Utility integration on IEC CIM: 61968 reference model, system of record per CIM package, profiles, 61968-100 messages, CGMES, model management, 62351

Arsitektur IndustriLengkapIEC 61970-301:2020+AMD1:2022; IEC 61968-11; IEC 61968-100; CGMES 3.0; IEC 62351utilitycimintegrationdesign

Cara menggunakan: Use it when integrating EMS, ADMS, OMS, GIS, MDM and asset systems on the Common Information Model. Fill the system of record per CIM class group and the profile register first. The main pitfall is two systems both mastering network connectivity, which breaks every model load.

Pratinjau

Utility Integration Design (IEC CIM): [Utility or programme name]

Solution design for integrating utility operational and business systems (EMS, ADMS and DMS, OMS, GIS, MDM, asset management, customer and billing, market systems) on the IEC Common Information Model. The structure follows the IEC 61970 and IEC 61968 series: the CIM base in IEC 61970-301:2020+AMD1:2022, the distribution extensions in IEC 61968-11, the message implementation profile in IEC 61968-100, grid model exchange with CGMES 3.0 (IEC TS 61970-600-1 and -600-2:2021, ENTSO-E) and security with the IEC 62351 series. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document ID[CIM-INT-001]
Version[0.1]
Status[Draft / In review / Approved / Superseded]
Owner[@utility-integration-architect]
Approvers/reviewers[@network-model-manager], [@control-room-lead], [@gis-lead], [@ot-security-lead], [@enterprise-architect]
Utility type and segments[TSO / DSO / vertically integrated / water or gas], [transmission, distribution, metering]
CIM baseline[CIM UML release, e.g. CIM17 or later], IEC 61970-301:2020+AMD1:2022, IEC 61968-11 [edition]
Profiles in use[CGMES 3.0, distribution profiles, IEC 61968-9 metering, local profiles]
Regulatory context[ENTSO-E network codes, national regulator, NIS2 or national critical infrastructure rules]
Classification[Internal / Confidential / Critical infrastructure restricted]
Last updatedYYYY-MM-DD

Approvals

RoleNameDecisionDate
Network model manager[@name][Approve / Approve with conditions / Reject]YYYY-MM-DD
Control room operations[@name][Decision]YYYY-MM-DD
OT security[@name][Decision]YYYY-MM-DD
Architecture board[@name][Decision]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]First draft
1.0YYYY-MM-DD[@name]Example: Approved for ADMS phase 1
1.1YYYY-MM-DD[@name]Example: Moved grid model exchange from CGMES 2.4.15 to CGMES 3.0

Contents

1. Scope and drivers

1.1 Scope

In scopeOut of scope
Example: As-built distribution network model from GIS to ADMS and OMSProtection relay settings management
Example: Meter events and readings from MDM to OMS and billingHead-end to meter communication protocols
Example: Transmission grid model exchange with the regional coordination centre in CGMESMarket bidding and settlement
Example: Work orders between ADMS, asset management and mobile workforce[Item]

1.2 Drivers

IDDriverMeasureTarget
DRV-001 (Example)One network model for control room and planningModel build time from GIS change to ADMSUnder [24 hours]
DRV-002 (Example)Faster outage restorationMeter last-gasp events reaching OMSUnder [60 seconds]
DRV-003 (Example)Regulatory model exchangeAccepted CGMES submissions[100 %] on schedule
[DRV-NNN][Driver][Measure][Target]

2. Requirements

2.1 Functional requirements

IDRequirementPriorityAcceptance criterion
FR-001 (Example)GIS publishes network changes as incremental model updates to ADMSMustADMS applies a test change set without a full model reload
FR-002 (Example)MDM sends meter outage and restoration events to OMSMustEvents correlated to the correct transformer in 99 % of tests
FR-003 (Example)OMS sends outage records to customer systems for notificationMustCustomer notice within [10 minutes] of outage confirmation
FR-004 (Example)EMS exports the transmission model and state in CGMES 3.0MustFiles pass the ENTSO-E validation rules used by the coordination centre
FR-005 (Example)Asset management receives equipment changes from field work ordersShouldAsset record updated within one working day
[FR-NNN][Requirement][Must / Should / Could][Criterion]

2.2 Quality attributes

IDAttributeRequirementVerification
NFR-001 (Example)Model sizeDistribution model of [n] million objects loads within [n hours]Load test
NFR-002 (Example)Event latencyMeter events under [60 seconds] end to end during storm volumes of [n] events per minuteStorm simulation
NFR-003 (Example)AvailabilityControl room interfaces keep working when the enterprise integration platform is downFailover test
NFR-004 (Example)SecurityInterfaces to control systems meet the zone rules in section 9Security review
[NFR-NNN][Attribute][Requirement][Verification]

2.3 Volumes and sizing

State the volumes that size the broker, the model repository and the OMS interfaces, and write down what each number means for the design. The figures below are a worked example for a mid-sized distribution utility; replace them with your own.

