Energy Sector Controls Profile Template (ISO/IEC 27019)

OT asset classes, zone and conduit model, applicability decision, sector supplement register, energy topics mapped to Annex A, implementation table, IEC 62443 use, risk example

ISMS और ISO/IEC 27001पूर्णISO/IEC 27019:2024; ISO/IEC 27001:2022 + Amd 1:2024 6.1.3 and Annex A (cited only); IEC 62443 (cited)energy27019controls
एडिटर में खोलें.md डाउनलोड करें

उपयोग कैसे करें: Use it when the ISMS scope includes energy process control: control centres, substations, plants, smart metering, DER or charging. Fill the OT asset landscape and the sector supplement register from your licensed copy of ISO/IEC 27019 first. The main pitfall is applying office IT controls unchanged to OT, where scanning or patching can trip a process and safety must come first.

प्रीव्यू

Energy Sector Controls Profile (ISO/IEC 27019): [Organization name]

Sector profile for energy utilities and organizations that run energy process control: power, gas, oil and heat generation, transmission, storage and distribution, plus smart metering, distributed energy resources and charging infrastructure. It records how the sector guidance in ISO/IEC 27019:2024 (energy utility industry controls, based on ISO/IEC 27002:2022) is applied inside an ISMS that meets ISO/IEC 27001:2022 + Amd 1:2024, mainly through risk treatment (6.1.3) and the Statement of Applicability. It also shows where IEC 62443 (industrial automation and control systems security) fits. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document IDDOC-ISMS-108
Version[1.0]
Status[Draft / In review / Approved / Superseded]
Owner[@ot-security-lead]
Approvers/reviewers[@ciso], [@head-of-operations], [@safety-manager], [@isms-manager]
Last updatedYYYY-MM-DD
Classification[Confidential: contains OT architecture details]
Standard and editionISO/IEC 27019:2024; ISO/IEC 27002:2022; ISO/IEC 27001:2022 + Amd 1:2024
Next scheduled reviewYYYY-MM-DD
Energy activities in scope[Generation / Transmission / Distribution / Storage / Gas / Oil / Heat / Metering / DER / Charging]
OT sites in scope[List sites, or refer to DOC-ISMS-002 scope]
OT security framework used alongside[IEC 62443 series / NERC CIP / National framework / None]

Approvals

RoleNameDecisionDate
OT security lead (author)[@ot-security-lead][Prepared]YYYY-MM-DD
Head of operations or asset management[@head-of-operations][Approved]YYYY-MM-DD
Safety manager[@safety-manager][Reviewed: no safety conflict]YYYY-MM-DD
CISO[@ciso][Approved]YYYY-MM-DD

Revision history

VersionDateAuthorChange
1.0YYYY-MM-DD[@ot-security-lead]First issue
[x.y]YYYY-MM-DD[@author][Change summary]

Contents

1. Purpose and scope

This profile explains how [Organization name] protects the information and systems that control and monitor its energy processes. It:

  • lists the OT systems, sites and zones in scope (section 3);
  • records which sector-specific controls from ISO/IEC 27019:2024 apply and why (sections 4 and 5);
  • maps each energy topic to the ISO/IEC 27001:2022 Annex A controls that carry it in the Statement of Applicability, DOC-ISMS-011 (section 6);
  • assigns owners, status and evidence to each implementation item (section 7).

In scope: [control centres, substations, generating plants, compressor or pumping stations, heat plants, metering head-end systems, DER and charging back-ends, remote maintenance access, engineering workstations].

Out of scope: [office IT already covered by the general ISMS policies, nuclear process control]. ISO/IEC 27019:2024 states that it does not cover the process control domain of nuclear facilities, which is addressed by IEC 63096. If you operate nuclear assets, follow that standard and your nuclear regulator for those systems.

