사용법: Use it when a defence, government or system of systems sponsor asks for an architecture in the OMG Unified Architecture Framework. Fill the stakeholders, concerns and grid selection first, then the Strategic and Operational viewpoints before any solution views. The main pitfall is filling every grid cell instead of only those that answer a stated concern.

미리보기

UAF Architecture Description: [Enterprise, mission or system of systems name]

Architecture description organised by the OMG Unified Architecture Framework (UAF) version 1.3 grid: Architecture Management, Summary and Overview, Strategic, Operational, Services, Personnel, Resources, Security, Projects, Standards and Actual Resources viewpoints, read across the aspects (Motivation, Taxonomy, Structure, Connectivity, Processes, States, Sequences, Information, Parameters, Constraints, Roadmap, Traceability). It records stakeholders and concerns, the grid cells selected, the content of each viewpoint, cross-cutting requirements, information, measures and risks, traceability and correspondence rules, the mapping to DoDAF 2.02 and NAF v4, and model management. Conformance is claimed against ISO/IEC/IEEE 42010:2022. Replace every [bracketed] value and every row marked Example; the worked example is a regional wildfire response system of systems.

Document control

FieldValue
Document ID[UAF-AD-001]
Version[0.1]
Status[Draft / In review / Approved / Superseded]
Owner[@chief-architect]
Approvers/reviewers[@capability-owner], [@systems-engineer], [@security-accreditor], [@programme-manager]
Last updatedYYYY-MM-DD
Classification[Official / Internal / Restricted]
Architecture name and identifier[Name], [ARCH-ID]
Architecture type[Enterprise / Capability / Solution / System of systems]
Time frame[As-is YYYY / To-be YYYY / Transition steps]
Framework and versionOMG UAF 1.3 (DMM formal/25-10-01, UAFML formal/25-10-03)
Modelling tool and model location[Tool and version], [repository path or model server URL]
Conformance claimedISO/IEC/IEEE 42010:2022 architecture description

Approvals

RoleNameDecisionDate
Architecture owner[@name][Approve / Approve with conditions / Reject]YYYY-MM-DD
Capability owner[@name][Decision]YYYY-MM-DD
Security accreditor[@name][Decision]YYYY-MM-DD
Programme manager[@name][Decision]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]First draft: scope, stakeholders, selected grid cells
1.0YYYY-MM-DD[@name]Example: Approved to-be architecture for increment 1
1.1YYYY-MM-DD[@name]Example: Added Security Constraints and Parameters: Risk views after accreditation review

Contents

1. Purpose, scope and conformance

1.1 Purpose

[State the decision or activity this description supports.] Example: This architecture description supports the investment decision for a regional wildfire response capability that joins fire services, the forestry agency, emergency medical services and two municipalities into one system of systems. It defines the target capability for 2029, the operational concept, the services and resources needed, the security posture and the three projects that deliver it.

1.2 Scope and boundary

ItemValue
Enterprise or system of interestExample: Regional Wildfire Response (RWR) system of systems
Participating organisationsExample: Regional fire service, forestry agency, ambulance trust, two municipalities, national weather service (external)
In scopeExample: Detection, alerting, incident command, resource dispatch, public warning, after-action review
Out of scopeExample: Long-term forest management; aircraft maintenance
Architecture states describedExample: As-is 2026, to-be 2029, transition steps 2027 and 2028
Level of detailExample: Capability and logical levels complete; resource level for new systems only

1.3 Conformance

UAF states that it conforms to the architecture description terms of ISO/IEC/IEEE 42010, citing the 2011 edition. This description claims conformance to the 2022 edition, which uses the same core ideas (stakeholders, concerns, viewpoints, views, model kinds, correspondences) with an updated vocabulary. Record how each 42010 element is satisfied here.

