Markdown Editor

ISMS Process Map Template (ISO/IEC 27001 4.4, TS 27022)

21 ISMS processes in governance, risk, operational and support groups, owners, inputs and outputs, interactions, SIPOC, clause mapping, KPIs, maturity

ISMS और ISO/IEC 27001पूर्णISO/IEC 27001:2022 + Amd 1:2024 clauses 4.4 and 8.1 (cited only); ISO/IEC TS 27022:2021 (orientation)processmap
एडिटर में खोलें.md डाउनलोड करें

उपयोग कैसे करें: Use it after context and scope are agreed and before you assign roles in the RACI. Fill the process register first with a named owner per process, then the interactions and the SIPOC tables for the processes auditors sample most. The main pitfall is a map of boxes that matches no real activity or records.

प्रीव्यू

ISMS Process Map: [Organization name]

The process map of an information security management system (ISMS): which processes run the ISMS, who owns them, what goes in and comes out, how they connect and how their performance is measured. It supports ISO/IEC 27001:2022 + Amd 1:2024 clause 4.4, which treats the ISMS as a set of connected processes rather than a pile of documents, and clause 8.1 on operational planning and control. The grouping into governance, risk, operational and support processes is loosely oriented on the process reference model in ISO/IEC TS 27022:2021, without reproducing it. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document IDDOC-ISMS-004
Version[1.0]
Status[Draft / In review / Approved / Superseded]
Owner[@isms-manager]
Approvers/reviewers[@ciso], [@coo], [@process-owners]
Last updatedYYYY-MM-DD
Classification[Internal]
Standard and editionISO/IEC 27001:2022 + Amd 1:2024, clauses 4.4 and 8.1; orientation ISO/IEC TS 27022:2021
Scope referenceDOC-ISMS-002
Roles referenceDOC-ISMS-006
Number of processes[21]
Next scheduled reviewYYYY-MM-DD

Approvals

RoleNameDecisionDate
ISMS manager[@isms-manager][Prepared]YYYY-MM-DD
Chief information security officer[@ciso][Approved / Approved with changes]YYYY-MM-DD
Top management representative[@coo][Approved]YYYY-MM-DD

Revision history

VersionDateAuthorChange
1.0 (Example)2027-02-10[@isms-manager]First process map for the certification project
1.1 (Example)2027-09-01[@isms-manager]O-04 vulnerability and threat management split from O-05 incident management; owner of S-02 changed

Contents

  1. Purpose and scope
  2. Process approach and model
  3. Process landscape
  4. Process register
  5. Process interactions
  6. SIPOC for key processes
  7. Mapping of processes to clauses
  8. Process performance indicators
  9. Process owner duties and process description minimum
  10. Process review and maturity
  11. Size tiers
  12. Records and evidence
  13. References

1. Purpose and scope

This document defines the processes that establish, run, monitor and improve the ISMS of [Organization name] within the scope set in DOC-ISMS-002. It names an owner for each process, its inputs and outputs, the processes it hands over to, its key performance indicators and the clauses of ISO/IEC 27001 it serves.

It covers ISMS processes, not the business processes the ISMS protects. Business processes (for example customer onboarding or software release) appear only where an ISMS process interfaces with them, such as change management or supplier management.

Users: top management, the ISMS manager, process owners, control owners, internal auditors and the certification body during Stage 1.

2. Process approach and model

The ISMS is run as a set of interacting processes, following the plan-do-check-act logic of the management system clauses:

  • Governance processes (G) set direction and check the system: context and scope, leadership and policy, objectives and planned changes, performance monitoring, internal audit, management review and improvement.
  • Risk processes (R) identify, analyse, evaluate, treat and accept information security risks and keep the Statement of Applicability current.
  • Operational processes (O) run the controls day to day: operational planning and control, access and identity, change and configuration, vulnerability and threat management, incident management, supplier security and ICT readiness.
  • Support processes (S) give the other processes what they need: resources, competence and awareness, communication and documented information.

ISO/IEC TS 27022:2021 describes a process reference model for ISMS processes. This map follows the same process-oriented idea but uses four groups and its own process names. If you want to align closely with the TS, read it and adjust section 4; do not copy its process descriptions into your documents. The TS is under systematic review, with a preliminary work item for a revision listed in the ISO catalogue on 2026-11-01.

