ISMS Internal Audit Report Template (ISO/IEC 27001 clause 9.2)

Report for one ISMS audit: scope, criteria, team and independence, sampling, findings with evidence and clause references, conclusions, distribution, follow-up

ISMS・ISO/IEC 27001フルISO/IEC 27001:2022 + Amd 1:2024 clause 9.2 (cited only); ISO 19011:2026; ISO/IEC 27007:2020internalauditreport

使い方: Use it after each internal ISMS audit to report results to management. Fill scope, criteria and the audit team's independence first, then each finding with requirement, evidence and extent. The main pitfall is a finding that states an opinion and cannot be re-checked.

プレビュー

ISMS Internal Audit Report: [Organization name] [IA-YYYY-NN]

Report format for one internal audit of an information security management system (ISMS) under ISO/IEC 27001:2022 + Amd 1:2024, clause 9.2 (internal audit). An audit only counts if the managers who can act on it see the outcome and a record of it survives for the next auditor. This report records the scope and criteria, the audit team and its independence, the sampling, the findings with evidence and clause references, the conclusions, the distribution and the follow-up. Method follows the guidance of ISO 19011:2026 and ISO/IEC 27007:2020. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document IDDOC-ISMS-084
Audit reference[IA-YYYY-NN] (Example: IA-2027-01)
Version[1.0]
Status[Draft for factual review / Issued / Superseded]
Owner[@audit-programme-manager]
Approvers/reviewers[@lead-auditor] (author), [@isms-manager] (factual review), [@ceo or steering committee chair] (receives)
Last updatedYYYY-MM-DD
Classification[Confidential]
Standard and editionISO/IEC 27001:2022 + Amd 1:2024 clause 9.2; guidance ISO 19011:2026 and ISO/IEC 27007:2020
Audit datesYYYY-MM-DD to YYYY-MM-DD
Audit programme referenceDOC-ISMS-082 [programme period], audit [A-NN]
Checklist referenceDOC-ISMS-083, completed copy [file name]
Next scheduled reviewNot applicable for an issued report; the master format is reviewed with DOC-ISMS-082 on YYYY-MM-DD

Approvals

RoleNameDecisionDate
Lead auditor[@lead-auditor][Prepared and signed]YYYY-MM-DD
ISMS manager[@isms-manager][Facts confirmed / Facts disputed, see section 9.4]YYYY-MM-DD
Audit programme manager[@audit-programme-manager][Issued]YYYY-MM-DD

Revision history

VersionDateAuthorChange
0.9 (Example)2027-03-25[@lead-auditor]Draft for factual review
1.0 (Example)2027-03-29[@lead-auditor]Issued; AF-2027-003 extent corrected from 3 to 2 documents after factual review
[x.y]YYYY-MM-DD[@author][Change]

Contents

  1. Executive summary
  2. Audit objectives, scope and criteria
  3. Audit team, independence and impartiality
  4. Audit plan and method
  5. Sampling and evidence reviewed
  6. Summary of findings
  7. Detailed findings
  8. Positive practices
  9. Conclusions
  10. Follow-up of previous findings
  11. Corrective action and follow-up
  12. Distribution and confidentiality
  13. Size tiers
  14. Records and evidence
  15. References

1. Executive summary

[Two or three short paragraphs: what was audited, the overall conclusion, the most important findings, any decision needed from top management.]

Example (Quillmere Analytics Ltd, IA-2027-01): The internal audit on 15 to 17 March 2027 covered clauses 4 to 10 of ISO/IEC 27001:2022 + Amd 1:2024 and 30 Annex A controls from the 2027 rotation set. The audit found 0 major nonconformities, 2 minor nonconformities, 1 observation and 1 opportunity for improvement.

The ISMS conforms to the standard and to the organization's own requirements for most of the audited scope and is effectively implemented in risk management, incident handling, supplier management and backup. Two weaknesses need corrective action before the Stage 2 audit planned for May 2027 (2027-05-10 to 12): measurement results are collected but not analysed or evaluated (clause 9.1), and access for departing contractors is removed late because contractor departures do not reach IT through the HR leaver process (control A.5.18 as implemented by the access control policy).

