Property Condition Assessment Template (ASTM E2018)

Building condition survey: scope and limits, property description, condition by system, immediate and 10-year cost forecast, recommendations

부동산·시설표준ASTM E2018-24 (structure only)propertyconditionassessment

사용법: Use it when a buyer, lender or owner needs the condition of a building and a capital cost forecast. Agree the scope, sampling, cost threshold and forecast period first. The main pitfall is mixing what was seen with what was told, or claiming a standard the work did not follow.

미리보기

Property Condition Assessment: [Property name]

A building condition survey and capital expenditure forecast for a commercial property: what was inspected, the condition of each building system, the defects found, the cost to put them right now and the replacements expected over the forecast period. Buyers, lenders, owners and facility managers use it to price risk and plan budgets. Structure aligned with the baseline property condition assessment process described in ASTM E2018-24, Standard Guide for Property Condition Assessments: Baseline Property Condition Assessment Process (a walk-through survey, document review, research and interviews, reported as a property condition report with opinions of costs). Replace every [bracketed] value and every row marked Example. This is a documentation format, not engineering, legal or financial advice: use a qualified surveyor or engineer, and check the current edition of any standard you claim to follow.

Document control

FieldValue
Report ID[PCA-QPB-2026]
Property[Quelmont Park Building B]
Client and user[Varrowby Property Fund; lender if relied upon]
Assessor[Name, qualification, firm]
Site visit dateYYYY-MM-DD
Forecast period[Example: 10 years from the report date]
Cost threshold[Example: items under 3,000 not reported individually]
Standard followed[Example: ASTM E2018-24, or "not claimed"]
Version and status[1.0, Final]
Last updatedYYYY-MM-DD

1. Scope and limitations

ItemEntry
Systems in scopeExample: Site, structure, roof, facade and windows, mechanical, electrical, plumbing, vertical transport, fire and life safety, interiors of common parts, accessibility overview
SamplingExample: All common parts, roof, plant rooms, 4 of 5 let units, vacant unit U-202
Not accessedExample: Unit U-102 (clinic in use); roof void above U-201
Documents reviewedExample: As-built drawings, maintenance logs 2023 to 2026, lift and fire alarm certificates, energy certificate
InterviewsExample: Building manager, Hollin Facility Services
Out of scopeExample: Environmental assessment (separate Phase I), asbestos survey, structural calculations

2. Property description

ItemEntry
Use and sizeExample: Office and ground floor retail, 4,200 m2 net lettable, 3 storeys
Year builtExample: 2004
StructureExample: Reinforced concrete frame, flat slabs
RoofExample: Flat roof with single-ply membrane, about 1,400 m2
EnvelopeExample: Curtain wall and aluminium windows
ServicesExample: 2 air-cooled chillers, gas boilers, 2 passenger lifts, addressable fire alarm

3. Condition ratings by system

IDSystemConditionObservationsRemaining useful life (years)
SYS-01 (Example)StructureGoodNo visible cracking or deflectionBeyond forecast
SYS-02 (Example)RoofPoorMembrane blistering, two ponding areas, repairs logged in 2025 and 20262
SYS-03 (Example)FacadeFairSealant hardening at curtain wall joints3
SYS-04 (Example)HVACFairChillers original, refrigerant top-ups recorded6
SYS-05 (Example)Electrical and lightingFairFluorescent lighting in common parts1 (upgrade)
SYS-06 (Example)Vertical transportFairOriginal controllers, rising call-out rate4
SYS-07 (Example)Fire and life safetyPoorPanel shows repeated zone faultsImmediate
SYS-08 (Example)Site and accessibilityFairLoose ramp handrail; car park surface worn0 to 5

4. Opinions of costs

Item IDSystemDescriptionYearCost
PCA-FIRE-01 (Example)SYS-07Repair fire alarm panel faults and re-certify0 (immediate)18,000
PCA-SITE-01 (Example)SYS-08Re-fix ramp handrail0 (immediate)3,500
PCA-ELEC-01 (Example)SYS-05LED lighting upgrade, 4,200 m2 at 12150,400
PCA-ROOF-01 (Example)SYS-02Replace roof membrane, 1,400 m2 at 952133,000
PCA-ENV-01 (Example)SYS-03Renew facade sealant322,000
PCA-INT-01 (Example)InteriorsRedecorate common parts315,000
PCA-VT-01 (Example)SYS-06Modernise 2 lifts at 60,0004120,000
PCA-SITE-02 (Example)SYS-08Resurface car park, 1,800 m2 at 25545,000
PCA-HVAC-01 (Example)SYS-04Replace 2 chillers at 85,0006170,000
PCA-INT-02 (Example)InteriorsRedecorate common parts815,000

4.1 Forecast by year

Year012345678910Total
Cost (Example)21,50050,400133,00037,000120,00045,000170,000015,00000591,900

Example: immediate costs are 21,500 and years 1 to 10 add 570,400. With a 10% contingency (59,190) the total is 651,090, about 155 per m2 of net lettable area, at current prices without inflation or tax.

5. Recommendations and next steps

Rec. IDItemRecommendationOwnerFeeds into
REC-01 (Example)PCA-FIRE-01Repair before completion and obtain a new certificateSellerreal-estate/property-due-diligence-checklist
REC-02 (Example)PCA-ROOF-01Price the replacement into the offerBuyerreal-estate/property-valuation-report
REC-03 (Example)PCA-HVAC-01Specify replacement with an energy reviewFacility managerreal-estate/facility-management-plan, compliance/iso-50001-energy-review
REC-04 (Example)All forecast itemsBuild a 10-year capital planAsset managerfinance/capex-request

6. Assessor's statement

[This report reflects the condition observed on the site visit date and the documents listed in section 1. It relies on information from the persons interviewed. Costs are opinions of probable cost, not quotes. Signed: name, qualification, date.]

Standard and licence note

Structure aligned with ASTM E2018-24, Standard Guide for Property Condition Assessments: Baseline Property Condition Assessment Process (ASTM International, active edition, page updated 4 January 2024), cited by name and described in original wording only. Official text: ASTM International, purchase or licensed access: https://store.astm.org/e2018-24.html. The text, rating scale and examples are original. Check the current edition and use a qualified professional. Template licence: MIT.