2. ISO/IEC 27019 at a glance

QuestionAnswer for this profile
What it isSector guidance: information security controls for the energy utility industry, built on the ISO/IEC 27002:2022 control set
EditionISO/IEC 27019:2024 (second edition, published 2024-10-18, replaces the 2017 edition)
Certifiable?No. Certification is to ISO/IEC 27001:2022 + Amd 1:2024. The sector controls inform risk treatment and the SoA
Systems it addressesProcess control and automation technology, PLCs and field devices, supporting systems such as historians and visualization, telecontrol and process networks, smart metering, emission measurement, protection and safety systems, energy management systems for DER, charging and customer installations, related software, premises and remote maintenance (summarised from the public scope)
How it is organisedIn line with the four themes of ISO/IEC 27002:2022 (organizational, people, physical, technological). It adds energy-specific guidance to existing controls and, as the 2017 edition did, energy-specific controls of its own. Check your copy for the exact list, numbering and any annexes
Who reads itOT security leads, control engineers, asset managers, ISMS managers, auditors familiar with the energy domain
Licensed copy held by[@ot-security-lead], [document repository path]

How the pieces fit:

3. OT asset landscape and zones

3.1 OT asset classes

Asset classExamplesOwnerZoneSafety relevant?Count
Control centre systems[SCADA, energy management system, distribution management system, outage management system][@control-centre-manager][Z3 control centre][Yes / No][n]
Field controllers (Example)PLCs and remote terminal units at 3 plantsPlant engineeringZ1 fieldYes42
Protection and safety systems[Protection relays, safety PLCs, governors][@protection-engineer][Z1 field]Yes[n]
Supporting systems[Historian, engineering workstations, HMI][@ot-engineering][Z2 site supervisory][Yes / No][n]
Telecontrol and process networks[Fibre, radio, cellular links, telecontrol gateways][@ot-network-lead][Conduits][Yes / No][n]
Metering[Smart meters, head-end system, meter data management][@metering-manager][Z2 / IT-OT DMZ][No][n]
DER and charging back-ends[Solar inverters, battery management, charging station management][@der-manager][Z2 / cloud][Yes / No][n]
Remote maintenance[Vendor access gateways, jump hosts][@ot-security-lead][IT-OT DMZ][No][n]

3.2 Zone model

Use the same zone names as the network security standard (DOC-ISMS-063). Each arrow below is a conduit: an allowed, documented and monitored communication path.

Rules for the zone model:

  1. No direct path from enterprise IT or the internet to Z1 or Z0.
  2. Vendor access ends in the DMZ and needs a per-session approval.
  3. Safety systems (Z0) send status outward only; no inbound write path.
  4. Every conduit has an owner, a rule set and a review date in the firewall rule review (security/firewall-rule-review).

4. Applicability decision

Apply this decision to every entry in section 5 and record the result in the SoA.

Decision record fields: entry ID, decision, reason (risk ID, legal reference from DOC-ISMS-014, contract clause), decision maker, date.

5. Sector supplement register

Two kinds of entries:

  • Energy-specific controls: controls the sector standard adds to the ISO/IEC 27002 set. Record them as additional controls in the SoA.
  • Sector guidance on existing controls: extra implementation guidance on a control that is already in Annex A. Record it in the implementation notes of that Annex A row.
Entry IDReference in 27019TypeYour short labelRelated Annex AApplicableSection 7 item
ENR-REG-001 (Example)[ENR control number from your copy]Energy-specific controlSecurity of control centre premisesA.7.1, A.7.2, A.7.3YesENR-IMP-004
ENR-REG-002 (Example)[ENR control number from your copy]Energy-specific controlProtection of unattended peripheral sitesA.7.1, A.7.4YesENR-IMP-005
ENR-REG-003 (Example)[ENR control number from your copy]Energy-specific controlHandling legacy systems that cannot be patchedA.8.8, A.8.22YesENR-IMP-002
ENR-REG-004 (Example)[Number from your copy]Guidance on existing controlRemote maintenance of process control systemsA.5.19, A.8.2, A.8.5YesENR-IMP-001
ENR-REG-005[Number from your copy][Type][Your label][A.x.y][Yes / No][ENR-IMP-nnn]
ENR-REG-006[Number from your copy][Type][Your label][A.x.y][Yes / No][ENR-IMP-nnn]

The example labels describe common energy topics. Confirm that each one corresponds to an entry in your copy before keeping it, and add a row for every energy-specific control listed there.