Decision needed: top management to confirm the owner for contractor offboarding, which today sits between Finance (contracts) and Engineering Operations (accounts).

2. Audit objectives, scope and criteria

ItemValue
Objectives[List] (Example: confirm conformity of clauses 4 to 10 before Stage 2; test the operation of the 2027 Annex A rotation set; check readiness evidence for the certification audit)
Clauses in scope[4 to 10]
Annex A controls in scope[List or set name] (Example: 30 controls in the 2027 rotation set, trails TR-01, TR-03, TR-04, TR-05, TR-10, TR-11; the 7 controls re-sampled every year, A.5.15 to A.5.18, A.8.8, A.8.13 and A.8.24, are part of this set)
Sites, services, teams[List] (Example: head office, remote staff, production on the public cloud primary and DR regions, customer support)
Record periodYYYY-MM-DD to YYYY-MM-DD (Example: 2026-09-01 to 2027-02-28)
Audit criteriaISO/IEC 27001:2022 + Amd 1:2024; Statement of Applicability DOC-ISMS-011 version [x]; information security policy DOC-ISMS-001; topic policies in DOC-ISMS-005; legal, regulatory and contractual requirements in DOC-ISMS-014
Out of scope for this audit[List with reason] (Example: A.7 controls at the office, scheduled for the 2029 walk-through)
Changes to scope during the audit[None / description and reason]

3. Audit team, independence and impartiality

RoleName or roleCompetence evidenceAreas auditedAreas excluded for independence
Lead auditor[@lead-auditor][Training, prior audits][Clauses, trails][Areas]
Auditor[@auditor][Training, prior audits][Clauses, trails][Areas]
Lead auditor (Example)External contract auditorISO/IEC 27001 lead auditor training, competence record in DOC-ISMS-026Clauses 4 to 10, TR-01, TR-04, TR-05, TR-11None
Auditor (Example)Finance Manager (trained internal auditor)Internal auditor course 2026, one shadow auditTR-03, TR-10, clause 7TR-04 supplier trail and A.5.19 to A.5.23, because Finance runs procurement
Not on team (Example)Head of Engineering Operations (0.5 FTE ISMS manager)All: manages the ISMS and the audit programme; clause 9.2 was audited by the lead auditor

Confirmations:

  • No auditor audited a process they operate, designed or manage.
  • Clause 9.2 was audited by someone other than the audit programme manager.
  • Audit evidence was stored in the agreed restricted location.
  • Any AI-based tool used to summarise evidence was agreed in the audit plan and its output checked against source records. [Not used / Tool and use]

4. Audit plan and method

ItemValue
Method[On site / Remote / Blended] (Example: blended, day 1 on site at the office, days 2 and 3 remote with screen sharing)
Remote platform and rules[Platform category, recording rules] (Example: company video meeting tool, no recording, evidence exported by the auditee and uploaded to the audit folder)
Opening meetingYYYY-MM-DD, attendees by role
Closing meetingYYYY-MM-DD, attendees by role
Interviews[Number and roles] (Example: 11 interviews: CEO, ISMS manager, 2 risk owners, 3 control owners, HR lead, 3 staff from sales, support and engineering)
Limitations[None / description] (Example: cloud provider assurance report for the DR region not available during the audit, received 2027-03-19 and reviewed before the report was issued)

5. Sampling and evidence reviewed

PopulationSizeSampleMethodResult
[Population][n][n][Whole / Judgement / Random / Data analytics][Exceptions]
Leavers, record period (Example)9 (7 employees, 2 contractors)9Whole population2 exceptions (AF-2027-002)
Joiners, record period (Example)115Judgement: 3 engineers with production access, 2 random0 exceptions
Production changes (Example)21410Random 8 by change ID plus 2 emergency changes0 exceptions
Critical vulnerabilities (Example)175Judgement: oldest 50 exceptions outside the policy deadline
Suppliers (Example)315Judgement: 3 critical plus 2 random0 exceptions
Endpoints (Example)525Random from the MDM inventory0 exceptions
Risks in the register (Example)645Judgement: 3 High, 2 MediumScores reproduced correctly
Controlled documents (Example)385Random from DOC-ISMS-0282 superseded copies found outside the repository (AF-2027-003)

