ISMS Steering Committee Charter Template (ISO/IEC 27001)
Committee purpose, membership, quorum, cadence, decision rights, inputs, standing agenda, minutes and action log, link to management review 9.3
사용법: Use it when ISMS decisions need more than one executive between management reviews: risk acceptance, policy approval, budget and priorities. Fill the decision rights first and check them against the roles and RACI and the risk methodology. The main pitfall is presenting committee minutes as the management review without the clause 9.3 inputs and outputs.
미리보기
ISMS Steering Committee Charter: [Organization name]
Sets up the body that steers the information security management system (ISMS) between management reviews: its purpose, members, quorum, meeting cadence, standing agenda, decision rights, inputs, minutes and action log. It supports ISO/IEC 27001:2022 + Amd 1:2024 clause 5.1 (leadership and commitment), clause 5.3 (roles and authorities), clause 9.3 (management review) and Annex A control A.5.4 (management responsibilities for security). The standard does not require a steering committee; it is a common way to show leadership and to prepare the management review. Replace every
[bracketed]value and every row marked Example.
Document control
| Field | Value |
|---|---|
| Document ID | DOC-ISMS-007 |
| Version | [1.0] |
| Status | [Draft / In review / Approved / Superseded] |
| Owner | [@ciso or committee chair] |
| Approvers/reviewers | [@ceo], [@cfo], [@isms-manager], [@internal-auditor (reviewer)] |
| Last updated | YYYY-MM-DD |
| Classification | [Internal] |
| Standard and edition | ISO/IEC 27001:2022 + Amd 1:2024 (clauses 5.1, 5.3, 9.3; A.5.4) |
| Next scheduled review | YYYY-MM-DD (every [12] months) |
| Committee chair | [@coo or ceo] |
| Committee secretary | [@isms-manager] |
| Meeting cadence | [Quarterly, plus extraordinary meetings] |
| Related documents | DOC-ISMS-006 roles and RACI, DOC-ISMS-010 risk methodology, DOC-ISMS-015 risk appetite and criteria, DOC-ISMS-085 management review minutes |
Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| Top management sponsor | [@ceo] | [Approved / Approved with changes] | YYYY-MM-DD |
| Committee chair | [@coo] | [Accepted] | YYYY-MM-DD |
| ISMS manager (prepared by) | [@isms-manager] | [Prepared] | YYYY-MM-DD |
Revision history
| Version | Date | Author | Change |
|---|---|---|---|
| 1.0 | YYYY-MM-DD | [@isms-manager] | First issue |
| [x.y] | YYYY-MM-DD | [@author] | [Change summary] |
Contents
- 1. Purpose and authority
- 2. Relationship to management review and other bodies
- 3. Membership
- 4. Quorum and decision making
- 5. Cadence and meeting types
- 6. Decision rights
- 7. Inputs
- 8. Standing agenda
- 9. Minutes template
- 10. Action log
- 11. Annual work plan
- 12. Size tiers
- 13. Committee effectiveness review
- 14. Records and evidence
- 15. References
- Standard and licence note
1. Purpose and authority
The ISMS steering committee (the committee) is appointed by top management of [Organization name] to:
- Direct and monitor the ISMS between management reviews, so that it delivers what top management set out to achieve (clause 5.1).
- Make the security decisions delegated to it in section 6: approval of topic-specific policies, acceptance of risks within its limits, prioritisation of risk treatment and use of the approved ISMS budget.
- Coordinate security across functions (IT, engineering, HR, legal, operations, procurement, facilities) so that controls do not stop at departmental borders.
- Prepare the inputs for the management review (clause 9.3) and follow up its decisions.
- Escalate to top management or the board any matter beyond its authority.
| Item | Value |
|---|---|
| Appointed by | [Top management or board resolution, reference and date] |
| Scope of authority | ISMS within the scope in DOC-ISMS-002 |
| Accountable to | [CEO / executive committee / board risk committee] |
| Reports | Summary of decisions and escalations after each meeting; annual activity report |
| Authority limits | Section 6; anything not listed is escalated |
The committee does not replace line management. Risk owners, asset owners and control owners keep their responsibilities as defined in DOC-ISMS-006.