ISO/IEC/IEEE 42010:2022 elementWhere satisfied in this document
Identification of the entity of interest and its environmentSection 1.2
Stakeholders and their concernsSection 4.1
Architecture viewpoints used, with the concerns they frameSection 4.2 (UAF grid selection)
Architecture views and modelsSections 5 to 14 and the referenced model
Correspondences and correspondence rulesSection 15
Architecture decisions and rationaleSection 18
Known issues and inconsistenciesSection 18

The companion Architecture Description (ISO/IEC/IEEE 42010) template (architecture/architecture-description-42010) gives the generic structure; this template specialises it for UAF.

2. Architecture management

UAF 1.3 places metadata about the architecture in the Architecture Management viewpoint (prefix Am). Record the content of the cells you use.

Grid cellView specificationContent in this architecture
Am-MvArchitecture PrinciplesExample: AP-01 Capability before solution; AP-02 Reuse national services first; AP-03 Every exchange is secured at the classification of its most sensitive element
Am-SrArchitecture ViewsThe selected grid cells and their stakeholders (section 4.2)
Am-CnArchitecture ReferencesExample: References to the national emergency services architecture and the forestry agency's IT architecture
Am-PrArchitecture Development MethodExample: Iterative: capability baseline, operational concept workshop, solution options, review, increment planning
Am-StArchitecture StatusExample: Strategic and Operational views approved; Resources views in review
Am-IfDictionarySection 19.1 and the model dictionary
Am-PmArchitecture ParametersExample: Measures used to compare options: time to alert, coverage, cost
Am-CtArchitecture ConstraintsExample: Must reuse the national emergency radio network; no new classified enclave
Am-RmArchitecture RoadmapExample: Releases of this architecture: v1.0 investment decision, v2.0 design authority baseline
Am-TrArchitecture TraceabilityExample: Links from this description to the investment case and the CONOPS

3. Summary and overview

ItemContent
Purpose and decisionExample: Approve investment of [amount] for RWR increment 1
Key findingsExample: Detection-to-alert time is limited by manual hand-offs between three control rooms, not by sensors; a shared common operating picture service removes two hand-offs
Recommended optionExample: Option B: shared incident data service on the regional cloud, integrated with existing dispatch systems
AssumptionsExample: The national weather service keeps providing fire weather indices through its public interface
ConstraintsExample: Existing radio network retained until 2031
Limitations of this descriptionExample: Actual Resources analysed for the summer peak only
Analysis performedExample: Coverage simulation, cost comparison of three options, security risk assessment

4. Stakeholders, concerns and grid selection

4.1 Stakeholders and concerns

IDStakeholderConcernAnswered by cells
CON-01 (Example)Regional fire chief (capability owner)Which capabilities are needed by 2029 and in what order?St-Tx, St-Rm, Pj-Rm
CON-02 (Example)Incident commandersHow will incidents be run across agencies?Op-Sr, Op-Pr, Op-Sq, Ps-Sr
CON-03 (Example)Systems engineersWhich systems and interfaces are new or changed?Rs-Sr, Rs-Cn, Sv-Cn
CON-04 (Example)Security accreditorWhat information is exchanged at which classification and how is it protected?Sc-Tx, Sc-Cn, Sc-Ct, Sc-Mv
CON-05 (Example)Programme managerWhich projects deliver what, with which dependencies?Pj-Sr, Pj-Cn, Pj-Rm
CON-06 (Example)Finance boardWhat does each option cost and what does it achieve?Am-Pm, Ar-Sr, Parameters (section 14.3)
[CON-NN][Stakeholder][Concern][Cells]

4.2 Grid selection

Rows are viewpoints, columns are aspects. Mark each cell S (selected), R (referenced from another architecture) or leave it blank. Abbreviations follow the UAF acronyms.

ViewpointMvTxSrCnPrStSqIfPmCtRmTr
Architecture Management (Am)SSSSSSSSSS
Strategic (St)SSSSSSS
Operational (Op)SSSSSSSSS
Services (Sv)SSSSSSS
Personnel (Ps)SSSSS
Resources (Rs)SSSSSSSSS
Security (Sc)SSSSSS
Projects (Pj)SSSSS
Standards (Sd)SSSS
Actual Resources (Ar)SSS

Example selection shown. Cells exist in the published grid only where UAF defines a view specification; check the grid in the DMM before selecting a cell. Requirements (Motivation), Information and Parameters content that spans viewpoints is summarised in section 14.

