Markdown Editor

Opportunity Qualification and Bid/No-Bid Template

Bid/no-bid record: gates, buying context, solution fit and gaps, competition, price to win, deal economics, delivery risk, bid cost, scorecard, decision

ビジネスフルAPMP Body of Knowledge (bid/no-bid topics)opportunityqualification

使い方: Use it when a sales or tender opportunity appears and the company must decide whether to invest in a bid. Fill the opportunity summary, customer buying context and solution fit first, then run the knock-outs and weighted scorecard at each gate. The main pitfall is scoring from optimism: every high score needs checkable evidence.

プレビュー

Opportunity Qualification (Bid/No-Bid): [Opportunity name]

Qualification record for a sales or tender opportunity, written by the pursuit team before significant bid effort is spent. It scores strategic fit, customer access, solution fit, competitive position, commercial viability and delivery risk, estimates the cost of bidding, and records a Bid, Bid with conditions, Defer or No-bid decision with named owners. The structure follows common capture and bid decision practice as taught by the Association of Proposal Management Professionals (APMP Body of Knowledge, topics on opportunity qualification and the bid/no-bid decision) and is written from the point of view of the solution architect who must say whether the company can credibly design, price and deliver a winning solution. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document ID[OPP-QUAL-001]
Opportunity ID (CRM)[CRM reference]
Customer[Customer legal name]
Version[0.1]
Status[Draft / In review / Decided / Superseded]
Current gate[Gate 0 Pursue / Gate 1 Bid / Gate 2 Submit]
Owner[@capture-lead]
Solution architect[@solution-architect]
Approvers/reviewers[@sales-director], [@delivery-director], [@finance-partner], [@legal-counsel]
Decision owner[@decision-owner]
Last updatedYYYY-MM-DD
Classification[Confidential: commercial in confidence]
Related documents[Account plan], [Capture plan], [RFP reference]

Approvals

RoleNameDecisionDate
Decision owner[@name][Bid / Bid with conditions / Defer / No-bid]YYYY-MM-DD
Sales director[@name][Support / Object]YYYY-MM-DD
Delivery director[@name][Support / Object]YYYY-MM-DD
Finance[@name][Support / Object]YYYY-MM-DD
Legal and contracts[@name][Support / Object]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]First draft at Gate 0
0.2YYYY-MM-DD[@name]Example: Updated after RFP release; scorecard re-run at Gate 1
1.0YYYY-MM-DD[@name]Example: Decision recorded: Bid with conditions

Contents

1. Opportunity summary

FieldValue
Opportunity name[Name]
Customer and business unit[Customer], [Division]
Sector and region[Sector], [Country or region]
What the customer wants to buyExample: Replacement of a 15-year-old claims platform with a configurable SaaS product, including data migration and five integrations
Why now (compelling event)Example: Current vendor ends support on YYYY-MM-DD; regulator finding requires audit trail improvements
Estimated total contract value (TCV)Example: USD 4,800,000 over 3 years
Contract type[Fixed price / Time and materials / Managed service / Subscription plus services]
Procurement route[Direct award / Competitive RFP / Framework call-off / Public tender]
Source of the opportunity[Existing account / Partner referral / Public notice / Inbound]
Key datesRFI YYYY-MM-DD, RFP release YYYY-MM-DD, submission YYYY-MM-DD, award YYYY-MM-DD, start YYYY-MM-DD
Our relationship status[Incumbent / Existing customer, new area / New logo]
Partners or subcontractors[Partner name and role]

Opportunity statement: In two or three sentences, state the customer problem, the outcome they expect, and why the company is or is not a natural supplier. Write it so that someone outside the account team can judge whether the pursuit makes sense.

2. Qualification gates

Qualification is continuous. The same record is reviewed at each gate, the scorecard is re-run with new evidence, and the decision can change. A pursuit that keeps passing gates only because effort has already been spent is a sunk-cost decision; the gate owner must be able to stop it.

