Markdown Editor

TOGAF EA Practitioner Scenario Workbook Template

Exam codes and format, readiness by ADM phase, six-step scenario method, phase and deliverable locator, six fictional scenarios, attempt and error logs

ArsitekturLengkapTOGAF EA Practitioner certification (OGEA-101/102/103/10B); TOGAF Standard, 10th Edition (names only)togafpractitionerscenarioworkbook

Cara menggunakan: Use it when you prepare for the scenario-based TOGAF EA Practitioner exam (OGEA-102, OGEA-103 or the OGEA-10B bridge). Learn the six-step method first, then work the fictional scenarios under 11-minute timing and log every ranking. The main pitfall is choosing the most technically complete option instead of the one that fits where the work stands.

Pratinjau

Scenario Practice Workbook: TOGAF EA Practitioner ([Candidate or study group])

Practice log for the scenario-based part of the TOGAF Enterprise Architecture Practitioner certification (exam OGEA-102, or the Part 2 section of OGEA-103 and the Section 2 questions of the OGEA-10B bridge), aligned with the TOGAF Standard, 10th Edition. It gives a repeatable analysis method (locate the phase, name the stakeholders and concerns, find the governing artefacts, rank every answer option with a reason), six fictional practice scenarios written for this template, an error log and an open-book navigation plan. It contains no text from the TOGAF Standard or from any study guide: it uses only the names of ADM phases and deliverables. Study the content itself from your own licensed copy. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document ID[TOGAF-WB-001]
Candidate or study group[Name]
Target exam[OGEA-102 / OGEA-103 / OGEA-10B]
Certification path[Foundation held, Part 2 only / Combined / Bridge from TOGAF 9 Certified]
Edition studiedTOGAF Standard, 10th Edition ([licensed copy, update and corrigendum level])
Training provider[Accredited provider / Self-study]
Target exam dateYYYY-MM-DD
Version[0.1]
Status[Draft / In progress / Exam ready / Archived]
Owner[@candidate]
Approvers/reviewers[@mentor], [@study-partner]
Last updatedYYYY-MM-DD
Classification[Personal / Internal]

Approvals

RoleNameDecisionDate
Candidate[@candidate][Ready to book / Not ready]YYYY-MM-DD
Mentor or reviewer[@mentor][Agree / Revise plan]YYYY-MM-DD
Training budget owner[@manager][Approve exam fee / Defer]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@candidate]Exam facts recorded, readiness baseline
0.2YYYY-MM-DD[@candidate]Example: Six practice scenarios attempted under timing
1.0YYYY-MM-DD[@candidate]Example: Readiness gate met, exam booked

Contents

1. Purpose and exam facts

Scenario questions test judgement rather than recall. Each presents an organisation, a situation in the architecture work and four candidate responses that all sound reasonable. The candidate who scores well is the one who reads the scenario as a practising architect would: where are we in the work, who cares about the outcome, which agreed artefact governs the next step, and which response moves the work forward without skipping governance. This workbook drills that reading habit with original scenarios.

1.1 Exam codes and paths

Exam codeExamWho takes it
OGEA-101TOGAF Enterprise Architecture Part 1Candidates without TOGAF EA Foundation who take the parts separately
OGEA-102TOGAF Enterprise Architecture Part 2Candidates who hold TOGAF EA Foundation or have passed Part 1
OGEA-103TOGAF Enterprise Architecture Combined Part 1 and Part 2Candidates taking both parts in one sitting
OGEA-10BTOGAF Enterprise Architecture BridgeHolders of TOGAF 9 Certified

1.2 Format as stated in the Open Group datasheets

ExamQuestion typeQuestions and timePass markOpen book
Part 1Multiple choice40 questions, 60 minutes24 of 40 (60%)No
Part 2Complex multiple-choice, scenario based8 questions, 90 minutes24 of 40 (60%)Yes
BridgeSection 1: 10 multiple-choice questions in 20 minutes; Section 2: 4 questions in 40 minutes14 questions, 60 minutes in total18 of 30 (60%)Section 2 only

All three exams are supervised and delivered at Pearson VUE test centres or online through OnVUE. Part 2 awards 40 marks across 8 questions, so a single question carries several marks; check the current examination rules from the Open Group for how marks are allocated between the options before you plan your answer strategy. Candidates who also complete the Learning Studies in an accredited course earn an additional Applied Practitioner badge.