5. Strategic viewpoint

5.1 Strategic Motivation and Taxonomy

IDCapabilityDefinition (outcome, solution independent)ParentMeasure
CAP-01 (Example)Detect wildfireIdentify a new fire and its locationNoneTime from ignition to confirmed detection
CAP-01.1 (Example)Remote sensing detectionDetect fires from sensors and imageryCAP-01Area covered, false alarm rate
CAP-02 (Example)Alert and warnInform responders and the public of a confirmed fireNoneTime from detection to first responder alert
CAP-03 (Example)Command multi-agency incidentCoordinate all agencies on one incident pictureNoneNumber of manual hand-offs
CAP-04 (Example)Dispatch resourcesAssign and track crews, vehicles and aircraftCAP-03Time to dispatch
CAP-05 (Example)Learn after actionCapture data and lessons from each incidentNoneShare of incidents with completed review
[CAP-NN][Capability][Definition][Parent][Measure]

Record challenges and opportunities that motivate the change in the Strategic Motivation view, for example the rise in fire season length reported by the regional climate assessment.

5.2 Strategic Structure, Connectivity and Constraints

Show capability composition and dependencies. Example: CAP-03 depends on CAP-02 for alerts and on CAP-04 for resource status; CAP-05 depends on data retained by CAP-03.

Constraint IDCapabilityConstraintSource
ST-CT-01 (Example)CAP-02First responder alert within 5 minutes of confirmed detectionRegional emergency plan
[ST-CT-NN][Capability][Constraint][Source]

5.3 Strategic Roadmap: Deployment and Phasing

Capability2026 as-is202720282029 to-beDelivered by
CAP-01.1 (Example)Lookout towers and public callsPilot camera networkCamera network region-wideCamera and satellite fusionPRJ-01
CAP-03 (Example)Three separate control roomsShared incident data service in buildShared incident data service live (fire season 2028-05); joint command proceduresSingle common operating picturePRJ-02
[CAP-NN][State][State][State][State][Project]

Strategic Traceability links each capability to the operational activities that exhibit it (section 15).

6. Operational viewpoint

6.1 Operational Taxonomy and Structure

IDOperational performerRole in the conceptCapabilities exhibited
OP-01 (Example)Detection cellReceives and confirms fire reportsCAP-01
OP-02 (Example)Joint incident commandLeads the response to a confirmed incidentCAP-03
OP-03 (Example)Resource dispatchAssigns crews and assetsCAP-04
OP-04 (Example)Public warning authorityIssues warnings to the publicCAP-02
OP-05 (Example)Field crewFights fire and reports statusCAP-03, CAP-04
[OP-NN][Performer][Role][Capabilities]

6.2 Operational Connectivity

Exchange IDFromToInformationTriggerTimeliness
OX-01 (Example)OP-01OP-02Confirmed fire location and sizeDetection confirmedWithin 2 minutes
OX-02 (Example)OP-02OP-04Warning area and messageCommand decisionWithin 5 minutes
OX-03 (Example)OP-05OP-02Crew position and fire line statusEvery 10 minutes and on changeNear real time
[OX-NN][From][To][Information][Trigger][Timeliness]

6.3 Operational Processes, States and Sequences

Describe the main operational activities, the states of a key element and one or two time-ordered scenarios. The CONOPS (requirements/conops) holds the narrative; this section holds the model.

6.4 Operational Information and Constraints

IDInformation elementDescriptionClassificationConstraint
OI-01 (Example)Incident recordLocation, perimeter, status, assigned resourcesOfficialRetained 7 years for inquiries
OI-02 (Example)Casualty informationPersons injured or missingPersonal, sensitiveShared with ambulance service only
[OI-NN][Element][Description][Classification][Constraint]

7. Services viewpoint

IDServiceConsumersProvider (to be decided in Resources)Supports activitiesPolicy and level
SV-01 (Example)Incident data serviceOP-02, OP-03, OP-04Shared regional serviceCommand, dispatch, warning99.9 percent during fire season
SV-02 (Example)Sensor alert serviceOP-01Camera network operatorDetectionAlert within 60 seconds of image analysis
SV-03 (Example)Public warning serviceOP-04National warning platformPublic warningMessage delivered to area within 3 minutes
[SV-NN][Service][Consumers][Provider][Activities][Level]

Services Connectivity, Processes and States show how services interact and behave; Services Roadmap shows when each service version becomes available. Interfaces at resource level go into the Interface Control Document (architecture/interface-control-document).