3. Process landscape

How to read it: context feeds risk assessment, risk treatment drives the operation of controls, operation produces measurements, monitoring and audit feed management review, and management review drives improvement and new objectives, which loops back into the next risk cycle. Support processes serve all the others (dotted lines).

4. Process register

IDProcessOwnerPurposeKey inputsKey outputsMain documents
G-01 (Example)Context and scope[@isms-manager]Determine issues, parties, requirements and scopeStrategy, contracts, legal register, interfacesContext analysis, scope statementDOC-ISMS-003, DOC-ISMS-002
G-02 (Example)Leadership and policy[@ceo]Show commitment, set policy, assign rolesContext, risk appetite, business strategyInformation security policy, topic policies, rolesDOC-ISMS-001, DOC-ISMS-005, DOC-ISMS-006
G-03 (Example)Objectives and planned changes[@ciso]Set measurable objectives and plan ISMS changesPolicy, risks, review decisionsObjectives register, ISMS change plansDOC-ISMS-024, DOC-ISMS-025
G-04 (Example)Performance monitoring[@isms-manager]Measure and evaluate ISMS and control performanceMeasurement definitions, operational dataMeasurement results, performance reportDOC-ISMS-080, DOC-ISMS-081
G-05 (Example)Internal audit[@internal-audit-lead]Check conformity and effective implementationAudit programme, previous results, risksAudit reports, findingsDOC-ISMS-082, DOC-ISMS-083, DOC-ISMS-084
G-06 (Example)Management review[@ceo]Decide on suitability, adequacy and effectiveness of the ISMSReview inputs from all processesDecisions, actions, resource changesDOC-ISMS-085
G-07 (Example)Improvement and corrective action[@isms-manager]Correct nonconformities, remove causes, improveFindings, incidents, review decisionsCorrective actions, improvement registerDOC-ISMS-087, DOC-ISMS-086, DOC-ISMS-088
R-01 (Example)Risk assessment[@risk-manager]Identify, analyse and evaluate risksMethod, criteria, assets, threats, contextRisk register, assessment reportDOC-ISMS-010, DOC-ISMS-015, DOC-ISMS-016, DOC-ISMS-017
R-02 (Example)Risk treatment and SoA[@ciso]Select treatments and controls, keep the SoA currentEvaluated risks, Annex A, requirementsRisk treatment plan, SoADOC-ISMS-013, DOC-ISMS-011
R-03 (Example)Risk acceptance and monitoring[@risk-manager]Obtain acceptance of residual risk, track risk changesTreatment results, criteriaAcceptance records, risk trendDOC-ISMS-019, DOC-ISMS-016
O-01 (Example)Operational planning and control[@it-ops-lead]Plan and control the running of controls, including outsourced processesTreatment plan, SoA, operating proceduresOperating records, control evidenceDOC-ISMS-049, DOC-ISMS-033
O-02 (Example)Access and identity[@iam-lead]Grant, review and remove access under least privilegeHR events, access requests, policyAccess records, review resultsDOC-ISMS-041
O-03 (Example)Change and configuration[@it-ops-lead]Control changes and keep secure configurationsChange requests, baselinesApproved changes, configuration recordsDOC-ISMS-060, ops/change-enablement-policy
O-04 (Example)Vulnerability and threat[@security-engineer]Find and fix vulnerabilities, use threat intelligenceScans, advisories, intelligence feedsRemediation tracker, intelligence reportsDOC-ISMS-072, DOC-ISMS-045
O-05 (Example)Incident management[@security-ops-lead]Detect, respond to and learn from incidentsEvent reports, monitoring alertsIncident records, reviews, notificationsDOC-ISMS-020, DOC-ISMS-021, DOC-ISMS-022, DOC-ISMS-023
O-06 (Example)Supplier security[@procurement-lead]Assess, contract, monitor and exit suppliers securelySupplier requests, risk criteriaSupplier register, assessments, agreementsDOC-ISMS-066, DOC-ISMS-067, DOC-ISMS-068
O-07 (Example)ICT readiness and continuity[@bc-manager]Keep ICT ready to meet continuity objectivesBIA, recovery objectivesICT readiness plan, test resultsDOC-ISMS-047, DOC-ISMS-120, DOC-ISMS-121
S-01 (Example)Resources[@coo]Provide people, budget and toolsPlans, review decisionsBudget, resource planDOC-ISMS-031
S-02 (Example)Competence and awareness[@hr-lead]Ensure competence and awarenessRole requirements, gapsTraining records, competence matrixDOC-ISMS-026
S-03 (Example)Communication[@isms-manager]Plan internal and external communicationCommunication needsCommunication plan and logDOC-ISMS-027
S-04 (Example)Documented information[@isms-manager]Create, control and retain documents and recordsDocument requests, retention rulesDocument register, controlled documentsDOC-ISMS-028

Total: 7 governance, 3 risk, 7 operational and 4 support processes, 21 processes in all (Example).