Documents reviewed: [list with IDs and versions]. Example: DOC-ISMS-001 v2.0, DOC-ISMS-002 v1.2, DOC-ISMS-010 v2.0, DOC-ISMS-011 v1.1, DOC-ISMS-013 v1.3, DOC-ISMS-016 (export 2027-03-10), DOC-ISMS-024 v1.0, DOC-ISMS-041 v1.0, DOC-ISMS-080 v1.0.

6. Summary of findings

GradeCountFinding IDs
Major nonconformity (MAJ)[n] (Example: 0)[IDs]
Minor nonconformity (MIN)[n] (Example: 2)[IDs] (Example: AF-2027-001, AF-2027-002)
Observation (OBS)[n] (Example: 1)[IDs] (Example: AF-2027-003)
Opportunity for improvement (OFI)[n] (Example: 1)[IDs] (Example: AF-2027-004)
Total[n] (Example: 4)

Results by clause (Example, from checklist section 17):

ClauseQuestionsCMAJMINOBSOFI (with C)
4 Context440000
5 Leadership330000
6 Planning550001
7 Support760010
8 Operation330000
9 Performance evaluation650100
10 Improvement220000
Total30280111
Annex A controls sampled30290100

7. Detailed findings

7.1 Finding format

FieldContent
Finding IDAF-YYYY-NNN (from DOC-ISMS-086)
GradeMAJ / MIN / OBS / OFI
RequirementClause, Annex A control as applied in the SoA, or policy section
EvidenceWhat was seen, with record IDs and dates
ExtentExceptions out of sample, and sample out of population
StatementWhat is missing or not met, in one sentence
Risk or effectWhy it matters, with risk register ID where one exists
OwnerProcess owner who will respond
Response dueDate for the correction and corrective action plan

7.2 Findings

AF-2027-001 (Example): Minor nonconformity, clause 9.1

FieldContent
RequirementClause 9.1: metric results have to be looked at on a set schedule and used to judge how well the ISMS is working; measurement programme DOC-ISMS-080 requires a monthly review of metric results by the ISMS manager
EvidenceMetric extracts for December 2026, January 2027 and February 2027 exist in the ISMS folder. No record of analysis, evaluation or decisions for any of the three months. Interview with the ISMS manager confirmed the reviews did not take place because of release workload
Extent3 of 3 monthly reviews in the sampled period missing
StatementMeasurement results are collected but are not analysed or evaluated as the organization planned
Risk or effectManagement review in April 2027 would lack evaluated performance information; trends such as rising patch times would go unnoticed
OwnerISMS manager
Response due2027-04-28

AF-2027-002 (Example): Minor nonconformity, control A.5.18 as implemented by the access control policy

FieldContent
RequirementSoA DOC-ISMS-011 marks A.5.18 Implemented; access control policy DOC-ISMS-041 requires all access of a leaver to be removed within 1 business day of the last working day
EvidenceHR leaver list and identity provider audit log export of 2027-03-16. Seven employee leavers removed on the last working day. Two contractor leavers removed 4 and 6 business days late; the requests came from the engineering manager, not from HR
Extent2 of 9 leavers (both contractors, 2 of 2 contractor leavers)
StatementAccess of departing contractors is not removed within the time the policy requires
Risk or effectFormer contractors kept access to the code repository and the support tool after leaving; linked risk R-018 (unauthorised access by former personnel)
OwnerHead of Engineering Operations, with Finance for contractor contracts
Response due2027-04-28

