TOGAF Architecture Compliance Assessment Template

Baseline, rating scale and roll-up rules, evidence register, checklist by domain, requirements traceability, findings, dispensations, conditions, board decision

ArsitekturLengkapTOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1): Phase G, Compliance Assessmentcomplianceassessment

Cara menggunakan: Use it when a project or supplier must be checked against the approved architecture at a design, pre-production or post-implementation review point. Fill the baseline and the rating scale first, then rate each check from evidence and trace every contracted requirement. The main pitfall is letting missing evidence pass silently; rate it as not evidenced.

Pratinjau

Architecture Compliance Assessment: [Project or solution name]

Architecture Compliance Assessment for one project, work package or solution, the review record used in Phase G (Implementation Governance) of the Architecture Development Method in The TOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1). It states which approved architecture the project was measured against, checks the design and the build domain by domain, traces every contracted requirement to evidence, records findings, requested dispensations and conditions, and closes with one rating and the Architecture Board decision. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document ID[ACA-YYYY-NNN]
Project or work package[Project name, WP-nn]
Architecture Contract[AC-nn, version]
Review point[Concept / Design / Pre-production / Post-implementation]
Review tier[Tier 1 / Tier 2 / Tier 3, per the board charter]
Board outcome record[ARB-YYYY-NNN]
Version[0.1]
Status[Draft / In review / Approved / Superseded]
Owner (lead assessor)[@lead-assessor]
Approvers / reviewers[Architecture Board chair, domain architects, security architect]
Assessed party[Delivery team or supplier name, @delivery-lead]
Assessment periodYYYY-MM-DD to YYYY-MM-DD
Classification[Internal / Confidential]
Last updatedYYYY-MM-DD

Approvals

RoleNameDecisionConditionsDate
Lead assessor[@lead-assessor][Submitted to board][None]YYYY-MM-DD
Architecture Board chair[@chair][Compliant / Compliant with conditions / Dispensation / Non-compliant][Condition IDs]YYYY-MM-DD
Security architect[@security][Agreed / Not agreed][Conditions]YYYY-MM-DD
Delivery lead (acknowledgement)[@delivery-lead][Acknowledged][Comments]YYYY-MM-DD
Business owner (risk acceptance)[@business-owner][Accepts residual risk / Does not accept][Conditions]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]Scope, baseline and evidence request issued to the delivery party
0.5YYYY-MM-DD[@name]Example: Checklist completed, eight findings drafted and discussed with the delivery lead
1.0YYYY-MM-DD[@name]Example: Board decision ARB-2027-007 recorded: compliant with conditions C1 and C2

Contents

1. Assessment summary

ItemResult
Overall ratingExample: Conformant with conditions
Recommended board outcomeExample: Compliant with conditions
Checks assessedExample: 33 checks: 20 conformant, 7 conformant with conditions, 4 partially conformant, 2 non-conformant, 0 not applicable
FindingsExample: 8 findings: 1 high, 7 medium, 0 low
Dispensations requestedExample: 1 (DSP-2027-02, batch export to the legacy CRM for 9 months)
Conditions proposedExample: 2 (C1 matching accuracy report, C2 retention rules configured)
Decision requested[Approve the outcome, the conditions and the dispensation]

Example narrative: The customer data hub design conforms to the target data and application architecture and to all mandatory technology standards. Of the two non-conformant checks, CHK-DAT-04 (retention rules not yet designed for two entities) is resolved by condition C2 before go-live. CHK-INT-03 is the interim nightly batch export to the legacy CRM, which departs from principle AP-01 and needs dispensation DSP-2027-02 until the CRM is retired. The matching accuracy target in ARS-DAT-03 is designed for but not yet evidenced at full volume, which is condition C1.