GateTimingQuestionMinimum evidenceDecision owner
Gate 0 Pursue (Example)When the opportunity is first identifiedIs this worth investing capture effort in?Opportunity summary, strategic fit, initial customer contactSales director
Gate 1 Bid (Example)On RFP release or when the scope is firmShould we prepare a full response?Sections 3 to 11 complete, solution concept, rough estimateBusiness unit head
Gate 2 Submit (Example)Before final pricing is releasedIs the response compliant, priced and deliverable?Compliance matrix, approved estimate, risk register, legal reviewBusiness unit head and finance
[Gate][Timing][Question][Evidence][@owner]

3. Customer and buying context

3.1 Need and drivers

Driver IDBusiness driverEvidenceSource
DRV-001 (Example)Regulator requires a complete audit trail of claim decisions within 18 monthsPublished supervisory letter, discussed with the head of complianceMeeting YYYY-MM-DD
DRV-002 (Example)Reduce cost to process a claimAnnual report states a cost reduction targetPublic filing
DRV-003 (Example)Current platform vendor exits the marketVendor notice shared by customer ITEmail YYYY-MM-DD
[DRV-NNN][Driver][Evidence][Source]

3.2 Budget and funding

QuestionAnswerConfidence
Is the budget approved, and at what amount?Example: Capital budget approved for the current financial year; amount not disclosed, estimated from the business case rangeMedium
Which budget line pays (capital, operating, shared)?[Answer][High / Medium / Low]
Is funding conditional on another event?[Answer][Confidence]

3.3 Decision process and stakeholders

StakeholderRole in decisionMain concernOur accessAttitude to us
Example: Chief Operating OfficerEconomic buyer, signs the contractCost per claim and delivery certaintyOne meeting in the last 6 monthsNeutral
Example: Head of ClaimsBusiness sponsor and main userAdjuster productivity during transitionRegular contactSupportive
Example: Chief Information OfficerTechnical approverIntegration with the policy system, cloud policy complianceThrough partner onlyUnknown
Example: Procurement leadRuns the evaluationCompliant, comparable responsesFormal channel onlyNeutral
[Name or role][Economic buyer / Technical approver / User / Influencer / Gatekeeper][Concern][Access][Supportive / Neutral / Opposed / Unknown]

Record the full engagement plan in the Stakeholder Register (project/stakeholder-register) once the pursuit passes Gate 0.

3.4 Evaluation criteria and timeline

ItemKnown valueSource
Published evaluation weightingExample: Technical 50 %, price 30 %, social value and delivery 20 %Draft RFP
Mandatory requirements known so far[Number and summary][Source]
Evaluation method[Points-based / Pass-fail plus price / Best value][Source]
Presentations or demonstrations[Yes, date / No][Source]
Contract start and first milestone[Dates][Source]

4. Strategic fit

QuestionAssessmentEvidence
Is the sector and region a target market in the current plan?Example: Yes, insurance is one of three priority sectorsAnnual sales plan
Does the work use offerings we want to grow?Example: Yes, SaaS implementation and managed integration serviceOffering roadmap
Will a win create a referenceable customer?Example: Likely; customer allows case studies after go-livePrevious contract
Does it open follow-on work?Example: Phase 2 policy administration replacement plannedCustomer roadmap presentation
Does it conflict with another customer, partner or bid?Example: No conflict foundConflict check YYYY-MM-DD
Does it carry reputational or ethical concerns?[Assessment][Evidence]
What is the opportunity cost (what else would this team work on)?[Assessment][Evidence]

5. Solution fit and capability gaps

5.1 Requirement coverage

Read the RFP, RFI or the customer's statement of need and classify every known requirement before scoring. Use the RFP Compliance Matrix (business/rfp-compliance-matrix) once the formal document is released.

Coverage classCountShareComment
Fully met by existing product or service (Example)14271 %Standard configuration
Met with configuration or minor extension (Example)3819 %Estimated in solution estimate
Met by a partner (Example)126 %Document capture partner
Not met (Example)84 %See section 5.2
Total (Example)200100 %

5.2 Capability gaps

Gap IDRequirement or capabilityGap descriptionClosure optionCost or effort to closeResidual risk
GAP-001 (Example)Data residency in the customer's countryOur SaaS region is outside the countryUse provider region launched last year; confirm product certification4 weeks product workMedium
GAP-002 (Example)Real-time integration with the legacy policy systemNo adapter for the policy system's message formatBuild adapter on the integration platform60 person-daysMedium
GAP-003 (Example)Native-language user interfaceProduct supports 8 languages, not the required onePartner translation, customer reviewUSD 30,000Low
[GAP-NNN][Requirement][Gap][Build / Partner / Roadmap / Negotiate out / Accept][Cost][L / M / H]