1.3 Licence rule for this workbook

The TOGAF Standard is a licensed publication of The Open Group. This workbook uses only the names of ADM phases and deliverables. Do not paste text from the standard, a study guide or course material into it, and do not write summaries of it here. Where the method below says "check the standard", open your own licensed copy and record only a page or section pointer in section 9.

2. Readiness tracker by phase

AreaRating round 1Rating round 2Rating round 3Practice scenarios attemptedMain weakness
Preliminary Phase[1 to 5][ ][ ][n][Weakness]
Phase A: Architecture Vision[ ][ ][ ][n][Weakness]
Phase B: Business Architecture[ ][ ][ ][n][Weakness]
Phase C: Information Systems Architectures (Data and Application)[ ][ ][ ][n][Weakness]
Phase D: Technology Architecture[ ][ ][ ][n][Weakness]
Phase E: Opportunities and Solutions[ ][ ][ ][n][Weakness]
Phase F: Migration Planning[ ][ ][ ][n][Weakness]
Phase G: Implementation Governance[ ][ ][ ][n][Weakness]
Phase H: Architecture Change Management[ ][ ][ ][n][Weakness]
Requirements Management[ ][ ][ ][n][Weakness]
Stakeholder management technique[ ][ ][ ][n][Weakness]
Architecture governance and contracts[ ][ ][ ][n][Weakness]
Example: Phase G: Implementation Governance2343Accepted deviations without a formal dispensation

3. Scenario analysis method

The method below is original to this workbook. It does not restate the standard; it is a reading discipline for any scenario question.

StepQuestion to answerWhat to writeTypical trap
1 LocateWhich phase is the work in, and is that phase starting, under way or ending?Phase name plus "start", "mid" or "close"Treating the question as being about the phase that is mentioned last in the text
2 StakeholdersWho is named, what does each of them worry about, and who has authority to decide?Two to five stakeholders with one concern eachIgnoring a stakeholder mentioned only once, such as a regulator or a works council
3 Governing artefactsWhich documents or agreements already exist and bind the next step?Names of agreed deliverables, principles, contracts or plansProposing to create something that the scenario says already exists
4 RiskWhat goes wrong if the architect acts too early, too late or outside governance?One sentenceIgnoring time pressure or budget limits stated in the scenario
5 Test optionsDoes each option fit the phase, address the key concerns and respect the governing artefacts?A tick or cross per step for each optionRewarding an option for length or detail
6 RankWhich option is best, which is second, which is a distractor and which is wrong?Ranking with a reason per optionChoosing between two options without ranking the other two

3.1 Option tests

Apply these tests to each option in step 5. They are judgement heuristics written for this workbook.

  • Fit to state: an option that belongs to a later phase is usually premature; one that belongs to an earlier phase is usually redundant unless the scenario signals that earlier work is missing or invalid.
  • Concern coverage: the best option addresses the concern of the stakeholder with decision authority and does not ignore the concern of a stakeholder with a veto (legal, regulator, security).
  • Governance respect: an option that bypasses an agreed contract, principle or board is weak even when it would be faster.
  • Reuse before create: an option that builds on artefacts already in the repository beats one that starts again.
  • Proportion: an option that matches effort to the size of the problem beats one that launches a full new cycle for a small change, or one that patches a structural problem.
  • Traceability: an option that keeps requirements, decisions and changes traceable beats one that relies on informal agreement.