2. Scope, trigger and timing

2.1 Subject of the assessment

FieldValue
Solution or work packageExample: WP-02 Customer data hub: golden customer record, matching service, customer API, event publication
Design version assessedExample: Solution design v1.2 dated YYYY-MM-DD; data model release 0.9
Environments in scopeExample: Design documents only; no running environment at this review point
Out of scopeExample: Claims platform changes (WP-03), handler workspace (WP-04), vendor internal code quality
Related assessmentsExample: Concept review ARB-2027-004 (compliant)

2.2 Trigger and review point

Review pointTypical timingWhat is assessedUsed here
ConceptBefore funding of detailed designFit with target architecture and roadmap; options consideredNo
DesignBefore build startsDesign against principles, standards and contracted requirementsExample: Yes
Pre-productionBefore go-liveBuilt system and configuration against the approved design; conditions closedNo
Post-implementation[3 to 12] months after go-liveRealised architecture, drift, debt incurredNo

Example: this assessment is triggered by review point R2 in contract AC-02 (section 8 of the contract), tier 1 under the board charter because the hub holds personal data of more than [100,000] customers.

2.3 Assessment team and independence

RoleNameIndependence from the project
Lead assessor[@lead-assessor]Example: Enterprise data architect, not on the project
Domain assessor, application and integration[@name]Example: Independent
Domain assessor, technology[@name]Example: Platform team member; declared interest in hosting choice
Security assessor[@security]Example: Independent
Project contact[@delivery-lead]Assessed party

Record any declared interest. An assessor with an interest in a check does not rate that check; another assessor does.

3. Architecture baseline used

RefBaseline itemVersion / dateSourcePrecedence
BL-01 (Example)Architecture Contract AC-021.0, YYYY-MM-DDarchitecture/architecture-contract1
BL-02 (Example)Architecture Requirements Specification, the IDs contracted in AC-02 section 5.11.0 (baseline B1)architecture/architecture-requirements-specification2
BL-03 (Example)Architecture Definition Document, data and application parts1.0architecture/architecture-definition-document3
BL-04 (Example)Architecture Principles Catalogue2.3architecture/architecture-principles4
BL-05 (Example)Technology standards list and radar (adopt ring)Snapshot YYYY-MM-DDarchitecture/tech-radar4
BL-06 (Example)Security architecture and zero trust patterns2.0security/security-architecture4
BL-07 (Example)Integration reference architecture1.4architecture/reference-architecture5
[BL-nn][Item][Version][Location][Rank]

Precedence rule: Example: the contract wins over the requirements specification, which wins over the definition document; principles and standards apply where the higher documents are silent. Standards changes published after the contract date apply only if the contract was varied to include them (record the variation ID).

4. Method and rating scale

4.1 Steps

  1. Agree the scope and the frozen design version with the delivery lead.
  2. Send the evidence request (section 5) at least [5] working days before the assessment sessions.
  3. Rate every check in section 6 using the scale in 4.2, citing evidence.
  4. Trace every contracted requirement in section 7.
  5. Walk through draft findings with the delivery lead to correct factual errors; ratings remain the assessor's decision.
  6. Roll up to an overall rating with the rules in 4.3 and submit to the board.

4.2 Per-check rating scale

This scale is original to this template. It is not the graded compliance scale described in the TOGAF Standard. Organisations that use another graded scale can map it here, as long as the mapping is published.

CodeRatingMeaningEvidence needed
CConformantThe design or build meets the requirement fullyNamed evidence that shows it
CCConformant with conditionsMeets the intent; a specific, small gap will be closed by a dateEvidence plus a dated condition
PCPartially conformantPart of the requirement is met; material gap remainsEvidence of what exists; finding raised
NCNon-conformantThe requirement is not met or is contradictedFinding raised; condition, dispensation or rework
NENot evidencedClaimed but no evidence provided by the deadlineTreated as NC for roll-up until evidence arrives
NANot applicableThe requirement does not apply to this scopeReason recorded