6. Mapping of energy topics to Annex A

Energy topicPrimary Annex A controls (short labels)Notes for OT
Process control asset inventoryA.5.9 inventory of information and assetsInclude firmware versions, vendor, safety function, zone
Classification of OT informationA.5.12 information classification, A.5.13 information labellingNetwork diagrams, setpoints and protection settings are confidential
Supplier and OEM relationshipsA.5.19, A.5.20, A.5.21, A.5.22 supplier relationships and ICT supply chainOEM service contracts must cover remote access, patch support, end of life
Remote maintenanceA.5.15 access control rules, A.8.2 privileged access rights, A.8.5 secure authenticationSession approval, MFA at the DMZ, recording, time limits
Incident response in OTA.5.24 to A.5.28 incident managementJoint playbooks with control room; manual operation fallback
Operation during disruptionA.5.29 security during disruption, A.5.30 ICT readiness for business continuityBlack start, island operation, backup control centre
Legal and regulatory dutiesA.5.31 legal, regulatory and contractual requirementsSector regulator, NIS2, network codes, NERC CIP where applicable
OT operating proceduresA.5.37 documented operating proceduresSwitching orders, change windows, emergency procedures
Competence of OT staffA.6.3 awareness, education and trainingRole-based training for control room and field engineers
Control centres and substationsA.7.1 to A.7.4 perimeters, entry, secure areas, monitoringUnattended sites need intrusion detection and alarm response
Environmental and utility protectionA.7.5 physical and environmental threats, A.7.11 supporting utilitiesFlooding, fire, UPS and auxiliary supply for protection systems
Field device maintenanceA.7.13 equipment maintenanceAuthorised maintainers, firmware integrity check
Endpoint hardeningA.8.1 user endpoint devices, A.8.9 configuration managementEngineering laptops dedicated to OT, application allow-listing
Malware protectionA.8.7 protection against malwareAllow-listing where antivirus is not vendor-approved; removable media kiosks
Vulnerability and patch managementA.8.8 technical vulnerability managementVendor-qualified patches only, compensating controls for legacy
Backup of configurationsA.8.13 information backupPLC programs, relay settings, SCADA databases; tested restores
RedundancyA.8.14 redundancy of processing facilitiesRedundant control centre, dual communication paths
Logging and monitoringA.8.15 logging, A.8.16 monitoring activities, A.8.17 clock synchronizationPassive OT network monitoring; time sync matters for protection event analysis
Network segregationA.8.20 network security, A.8.21 network services, A.8.22 network segregationZones and conduits as in section 3.2
Telecontrol protocol securityA.8.24 use of cryptography, A.8.20 network securitySecure protocol profiles where devices support them
Engineering and changeA.8.25, A.8.27 secure development and architecture, A.8.32 change managementFactory and site acceptance tests include security tests
Testing without disruptionA.8.29 security testing, A.8.34 protecting systems during audit testingNo active scanning in Z1 without engineering approval

7. Implementation table

Item IDRegister entryWhat is doneOwnerStatusDueEvidence
ENR-IMP-001 (Example)ENR-REG-004Vendor remote access through DMZ jump host with MFA, per-session approval by control room, recording kept 90 daysOT security leadImplemented2027-03-31Access approval log, session recordings, quarterly access review
ENR-IMP-002 (Example)ENR-REG-00311 legacy HMIs that cannot be patched isolated in a dedicated segment with allow-listed flows only, replacement budgetedPlant engineeringPartial2027-09-30Firewall rule review FRR-2027-02, capital plan line
ENR-IMP-003 (Example)Annex A A.8.13 guidanceMonthly offline backup of PLC programs and relay settings, restore test twice a yearOT engineeringImplemented2027-02-28Backup log, restore test report (DOC-ISMS-071)
ENR-IMP-004 (Example)ENR-REG-001Two-factor entry at the control centre, visitor escort, CCTV with 30-day retentionFacilitiesImplemented2027-01-31Badge logs, CCTV retention record
ENR-IMP-005 (Example)ENR-REG-002Intrusion alarms at 6 unattended substations linked to the control room, response within the agreed timeField operationsPlanned2027-12-31Alarm test records
ENR-IMP-006[ENR-REG-nnn][Action][@owner][Planned / Partial / Implemented]YYYY-MM-DD[Record]

Status summary (Example): 6 items in this table, of which 3 are implemented, 1 partial, 1 planned and 1 blank row awaiting entries. Report the counts in the ISMS performance report (DOC-ISMS-081).