4. Phase and deliverable locator

Phase or areaScenario signals (practice wording)Deliverable names to look forLibrary template
Preliminary PhaseOrganisation has no agreed way of doing architecture; principles absent; unclear who sponsors architecture workArchitecture Principles, Tailored Architecture Framework, Organizational Model for Enterprise Architecture, Request for Architecture WorkArchitecture Principles (architecture/architecture-principles), Request for Architecture Work (architecture/request-for-architecture-work)
Phase A: Architecture VisionA sponsor has asked for work; scope, goals and stakeholders need to be agreed before detailed workArchitecture Vision, Statement of Architecture Work, Communications Plan, Capability AssessmentTOGAF Architecture Vision (architecture/togaf-architecture-vision), Statement of Architecture Work (architecture/statement-of-architecture-work)
Phases B, C, DBaseline and target descriptions are being developed; gaps across business, data, application and technology must be foundArchitecture Definition Document, Architecture Requirements Specification, Architecture Building BlocksArchitecture Definition Document (architecture/architecture-definition-document), Architecture Requirements Specification (architecture/architecture-requirements-specification)
Phase E: Opportunities and SolutionsTarget is agreed; the question is how to group work into deliverable packages and what to build, buy or reuseArchitecture Roadmap, Transition Architecture, Solution Building BlocksArchitecture Roadmap and Transition (architecture/architecture-roadmap-transition), Build vs Buy Analysis (architecture/build-vs-buy-analysis)
Phase F: Migration PlanningPackages exist; they must be sequenced, costed and agreed with portfolio and project managementImplementation and Migration Plan, Implementation Governance Model, Architecture Roadmap, Transition ArchitectureArchitecture Roadmap and Transition (architecture/architecture-roadmap-transition)
Phase G: Implementation GovernanceProjects are building; deviations, compliance reviews and contracts are in playArchitecture Contract, Compliance Assessment, Change RequestArchitecture Contract (architecture/architecture-contract), Architecture Compliance Assessment (architecture/architecture-compliance-assessment)
Phase H: Architecture Change ManagementSomething changed after implementation began or ended: regulation, technology, strategyChange Request, Requirements Impact AssessmentArchitecture Change Request (architecture/architecture-change-request)
Requirements ManagementRequirements are new, changed or in conflict at any point in the cycleArchitecture Requirements Specification, Requirements Impact AssessmentArchitecture Requirements Specification (architecture/architecture-requirements-specification)
Governance across the cycleWho decides, how disputes and dispensations are handledArchitecture Contract, Compliance AssessmentArchitecture Governance Charter (architecture/architecture-governance-charter)

5. Stakeholder and concern worksheet

IDScenarioStakeholderConcern (one line)AuthorityCan block?Option that best answers this concern
STK-001 (Example)PS-01Chief Operating Officer (sponsor)Smart metering benefits within two yearsApproves scope and fundingYesA
STK-002 (Example)PS-01Regulator liaisonBilling accuracy rules must not be breachedAdvises the boardYesA
STK-003 (Example)PS-02Data protection officerPatient data merged without a lawful basisCan stop processingYesB
STK-004 (Example)PS-02Clinical directorsNo downtime of patient administration during the mergeStrong influencePartlyB
STK-005 (Example)PS-04Programme directorDelivery date for the claims platformOwns the project budgetPartlyC
[STK-NNN][PS-NN][Stakeholder][Concern][Authority][Yes / Partly / No][Option]

For real engagements, keep stakeholders in the Stakeholder Register (project/stakeholder-register).

6. Fictional practice scenarios

Each scenario gives a context, a question and four options, followed by a model ranking and the reason for each position. The model ranking applies the method in section 3; argue with it in your log if your reasoning differs.

6.1 PS-01 Brightwater Water: starting the engagement

Example: Brightwater Water is a fictional regional water utility. Last year it set up a small architecture team, and the executive board approved a set of architecture principles and a governance board. The Chief Operating Officer now asks the architecture team to support a smart metering programme intended to cut leakage and automate billing. The finance director, the head of field operations and the regulator liaison each describe the scope differently: finance sees a billing project, operations sees a sensor network, the regulator liaison worries about billing accuracy rules. No document yet records what the engagement covers.

Question: what should the lead architect do next?