4.3 Roll-up rules

RuleConditionEffect on overall rating
R1Any NC or NE on a check marked critical, with neither a dated condition nor a dispensation proposedOverall rating is non-conformant
R2Any NC on a non-critical check, or any PC on a critical checkOverall rating is at best conformant with conditions
R3More than [20%] of applicable checks rated PC or worseOverall rating is at best partially conformant
R4All applicable checks C or CCOverall rating is conformant with conditions if any CC exists, otherwise conformant

4.4 Mapping to board outcomes

Overall ratingUsual board outcome (charter section 7)
ConformantCompliant
Conformant with conditionsCompliant with conditions
Partially conformantCompliant with conditions if every gap has a dated condition; otherwise non-compliant
Non-conformant, deviation justifiedDispensation (time-limited, with exit plan)
Non-conformant, deviation not justifiedNon-compliant: rework and resubmit

5. Evidence register

Evidence IDArtefactVersion / dateProvided byType
EV-01 (Example)Solution design document, customer data hub1.2, YYYY-MM-DDDelivery leadDocument
EV-02 (Example)Logical data model and data dictionary extractRelease 0.9Data architectModel
EV-03 (Example)Interface catalogue and API specification (OpenAPI)0.8Integration leadSpecification
EV-04 (Example)Threat model and security controls matrix1.0Security championDocument
EV-05 (Example)Infrastructure as code repository, main branchCommit [hash]Platform engineerConfiguration
EV-06 (Example)Matching algorithm test results on a 50,000 record sampleYYYY-MM-DDData teamTest result
EV-07 (Example)Architecture decision records ADR-014 to ADR-019CurrentLead developerDecision record
EV-08 (Example)Interview with operations lead on monitoring designYYYY-MM-DDAssessor notesInterview
[EV-nn][Artefact][Version][Who][Document / Model / Configuration / Test result / Interview]

Evidence requested but not provided by the deadline: Example: data retention design for entities Household and Contact Preference. CHK-DAT-04 is rated NC rather than NE because the data model (EV-02) shows that no rules exist for these entities.

6. Compliance checklist by domain

Columns: Crit marks a critical check (Y or N). Rating uses the scale in 4.2.

6.1 Business and process

Check IDCheckBaselineCritEvidenceRatingNote
CHK-BUS-01Does the solution support the business capabilities assigned to this work package and no others?BL-03NEV-01C (Example)Customer information management only
CHK-BUS-02Are the process changes for business users documented and owned by a named business role?BL-01NEV-01CC (Example)Data steward process drafted; owner to be confirmed before go-live
CHK-BUS-03Do the benefits this work package contributes to have a measure and an owner?BL-01NEV-01C (Example)KPI-02 golden ID coverage
[CHK-BUS-nn][Check][BL-nn][Y / N][EV-nn][C / CC / PC / NC / NE / NA][Note]

6.2 Information and data

Check IDCheckBaselineCritEvidenceRatingNote
CHK-DAT-01Is every data entity in scope mastered in exactly one system, as the target data architecture states?BL-03, DP-01YEV-02C (Example)Customer and Party mastered in the hub
CHK-DAT-02Does the design meet the matching accuracy target in ARS-DAT-03, with a test method?BL-02, ARS-DAT-03YEV-06CC (Example)Method sound; full-volume result pending (C1)
CHK-DAT-03Are data owners and stewards named for every mastered entity?BL-04NEV-02C (Example)Named in the data dictionary
CHK-DAT-04Are retention and deletion rules designed for every entity holding personal data?BL-02, ARS-DAT-05YEV-02NC (Example)Two entities missing (FND-01, C2)
CHK-DAT-05Is personal data classified and are the classification labels carried into storage and APIs?BL-06YEV-02, EV-03C (Example)
CHK-DAT-06Is consent, with its history, recorded for each customer and purpose, including records migrated from each source?BL-02, ARS-DAT-04YEV-02PC (Example)Policy system C consent has no capture channel (FND-04)
[CHK-DAT-nn][Check][BL-nn][Y / N][EV-nn][Rating][Note]