2. Relationship to management review and other bodies
The clause 9.3 review is the moment when top management itself steps back and judges whether the ISMS is still the right one for the business and is working. It runs on a fixed rhythm, works from a set agenda that the standard prescribes (follow-up of earlier decisions, what has changed, how security has performed, audit and risk results, ideas for improvement), and ends in recorded decisions. The committee is not a substitute; it prepares and follows up.
| Aspect | ISMS steering committee (this charter) | Management review (clause 9.3, DOC-ISMS-085) |
|---|---|---|
| Required by ISO/IEC 27001 | No; an organisational choice | Yes |
| Who | Committee members in section 3 | Top management (may include committee members) |
| Frequency | [Quarterly] plus extraordinary meetings | At planned intervals, typically [once a year]; some organisations hold it twice a year |
| Purpose | Steer, decide within delegated limits, coordinate, prepare | Judge whether the ISMS still fits the business, is sufficient and works; decide on improvement and changes |
| Inputs | KPIs, risk changes, incidents, audit status, project status, exceptions | All inputs listed in clause 9.3.2 |
| Outputs | Decisions, acceptances, action items, escalations | Decisions on improvement opportunities and changes to the ISMS (9.3.3), retained as documented information |
| Record | Committee minutes and action log (sections 9 and 10) | Management review minutes (compliance/management-review) |
How they connect:
Other bodies:
| Body | Relationship | Interface |
|---|---|---|
| Board or board risk committee | Receives the annual security report and escalations of Critical risks | CISO reports [twice a year] |
| Audit committee | Receives internal audit results directly | Internal auditor reports independently (DOC-ISMS-006 section 7) |
| Change advisory board | Escalates changes with High security risk | Change records reference committee decisions |
| Privacy or data governance board | Shares privacy risks and DPIA outcomes | DPO attends both |
| Other management system committees (quality, continuity) | Joint agenda items in an integrated management system | Combined meetings allowed if minutes separate ISMS decisions |
3. Membership
3.1 Core members (voting)
| Seat | Role holder | Why on the committee |
|---|---|---|
| Chair | [COO / CEO] | Executive authority across functions; chairs and casts deciding vote |
| CISO or security lead | [@ciso] | Security strategy, risk reporting, incident escalation |
| Head of IT operations | [@it-ops-lead] | Owns most technical controls and their budget |
| Head of engineering or product | [@cto] | Secure development, product risks, customer commitments |
| HR lead | [@hr-lead] | People controls, training, disciplinary process |
| Finance lead | [@cfo] | Budget, insurance, fraud-related controls |
| Legal or compliance lead | [@general-counsel] | Legal register, contracts, regulatory notifications |
| Business unit representative | [@bu-head] | Business impact and risk ownership |
3.2 Advisors and attendees (non-voting)
| Seat | Role holder | Attends |
|---|---|---|
| Secretary | ISMS manager [@isms-manager] | Every meeting; prepares packs, minutes and action log |
| DPO or privacy lead | [@dpo] | Every meeting (privacy items) |
| Internal auditor | [@internal-auditor] | By invitation for audit results; observes, does not vote, to keep independence |
| Risk owners and control owners | As needed | For their agenda items |
| Supplier representatives | As needed | For supplier performance or incident items |
3.3 Membership rules
- Top management appoints the chair; the chair appoints other members with top management's agreement.
- Each core member names a deputy with authority to vote in their absence (see DOC-ISMS-006 section 8).
- Members declare conflicts of interest at the start of each meeting; a conflicted member does not vote on that item.
- New members receive an induction from the ISMS manager covering this charter, the risk methodology and current High and Critical risks.
4. Quorum and decision making
| Rule | Value |
|---|---|
| Quorum | Chair (or deputy) plus at least [half] of the core members, including the CISO or deputy |
| Decision method | Consensus; if not reached, simple majority of voting members present; chair has the deciding vote |
| Risk acceptance | Requires the risk owner present or represented and the CISO's recorded opinion |
| Decisions outside meetings | Written procedure by e-mail or workflow tool, approved by a quorum within [5] working days, recorded in the next minutes |
| Urgent decisions | Chair and CISO may decide jointly when a delay would cause harm; ratified at the next meeting |
| Dissent | Any member may ask for a dissent to be minuted |
| Inquorate meeting | Discussion may continue; decisions are taken by written procedure |
Decision flow for an item that needs a decision:
5. Cadence and meeting types
| Meeting type | When | Duration (Example) | Purpose |
|---|---|---|---|
| Regular meeting | [Quarterly]; [monthly] during the implementation project | 90 minutes | Standing agenda (section 8) |
| Extraordinary meeting | Within [2] working days of a Critical risk, a major incident or a major audit finding | 60 minutes | Specific decision |
| Annual planning meeting | [January] | 2 hours | Objectives, budget, audit programme, calendar for the year |
| Management review preparation | [4 to 6] weeks before management review | Part of a regular meeting | Agree the input pack |
Papers are sent [5] working days before a regular meeting. Items received later move to the next meeting unless the chair agrees otherwise.