OptionResponse
AHold sessions with the sponsor and the named stakeholders to agree goals, scope, constraints and concerns, draft the Architecture Vision and seek approval of a Statement of Architecture Work
BAsk the board to re-approve the architecture principles and define a tailored framework before any engagement starts
CBegin documenting the baseline business processes for meter reading and billing so that the gaps are known early
DIssue a request for information to meter vendors so that feasible solutions are understood before scope is fixed

Model ranking: A, C, B, D. A fits the start of Phase A: a request exists, scope is disputed and stakeholders must agree before detailed work. C is useful work but belongs later; it would also proceed without an agreed scope. B repeats Preliminary work the scenario says is already done. D jumps to solutions and lets vendors shape scope, which ignores the regulator concern.

6.2 PS-02 Kestrel Health: conflicting concerns in the target design

Example: Kestrel Health is a fictional hospital group formed by merging two trusts, each with its own patient administration system. An approved Statement of Architecture Work asks for a single target architecture within nine months. During business and data architecture work, the clinical directors insist that no patient administration downtime is acceptable, while the data protection officer warns that combining patient records from both trusts needs a documented lawful basis and a data minimisation review. The application team has already proposed choosing the larger trust's system.

Question: how should the architect proceed with the target architecture?

OptionResponse
AAdopt the larger trust's system as the target now, since it covers most patients, and treat data protection as a project task
BRecord both concerns as architecture requirements, develop target data and application options that address them, assess gaps and trade-offs with both stakeholders, and capture the outcome in the Architecture Definition Document and the Architecture Requirements Specification
CEscalate to the governance board and pause until the clinical and data protection leads agree between themselves
DDevelop the technology architecture first, because hosting and availability determine whether zero downtime is achievable

Model ranking: B, C, D, A. B is mid-cycle work in Phases B and C: it turns concerns into requirements, keeps options open and records the result in the agreed deliverables. C is a reasonable fallback if analysis fails, but pausing before analysis is premature. D addresses only one concern and reverses the natural dependency of technology on data and application decisions. A pre-empts the architecture and ignores a stakeholder who can stop the processing.

6.3 PS-03 Corvane Mutual: budget cut after the target is agreed

Example: Corvane Mutual is a fictional insurer. Its board approved an Architecture Definition Document for a new policy and claims platform with a three-year roadmap. A month later, the budget is cut by 30 percent. The portfolio office asks the architecture team what can still be delivered and in what order. Several work packages depend on a new customer data hub.

Question: what is the best response?

OptionResponse
AKeep the approved target, re-prioritise and re-sequence the work packages by business value and dependency (keeping the customer data hub early), define revised transition architectures, and agree an updated Architecture Roadmap and Implementation and Migration Plan with the portfolio office
BReduce the target architecture to fit the new budget and reissue the Architecture Definition Document without stakeholder review
CRestart the engagement from the Architecture Vision because the business case has changed
DLet each project manager decide which features to drop within their own budget

Model ranking: A, C, B, D. A works in Phases E and F with the portfolio office, keeps the agreed target as the direction and respects dependencies. C is defensible only if the cut invalidates the business goals; the scenario does not say so, so it is disproportionate. B changes an approved deliverable without governance. D loses architectural control and breaks the dependency on the data hub.

6.4 PS-04 Corvane Mutual: a delivery partner deviates

Example: Implementation of the Corvane Mutual claims platform is under way. An Architecture Contract with the delivery partner requires event-based integration through the enterprise integration platform. A compliance review finds that the partner has built direct database links between the claims and billing systems to meet a deadline. The programme director argues that the deadline matters more.

Question: what should the architect do?

OptionResponse
AAccept the deviation informally because the deadline is fixed and the links can be replaced later
BStop the project until the partner removes the database links
CRecord the non-compliance in a Compliance Assessment, take it to the governance board, which may grant a time-limited dispensation with conditions and a remediation date, and update the contract and roadmap accordingly
DChange the target architecture to allow direct database links, because the delivery reality has shown that events are impractical

Model ranking: C, B, D, A. C is Phase G governance: it uses the existing contract, makes the deviation visible, lets the authorised body decide and keeps remediation traceable. B upholds the architecture but ignores a legitimate business concern and the board's role. D treats one project's shortcut as a reason to change the enterprise target without a change process. A hides the deviation and creates unmanaged technical debt.