AF-2027-003 (Example): Observation, clause 7.5.3

FieldContent
RequirementClause 7.5.3: ISMS documents are kept under control, so old versions do not stay in circulation and records are kept and disposed of on purpose; the document control rules recorded with the documented information register DOC-ISMS-028 require superseded versions to be withdrawn from use
EvidenceThe document repository holds the current versions with correct approval records. A shared team drive holds copies of two superseded topic policies (remote working v0.9, acceptable use v1.0), last opened in January 2027
Extent2 of 38 controlled documents have uncontrolled superseded copies
StatementSuperseded copies outside the repository could be used by mistake
OwnerISMS manager
Response dueDecision by 2027-04-28

AF-2027-004 (Example): Opportunity for improvement, clause 6.2

FieldContent
RequirementClause 6.2 is met: objectives are set, measurable and monitored
ObservationFour of the six objectives in DOC-ISMS-024 have targets but no baseline value, so progress is hard to show at management review
SuggestionRecord a baseline for each objective when it is set
OwnerISMS manager, logged as CI-2027-007 in DOC-ISMS-088

8. Positive practices

AreaPracticeEvidence
[Area][Practice][Evidence]
Backup (Example)Quarterly restore tests completed on time, with restore time measured against the targetDOC-ISMS-071, four quarters
Risk management (Example)Every sampled risk had an owner, a reproducible score and a treatment decision traceable to the SoADOC-ISMS-016, 5 of 5 risks
Incident handling (Example)Both incidents in the period had a post-incident review with actions closedDOC-ISMS-021, DOC-ISMS-022

9. Conclusions

9.1 Conformity

[Statement on conformity with ISO/IEC 27001:2022 + Amd 1:2024 and with the organization's own requirements, for the audited scope.]

Example: The ISMS conforms to the requirements of clauses 4 to 10 for the audited scope, except for clause 9.1 (AF-2027-001). The sampled Annex A controls operate as described in the SoA, except A.5.18 for contractor leavers (AF-2027-002).

9.2 Effectiveness

[Statement on whether the ISMS is effectively implemented and maintained, and whether it achieves its intended results.]

Example: The ISMS is effectively implemented and maintained. Risk management, incident handling, supplier management and backup produce reliable records. Performance evaluation is the weakest process and needs correction so that the first management review before Stage 2 is based on evaluated data.

9.3 Objectives and limits

ObjectiveMet?Comment
[Objective from section 2][Yes / Partly / No][Comment]
Conformity of clauses 4 to 10 before Stage 2 (Example)YesTwo minor findings to close before Stage 2
Operation of the 2027 Annex A rotation set (Example)Yes30 of 30 controls tested
Readiness evidence for the certification audit (Example)PartlyManagement review not yet held; planned for April 2027

Limits on the evidence: [None / description]. Example: judgement-based samples; the conclusions apply to the sampled period and items and do not give statistical assurance over the whole population.

9.4 Disputed facts

[None / finding ID, the auditee's position and the lead auditor's response.]

10. Follow-up of previous findings

Finding IDSourceGradeStatus at this auditEffective?Evidence
[AF-YYYY-NNN][Internal audit / CB / Customer / Assessment][Grade][Open / Closed][Yes / No, reopened / Not yet verifiable][Record]
AF-2026-006 (Example)Gap assessment DOC-ISMS-098MINClosed 2026-12-10Yes: 3 of 3 sampled supplier contracts now include security clausesContracts SUP-004, SUP-011, SUP-019
AF-2026-009 (Example)Internal audit IA-2026-02OBSOpenNot yet verifiableAsset inventory review planned April 2027

11. Corrective action and follow-up

Finding IDResponseRecordOwnerPlan dueVerification methodVerification due
[AF-YYYY-NNN][Correction and corrective action / Decision / Evaluation][NC-YYYY-NNN / CI-YYYY-NNN][@owner]YYYY-MM-DD[Method]YYYY-MM-DD
AF-2027-001 (Example)Corrective actionNC-2027-004ISMS manager2027-04-28Review the April and May 2027 metric reviews2027-05-21
AF-2027-002 (Example)Corrective actionNC-2027-005Head of Engineering Operations2027-04-28Re-sample all contractor and employee leavers since the fix2027-05-21
AF-2027-003 (Example)Owner decisionDOC-ISMS-086 entryISMS manager2027-04-28Check shared drives for superseded copiesNext audit
AF-2027-004 (Example)EvaluationCI-2027-007ISMS manager2027-04-28Improvement register statusNext management review