8. OT considerations and IEC 62443

8.1 Priorities

In OT the usual order of protection goals changes. Write your order and apply it to every decision in sections 4 to 7:

  1. Safety of people and the environment.
  2. Availability and integrity of the physical process.
  3. Integrity of control data and settings.
  4. Confidentiality of operational and customer information.

8.2 Engineering rules

Rule IDRuleReason
OT-RULE-001 (Example)No active vulnerability scans in Z1 or Z0 during operation; use passive monitoring and vendor advisoriesScans can crash older controllers
OT-RULE-002 (Example)Patches installed only after vendor qualification and a test on a reference systemUnqualified patches can void safety certification
OT-RULE-003 (Example)Emergency access ("break glass") accounts exist for control room operators and are reviewed after each useOperators must never be locked out during an incident
OT-RULE-004 (Example)Removable media only through a scanning kiosk in the DMZRemovable media remain a common OT infection route
OT-RULE-005[Rule][Reason]

8.3 Using IEC 62443 alongside ISO/IEC 27019

The IEC 62443 series addresses security for industrial automation and control systems (IACS). It is developed jointly by the ISA99 committee and IEC TC 65 and published by IEC (and by ISA as ANSI/ISA-62443). Use it where ISO/IEC 27019 tells you what to protect and you need technical depth on how. Commonly used parts (check current editions with the publisher):

PartTopicHow this profile uses it
IEC 62443-2-1Security programme for IACS asset ownersCross-check of sections 4 to 7 with the asset owner programme
IEC 62443-2-4Requirements for IACS service providersClauses in OEM and integrator contracts (DOC-ISMS-068)
IEC 62443-3-2Risk assessment, zones and conduitsMethod behind the zone model in section 3.2
IEC 62443-3-3System security requirements and security levelsTarget security level per zone
IEC 62443-4-1 and 4-2Secure product development and component requirementsProcurement requirements for new devices

Other energy references to consider: IEC 62351 for power system communication security, IEC 63096 for nuclear facilities, and the national or regional energy frameworks listed in section 10.

9. Worked risk example

Example: Quillmere Group (2,400 staff, 6 sites in 4 countries, OT and IT) runs combined heat and power units and rooftop solar at its 3 plants. These are energy management and DER systems, which fall within the systems ISO/IEC 27019 addresses even though the group is a manufacturer, not a utility.

FieldValue
Risk IDR-071 (Example)
ScenarioThe CHP unit's OEM connects through an always-on remote access router at Plant 2. Stolen OEM credentials allow an attacker to change setpoints
Inherent likelihood x impact4 x 5 = 20, Critical
TreatmentENR-IMP-001 (remote access through DMZ jump host, MFA, per-session approval, recording); OT-RULE-003; OEM contract clause for credential management
Residual likelihood x impact2 x 5 = 10, High
AcceptanceHigh residual risk accepted by top management with treatment in place (DOC-ISMS-019 record ACC-071 (Example))
ReviewEvery 6 months, or after any OEM access incident

10. Regulatory examples

FrameworkRegionRelevanceCheck
Directive (EU) 2022/2555 (NIS2)EUEnergy (electricity, district heating and cooling, oil, gas, hydrogen) is a sector of high criticality; risk management measures and incident reportingNational transposition law and competent authority
Commission Delegated Regulation (EU) 2024/1366, network code on cybersecurity aspects of cross-border electricity flowsEUSector-specific cybersecurity rules for high-impact and critical-impact electricity entitiesConsolidated text on EUR-Lex (amended 2025)
NERC CIP reliability standardsNorth AmericaMandatory cybersecurity standards for the bulk electric systemCurrent versions on the NERC website
[National energy regulator rules][Country][Licence conditions, security requirements][Source]

