스태프 엔지니어 설계 리뷰 키트
엄격한 설계 리뷰: 시스템 설계 문서, 추정, 기술 설계, ADR, 기술 선택, TCO, 리뷰 체크리스트, ATAM, FMEA, 운영 준비.
방법과 패턴
System Design Document Template
전체System design at scale – requirements, capacity estimates (KaTeX), API, data model, HLD, deep dives, reliability, cost, trade-offs
Back-of-Envelope Estimation and Capacity Model Template
전체Reference latency and unit tables, assumptions register, QPS, storage, bandwidth, cache, server and cost formulas, worked example, sensitivity, traceability
Jeff Dean latency numbers (LADIS 2009)Technical Design Document Template
전체In-depth design doc – context, goals and non-goals, APIs, data, flows, alternatives matrix, cross-cutting concerns, testing, rollout, cost
의사결정
Architecture Decision Record Template (Tyree-Akerman, Y-Statement)
표준Detailed ADR – Tyree & Akerman fields (assumptions, constraints, positions, argument, implications, related items) plus Y-statement
Tyree & Akerman decision template; Y-statement (Zimmermann)Technology Selection and Build vs Buy Template
표준Build, buy, open source or managed service evaluation with weighted decision matrix, PoC results, risks, cost and decision
Total Cost of Ownership (TCO) Analysis Template
표준Multi-year TCO comparison of options by cost category, with NPV discounting, sensitivity, break-even and recommendation
검증
System Design Review Checklist and Scoring Rubric Template
전체Design review checklist in 13 areas, evidence-based scoring rubric, weighted score, red flags, findings register, decision record, 45-minute interview rubric
Architecture Evaluation Report Template (ATAM)
전체ATAM evaluation report – business drivers, approaches, utility tree, voted scenarios, sensitivity and trade-off points, risks, risk themes
SEI ATAMArchitecture Review Board Request Template
표준ARB submission: context, scope, proposed architecture, alternatives, principles compliance, risk flags, decisions and outcome
Software FMEA Template (IEC 60812)
전체Software failure modes, effects, causes, controls, S/O/D scales, RPN and action priority, actions and re-scoring
IEC 60812:2018Production Readiness Review Template
전체Production readiness review: SLOs, load test evidence, observability, on-call, rollback, backups, security, failure modes, sign-off
Google SRE PRR conventions