6. Decision rights
| Decision | Committee role | Limit or condition | Escalates to |
|---|---|---|---|
| Approve topic-specific policies (DOC-ISMS-005) | Approves | Policy consistent with DOC-ISMS-001 | Top management for DOC-ISMS-001 itself |
| Approve the information security policy | Recommends | Top management approves (clause 5.2) | Top management |
| Accept Low and Medium residual risks | Informed | Risk owner accepts Low; risk owner plus department head accept Medium (DOC-ISMS-010) | Top management for Medium in an Averse category (DOC-ISMS-015 section 9 rule 1) |
| High residual risks (score 10 to 16) | Reviews the treatment decision and recommends acceptance or treatment | Treatment plan with dates required | Top management accepts |
| Critical residual risks (score 17 to 25) | Reviews; requires a treatment plan | Not accepted by the committee | Top management documented decision |
| Prioritise risk treatment plan items (DOC-ISMS-013) | Decides | Within approved budget | Top management if budget is exceeded |
| Spend from approved ISMS budget | Approves | Up to USD [50,000] per item (Example) | CEO above the limit |
| Policy exceptions with Low or Medium residual risk | Informed; reviews the exception register each meeting | Approved by the risk owner (Low) or the risk owner plus department head (Medium); compensating controls and expiry of up to [12] months required | Top management for Medium in an Averse category |
| Policy exceptions with High residual risk | Reviews and recommends | Treatment plan and expiry of up to [6] months required (DOC-ISMS-019) | Top management accepts |
| Policy exceptions with Critical residual risk | Not approvable as an exception | Treat or stop the activity | Top management, as a risk decision under DOC-ISMS-019, never as an exception |
| Approve the internal audit programme | Endorses | Top management approves | Top management |
| Approve ISMS objectives (DOC-ISMS-024) | Recommends | Consistent with the policy | Top management approves |
| Approve changes to the ISMS (6.3, DOC-ISMS-025) | Approves | Changes that do not alter scope or policy | Top management for scope changes |
| Approve the Statement of Applicability | Reviews | CISO and sponsor approve | Top management |
| Accept supplier security risks for critical suppliers | Decides on High findings | Per supplier assessment (DOC-ISMS-067) | Top management for Critical findings |
7. Inputs
| Input | Provided by | Source | Frequency |
|---|---|---|---|
| ISMS dashboard: KPIs and objectives status | ISMS manager | DOC-ISMS-081 performance report, DOC-ISMS-080 measurement programme | Every meeting |
| Risk register changes: new, raised, overdue treatment, expiring acceptances | ISMS manager | DOC-ISMS-016, DOC-ISMS-013 | Every meeting |
| Risk acceptance requests (High and Critical) | Risk owners | DOC-ISMS-019 | As raised |
| Incidents and near misses since last meeting | Incident manager | DOC-ISMS-021, DOC-ISMS-022 | Every meeting |
| Internal and external audit results and open findings | ISMS manager, internal auditor | DOC-ISMS-084, DOC-ISMS-086 | After each audit |
| Corrective actions status | ISMS manager | DOC-ISMS-087 | Every meeting |
| Exceptions granted and expiring | CISO | DOC-ISMS-122 | Every meeting |
| Supplier security issues | Procurement | DOC-ISMS-066, DOC-ISMS-067 | Quarterly |
| Projects and changes with security impact | Project owners | DOC-ISMS-046, change records | As needed |
| Legal and regulatory changes | Legal | DOC-ISMS-014 | Quarterly |
| Threat intelligence summary | Security operations | DOC-ISMS-045 | Quarterly |
| Budget versus plan | Finance | DOC-ISMS-031 | Quarterly |
| Management review actions | ISMS manager | DOC-ISMS-085 | Every meeting until closed |
8. Standing agenda
| No. | Item | Lead | Time (Example) | Expected outcome |
|---|---|---|---|---|
| 1 | Opening, quorum, conflicts of interest | Chair | 5 min | Quorum confirmed, conflicts recorded |
| 2 | Approval of previous minutes | Chair | 5 min | Minutes approved |
| 3 | Action log review | Secretary | 10 min | Actions closed, re-planned or escalated |
| 4 | ISMS dashboard and objectives | ISMS manager | 10 min | Off-track objectives get an owner and action |
| 5 | Risk review: new, changed, overdue, acceptances | CISO | 20 min | Acceptances recommended or decided; treatments prioritised |
| 6 | Incidents and lessons learned | Incident manager | 10 min | Improvement actions assigned |
| 7 | Audit results and corrective actions | ISMS manager | 10 min | Overdue actions escalated |
| 8 | Policies, exceptions and changes for approval | Policy owners | 10 min | Approvals recorded |
| 9 | Suppliers, projects, legal changes | Members | 5 min | Items noted or actions assigned |
| 10 | Escalations to top management and any other business | Chair | 5 min | Escalations listed |
Total time in this example: 90 minutes (5 + 5 + 10 + 10 + 20 + 10 + 10 + 10 + 5 + 5).