5. Process interactions

FromOutput handed overToFrequency (Example)
G-01Issues, requirements, scopeR-01, G-02, O-06Annually and on trigger
G-02Policy, roles, risk appetite approvalG-03, R-01, S-02Annually
R-01Evaluated risksR-02, G-06, G-07 (reassessment results)Annually and on trigger
R-02Treatment plan, SoAO-01, G-03, S-01After each assessment
R-02Residual risks for acceptanceR-03After each assessment
O-01 to O-07Control evidence and operational dataG-04, G-05Continuous, monthly summary
O-05Lessons learned, new threatsR-01, G-07After each significant incident
O-04Emerging threats and unremediated vulnerabilitiesR-01, O-05Monthly
O-06Supplier risks and incidentsR-01, O-05On assessment and event
G-04Measurement resultsG-06, G-03Quarterly
G-05Audit results, nonconformitiesG-07, G-06Per audit
G-06Decisions, actions, resource changesG-03, G-07, S-01At least annually
G-07Corrective actions and improvements, action statusR-01, O-01, S-04, G-06Continuous
S-04Controlled documents, recordsAllContinuous
S-02Competent and aware staffAllContinuous
S-03Communications to partiesAll, interested partiesPer plan

The sequence shows one typical chain from the table: an incident leads to a corrective action, a reassessment of risk and a management decision.

6. SIPOC for key processes

6.1 R-01 Risk assessment

SuppliersInputsProcess stepsOutputsCustomers
G-01, asset owners, O-04, O-05, O-06Context, asset inventory, threat catalogue, incidents, supplier risks, risk criteria1. Plan the cycle. 2. Identify risks (event-based or asset-based). 3. Analyse likelihood and impact on the 5 x 5 scale. 4. Evaluate against bands and criteria. 5. ReportUpdated risk register, risk assessment reportR-02, R-03, G-06, risk owners

6.2 O-05 Incident management

SuppliersInputsProcess stepsOutputsCustomers
All staff, monitoring provider, customers, suppliersEvent reports, alerts, threat intelligence1. Report and log. 2. Assess and classify. 3. Contain, eradicate, recover. 4. Notify where required. 5. Review and learnIncident records, notifications, post-incident reviewsCustomers, authorities where required, R-01, G-07, G-06

6.3 G-05 Internal audit

SuppliersInputsProcess stepsOutputsCustomers
G-06, R-01, previous auditsAudit programme, risk results, previous findings, process changes1. Plan the audit. 2. Prepare checklist. 3. Collect evidence. 4. Report findings. 5. Follow upAudit report, nonconformities, observationsG-07, G-06, process owners

6.4 G-06 Management review

SuppliersInputsProcess stepsOutputsCustomers
G-04, G-05, R-01, O-05, G-01, S-01Status of previous actions, changes in issues and parties, performance, audit results, risk status, opportunities1. Collect inputs. 2. Hold the review. 3. Decide. 4. Record minutes. 5. Track actionsDecisions on improvement and changes, resource decisions, minutesG-03, G-07, S-01, all owners

7. Mapping of processes to clauses

Clause (ISO/IEC 27001:2022)Short label (own words)Process
4.1IssuesG-01
4.2Interested parties and requirementsG-01
4.3ScopeG-01
4.4ISMS and its processesG-01, this document
5.1Leadership and commitmentG-02
5.2PolicyG-02
5.3Roles, responsibilities and authoritiesG-02
6.1.1Risks and opportunities, generalR-01, G-03
6.1.2Risk assessmentR-01
6.1.3Risk treatment and SoAR-02, R-03
6.2ObjectivesG-03
6.3Planning of changesG-03
7.1ResourcesS-01
7.2CompetenceS-02
7.3AwarenessS-02
7.4CommunicationS-03
7.5Documented informationS-04
8.1Operational planning and controlO-01
8.2Performing risk assessmentsR-01
8.3Implementing risk treatmentR-02, O-01
9.1Monitoring and measurementG-04
9.2Internal auditG-05
9.3Management reviewG-06
10.1Continual improvementG-07
10.2Nonconformity and corrective actionG-07