IDQuantityExample valueDerivationDesign consequence
VOL-001 (Example)Metered usage points1,200,000Customer registerUsage point mRIDs and the MDM to OMS mapping table hold 1.2 million rows
VOL-002 (Example)Meters losing supply in a severe storm hour150,00012.5 % of VOL-001Worst-case burst for MSG-001
VOL-003 (Example)Last-gasp messages received by the head-end90,000 in the first 30 minutes60 % reception rate of VOL-002 (last gasps are often lost when the network itself is down)3,000 events per minute on average; size the broker and the OMS adapter for 3 times that peak, 9,000 per minute, which becomes the NFR-002 storm figure
VOL-004 (Example)Distribution network objects4,000,000GIS export countA full model load is an hours-long job, so full reloads are a recovery path only (DEC-002)
VOL-005 (Example)Approved GIS jobs per working day300GIS workflow statisticsAbout 300 difference models a day; at an average of 200 changed objects each, 60,000 object changes a day flow through VAL rules
VOL-006 (Example)Outage records created per storm day2,500OMS historyMSG-003 volume is modest; latency, not throughput, drives its design

Check the arithmetic each time a value changes: VOL-003 divided by 30 minutes gives the average rate, and VOL-005 times the average change-set size gives the daily validation load.

3. System landscape and IEC 61968 interface reference model

Business function (IEC 61968-1 name)SystemProductOwner
Network operations (Example)ADMS, OMS[Product]@control-room-lead
Records and asset management (Example)GIS, asset management[Product]@gis-lead
Operational planning and optimisation (Example)ADMS study mode[Product]@operations-planning
Maintenance and construction (Example)Work management, mobile workforce[Product]@field-ops
Network extension planning (Example)Planning tool[Product]@network-planning
Customer support (Example)CRM, customer portal[Product]@customer-it
Meter reading and control (Example)MDM, head-end[Product]@metering-lead
Energy management (IEC 61970 scope) (Example)EMS, SCADA[Product]@transmission-ops

4. Canonical model and system of record

CIM package or class groupSystem of recordConsumersIdentifier ruleNotes
Wires and connectivity (conducting equipment, terminals, connectivity nodes) (Example)GIS for distribution, EMS modelling tool for transmissionADMS, OMS, planningPersistent mRID (UUID) assigned at creation, never reusedBoundary between GIS and EMS at the primary substation busbar
Assets (asset, asset info, lifecycle) (Example)Asset managementGIS, ADMSAsset mRID plus asset tagLinked to power system resources
Measurements (analog, discrete, accumulator) (Example)SCADA point databaseADMS, historianmRID per measurement, mapped to SCADA point ID
Metering (usage point, meter, readings, end device events) (Example)MDMOMS, billingUsage point IDEvent types from IEC 61968-9
Customers and service locations (Example)CRM and billingOMS, MDMCustomer account IDPersonal data minimised in operational systems
Work (work, work tasks) (Example)Work managementADMS, asset managementWork order number
[Package or class group][System][Consumers][Rule][Notes]

Rules:

  • Use the CIM master resource identifier (mRID) as the cross-system key for every exchanged object; keep local keys only as name aliases.
  • Extend the CIM only in a utility namespace, record each extension in section 5.3 and propose it to the CIM Users Group when it is of general use.
  • Never transform the meaning of a class between systems; if two systems disagree on what an object is, resolve it in the system of record.