9. Minutes template
Copy this block for each meeting.
| Field | Value |
|---|---|
| Meeting ID | SC-2027-Q1 (Example) |
| Date, time, place | 2027-03-18, 10:00 to 11:30, [room or video link] |
| Chair | [@coo] |
| Secretary | [@isms-manager] |
| Members present | [Names or roles] |
| Apologies and deputies | [Names, deputy attending] |
| Quorum | [Yes / No] |
| Conflicts declared | [None / member and item] |
| Previous minutes | [Approved / Approved with changes] |
Decisions:
| Decision ID | Agenda item | Decision | Basis (document or record) | Owner | Date due |
|---|---|---|---|---|---|
| SC-2027-Q1-D01 (Example) | 5 Risk review | Recommend that top management accept RISK-024 (legacy reporting server, score 12, High) for 6 months with treatment RTP-022 | DOC-ISMS-019 request ACC-007 | CISO | 2027-03-25 |
| SC-2027-Q1-D02 (Example) | 8 Policies | Approve the remote working policy version 1.0 | DOC-ISMS-054 draft | HR lead | 2027-03-18 |
| SC-2027-Q1-D03 (Example) | 5 Risk review | Prioritise phishing-resistant MFA for administrators ahead of the DLP pilot | DOC-ISMS-013 items RTP-009, RTP-017 | Head of IT operations | 2027-06-30 |
| [SC-YYYY-QN-DNN] | [Item] | [Decision] | [Reference] | [Owner] | YYYY-MM-DD |
Escalations to top management:
| Escalation ID | Subject | Reason | Requested decision | Sent on |
|---|---|---|---|---|
| SC-2027-Q1-E01 (Example) | RISK-024 acceptance | High residual risk needs top management acceptance | Accept for 6 months with RTP-022 | 2027-03-19 |
Minutes approved by: [chair], date YYYY-MM-DD.
10. Action log
| Action ID | Source | Action | Owner | Due | Status | Evidence of closure |
|---|---|---|---|---|---|---|
| ACT-2027-001 (Example) | SC-2027-Q1-D03 | Roll out phishing-resistant MFA to all 42 administrator accounts | Head of IT operations | 2027-06-30 | In progress (28 of 42 done) | Identity provider report |
| ACT-2027-002 (Example) | Management review 2026 output 4 | Add supplier security KPIs to the dashboard | ISMS manager | 2027-03-31 | Closed | Dashboard v2.1 |
| ACT-2027-003 (Example) | SC-2027-Q1 item 7 | Close overdue corrective action CA-2026-011 (access review evidence) | Asset owner, finance systems | 2027-04-30 | Open | |
| [ACT-YYYY-NNN] | [Source] | [Action] | [Owner] | YYYY-MM-DD | [Open / In progress / Closed / Escalated] | [Reference] |
Status rules: an action overdue by more than [30] days is reported to the chair; an action re-planned twice is escalated to top management.
11. Annual work plan
| Meeting | Special focus in addition to the standing agenda |
|---|---|
| Annual planning (January) | Objectives, budget, internal audit programme, calendar |
| Q1 (March) | Risk acceptances expiring, policy review results |
| Q2 (June) | Risk reassessment results and treatment priorities |
| Q3 (September) | Internal audit results, management review input pack |
| Q4 (December) | Management review outputs, surveillance audit results, next year's plan |
12. Size tiers
| Topic | Small: Quillmere Analytics Ltd (46 staff) | Medium: Quillmere Health Systems (320 staff) | Large: Quillmere Group (2,400 staff, 6 sites) |
|---|---|---|---|
| Form | Standing ISMS item in the monthly leadership meeting (CEO, CTO, COO, Head of Engineering Operations) | Dedicated quarterly committee, monthly during the 10-month certification project | Group security council plus a committee per site; council chaired by the group COO |
| Chair | CEO | COO | Group COO; site directors chair site committees |
| Secretary | Head of Engineering Operations (ISMS manager, 0.5 FTE) | Full-time ISMS manager | Group ISMS manager in the 14-person security office |
| Members | 4 | 8 core members plus privacy lead | Council: group COO (chair) plus 9 core members: CISO, group CIO, OT lead, group HR, legal, finance and 3 site representatives in rotation |
| Decision limits (Example) | Spend up to USD 10,000 | Spend up to USD 50,000 | Council up to USD 250,000; site committees up to USD 25,000 |
| Minutes | Section in leadership minutes with decision IDs | Separate minutes and action log | Council minutes; site minutes roll up to the council action log |
| Integration | None needed | Joint item with the quality lead for audit planning | Integrated with ISO 9001 and ISO 22301 governance; separate ISMS decision section |
13. Committee effectiveness review
Once a year, before the annual planning meeting, the chair and secretary review:
| Question | Measure (Example) | Target (Example) |
|---|---|---|
| Did meetings take place as planned? | Meetings held versus planned | 4 of 4 |
| Were meetings quorate? | Quorate meetings | 100% |
| Were actions closed on time? | Actions closed by due date | At least 80% |
| Were papers sent on time? | Packs sent 5 working days before | At least 90% |
| Did decisions reach the management review? | Escalations and summaries in the 9.3 input pack | All |
| Are the right functions present? | Attendance per seat | At least 75% per seat |
Findings feed the continual improvement register (DOC-ISMS-088) and, if needed, a revision of this charter.