Annex A control groups mapped to operational processes (Example):

ProcessMain Annex A controls (number and own label)
O-02A.5.15 to A.5.18 access rules, identity, authentication information, access rights; A.8.2 to A.8.5 privileged access, access restriction, source code access, secure authentication
O-03A.8.9 configuration management, A.8.32 change management
O-04A.5.7 threat intelligence, A.8.8 technical vulnerabilities
O-05A.5.24 to A.5.28 incident planning, assessment, response, learning, evidence; A.6.8 event reporting
O-06A.5.19 to A.5.23 supplier relationships, agreements, ICT supply chain, monitoring, cloud services
O-07A.5.29 security during disruption, A.5.30 ICT readiness, A.8.13 backup, A.8.14 redundancy
O-01A.5.37 documented operating procedures and the remaining controls marked applicable in the SoA

Keep these labels consistent with the SoA (DOC-ISMS-011, compliance/statement-of-applicability).

8. Process performance indicators

ProcessIndicatorTarget (Example)SourceFrequency
G-01Context analysis reviewed within 12 months100%Revision historyAnnually
G-03Objectives on trackAt least 80%Objectives registerQuarterly
G-05Audit programme completed as planned100% of planned audits in the cycleAudit programmeQuarterly
G-06Management review actions closed by due dateAt least 90%Action logQuarterly
G-07Corrective actions closed within agreed timeAt least 85%CAPA recordsMonthly
R-01Risk assessment cycle completed on scheduleYesAssessment reportAnnually
R-03Accepted risks past their review date0Acceptance registerMonthly
O-02Leaver accounts disabled within 24 hoursAt least 98%Identity systemMonthly
O-03Changes with security review before production100% of high-risk changesChange recordsMonthly
O-04Critical vulnerabilities fixed within target timeAt least 95%Remediation trackerMonthly
O-05Incidents reported to customers within contract deadline100%Incident registerMonthly
O-06Critical suppliers assessed within 12 months100%Supplier registerQuarterly
O-07ICT recovery tests meeting the recovery time objective100% of testsTest reportsPer test
S-02Staff with current awareness trainingAt least 95%Training recordsMonthly
S-04Documents past review dateUnder 5%Document registerMonthly

Full definitions (formula, data source, owner, thresholds) belong in the measurement programme (DOC-ISMS-080, isms/isms-measurement-programme), and results in the performance report (DOC-ISMS-081).

9. Process owner duties and process description minimum

Each process owner:

  1. keeps the process description current and approved;
  2. makes sure the people who run the process are competent and aware;
  3. monitors the process indicators and acts on adverse trends;
  4. keeps the records listed in section 12 for their process;
  5. reports status and issues to the ISMS manager for management review;
  6. raises changes to the process through the ISMS change plan when the change affects the ISMS (DOC-ISMS-025);
  7. takes part in internal audits of the process and owns its corrective actions.

Minimum content of a process description (one page is often enough):

Process ID and name:
Owner and deputy:
Purpose:
Trigger (event or schedule):
Inputs and their suppliers:
Steps (5 to 10 lines):
Outputs and their customers:
Records produced and where kept:
Indicators (link to DOC-ISMS-080):
Related procedures and policies (document IDs):
Clauses and Annex A controls served:
Last review date:

10. Process review and maturity

Once a year, before management review, each owner rates the process on this simple scale:

LevelDescription
1 InitialDone, but depends on individuals; few records
2 RepeatableDocumented steps, records kept, owner known
3 DefinedDescription approved, indicators measured, staff trained
4 MeasuredIndicators reviewed and acted on, targets met most of the time
5 ImprovingLessons from audits, incidents and indicators change the process
ProcessLevel last yearLevel nowMain gapImprovement action
O-06 (Example)12No register of critical suppliers before the projectSupplier register built, assessments scheduled (IMP-004)
G-04 (Example)23Indicators defined but not reviewedQuarterly performance report introduced
[Process][n][n][Gap][Action]

Improvement actions go to the continual improvement register (DOC-ISMS-088, isms/continual-improvement-register).