4.1 Identifier governance

IDRuleReason
IDG-001 (Example)The system of record creates the mRID at object creation, as a UUID, and never changes it, even when the object is moved, renamed or re-parentedConsumers keep history and links across model releases
IDG-002 (Example)Replaced equipment gets a new mRID; the asset swap is recorded in the Assets package, not by reusing the old power system resource identifierSeparates the functional position from the physical asset installed there
IDG-003 (Example)Each consumer stores the mRID alongside its local key; a cross-reference service answers lookups in both directionsAdapters do not need their own mapping tables
IDG-004 (Example)Objects at the GIS and EMS boundary (primary substation busbars) are created once by the transmission model authority and referenced by the distribution modelStops duplicate boundary objects when the two models are merged
IDG-005 (Example)Deleted objects keep their mRID in a tombstone list for [7 years]Historic outage and asset records still resolve
[IDG-NNN][Rule][Reason]

Migration note: legacy systems rarely hold stable identifiers. Before the first model load, run an identifier assignment exercise: generate mRIDs in the system of record, publish the local key to mRID map, and freeze local key reuse from that date.

5. CIM profile selection and governance

5.1 Profile register

Profile IDProfileBasisVersionUsed byOwner
PRF-001 (Example)Distribution network model (equipment, topology, geography)IEC 61968-13 distribution profiles, local restrictions[Version]GIS to NMM to ADMS@network-model-manager
PRF-002 (Example)Transmission grid model and stateCGMES 3.0 (IEC TS 61970-600-1 and -600-2:2021, ENTSO-E)3.0EMS to coordination centre@transmission-ops
PRF-003 (Example)Meter end device eventsIEC 61968-9 message types[Edition]MDM to OMS@metering-lead
PRF-004 (Example)Outage recordsLocal profile on CIM Operations and Customers packages[Version]OMS to CRM@integration-lead
[PRF-NNN][Profile][Basis][Version][Used by][@owner]

5.2 Profile governance

StepRule
Authoring (Example)Profiles are built from the baseline CIM UML in a profiling tool and stored with the UML in version control
Artefacts (Example)Each profile publishes RDF schema or XML schema, documentation and validation rules
Versioning (Example)Semantic versions; breaking changes need a migration window of [two releases]
Change board (Example)Monthly; members from GIS, control room, metering, integration
Baseline upgrade (Example)Review each new CIM release once a year; upgrade profiles only with a business need

5.3 Extension register

Extension IDClass or attributeReasonNamespaceProposed upstream
EXT-001 (Example)Local feeder colour code attributeRequired by field crewshttp://[utility]/cim/ext#No
[EXT-NNN][Item][Reason][Namespace][Yes / No]

6. Message design (IEC 61968-100)

6.1 Message catalogue

IDNoun (profile)Verb patternSourceTargetTransportPatternLatency class
MSG-001 (Example)EndDeviceEvents (PRF-003)created (event)MDMOMSMessage broker topicPublish and subscribeSeconds
MSG-002 (Example)MeterReadingsget, replyOMSMDMWeb service or RESTRequest and replySeconds
MSG-003 (Example)OutageRecords (PRF-004)created, changed, closedOMSCRMMessage brokerPublish and subscribeMinutes
MSG-004 (Example)WorkOrderscreate, then replyADMSWork managementMessage broker queueAsynchronous request and replyMinutes
MSG-005 (Example)Network model change set (PRF-001)Model exchange, not a messageNMMADMSFile or model repositorySection 7Hours
[MSG-NNN][Noun][Verb][Source][Target][Transport][Pattern][Class]

6.2 Envelope and header rules

IDRule
HDR-001 (Example)Every message carries a message ID, correlation ID, timestamp in UTC, source system and user or service identity
HDR-002 (Example)Replies carry a result (OK, partial, failed) and error codes from the utility error catalogue
HDR-003 (Example)Payloads validate against the profile schema before publishing; invalid payloads go to an error queue
HDR-004 (Example)Large payloads are compressed and flagged in the header, or exchanged as files with a reference message
HDR-005 (Example)Event consumers are idempotent on message ID
[HDR-NNN][Rule]

6.3 Storm behaviour

During major events, meter last-gasp messages arrive in bursts. Design for the worst case named in NFR-002 and sized in VOL-003: buffer at the broker, filter duplicates by usage point and time window, prioritise events for already-predicted outages lower than new ones, and protect the OMS with a rate limit and back-pressure rather than dropping messages silently.

Design choices for the storm path:

OptionHow it worksStrengthWeakness
A. Pass every event to OMS (Example)Broker forwards all MSG-001 eventsSimple; OMS sees everythingOMS prediction engine saturates at storm peak
B. Aggregate in the adapter (Example)Adapter groups events per distribution transformer over a [60 second] window and sends one summary per transformerCuts volume by roughly the meters per transformer ratioAdds up to one window of latency; needs the usage point to transformer map from the network model
C. Filter at the head-end (Example)Head-end suppresses events for meters already known to be offLeast trafficLogic sits in a vendor system outside the profile governance

Chosen: [Example: B, because it keeps the logic in a governed adapter and the 60 second window fits DRV-002]. Restoration events use the same path, so that OMS can confirm restoration per transformer and flag nested outages where some meters stay off.