14. Records and evidence
| Record | Proves | Kept by | Where | Retention (Example) |
|---|---|---|---|---|
| Approved charter (this document) | Delegated authority from top management | Secretary | Document management system | Current plus [3] previous versions |
| Meeting packs | Inputs reviewed | Secretary | Committee folder | [3] years |
| Approved minutes with decision IDs | Decisions taken within authority | Secretary | Committee folder | [6] years or as required by corporate records policy |
| Action log | Follow-up of decisions | Secretary | Committee folder or tracker | [3] years after closure |
| Written-procedure decisions | Decisions outside meetings | Secretary | Committee folder | Same as minutes |
| Escalations to top management and responses | Authority limits respected | Chair | Committee folder | [6] years |
| Annual effectiveness review | Committee performance | Chair | Committee folder | [3] years |
Map these records to clauses 5.1, 5.3 and 9.3 and control A.5.4 in the control evidence matrix (DOC-ISMS-033).
15. References
| Reference | Edition | Use |
|---|---|---|
| ISO/IEC 27001:2022 + Amd 1:2024 | Current (https://www.iso.org/standard/82875.html, Amd 1: https://www.iso.org/standard/88435.html) | Clauses 5.1, 5.3, 9.3; A.5.4 |
| ISO/IEC 27002:2022 | Current (https://www.iso.org/standard/75652.html) | Management responsibilities guidance |
| ISO/IEC 27003:2017 | Current; a revision is in progress, check for a newer edition (https://www.iso.org/standard/63417.html) | Leadership and management review guidance |
| ISO/IEC 27014:2020 | Current; a new edition is at FDIS stage in 2026 (https://www.iso.org/standard/74046.html) | Governance of information security: direct, monitor, evaluate |
Related templates: isms/isms-roles-raci, compliance/management-review,
isms/isms-performance-report, isms/isms-measurement-programme,
compliance/risk-register, compliance/risk-treatment-plan,
isms/isms-risk-acceptance-record, isms/isms-annual-calendar,
isms/isms-budget-resource-plan, isms/information-security-governance-27014,
security/security-exception-request, isms/control-evidence-matrix.
Standard and licence note
Structure aligned with ISO/IEC 27001:2022 + Amd 1:2024 (clauses 5.1, 5.3 and 9.3, Annex A control A.5.4), with guidance from ISO/IEC 27003:2017 and ISO/IEC 27014:2020. The charter text, tables, agenda, minutes format and examples are original. No ISO/IEC text is reproduced: clause and control numbers are cited with short descriptions written for this template. Obtain the official standards from ISO, IEC or your national standards body, and check the current edition before use (ISO/IEC 27003 and ISO/IEC 27014 are under revision). Quillmere entities are fictional; budget figures are examples in USD, use your local currency.
Template licence: MIT.
관련 템플릿
ISMS Project Charter Template (ISO/IEC 27001)
Objectives, draft scope, sponsor and roles, governance cadence, milestones to Stage 2, assumptions, constraints, project risks, change control, handover
ISMS 및 ISO/IEC 27001Access Control Policy Template (ISO/IEC 27001 A.5.15)
Access principles, role catalogue, joiner mover leaver SLAs, MFA and NIST SP 800-63B-4 password rules, privileged and service accounts, reviews, metrics
ISMS 및 ISO/IEC 27001Annex A Organizational Controls Guide Template (ISO/IEC 27001 A.5)
A.5.1 to A.5.37 in own words: intent, typical implementation, tier notes, evidence auditors sample, pitfalls, linked templates, self-check, study record