Spot rate SS and forward rate FF quoted as units of the price currency per one unit of the base currency, with interest rates ipricei_{\text{price}} and ibasei_{\text{base}} over the same period:

F=S×1+iprice1+ibaseF = S \times \frac{1 + i_{\text{price}}}{1 + i_{\text{base}}}

Plain vanilla interest rate swap fixed rate. With discount factors ZiZ_i for each payment date and equal accrual periods:

Swap rate (per period)=1−Zn∑i=1nZi\text{Swap rate (per period)} = \frac{1 - Z_n}{\sum_{i=1}^{n} Z_i}

Hedging policy and hedge accounting documentation are covered in FX and Interest Rate Hedging Policy (finance/fx-interest-rate-hedging-policy) and Hedge Designation Documentation (finance/hedge-designation-documentation).

11. Worked checks

IDFormulaInputs (Example)Result (Example)
WC-01Future valueUSD 1,000, 5% a year, 10 yearsUSD 1,628.89
WC-02Annuity present valueUSD 100 a year, 6%, 10 yearsUSD 736.01
WC-03Effective annual rate12% stated, monthly compounding12.68% (continuous: 12.75%)
WC-04Loan paymentUSD 200,000, 6% a year paid monthly (0.5% a month), 360 monthsUSD 1,199.10 a month
WC-05NPV and IRR-1,000 at t0; 300, 400, 500 at t1 to t3; r = 8%NPV 17.63; IRR 8.90%
WC-06Real returnNominal 7%, inflation 2.5%4.39% (approximation 4.5%)
WC-07TWR and MWRStart 100; value 110 at end of period 1, then deposit 50; value 152 at end of period 2TWR 4.50% (10% then -5%); MWR 0.80% per period
WC-08Two-asset volatilityWeights 60/40; volatilities 20% and 10%; correlation 0.3Variance 0.01888; volatility 13.74%
WC-09CAPMRisk-free 3%, beta 1.2, market risk premium 5%9.0%
WC-10Sharpe ratioReturn 8%, risk-free 3%, volatility 12.5%0.40
WC-11Treynor and JensenReturn 8%, risk-free 3%, beta 1.1, market 7%Treynor 4.55%; alpha 0.60%
WC-12Information ratioActive return 1.5%, tracking error 3%0.50
WC-13Parametric VaRUSD 10,000,000, daily volatility 1.2%, 99% (z = 2.3263)1-day USD 279,156; 10-day USD 882,769
WC-14Expected shortfallSame inputs, 99%1-day USD 319,861
WC-15Bond price5-year annual 4% coupon, yield 5%, per 100 face95.6705
WC-16Duration and convexitySame bondMacaulay 4.6203 years; modified 4.4003; convexity 24.47
WC-17Price change estimateSame bond, yield +1%Estimate -4.278% (duration -4.400%, convexity +0.122%); full repricing -4.281%
WC-18PVBPSame bond0.0421 per 100 face
WC-19Forward rateOne-year spot 3%, two-year spot 4%5.01%
WC-20Constant growth DDMNext dividend USD 2.00, r = 9%, g = 4%USD 40.00
WC-21WACCEquity 60% at 9%, debt 40% at 5%, tax 25%6.90%
WC-22Unlevered betaLevered beta 1.2, debt to equity 0.40/0.60, tax 25%0.80
WC-23Forward priceSpot 50, r = 5% continuous, no income, 6 months51.27
WC-24Put-call parityCall 4.50, spot 50, strike 50, r = 5% continuous, 1 yearPut 2.06
WC-25Binomial callSpot 50, u = 1.2, d = 0.8, r = 5% per period, strike 50πu\pi_u = 0.625; call 5.95
WC-26Covered interest paritySpot 1.10 USD per EUR; USD rate 4%, EUR rate 2%, one yearForward 1.1216 USD per EUR

Notes on the checks: in WC-07 the MWR is low because the extra 50 was invested just before the losing period; TWR ignores that timing. In WC-13 the ten-day figure assumes independent daily returns and an unchanged position. In WC-17 the approximation is close because the yield change is small; it becomes less accurate for larger moves or bonds with embedded options.

12. Calculator notes

TaskGeneric steps
Clear memoryClear the time value of money registers and the cash flow worksheet before each new problem
Payments per yearSet to 1 and enter the periodic rate and number of periods yourself, unless you deliberately use the built-in conversion
Timing modeEND for ordinary annuities and bonds; BGN only for annuities due
Sign conventionMoney paid out is negative, money received is positive; a PV and FV of the same sign usually produce an error
Time value keysN (periods), I/Y or i (rate per period, entered as a percentage), PV, PMT, FV; compute the unknown
Uneven cash flowsEnter the initial flow (CF0 or CFo), then each flow with its frequency (C01/F01 or CFj/Nj); compute NPV with I, or IRR
BondsPrice = PV with N = periods, I/Y = periodic yield, PMT = coupon per period, FV = 100
StatisticsUse the two-variable statistics mode for mean, standard deviation, correlation and regression slope
DisplaySet at least four decimal places for intermediate results
Setting checkMy calculator
Model[Model]
Decimal places[n]
Payments per year default[1]
Timing mode default[END]
Known quirks[Notes]

13. Glossary and references

TermMeaning
Basis pointOne hundredth of one percent (0.01%)
Clean and full priceBond price without and with accrued interest
Cost of carryNet cost of holding the underlying until delivery: financing cost minus income
Day count conventionRule for counting days in an interest period and in a year (for example Actual/365, 30/360)
Discount factorPresent value of one unit received at a future date
DurationSensitivity of a bond's price to a parallel change in yield
No-arbitrageCondition under which no riskless profit can be made without investment
Risk-neutral probabilityProbability under which the expected return on every asset equals the risk-free rate, used for pricing
Terminal valueValue at the end of the explicit forecast period of all later cash flows
Yield to maturitySingle discount rate that sets the present value of a bond's cash flows equal to its price

Background reading (cite; do not copy text, examples or problems):

  • Standard university textbooks on corporate finance, investments, fixed income and derivatives, in their current editions.
  • Your course notes or the official curriculum of your exam, read directly from the exam body or your provider.
  • Related templates: Exam Study Plan (finance/exam-study-plan), Study Guide (academic/study-guide), Investment Appraisal (finance/investment-appraisal), Valuation Report (finance/valuation-report), Bond Credit Analysis (finance/bond-credit-analysis), VaR Backtesting Report (finance/var-backtesting-report), Covenant Compliance Certificate (finance/covenant-compliance-certificate).

Standard and licence note

Based on general financial mathematics (time value of money, portfolio theory, the capital asset pricing model, bond mathematics, discounted cash flow valuation and no-arbitrage derivative pricing) as taught across university courses and professional programmes; no single standard governs it. The notation, explanations, worked examples and layout are original; no exam curriculum, textbook text, worked example or problem set is reproduced. Check your own course or exam materials for the notation and conventions they require, and the current official version of any exam rules on permitted calculators. Template licence: MIT.

संबंधित टेम्पलेट