6.5 PS-05 Larch Rail: a regulation changes after go-live

Example: Larch Rail is a fictional train operator that completed a ticketing modernisation last year. A new accessibility regulation now requires every ticket channel to support assisted booking and to record accessibility requests for audit. The change affects the mobile app, the booking API and the customer data model, but not the core fare engine.

Question: how should the architecture team respond?

OptionResponse
ARaise a Change Request, assess the impact on the existing architecture and requirements, and decide through governance whether the change can be handled within the current architecture or needs a new architecture cycle
BStart a full new architecture engagement from the Preliminary Phase
CAsk the mobile team to add the feature in the next release, as it is mainly a user interface change
DWait until the next planned architecture review before considering the regulation

Model ranking: A, C, B, D. A fits Phase H: it assesses impact before choosing the scale of response, and it keeps requirements traceable. C would deliver part of the change quickly but misses the API and data model impact and the audit record. B is disproportionate for a bounded change. D risks non-compliance with a legal deadline.

6.6 PS-06 Larch Rail: a requirement changes in the middle of the cycle

Example: During application architecture work for a new freight booking service at Larch Rail, the commercial director announces that freight customers must be able to book through partner platforms, not only through the Larch portal. Data architecture is nearly complete; technology architecture has not started.

Question: what should happen to this new requirement?

OptionResponse
AAdd it to the technology architecture when that work starts, since partner access is an integration concern
BRecord it in the Architecture Requirements Specification, assess its impact on the business, data and application work already done, and agree with stakeholders any rework before continuing
CTreat it as out of scope and refer it to a future engagement because the Statement of Architecture Work did not mention partners
DRework the Architecture Vision immediately and seek new approval of the whole engagement

Model ranking: B, D, C, A. B is requirements management in action: it captures the change, checks its effect on completed work and keeps stakeholders aligned. D may become necessary if the change alters the engagement goals, but impact should be assessed first. C may be right if the sponsor confirms it is out of scope, yet dismissing it without assessment ignores the commercial director. A defers a change that affects business and data decisions already in progress.

7. Attempt log

Attempt IDDateScenarioPhase locatedMy rankingReference rankingTop choice correct?Time (minutes)Error type (section 8)
ATT-001 (Example)YYYY-MM-DDPS-01Phase A, startA, B, C, DA, C, B, DYes9ERR-03
ATT-002 (Example)YYYY-MM-DDPS-02Phases B and C, midB, D, C, AB, C, D, AYes13ERR-05
ATT-003 (Example)YYYY-MM-DDPS-04Phase G, midA, C, B, DC, B, D, ANo12ERR-04
ATT-004 (Example)YYYY-MM-DDPS-05Phase H, startA, C, B, DA, C, B, DYes8None
[ATT-NNN]YYYY-MM-DD[PS-NN][Phase, state][Ranking][Ranking][Yes / No][n][ERR-NN]

Summary measures to track per round: share of top choices correct, share of full rankings matching, average time per scenario and the most frequent error type.

8. Error pattern analysis

Error typeDescriptionRemedyCount round 1Count round 2
ERR-01 Wrong phasePlaced the scenario in the wrong phase or the wrong state of a phaseRe-run step 1 and underline every time and status word in the scenario[n][n]
ERR-02 Missed stakeholderIgnored a stakeholder who can block the outcomeList every named role before reading options[n][n]
ERR-03 Redundant workPreferred an option that repeats work the scenario says is doneCheck step 3 for artefacts that already exist[n][n]
ERR-04 Governance bypassPreferred a fast option that skips a contract, board or principleApply the governance respect test[n][n]
ERR-05 DisproportionChose a full restart for a small change, or a patch for a structural problemApply the proportion test[n][n]
ERR-06 Solution firstChose vendor or technology action before the architecture supports itAsk whether the scope and target are agreed yet[n][n]
ERR-07 Time overrunCorrect reasoning but ran out of timePractise under the 11-minute budget; skim options before the full context[n][n]

Example: after round 1 the log shows ERR-04 three times and ERR-03 twice; the next study block focuses on Phase G scenarios and on the Architecture Contract and Compliance Assessment deliverables in the licensed copy.