8. Personnel viewpoint

IDPost or roleOrganisationFills performerCompetences requiredNumber in 2029 (Example)
PS-01 (Example)Joint incident commanderFire serviceOP-02Multi-agency command, common operating picture use12
PS-02 (Example)Detection analystForestry agencyOP-01Imagery interpretation8
PS-03 (Example)Warning officerMunicipalitiesOP-04Warning procedures6
[PS-NN][Post][Organisation][Performer][Competences][Number]

Use Personnel Connectivity for command and reporting lines, Personnel Sequences for hand-overs, Personnel Constraints for rules such as shift length, and Personnel Roadmap for recruitment and training over time.

9. Resources viewpoint

IDResourceTypeNew or existingImplementsOwner
RS-01 (Example)Camera detection networkCapability configurationNewSV-02Forestry agency
RS-02 (Example)Shared incident data platformSoftware systemNewSV-01Regional IT shared service
RS-03 (Example)Fire service dispatch systemSoftware systemExisting, changedPart of SV-01 consumersFire service
RS-04 (Example)Emergency radio networkCommunications systemExistingVoice exchangesNational operator
[RS-NN][Resource][Type][New / Existing][Service or function][Owner]
Resource exchangeFromToRealises operational exchangeProtocol or medium
RX-01 (Example)RS-01RS-02OX-01Event message over secured interface
RX-02 (Example)RS-02RS-03Dispatch requestIntegration interface
[RX-NN][From][To][OX-NN][Medium]

Resources Processes, States and Sequences describe functions and behaviour; Resources Roadmap records versions and retirements; Resources Information gives the logical data model. Detailed requirements go into the System Requirements Specification (requirements/system-requirements).

10. Security viewpoint

IDSecurity assetOwnerEnclaveClassificationControls applied (Security Controls view)
SC-01 (Example)Incident record (OI-01)Fire serviceRegional shared enclaveOfficialAccess by role, encryption in transit and at rest, audit
SC-02 (Example)Casualty information (OI-02)Ambulance trustHealth enclavePersonal, sensitiveSeparate store, need-to-know access, data protection impact assessment
SC-03 (Example)Camera feedsForestry agencySensor enclaveOfficialOne-way transfer to shared enclave
[SC-NN][Asset][Owner][Enclave][Classification][Controls]

Security Connectivity shows exchanges that cross enclave boundaries; Security Constraints records policy, law and guidance; Security Processes shows security activities such as access approval. Reference the control catalogue you use (for example ISO/IEC 27001 Annex A or NIST SP 800-53) by control identifier and keep the accreditation evidence in the security case.

11. Projects viewpoint

IDProjectDeliversStartKey milestoneDepends on
PRJ-01 (Example)Camera detection networkRS-01, CAP-01.1 increment2027-01Region-wide coverage 2028-06None
PRJ-02 (Example)Shared incident data platformRS-02, SV-01, CAP-03 increment2027-03Live for fire season 2028-05PRJ-03 interface changes
PRJ-03 (Example)Dispatch system integrationRS-03 change2027-06Integration accepted 2028-03None
[PRJ-NN][Project][Deliverables][Start][Milestone][Dependencies]

Link this to the Architecture Roadmap and Transition Plan (architecture/architecture-roadmap-transition) for the programme view.

12. Standards viewpoint

IDStandard or protocolVersionApplies toStatus over time
SD-01 (Example)Common Alerting Protocol (OASIS)[Version]SV-03 public warning messagesMandated
SD-02 (Example)Emergency services data exchange standard[Version]RX-02Current; next version expected [year]
SD-03 (Example)Regional cloud security baseline[Version]RS-02Mandated
[SD-NN][Standard][Version][Element][Status]

Standards Roadmap records when standards are adopted, mandated, or retired.