12. Distribution and confidentiality

RecipientContentFormatDate sent
[Top management / steering committee][Full report / summary][Format]YYYY-MM-DD
CEO and steering committee (Example)Full reportRepository link, restricted group2027-03-29
Process owners with findings (Example)Sections 7 and 11 for their findingsRepository link2027-03-29
Certification body (Example)Full report on request during Stage 1 and Stage 2Shared during the audit, not e-mailedOn request

Classification: [Confidential]. Do not share the report outside the distribution list without approval from the ISMS manager. Customers asking for audit evidence receive a summary or the certificate, not the internal report, unless a contract says otherwise.

13. Size tiers

AspectSmall: Quillmere Analytics Ltd (46 staff)Medium: Quillmere Health Systems (320 staff)Large or multi-site: Quillmere Group (2,400 staff, 6 sites)
Reports per yearOne full-scope reportFour reports, one per process-area audit, plus a yearly summaryOne report per site audit and per group function audit, plus a consolidated group report
Length and detailShort; whole populations sampled, so extent is exactMedium; sampling rule stated per populationSite reports follow a common format so findings can be compared and aggregated
Audit team sectionExternal contract auditor plus one trained staff memberInternal audit pool from other departmentsAuditors from other sites, integrated with ISO 9001 and ISO 22301 audits
DistributionCEO and steering committeeProcess owners, ISMS manager, steering committeeSite management, CISO, group steering committee, regional legal where findings touch local law
Management review inputReport itselfYearly summary of the four auditsConsolidated themes across sites, repeat findings, site comparison

14. Records and evidence

RecordProvesOwnerLocationRetention (Example)
Issued audit report (this document)Results reported to relevant managementAudit programme managerISMS audit folder, read-onlyCurrent certification cycle plus 3 years
Completed checklist DOC-ISMS-083 and evidence filesFindings are based on sampled evidenceLead auditorSame folder, restrictedSame
Distribution recordReport reached relevant managementAudit programme managerRepository access log or sent listSame
Findings register entries DOC-ISMS-086Findings tracked to closureISMS managerFindings registerSame
Corrective action records DOC-ISMS-087Nonconformities handled under clause 10.2Process ownersCAPA recordsSame
Management review minutes DOC-ISMS-085Audit results considered by top managementISMS managerManagement review recordsSame

15. References

ReferenceEdition and status (as of November 2026)Use
ISO/IEC 27001:2022 + Amd 1:2024Current; Amd 1 published 2024-02-23Clause 9.2, audit criteria
ISO 19011:2026Current, published 2026-05-27Audit reporting, sampling, follow-up
ISO/IEC 27007:2020Current; a revision is in progress, check for a newer editionISMS-specific audit guidance
ISO/IEC 17021-1:2015CurrentMajor and minor nonconformity concepts used in grading
compliance/internal-audit-programDOC-ISMS-082Programme
isms/isms-internal-audit-checklistDOC-ISMS-083Questions, sampling and grading
isms/audit-findings-registerDOC-ISMS-086Finding IDs and status
compliance/capa-nonconformityDOC-ISMS-087Corrective action records
isms/continual-improvement-registerDOC-ISMS-088OFIs
compliance/management-reviewDOC-ISMS-085Audit results as input

Standard and licence note

Structure aligned with ISO/IEC 27001:2022 + Amd 1:2024 clause 9.2 (internal audit), with reporting practice following ISO 19011:2026 and ISO/IEC 27007:2020. The report structure, grading definitions, field descriptions and worked example are original wording written for this template; no ISO or IEC text, tables or definitions are reproduced. Use the official standards, which are copyrighted and sold by ISO, IEC and national standards bodies, as the audit criteria. Check the current editions before use: ISO/IEC 27007 is under revision. An internal audit report does not certify anything; certification decisions belong to the accredited certification body. Template licence: MIT.