11. Size tiers

AspectSmall (under 50 people)Medium (50 to 500)Large or multi-site (over 500 or several sites)
Size referenceQuillmere Analytics Ltd, 46 staff (38 employees, 8 contractors), part-time ISMS managerQuillmere Health Systems, 320 staff, full-time ISMS manager and 3-person security teamQuillmere Group, 2,400 staff, 6 sites in 4 countries, CISO and 14-person security office
Typical energy role (Example)Analytics or software supplier handling smart meter or DER data for utilities, no own OTRegional distribution operator, DER aggregator or charging network operator of similar sizeIntegrated utility, or a manufacturer with own generation and energy management at several plants
Use of ISO/IEC 27019Selected entries on metering data, supplier duties and remote access to customer systemsMost entries, one OT zone model, OT security lead roleFull register per site, group OT security standard, IEC 62443 security levels per zone
OT governanceISMS manager plus customer requirementsOT security lead reporting to the ISMS managerOT security function inside the security office, site OT coordinators
MonitoringCustomer-provided or none (no OT)Passive OT monitoring at the control centrePassive monitoring at every site feeding a central SOC
Review cycleYearlyYearly plus after major changesYearly per site, rolling group review

12. Records and evidence

RecordProvesOwnerLocationRetention
OT asset inventory extractAsset classes and zones in section 3 are currentOT engineering[CMDB / OT asset tool][Current plus 3 years of snapshots]
Zone and conduit diagram with review dateSegregation designOT network lead[Document repository][Superseded versions 3 years]
Sector supplement register and SoA rowsApplicability decisionsISMS manager[ISMS repository][Life of the ISMS plus 3 years]
Remote access approvals and session recordingsENR-IMP-001 operatesOT security lead[Jump host logs][Example: 90 days recordings, 1 year approvals]
Patch qualification and change recordsA.8.8 and A.8.32 in OTOT engineering[Change tool][Example: 3 years]
Backup and restore test reportsA.8.13 in OTOT engineeringDOC-ISMS-071[Example: 3 years]
Physical access logs for control centres and substationsA.7.2 and A.7.4Facilities[Access control system][Example: 1 year]
OT incident and exercise reportsIncident readiness in OTOT security leadDOC-ISMS-021, exercise folder[Example: 6 years]

Link each record to its control in isms/control-evidence-matrix (DOC-ISMS-033).

13. References

ReferenceEdition and statusUse
ISO/IEC 27019:2024, information security controls for the energy utility industryCurrent (https://www.iso.org/standard/85056.html)Sector controls and guidance
ISO/IEC 27001:2022 + Amd 1:2024Current (https://www.iso.org/standard/82875.html, Amd 1: https://www.iso.org/standard/88435.html)ISMS requirements, clause 6.1.3, Annex A
ISO/IEC 27002:2022Current (https://www.iso.org/standard/75652.html)Control guidance the sector standard builds on
ISO/IEC 27005:2022Current (https://www.iso.org/standard/80585.html)Risk management guidance
IEC 62443 seriesCheck current editions (cited without link)IACS security
IEC 62351 series, IEC 63096Check current editions (cited without link)Power system communication security, nuclear control systems
Directive (EU) 2022/2555 (NIS2)OJ L 333, 27.12.2022 (https://eur-lex.europa.eu/eli/dir/2022/2555/oj)Energy sector obligations in the EU
Commission Delegated Regulation (EU) 2024/1366As amended (https://eur-lex.europa.eu/eli/reg_del/2024/1366/oj)Electricity network code on cybersecurity
Related templatescompliance/statement-of-applicability, compliance/risk-methodology, compliance/risk-register, compliance/asset-inventory, compliance/legal-register, isms/network-security-standard, isms/secure-configuration-baseline, isms/supplier-security-agreement-27036, isms/iot-27400-security, isms/backup-restore-test-log, isms/control-framework-crosswalk, isms/control-evidence-matrix, security/firewall-rule-review, industry/utility-cim-integration-design, compliance/nis2-security-measuresLinked documents

Standard and licence note

Structure aligned with ISO/IEC 27019:2024 and ISO/IEC 27001:2022 + Amd 1:2024 (clause 6.1.3 and Annex A). The register, mapping, rules and examples are original. No text, control wording, tables or definitions from ISO, IEC or ISA standards are reproduced; the scope summary is a short paraphrase of the public catalogue description. You need your own licensed copy of ISO/IEC 27019 to fill section 5. Check the current editions before use, including the IEC 62443 parts. Official ISO text, purchase or licensed access: https://www.iso.org/standard/85056.html and https://www.iso.org/standard/82875.html. Regulatory summaries are short paraphrases; this is a documentation format, not legal advice.

Template licence: MIT.