6.4 Errors, retries and replay

IDRule
ERR-001 (Example)Transient failures (timeout, broker unavailable) retry with exponential back-off up to [5] attempts, then go to the dead-letter queue
ERR-002 (Example)Validation failures never retry; they go straight to the error queue with the failing rule and the profile version
ERR-003 (Example)Each dead-letter queue has an owner from section 11.1 and a response target of [4 working hours], or [30 minutes] for control room flows
ERR-004 (Example)Replay keeps the original message ID and timestamp so that idempotent consumers (HDR-005) discard what they already processed
ERR-005 (Example)Event topics keep [7 days] of history so a consumer restored from backup can rebuild its state
[ERR-NNN][Rule]

7. Model exchange and network model management

7.1 Model authority sets

Model authority setAuthorityContentExchange formatFrequency
MAS-01 (Example)Distribution GIS teamMedium and low voltage equipment and connectivityPRF-001, difference modelsOn each approved GIS job
MAS-02 (Example)Transmission modelling teamHigh voltage network and substationsPRF-002 (CGMES 3.0)Per release and on change
MAS-03 (Example)Neighbouring TSOExternal equivalents and boundaryCGMES boundary setAs published
[MAS-NN][Authority][Content][Format][Frequency]

7.2 Model lifecycle

A network change moves through these states before the control room uses it. Only validated, approved change sets reach the ADMS; validation errors return to the model authority, never to a manual fix in the ADMS.

7.3 Validation rules

IDRuleSeverity
VAL-001 (Example)Every conducting equipment has the number of terminals its class requiresBlocking
VAL-002 (Example)Every feeder traces back to one sourceBlocking
VAL-003 (Example)No mRID appears twiceBlocking
VAL-004 (Example)Ratings present for every transformerWarning
VAL-005 (Example)Geographic coordinates within the service territoryWarning
[VAL-NNN][Rule][Blocking / Warning]

Run blocking rules before publication and warnings in a daily data quality report owned by the GIS lead. Track the count of open warnings as a model quality measure in section 11.

7.4 Grid model exchange for transmission (CGMES)

Where the utility is a TSO or delivers models to one, describe the exchange cycle with the regional coordination centre:

StepDesign for this utility
Boundary set (Example)Use the boundary set published for the synchronous area; load each new release into the modelling tool before building models that reference it
Individual grid model build (Example)EMS modelling tool exports the equipment, topology, steady state hypothesis and state variable parts of the individual grid model (IGM) as CGMES 3.0 instance files
Timeframes (Example)[Year-ahead, month-ahead, week-ahead, day-ahead, intraday] as required by the applicable network code methodology
Local validation (Example)Run the same validation rule set the coordination centre applies, before upload; failures block submission
Submission (Example)Upload through [the ENTSO-E operational planning data platform or regional channel]; record acknowledgement and quality report
Merge feedback (Example)Quality issues from the common grid model (CGM) merge go back to the transmission modelling team as tickets with a fix deadline

7.5 Planned projects and future network states

Network extension planning works on future states that the control room must not see until commissioning. Keep planned projects as separate difference models against a base release, tag each with its expected energisation date, and promote it to the as-built path in 7.2 only when field completion is recorded. When two projects change the same equipment, the later project is rebased and revalidated before approval.

8. Integration architecture

ComponentPurposeZoneProductOwner
Enterprise integration platform (Example)Request and reply, routing, transformationEnterprise[Product]@integration-lead
Operational message broker (Example)High-volume events (meter, outage)Operations DMZ[Product]@integration-lead
Network model repository (Example)Store and version CIM models and change setsOperations[Product]@network-model-manager
Profile and schema registry (Example)Publish profiles and validate payloadsEnterprise[Product]@integration-lead
Monitoring (Example)End-to-end message tracking and alertingEnterprise and operations[Product]@operations

Design decisions:

  • Keep CIM transformation out of the control systems: adapters at the edge of each system convert local formats to profiles.
  • Put the operational message broker in a DMZ between the enterprise and the control zone, so the ADMS never accepts inbound sessions from the enterprise.
  • Use asynchronous messaging for all flows into the control zone and give each flow a dead-letter queue with an owner.