5.3 Solution concept readiness

QuestionAnswer
Is there a reference architecture or a previous implementation we can reuse?Example: Yes, two similar implementations in the last three years
Are the critical non-functional requirements (availability, performance, security, residency) achievable with the standard platform?[Answer, with any exceptions]
Is a proof of concept or demonstration likely to be required?[Answer; if yes, plan with Proof of Concept (architecture/proof-of-concept) and Demo Script (business/demo-script)]
Are there credible alternative solution options?[Answer; record them in Solution Options Analysis (architecture/solution-options-analysis)]
Which named architects and specialists are available to design and deliver?[Names and availability]

6. Competitive position

CompetitorLikely solutionStrengths in this dealWeaknesses in this dealLikely price position
Example: Incumbent vendorUpgrade of the current platformKnows the data and processes, low switching effortEnd-of-support notice damaged trustLower
Example: Global integratorMarket-leading suite with heavy customisationBrand, large teamLong timelines, high day ratesHigher
Example: Niche local supplierLocal productLocal language and presenceLimited scale, no SaaS certificationLower
[Competitor][Solution][Strengths][Weaknesses][Lower / Similar / Higher]

6.1 Discriminators

DiscriminatorWhy it matters to this customerProof we can offerCan competitors match it?
Example: Prebuilt audit trail meeting the regulator's requirementDirectly addresses DRV-001Reference customer audited last yearPartly; the incumbent needs an upgrade
Example: Fixed-price data migration with reconciliation evidenceRemoves the customer's biggest transition fearTwo prior migrations of similar sizeNo evidence that they can
[Discriminator][Driver it addresses][Proof][Yes / Partly / No]

6.2 Price to win

ItemValueBasis
Customer budget estimateExample: USD 4,500,000 to 5,200,000Business case range shared informally
Expected winning price rangeExample: USD 4,400,000 to 4,900,000Competitor analysis, previous public awards
Our expected price at target marginExample: USD 4,800,000Rough estimate, section 8
Gap and actions to close it[Gap][Scope options, delivery model, partner pricing]

7. Win probability factors

IDFactorAnswerEvidence
WPF-01Have we met the economic buyer in the last six months?Example: PartlyOne introductory meeting, no follow-up
WPF-02Did we influence the requirements before the RFP was written?Example: PartlyOur RFI answer shaped the audit trail requirement
WPF-03Does the customer understand our discriminators?Example: YesHead of Claims repeated them in the last meeting
WPF-04Is there an internal champion who will argue for us?Example: YesHead of Claims
WPF-05Do we know the evaluation criteria and their weights?Example: YesDraft RFP
WPF-06Is our solution compliant with every mandatory requirement?Example: PartlyGAP-001 open
WPF-07Is our likely price within the expected winning range?Example: YesSection 6.2
WPF-08Do we have a relevant, referenceable customer?Example: YesTwo in the same sector
WPF-09Is the incumbent vulnerable?Example: YesEnd-of-support notice
WPF-10Is the procurement genuinely open (not written for one supplier)?Example: YesRequirements are product-neutral
[WPF-NN][Factor][Yes / Partly / No][Evidence]

Estimated win probability: Example: 35 %. State how the estimate was reached (factor count, comparable past bids, independent review), and do not present it as more precise than the evidence allows.

8. Commercial viability

8.1 Deal economics

ItemValueNote
Total contract value (TCV)Example: USD 4,800,0003 years, subscription plus services
Estimated delivery and run costExample: USD 3,600,000From rough order of magnitude estimate in Solution Estimate (project/solution-estimate)
Gross marginExample: USD 1,200,000 (25 %)4,800,000 minus 3,600,000; 1,200,000 divided by 4,800,000
Company minimum margin for this offeringExample: 20 %Pricing policy
Cash flow profileExample: Milestone payments; negative cash position for the first 7 monthsFinance model
Payment terms[Terms][Note]
Currency and inflation exposure[Exposure][Note]
Third-party costs and pass-through[Licences, hosting, partners][Note]

8.2 Contract and legal exposure

TopicKnown positionAcceptable to us?Action
Liability capExample: Customer draft proposes unlimited liability for data breachesNoPropose cap at 12 months of fees, with insurance evidence
Service creditsExample: Up to 15 % of monthly feesYesNone
Intellectual property[Position][Yes / No / Negotiable][Action]
Termination for convenience[Position][Yes / No / Negotiable][Action]
Data protection and residency terms[Position][Yes / No / Negotiable][Action]
Acceptance criteria and warranty[Position][Yes / No / Negotiable][Action]

8.3 Expected value check

Expected value is a sanity check, not a decision rule. Example: win probability 35 % multiplied by gross margin USD 1,200,000 gives USD 420,000; subtracting the bid cost of USD 90,000 (section 10) gives an expected value of USD 330,000. If the expected value is negative or close to zero, the pursuit needs a strategic reason recorded in section 4.