6.3 Application

Check IDCheckBaselineCritEvidenceRatingNote
CHK-APP-01Are the application components the ones named in the target application architecture, with no unplanned additions?BL-03NEV-01C (Example)
CHK-APP-02Does the solution reuse the approved building blocks where they exist (identity, notification, document store)?BL-04, TP-01NEV-01C (Example)Reuses group identity service
CHK-APP-03Are applications to be retired by this work package identified with a retirement date?BL-01NEV-01PC (Example)Legacy CRM retirement date missing (FND-05)
[CHK-APP-nn][Check][BL-nn][Y / N][EV-nn][Rating][Note]

6.4 Integration

Check IDCheckBaselineCritEvidenceRatingNote
CHK-INT-01Are all interfaces exposed through the approved API gateway with published specifications?BL-02, ARS-APP-01YEV-03C (Example)
CHK-INT-02Are change events published to the enterprise event platform using the agreed envelope, with the golden customer ID and a schema version?BL-07, ARS-INT-01NEV-03C (Example)CloudEvents envelope
CHK-INT-03Are there no new point-to-point file transfers?BL-04, AP-01NEV-01NC (Example)Interim CRM batch export (FND-02, DSP-2027-02)
CHK-INT-04Are idempotency, retry and dead-letter handling designed for each asynchronous flow?BL-07NEV-03CC (Example)Dead-letter replay runbook pending
[CHK-INT-nn][Check][BL-nn][Y / N][EV-nn][Rating][Note]

6.5 Technology and hosting

Check IDCheckBaselineCritEvidenceRatingNote
CHK-TEC-01Are all products and services on the adopt ring of the technology radar, or approved for trial?BL-05YEV-05C (Example)
CHK-TEC-02Is the workload deployed in the approved landing zone and region, meeting data residency?BL-02, ARS-DAT-02YEV-05C (Example)EU region only
CHK-TEC-03Is all infrastructure defined as code and deployed by pipeline?BL-05NEV-05C (Example)
CHK-TEC-04Are product versions supported by the vendor for at least the planned life of this release?BL-05NEV-05CC (Example)Database minor version reaches end of support in 30 months; upgrade to be planned
[CHK-TEC-nn][Check][BL-nn][Y / N][EV-nn][Rating][Note]

6.6 Security and privacy

Check IDCheckBaselineCritEvidenceRatingNote
CHK-SEC-01Is there a current threat model covering every external interface and trust boundary?BL-06YEV-04C (Example)
CHK-SEC-02Do all human and machine identities authenticate through the approved identity provider with least privilege?BL-06YEV-04, EV-05C (Example)
CHK-SEC-03Is personal data encrypted in transit and at rest with keys managed in the approved key service?BL-06YEV-05C (Example)
CHK-SEC-04Has a data protection impact assessment been completed or screened out?BL-02YEV-04CC (Example)DPIA draft; DPO sign-off pending (FND-03)
CHK-SEC-05Are security events forwarded to the central monitoring service?BL-06NEV-05C (Example)
[CHK-SEC-nn][Check][BL-nn][Y / N][EV-nn][Rating][Note]

6.7 Operations and resilience

Check IDCheckBaselineCritEvidenceRatingNote
CHK-OPS-01Are availability and recovery targets stated and does the design meet the tier assigned to the service?BL-02YEV-01C (Example)Tier 2: RTO 4 hours, RPO 15 minutes
CHK-OPS-02Are service level objectives defined with the telemetry needed to measure them?BL-02NEV-08PC (Example)Matching latency SLO lacks a metric (FND-06)
CHK-OPS-03Is a support model agreed with the operations team that will run the service?BL-01NEV-08CC (Example)Handover plan drafted
CHK-OPS-04Is backup and restore designed and scheduled for testing before go-live?BL-02YEV-01C (Example)
[CHK-OPS-nn][Check][BL-nn][Y / N][EV-nn][Rating][Note]