9. Security (IEC 62351 and OT boundary)

Control areaDesign
Zones and conduits (Example)Enterprise, operations DMZ, control room and substation zones; conduits listed per exchange in section 9.1
Transport security (Example)TLS with mutual authentication on every interface; TLS profile per IEC 62351 where control protocols are involved
Role-based access (Example)Service identities per interface; roles aligned with the IEC 62351 RBAC model for control functions
Key and certificate management (Example)Utility PKI, automated renewal; see PKI Certificate Architecture (security/pki-certificate-architecture)
Model and file integrity (Example)Signed model releases, checksums verified before ADMS load
Logging (Example)Security events forwarded to the security operations centre with OT context
Regulation (Example)Map controls to [NIS2 measures / national critical infrastructure rules]; see NIS2 Security Measures (compliance/nis2-security-measures)

9.1 Conduits per exchange

Conduit IDZonesExchanges carriedInitiated fromControls
CND-01 (Example)Enterprise to operations DMZMSG-001 to MSG-004 (enterprise side)Each side connects to the DMZ broker; no direct sessions acrossFirewall allow list, mutual TLS, broker access control per topic
CND-02 (Example)Operations DMZ to control roomMSG-001, MSG-003, MSG-004 (control side)Control room adapters connect outbound to the DMZ brokerMutual TLS, one service identity per adapter, topic allow list
CND-03 (Example)Operations to control roomMSG-005 model change setsControl room pulls signed releases from the model repositorySignature and checksum check, release approval record
CND-04 (Example)Control room to external coordination centreCGMES submissions (section 7.4)Control room outbound onlyDedicated channel, certificate authentication
[CND-NN][Zones][Exchanges][Direction][Controls]

Every exchange in section 6 maps to exactly one conduit path. Review the table whenever an exchange is added; an exchange without a conduit is not approved.

10. Testing and interoperability

IDTestPass criterionEvidence
TST-001 (Example)Profile conformance for PRF-001 to PRF-004All payloads validate; no unknown extensionsValidator reports
TST-002 (Example)Model round trip GIS to ADMSChange set applied; topology identical to GIS traceComparison report
TST-003 (Example)Storm simulationNFR-002 met at [n] events per minuteLoad test report
TST-004 (Example)CGMES submissionCoordination centre validation passesAcceptance message
TST-005 (Example)Integration platform outageControl room flows continue through the operational brokerFailover record
TST-006 (Example)Full model loadNFR-001 met for VOL-004 objectsLoad test report
TST-007 (Example)Outage notification end to endFR-003 notice time met from OMS confirmation to customer messageScenario test record
TST-008 (Example)Work order to asset updateFR-005 asset record updated within one working dayScenario test record
TST-009 (Example)Conduit verificationOnly the flows in section 9.1 pass; signed releases rejected when tamperedFirewall review, scan and tamper test results
[TST-NNN][Test][Criterion][Evidence]

10.1 Traceability

RequirementDesign elementTest
FR-001 (Example)Section 7, PRF-001TST-002
FR-002 (Example)MSG-001, section 6.3TST-003
FR-003 (Example)MSG-003, PRF-004TST-007
FR-004 (Example)PRF-002, section 7.4TST-004
FR-005 (Example)MSG-004TST-008
NFR-001 (Example)Section 7, VOL-004TST-006
NFR-002 (Example)Section 6.3, VOL-003TST-003
NFR-003 (Example)Section 8TST-005
NFR-004 (Example)Section 9.1TST-009
[ID][Element][Test]

11. Operations, risks and decisions

11.1 RACI

ActivityNetwork model managerGIS teamControl roomIntegration teamOT security
Model release (Example)ARCII
Profile change (Example)ACCRC
Interface incident (Example)IICR/AC
Conduit change (Example)IICCR/A
Model data quality report (Example)ARIII
Dead-letter queue handling (Example)CCIR/AI

11.2 Risks

IDRiskLikelihoodImpactResponseOwner
RSK-001 (Example)GIS connectivity data quality too low for ADMSHighHighData cleansing programme, VAL rules before go-live@gis-lead
RSK-002 (Example)Vendor implements an older CIM releaseMediumMediumProfile version negotiation, adapter mapping@integration-lead
RSK-003 (Example)Storm volumes overload OMSMediumHighSection 6.3 controls, TST-003@control-room-lead
[RSK-NNN][Risk][L / M / H][L / M / H][Response][@owner]

11.3 Decisions

IDDecisionAlternativesDate
DEC-001 (Example)GIS is the model authority for distribution connectivityADMS editing tools as masterYYYY-MM-DD
DEC-002 (Example)Incremental model updates instead of nightly full loadsFull reloadYYYY-MM-DD
DEC-003 (Example)Aggregate meter events per transformer in the adapter (section 6.3, option B)Pass every event; filter at head-endYYYY-MM-DD
[DEC-NNN][Decision][Alternatives]YYYY-MM-DD

Record each decision in full in an Architecture Decision Log (architecture/architecture-decision-log).