13. Actual resources viewpoint

ConfigurationDescriptionScenarioMeasureResult (Example)
AR-01 Option A (Example)Existing three control rooms, cameras addedPeak day with 5 simultaneous firesConfirmed detection to first responder alert, 95th percentile14 minutes
AR-02 Option B (Example)Shared incident data platform plus camerasSameSame4.5 minutes
AR-03 Option C (Example)Single merged control roomSameSame4 minutes, with high organisational cost
[AR-NN][Configuration][Scenario][Measure][Result]

Actual Resources Connectivity shows the actual links in each configuration; Actual Resources Traceability links actual resources to the resource types in section 9.

14. Requirements, information and parameters

14.1 Requirements

IDRequirementTypeTraces toVerification
REQ-01 (Example)Alert first responders within 5 minutes of confirmed detection in 95 percent of incidentsOperationalCAP-02, OX-02, ST-CT-01Exercise and simulation AR-02
REQ-02 (Example)Incident data service available 99.9 percent from 1 May to 30 SeptemberServiceSV-01, RS-02Monitoring during first season
[REQ-NN][Requirement][Type][Elements][Method]

14.2 Information

Summarise the conceptual or logical information model (Operational Information and Resources Information views) and link to the Data Dictionary (architecture/data-dictionary) where one exists.

14.3 Parameters

Parameter typeContent in this architecture
EnvironmentExample: Fire season conditions: temperature above 30 C, wind above 40 km/h, low connectivity in valleys
MeasurementsExample: Detection time, alert time, coverage percentage, cost per year
Mission vignette and scenarioExample: V-01 Five simultaneous fires on a red flag day; V-02 Fire crossing municipal boundary at night
RiskExample: RSK-01 Camera network coverage gaps in valleys; RSK-02 Dispatch vendor delays interface changes

15. Traceability and correspondence rules

Rule IDCorrespondence ruleCheck
CR-01 (Example)Every capability is exhibited by at least one operational activityStrategic Traceability query; no unlinked capability
CR-02 (Example)Every operational exchange is realised by at least one resource exchange or recorded as manualOperational to Resources traceability
CR-03 (Example)Every service has a provider resource in the to-be stateServices Traceability
CR-04 (Example)Every security asset has an owner and an enclaveSecurity Traceability
CR-05 (Example)Every new resource is delivered by a project milestoneProject Traceability
[CR-NN][Rule][Check]
CapabilityOperational activityServiceResourceProjectRequirement
CAP-01.1 (Example)Confirm fire reportSV-02RS-01PRJ-01[REQ-NN]
CAP-02 (Example)Issue warningSV-03National warning platformNot applicable (existing)REQ-01
CAP-03 (Example)Lead joint responseSV-01RS-02, RS-03PRJ-02, PRJ-03REQ-02

16. Mapping to other frameworks

UAF grew out of the Unified Profile for DoDAF and MODAF (UPDM) and states that UAFML can be used to develop architectures compliant with DoDAF 2.02, MODAF 1.3 and NAF 3.1 and v4. MODAF guidance was withdrawn by the UK government in January 2021 and replaced by NAF v4; record MODAF only for legacy architectures.

Requested framework view groupUAF viewpoint that supplies itNotes
DoDAF All ViewpointArchitecture Management, Summary and OverviewOverview and dictionary content
DoDAF Capability ViewpointStrategicCapability taxonomy, dependencies, phasing
DoDAF Operational ViewpointOperationalPerformers, activities, exchanges
DoDAF Services ViewpointServicesService specifications
DoDAF Systems ViewpointResourcesSystems and resource exchanges
DoDAF Data and Information ViewpointInformation aspectConceptual and logical data
DoDAF Project ViewpointProjectsProjects and milestones
DoDAF Standards ViewpointStandardsStandards profile and forecast
NAF v4 viewsMatching UAF viewpoint and aspectCheck UAF Appendix A, Traceability, for the cell by cell mapping