6.8 Delivery and documentation

Check IDCheckBaselineCritEvidenceRatingNote
CHK-DOC-01Are significant design decisions recorded as decision records with options and reasons?BL-01NEV-07C (Example)
CHK-DOC-02Have the deliverables due at this review point under the contract been provided?BL-01NEV-01 to EV-07CC (Example)Retention design late
CHK-DOC-03Is the architecture repository updated with the solution models?BL-01NEV-02PC (Example)Models held only in the project space (FND-07)
CHK-DOC-04Are deviations from the baseline already known to the project disclosed in the submission?BL-01NEV-01C (Example)CRM export disclosed
[CHK-DOC-nn][Check][BL-nn][Y / N][EV-nn][Rating][Note]

6.9 Domain summary

DomainApplicableCCCPCNCNENADomain rating
Business and process (Example)3210000Conformant with conditions
Information and data (Example)6311100Conformant with conditions (NC covered by C2)
Application (Example)3201000Conformant with conditions
Integration (Example)4210100Dispensation requested
Technology and hosting (Example)4310000Conformant with conditions
Security and privacy (Example)5410000Conformant with conditions
Operations and resilience (Example)4211000Conformant with conditions
Delivery and documentation (Example)4211000Conformant with conditions
[Domain][n][n][n][n][n][n][n][Rating]

Example: the rows above total the 33 example checks printed in this template and match the counts in section 1. Recount after you add or delete checks.

7. Requirements traceability

Requirement IDRequirement (short)Design elementEvidenceCheckRating
ARS-DAT-03 (Example)Matching precision of at least 95% on a reviewed sampleMatching service, rules v3EV-06CHK-DAT-02CC
ARS-DAT-01 (Example)One golden customer ID; no writable local copiesGolden record storeEV-02CHK-DAT-01C
ARS-DAT-04 (Example)Consent and its history per customer and purposeConsent storeEV-02CHK-DAT-06PC
ARS-DAT-05 (Example)Owner, retention period and deletion rules for every entityRetention policy storeEV-02CHK-DAT-04NC
ARS-APP-01 (Example)Functions exposed only through published APIs on the gatewayCustomer API v1EV-03CHK-INT-01C
ARS-INT-01 (Example)Events carry the golden customer ID and a schema versionCustomer-changed eventEV-03CHK-INT-02C
ARS-DAT-02 (Example)Customer data only in EU regions of the approved landing zonePlatform subscription [ID]EV-05CHK-TEC-02C
ARS-SEC-01 (Example)Identities through the enterprise identity provider, MFA for usersIdentity integrationEV-04CHK-SEC-02C
ARS-SEC-03 (Example)Exit plan and recovery against tier 2 targetsMulti-zone deployment, backup design, exit planEV-01CHK-OPS-01C
ARS-TEC-03 (Example)Logs, metrics and traces to central observability, enough to measure SLOsMonitoring designEV-08CHK-OPS-02PC
[ARS-xxx-nn][Requirement][Element][EV-nn][CHK-nn][Rating]

Coverage: Example: 10 of 10 contracted requirements traced; 6 rated C, 1 CC, 2 PC, 1 NC. Keep the full matrix in the requirements traceability record (requirements/traceability-matrix) if the project maintains one.

8. Findings

8.1 Severity scale

SeverityMeaning
HighBreaks a critical check or creates a risk the business owner must accept explicitly
MediumBreaks or partly meets a non-critical check, or weakens a critical one; must be resolved by a date
LowImprovement on a check already rated C or CC that brings the solution closer to the baseline; tracked, not blocking