11. Size tiers

AspectSmall: Quillmere Analytics Ltd (Example)Medium: Quillmere Health Systems (Example)Large: Quillmere Group (Example)
Profile46 staff (38 employees, 8 contractors), B2B SaaS, part-time ISMS manager (0.5 FTE, the Head of Engineering Operations)320 staff, full-time ISMS manager plus 3-person security team, two offices and a colocation suite2,400 staff, 6 sites in 4 countries, OT and IT, CISO with a 14-person security office, integrated management system with ISO 9001 and ISO 22301
Number of processesAbout 14, by merging (for example G-03 into G-02, R-03 into R-02, O-02 to O-04 as one "IT security operations" process, S-01 to S-04 as one support process: 6 governance, 2 risk, 5 operational, 1 support)21 as in section 421 group processes plus site-level operational processes for OT (for example plant access and OT change)
Owners4 people own everything: CEO, ISMS manager (the Head of Engineering Operations), CTO, finance and people lead13 named owner roles, as in section 4Group process owners in the CISO office, with site owners for operational processes
Segregation guardrailThe ISMS manager must not audit their own processes: internal audit outsourced or done by a trained peer from another functionInternal audit by a separate trained auditorInternal audit function independent of the CISO office
Shared processesNoneChange and supplier processes shared with IT operationsDocument control, internal audit, management review and improvement shared with the ISO 9001 and ISO 22301 systems
Description formOne page per merged processProcess descriptions per section 9Group process manual plus site annexes

12. Records and evidence

ProcessRecords that prove it operatesOwnerWhere keptRetention (Example)
G-01Approved context analysis, scope statement[@isms-manager]Document system3 years after supersession
G-02Signed policy, communication evidence, role assignments[@ceo]Document system3 years after supersession
G-03Objectives register, change plans[@ciso]GRC tool or register3 years
G-04Measurement results, performance reports[@isms-manager]Reporting folder3 years
G-05Audit programme, reports, checklists[@internal-audit-lead]Audit folder3 years or one certification cycle
G-06Management review minutes and action log[@ceo]Board or ISMS folder3 years or one certification cycle
G-07Nonconformity and corrective action records[@isms-manager]CAPA register3 years after closure
R-01 to R-03Risk register snapshots, assessment reports, acceptance records[@risk-manager]GRC tool3 years
O-01 to O-07Access reviews, change records, vulnerability tracker, incident register, supplier assessments, test reportsProcess ownersOperational systemsPer retention schedule
S-01 to S-04Budget approvals, training records, communication log, document registerProcess ownersHR, finance and document systemsPer retention schedule

Link each record type to the controls it evidences in the control evidence matrix (DOC-ISMS-033, isms/control-evidence-matrix), and list the process map itself in the documented information register (DOC-ISMS-028). The annual calendar (DOC-ISMS-032, isms/isms-annual-calendar) schedules the recurring process activities.

13. References

ReferenceEditionUse
ISO/IEC 27001:2022, ISMS requirements2022, https://www.iso.org/standard/82875.htmlClauses 4.4, 8.1 and the clause mapping
ISO/IEC 27001:2022/Amd 1:20242024-02-23, https://www.iso.org/standard/88435.htmlClimate action changes to 4.1 and 4.2 (G-01)
ISO/IEC TS 27022:2021, ISMS processes2021, https://www.iso.org/standard/61004.htmlOrientation for the process grouping; under systematic review
ISO/IEC 27002:2022, controls2022, https://www.iso.org/standard/75652.htmlControl guidance for operational processes
ISO/IEC 27003:2017, ISMS guidance2017, https://www.iso.org/standard/63417.htmlClause explanations; a revision is in progress, check for a newer edition
ISO/IEC 27004:2016, measurement2016, https://www.iso.org/standard/64120.htmlProcess indicators; under revision

Related templates: isms/isms-context-interested-parties, isms/isms-roles-raci, isms/isms-manual, isms/isms-measurement-programme, isms/isms-performance-report, isms/isms-annual-calendar, isms/control-evidence-matrix, isms/continual-improvement-register, compliance/statement-of-applicability, isms/iso-27000-family-map.

Standard and licence note

Structure aligned with ISO/IEC 27001:2022 + Amd 1:2024, clauses 4.4 and 8.1, with the process grouping loosely oriented on ISO/IEC TS 27022:2021. The process names, register, SIPOC tables, indicators, maturity scale and guidance are original text. No ISO or IEC text, process descriptions or tables are reproduced; read the official standards, sold by ISO, IEC and national standards bodies, for the exact requirements. Check the current edition of each standard before use. This is a documentation format, not certification or legal advice. Template licence: MIT.

संबंधित टेम्पलेट