17. Model management and tool conformance

ItemValue
Modelling languageUAFML (UAF Modeling Language), a profile of SysML 1.6
Tool and version[Tool], [version]
Tool conformance level[Type 1 view specification / Type 2 conceptual syntax / Type 3 formal syntax / Type 4 model interchange], as the vendor declares
Model exchangeExample: XMI export at each baseline; stored with this document
Configuration managementExample: Model baselined at each document version; changes through the design authority
Model conventionsExample: Element names in singular nouns; IDs as in this document; one package per viewpoint
Review methodExample: Model walkthrough with stakeholders of each selected cell; correspondence rule queries run before each baseline

UAF 1.3 defines four conformance types for tools, each building on the one before: view specification conformance, conceptual syntax conformance, formal syntax conformance and model interchange conformance. Ask the tool vendor which type their implementation claims.

18. Issues, decisions and review record

IDTypeDescriptionRationale or resolutionOwnerStatus
UAF-DEC-001 (Example)DecisionChoose Option B (shared incident data platform)Meets REQ-01 at lower organisational cost than Option C (section 13)@chief-architectApproved
UAF-ISS-001 (Example)IssuePersonnel numbers for 2029 depend on the municipal budgetRe-check after budget approval@capability-ownerOpen
UAF-ISS-002 (Example)InconsistencyRX-02 protocol not yet agreed with dispatch vendorResolve in PRJ-03 design@systems-engineerOpen
[UAF-XXX-NNN][Type][Description][Rationale][@owner][Status]

Record full decisions in the Architecture Decision Log (architecture/architecture-decision-log).

19. Glossary and references

19.1 Glossary

TermMeaning in this document
Viewpoint (UAF grid row)A group of view specifications addressing related stakeholder concerns, such as Strategic or Operational; UAF 1.3 calls these viewpoints, earlier versions called them domains
Aspect (UAF grid column)A way of looking at elements, such as Taxonomy or Connectivity; earlier versions called these model kinds
View specificationA grid cell: the rules for one kind of view
CapabilityWhat the enterprise must be able to achieve, independent of how
Operational performerA logical role that carries out operational activities
ResourceA system, software, organisational or natural element that performs work
Actual resourceA specific configuration of resources used for analysis or verification
System of systemsA set of independently owned systems working together for a shared outcome

19.2 References

ReferenceVersion or dateUse
OMG Unified Architecture Framework (UAF), Domain Metamodel (DMM)Version 1.3, formal/25-10-01, formal version adopted April 2026, omg.org/spec/UAFGrid, viewpoints, aspects, view specification names
OMG UAF Modeling Language (UAFML)Version 1.3, formal/25-10-03Modelling language profile
OMG UAF Appendix A Traceability, Appendix B Sample Problem, Appendix C Enterprise Architecture GuideVersion 1.3 (informative)Framework mapping and method guidance
ISO/IEC/IEEE 42010, Software, systems and enterprise: Architecture description2022 (Edition 2)Conformance (section 1.3)
DoD Architecture FrameworkVersion 2.02Mapping (section 16)
NATO Architecture FrameworkVersion 4Mapping (section 16)
UK MOD Architecture Framework (MODAF)Withdrawn 15 January 2021, replaced by NAF v4Legacy note only
[Sponsor architecture standard][Version][Use]

Standard and licence note

Based on the OMG Unified Architecture Framework (UAF) version 1.3 (Domain Metamodel formal/25-10-01 and UAF Modeling Language formal/25-10-03, formal version April 2026), with conformance mapped to ISO/IEC/IEEE 42010:2022. Viewpoint, aspect and view specification names are used as published by OMG for reference; no specification text, figures or tables are reproduced, and all explanations, selections and the worked example are original. ISO/IEC/IEEE 42010 is copyrighted: only its element names are used. Check the current OMG specification at omg.org/spec/UAF and the current edition of each referenced framework before use. UAF, UML and SysML are trademarks of the Object Management Group; this template is not affiliated with or endorsed by OMG. Template licence: MIT.