8.2 Findings register

Finding IDCheckSeverityFindingImpactRecommended resolutionProposed treatment
FND-01 (Example)CHK-DAT-04HighRetention and deletion rules missing for Household and Contact PreferencePersonal data kept beyond its lawful period; audit exposureDesign and configure rules before go-liveCondition C2
FND-02 (Example)CHK-INT-03MediumNightly batch file to legacy CRM until CRM retirementDeparts from AP-01; stale data in CRM up to 24 hoursAccept for a limited time; retire CRMDispensation DSP-2027-02
FND-03 (Example)CHK-SEC-04MediumDPIA not yet signed off by the DPOGo-live without privacy sign-offComplete DPIA reviewAction A-01
FND-04 (Example)CHK-DAT-06MediumConsent records from policy system C carry no capture channelConsent for those customers cannot be fully evidenced; weakens a critical checkMap the channel, or record "migrated" with the source system, before the system C loadAction A-02
FND-05 (Example)CHK-APP-03MediumNo retirement date for the legacy CRMDispensation has no end; double running costAgree date with CRM ownerAction A-03, linked to DSP-2027-02
FND-06 (Example)CHK-OPS-02MediumMatching latency SLO has no metricSLO cannot be reportedAdd latency histogram metricAction A-04
FND-07 (Example)CHK-DOC-03MediumModels not in the architecture repositoryLater projects cannot reuse themPublish modelsAction A-05
FND-08 (Example)CHK-DAT-02MediumMatching accuracy shown on sample, not full volumeTarget may not hold at scaleRun full-volume testCondition C1
[FND-nn][CHK-nn][High / Medium / Low][Finding][Impact][Resolution][Condition / Dispensation / Action / Rework]

9. Dispensations requested

Dispensation IDFindingPrinciple or standard departed fromReasonRisk and mitigationRisk ownerRequested termExit plan
DSP-2027-02 (Example)FND-02AP-01 Integrate through published interfacesLegacy CRM has no API; retirement plannedStale CRM data up to 24 hours; checksum and row-count alerts; CRM read-only for customer fields[@data-owner]9 months (decided by the full board: term over 6 months and personal data affected; security member agrees, data protection officer consulted)CRM retired in WP-07; batch job deleted
[DSP-YYYY-NN][FND-nn][Principle or standard][Reason][Risk and mitigation][@owner][Months][Plan]

Once granted, copy the entry to the dispensation register in the board charter (architecture/architecture-governance-charter) and record accepted architecture debt in the tech debt register (architecture/tech-debt-register).

10. Conditions and actions

10.1 Conditions

Condition IDFindingConditionOwnerDueClosure evidenceVerified by
C1 (Example)FND-08Full-volume matching test meets the ARS-DAT-03 target[@data-lead]YYYY-MM-DD (before pre-production review)Test report on full volume, signed by data owner[@lead-assessor]
C2 (Example)FND-01Retention and deletion rules designed, configured and tested for all personal data entities[@solution-architect]YYYY-MM-DDConfiguration export and deletion test log[@security]
[Cn][FND-nn][Condition][@owner]YYYY-MM-DD[Evidence][@verifier]

10.2 Actions

Action IDFindingActionOwnerDueStatus
A-01 (Example)FND-03Obtain DPO sign-off of the DPIA[@privacy-lead]YYYY-MM-DDOpen
A-02 (Example)FND-04Map consent capture channel for policy system C records[@data-lead]YYYY-MM-DDOpen
A-03 (Example)FND-05Agree and publish the legacy CRM retirement date[@crm-owner]YYYY-MM-DDOpen
A-04 (Example)FND-06Add matching latency metric and dashboard[@sre-lead]YYYY-MM-DDOpen
A-05 (Example)FND-07Publish solution models to the repository[@solution-architect]YYYY-MM-DDOpen
[A-nn][FND-nn][Action][@owner]YYYY-MM-DD[Open / Done]

11. Overall rating and board decision

11.1 Roll-up

RuleApplies?Reason
R1Example: NoThe only NC on a critical check (CHK-DAT-04) has a condition, and the NC on CHK-INT-03 has a dispensation request
R2Example: YesNC on CHK-INT-03 (non-critical) and PC on CHK-DAT-06 (critical)
R3Example: No6 of 33 applicable checks are PC or worse (18%)
R4Example: Not reachedR2 already caps the rating

Overall rating: Example: Conformant with conditions, subject to DSP-2027-02.