9. Delivery risk

Risk IDCategoryRiskLikelihoodImpactMitigation or pricing responseOwner
QR-001 (Example)TechnicalLegacy policy system has no documented interface; adapter effort may doubleMediumHighFund a two-week technical discovery before fixed price; include assumption in the response@solution-architect
QR-002 (Example)DataSource data quality unknown; migration effort uncertainHighHighPrice data cleansing as time and materials; offer a data profiling sprint@data-lead
QR-003 (Example)ScheduleCustomer's go-live date leaves 9 months for a 12-month typical projectMediumHighPropose phased go-live; state critical dependencies@delivery-director
QR-004 (Example)ResourcingTwo key product specialists committed to another programme until Q3MediumMediumConfirm release dates or hire contractors@resource-manager
QR-005 (Example)RegulatoryResidency certification for the new region not yet completeLowHighConfirm certification date in writing from product team@product-manager
[QR-NNN][Category][Risk][L / M / H][L / M / H][Response][@owner]

Carry accepted risks and assumptions into the RAID Log (project/raid-log) and the response's assumptions list, so that the delivery team inherits them at contract signature.

10. Bid cost and resource ask

RoleNameEffort (days)PeriodReleased by
Bid or proposal manager (Example)[@name]25YYYY-MM-DD to YYYY-MM-DDBid office
Solution architect (Example)[@name]30SameArchitecture practice
Technical specialists (integration, data, security) (Example)[@names]20SameDelivery
Commercial and pricing (Example)[@name]8SameFinance
Legal and contracts (Example)[@name]5SameLegal
Executive sponsor (Example)[@name]2SameBusiness unit
Total (Example)90
Cost itemValue
Internal effort (Example)90 days at an internal cost of USD 1,000 per day = USD 90,000
Proof of concept or demonstration environment[Cost]
Travel and presentation costs[Cost]
Partner contributions[Cost or in kind]
Total bid costExample: USD 90,000 internal effort plus [other costs]; the expected value check in section 8.3 uses the internal effort only

11. Weighted scorecard

11.1 Knock-out criteria

IDKnock-out criterionResultEvidence
KO-01We can meet every mandatory requirement, or the gap can be closed before submissionExample: Pass with action (GAP-001)Section 5.2
KO-02The contract terms are within company risk policy, or can be negotiatedExample: Pass with action (liability cap)Section 8.2
KO-03No legal, ethical, sanctions or conflict-of-interest barrierExample: PassConflict check
KO-04We have the people to write the bid and to deliver the workExample: Pass with action (QR-004)Section 10
KO-05The submission date allows a quality responseExample: Pass6 weeks available
[KO-NN][Criterion][Pass / Pass with action / Fail][Evidence]

11.2 Scoring scale

ScoreMeaning
5Strong position, backed by documented evidence
4Good position, evidence mostly in place
3Neutral or mixed; evidence incomplete
2Weak position; known disadvantage
1Very weak position or no evidence

11.3 Scorecard

Weighted score for each criterion is the weight multiplied by the score divided by 5, so a perfect opportunity scores 100.

IDCriterionWeightScore (1 to 5)WeightedEvidence reference
QC-01Strategic alignment10Example: 48Section 4
QC-02Customer relationship and access15Example: 26Section 3.3, WPF-01
QC-03Requirement understanding and influence10Example: 36WPF-02, WPF-05
QC-04Solution fit15Example: 412Section 5
QC-05Competitive position and discriminators15Example: 39Section 6
QC-06Commercial attractiveness15Example: 412Section 8
QC-07Delivery risk (5 means low risk)10Example: 36Section 9
QC-08Bid feasibility (time, team, cost)10Example: 48Section 10
Total10067 (Example)

11.4 Decision thresholds

Weighted scoreDefault recommendation (Example policy)
70 or more, every knock-out a clean PassBid
55 to 69, or any knock-out passed with actionBid with conditions, or Defer until conditions are met
Below 55, or any knock-out failedNo-bid, unless the decision owner records a strategic exception

Example: the score of 67 with three knock-outs passed with action gives a default recommendation of Bid with conditions.