11.4 Delivery phases

PhaseScopeExit criterion
1. Foundations (Example)mRID assignment (section 4.1), profile register, model repository, validation rulesFirst full model passes all blocking VAL rules
2. Network model to ADMS (Example)PRF-001 difference models, MSG-005, CND-03TST-002 and TST-006 passed; control room sign-off
3. Outage and metering (Example)MSG-001 to MSG-003, storm pathTST-003 and TST-007 passed at VOL-003 peak
4. Work and assets (Example)MSG-004, asset synchronisationTST-008 passed
[Phase][Scope][Exit criterion]

11.5 Operational measures

MeasureTargetOwner
Change sets rejected by blocking rules (Example)Under [5 %] of submissions per month@gis-lead
Open model quality warnings (Example)Falling month on month@network-model-manager
Messages in dead-letter queues older than target (Example)Zero@integration-lead
CGMES submissions accepted first time (Example)[95 %]@transmission-ops

12. Glossary and references

12.1 Glossary

TermMeaning
CIMCommon Information Model: the IEC information model for electric utilities, maintained as UML
ProfileRestricted, versioned subset of the CIM for one exchange purpose
mRIDMaster resource identifier: globally unique, persistent object key
CGMESCommon Grid Model Exchange Standard: ENTSO-E profile set for transmission grid models
Model authority setPart of a model maintained by one authority and exchanged as a unit
Difference modelChange set that adds, removes or modifies objects relative to a base model
IGMIndividual grid model: one TSO's model for a given timeframe, exchanged in CGMES
CGMCommon grid model: the merge of individual grid models for a synchronous area or region
Boundary setShared set of boundary points and equivalents that lets individual models be merged
Dead-letter queueQueue that holds messages that could not be delivered or processed, for investigation and replay
ADMSAdvanced distribution management system
MDMMeter data management system

12.2 References

ReferenceVersion or dateUse
IEC 61970-301:2020+AMD1:2022, CIM base, webstore.iec.chEdition 7.1, 2022-02-22 (stability date 2026; check for a newer edition)Core, Wires, Topology packages
IEC 61968-11, Common information model extensions for distributionCheck the current edition at webstore.iec.chDistribution packages
IEC 61968-100, Implementation profiles for application integrationCheck the current editionMessage envelope and verbs
IEC 61968-1, Interface architecture and general recommendations; IEC 61968-9, Interfaces for meter reading and control; IEC 61968-13, distribution profilesCheck current editionsReference model, metering, distribution profiles
IEC 61970-552, CIM XML model exchange formatCheck the current editionModel serialisation
CGMES 3.0 (IEC TS 61970-600-1:2021 and -600-2:2021), ENTSO-E CIM for grid models exchange pagePage lists the UML package ENTSO-E CIM 17.2.0 / CGMES 3.0.0 / NC Profiles 2.5, approved 2026-09-10; CGMES 3.0 profiles unchanged since 2021Transmission model exchange
IEC 62351 series, power systems data and communications securityCheck current part editionsSecurity controls
CIM Users Group, UCA International Users Group, ucaiug.orgCurrent CIM UML releaseModel source, interoperability tests

Standard and licence note

Structure aligned with the IEC 61970 and IEC 61968 series (IEC 61970-301:2020+AMD1:2022 CIM base, IEC 61968-1, -9, -11, -13 and -100, IEC 61970-552), the CGMES 3.0 profile set published by ENTSO-E and standardised as IEC TS 61970-600-1 and -600-2:2021, and the IEC 62351 security series. IEC standards are copyrighted: this template uses only part numbers, package, class and verb names, and all descriptions are original text written for this collection; obtain the standards from the IEC webstore and the CIM UML from the CIM Users Group for normative content. Check the current official editions before use. Template licence: MIT.

Templat terkait