11.2 Board decision

FieldValue
Outcome record[ARB-YYYY-NNN] (Example: ARB-2027-007)
Forum and date[Board meeting YYYY-MM-DD] (Example: 2027-04-19)
OutcomeExample: Compliant with conditions
ConditionsExample: C1, C2 as in section 10.1
Dispensations grantedExample: DSP-2027-02 for 9 months, renewal not pre-approved
Changes from the recommendationExample: None
Reasons[Short reasoned statement citing baseline items]
Votes or consensus[Consensus / For n, against n, abstain n]
Declared interests[Member, item, effect]
Signed[@chair], YYYY-MM-DD

11.3 What the outcome allows

Example: The delivery party may start build of WP-02. Go-live is not permitted until C1 and C2 are verified at the pre-production review (review point R3 in AC-02). Disputes about any rating follow the escalation route in the board charter, section 10.

12. Follow-up and re-assessment

ItemRule
Condition trackingLead assessor reviews open conditions [every two weeks] and reports overdue items to the board secretary
Next review pointExample: Pre-production review R3, planned YYYY-MM-DD; reuse this checklist and add build evidence
Re-assessment triggersMaterial design change, new external interface, change of hosting, new category of personal data, failed condition
Dispensation reviewAt each board meeting until expiry; renewal requires a new risk assessment
Post-implementationRealised architecture and drift checked in the post-implementation review (project/post-implementation-review)
Periodic healthAfter go-live, the solution enters the periodic health check cycle (architecture/architecture-health-check)

Lessons about the assessment process itself (late evidence, unclear checks, missing baseline items) go to the board secretary for the annual review of the charter.

13. Glossary and references

13.1 Glossary

TermMeaning in this document
Compliance assessmentA recorded review of whether a project's design or build conforms to the approved architecture it is bound by
Baseline (for assessment)The set of approved documents and versions the project is measured against
Architecture ContractThe agreement between the architecture function and a delivery party on what is built and how conformance is checked
CheckA closed question, tied to a baseline item, answered from evidence
Critical checkA check whose failure prevents a positive outcome unless a dispensation is granted
ConditionA dated requirement the project must meet for the outcome to stand
DispensationA time-limited, risk-accepted permission to depart from a principle or standard
Roll-upThe published rules that turn many check ratings into one overall rating
Review pointA planned moment in delivery when an assessment takes place
[Term][Meaning]

13.2 References

IDReferenceVersion / date
REF-01The TOGAF Standard, 10th Edition (The Open Group, catalogue C220), incorporating Technical Corrigendum 1 (U254, 15 May 2025)19 May 2025
REF-02Architecture Board Charter (architecture/architecture-governance-charter)[x.y]
REF-03Architecture Contract (architecture/architecture-contract)[x.y]
REF-04Architecture Requirements Specification (architecture/architecture-requirements-specification)[x.y]
REF-05Architecture Definition Document (architecture/architecture-definition-document)[x.y]
REF-06Architecture Review Request (architecture/architecture-review-request)[x.y]
REF-07Architecture Change Request, for changes the assessment exposes (architecture/architecture-change-request)[x.y]
REF-08Technology radar (architecture/tech-radar)[Date]
REF-09Tech debt register (architecture/tech-debt-register)[Date]

Standard and licence note

Structure aligned with The TOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1), published by The Open Group: Architecture Compliance and the Compliance Assessment used during Phase G (Implementation Governance) of the Architecture Development Method, under an Architecture Contract and the Architecture Board. TOGAF and ArchiMate are registered trademarks of The Open Group. This template uses only the names of phases and deliverables; all text is original, including the check questions, the six-point rating scale, the roll-up rules and the severity scale, and no definitions, tables, checklists or other text from the standard are reproduced. Check the current edition at opengroup.org and obtain the standard for its full guidance. Template licence: MIT.