12. Decision and conditions

FieldValue
Gate[Gate 1 Bid]
Decision[Bid / Bid with conditions / Defer / No-bid]
Decision dateYYYY-MM-DD
Decision owner[@name]
RationaleExample: Strong solution fit and an attractive margin outweigh weak access to the economic buyer; the conditions below must be met before Gate 2
Strategic exception (if overriding the threshold)[Reason, or "None"]
Dissenting views[Name and view, or "None"]

12.1 Conditions

Condition IDConditionOwnerDueVerified at
CON-001 (Example)Secure a meeting with the Chief Operating Officer and the Chief Information Officer@account-leadYYYY-MM-DDGate 2
CON-002 (Example)Written confirmation of in-country hosting certification date (GAP-001)@product-managerYYYY-MM-DDGate 2
CON-003 (Example)Liability position approved by legal, with fallback@legal-counselYYYY-MM-DDGate 2
CON-004 (Example)Named delivery lead and two product specialists confirmed for the start date@resource-managerYYYY-MM-DDGate 2
[CON-NNN][Condition][@owner]YYYY-MM-DD[Gate]

12.2 No-bid handling

When the decision is No-bid, tell the customer promptly and courteously, give a short reason where appropriate, and say whether the company would like to be considered for future work. A well-handled No-bid protects the relationship and the company's reputation for bidding only when it can deliver. Record the reason in section 14 so that the portfolio of No-bid decisions can be reviewed.

13. Actions and capture handoff

Action IDActionOwnerDueStatus
ACT-001 (Example)Open the response workspace and compliance matrix@bid-managerYYYY-MM-DDOpen
ACT-002 (Example)Draft win themes from section 6.1 discriminators@capture-leadYYYY-MM-DDOpen
ACT-003 (Example)Start the solution concept and options analysis@solution-architectYYYY-MM-DDOpen
ACT-004 (Example)Prepare the rough order of magnitude estimate for Gate 2@estimatorYYYY-MM-DDOpen
[ACT-NNN][Action][@owner]YYYY-MM-DD[Open / Done]

The response team inherits: the drivers (section 3.1), the stakeholder map (3.3), the capability gaps and closure options (5.2), the discriminators (6.1), the risks and assumptions (9), and the conditions (12.1). Use them as the starting point for the RFP Technical Response (business/rfp-technical-response) and its executive summary.

14. Post-decision review

FieldValue
Outcome[Won / Lost / Withdrawn / No-bid / Cancelled by customer]
Outcome dateYYYY-MM-DD
Customer feedback received[Summary of debrief]
Winning supplier and price (if known)[Name, price]
Was the qualification score predictive?Example: Yes; access to the economic buyer was the deciding weakness, as scored
Scorecard or threshold change proposed[Change, or "None"]
Lessons for the account plan[Lesson]

Feed lessons into Lessons Learned (project/lessons-learned) and review the scorecard weights at least once a year against the business unit's win rate by score band.

15. Glossary and references

15.1 Glossary

TermMeaning
Bid/no-bid decisionThe formal choice whether to invest in preparing a response
CaptureWork before the formal request that positions the company to win
Compelling eventThe dated event that forces the customer to buy
DiscriminatorA feature of our offer that matters to the customer and that competitors cannot easily match
Economic buyerThe person with authority to approve the spend
Knock-out criterionA condition that, if failed, stops the bid regardless of score
Price to winThe price range judged likely to win given the competition and the customer's budget
TCVTotal contract value over the full term
Win themeA short message linking a customer driver to our discriminator and proof

15.2 References

IDReferenceVersion or dateUse
REF-01APMP Body of Knowledge, Association of Proposal Management Professionals, bok.apmp.org (members)Online edition, checked YYYY-MM-DDTopic coverage for opportunity qualification and bid decisions
REF-02Company bid governance policy[Version]Gates, thresholds and approval authority
REF-03Company pricing and margin policy[Version]Section 8
REF-04Customer RFI or RFP documents[Reference]Sections 3 and 5
REF-05Solution Estimate (project/solution-estimate)[Version]Section 8.1
REF-06[Other source][Version][Use]

Standard and licence note

Structure aligned with common capture and bid decision practice, including the opportunity qualification and bid/no-bid topics of the APMP Body of Knowledge (Association of Proposal Management Professionals), which is available to members and is cited by topic only. No text, scoring model, checklist or diagram from APMP or from any proposal management training provider is reproduced; the criteria, weights, thresholds and examples in this template are original and illustrative, and should be replaced by your organisation's bid governance policy. Check the current APMP Body of Knowledge and your internal policies before use. APMP is a trademark of its owner; this template is not affiliated with or endorsed by it. Template licence: MIT.

関連テンプレート