9. Open-book navigation plan

Topic I may need to checkWhere in my licensed copy (pointer only)Time to find (seconds)Checked on
Phase A objectives and steps[Volume, section number][n]YYYY-MM-DD
Phases B, C, D steps and gap analysis technique[Pointer][n]YYYY-MM-DD
Phase E and F steps[Pointer][n]YYYY-MM-DD
Phase G and Architecture Contract[Pointer][n]YYYY-MM-DD
Phase H and change handling[Pointer][n]YYYY-MM-DD
Requirements Management[Pointer][n]YYYY-MM-DD
Stakeholder management technique[Pointer][n]YYYY-MM-DD
Deliverable descriptions[Pointer][n]YYYY-MM-DD
Architecture levels and the Architecture Landscape[Pointer][n]YYYY-MM-DD

Navigation rules: use the open book to confirm a judgement you have already made with the method, not to discover the answer. If a lookup takes longer than two minutes, answer from your ranking and move on.

10. Exam-day plan

StepTime budget per scenario (Part 2)Action
11 minuteRead the question line, then skim the four options to see what they disagree about
24 minutesRead the scenario; write the phase, stakeholders, governing artefacts and risk
34 minutesTest each option and rank all four
41 minuteOptional lookup in the licensed copy to confirm a doubt
5About 1 minuteRecord the answer and move on

Example: 8 scenarios x 11 minutes = 88 minutes, leaving 2 minutes of the 90 for a final check of flagged items. For the bridge Section 2, 4 questions in 40 minutes gives 10 minutes each; trim step 4.

Readiness gate before booking:

CriterionTargetCurrentMet
Every area in section 2 rated 3 or higher12 of 12[n][Yes / No]
Scenarios attempted under timingAt least 20, including self-written ones[n][Yes / No]
Top choice correct in the last two rounds[Target you set, e.g. 75%][x%][Yes / No]
Average time per scenario11 minutes or less[n][Yes / No]
Personal open-book index testedEvery topic found in under 60 seconds[n][Yes / No]

11. Glossary and references

11.1 Glossary

TermMeaning in this workbook
ADMArchitecture Development Method, the TOGAF cycle of phases named in section 2
Scenario questionQuestion built on a described organisation and situation, with four candidate responses
RankingOrdering all four options from best to worst with a reason for each
Governing artefactA deliverable or agreement already approved that constrains the next step
Stakeholder concernAn interest or worry that a stakeholder needs the architecture to address
DispensationA governed, usually time-limited permission to deviate from an agreed architecture
Open bookThe candidate may consult a permitted copy of the standard during the exam

11.2 References

ReferenceVersion or date checkedUse
The Open Group, TOGAF Certification Portfolio page, opengroup.org/certifications/togafChecked 2026-10-23Exam codes and certification paths
The Open Group, TOGAF Enterprise Architecture Practitioner datasheet, linked from the certification pageChecked 2026-10-23Part 1 and Part 2 format and pass marks
The Open Group, TOGAF Enterprise Architecture Practitioner Bridge datasheet, linked from the certification pageChecked 2026-10-23Bridge format and pass mark
The Open Group publications catalogue, The TOGAF Standard, 10th Edition (C220), publications.opengroup.orgChecked 2026-10-23Edition name only
Your licensed copy of the TOGAF Standard, 10th Edition[Update and corrigendum level]All content study

Standard and licence note

Structure aligned with the certification structure published by The Open Group for the TOGAF Enterprise Architecture Practitioner certification (exam codes OGEA-101, OGEA-102, OGEA-103 and OGEA-10B, format facts as stated in the datasheets linked from the certification page on 2026-10-23) and with the TOGAF Standard, 10th Edition. TOGAF and ArchiMate are registered trademarks of The Open Group. This template uses only the names of ADM phases and deliverables; all text, including the analysis method and the six fictional scenarios, is original and was written without reference to the text of the standard or any study guide. This template is not affiliated with or endorsed by The Open Group. Check the current certification page, datasheets and examination rules before use. Template licence: MIT.

Templat terkait