# Annex A Organizational Controls Guide: [Organization name]

> A study and working guide to the 37 organizational controls in Annex A
> of ISO/IEC 27001:2022 + Amd 1:2024 (A.5.1 to A.5.37), with control
> guidance in ISO/IEC 27002:2022 as the companion reference. For each
> control it explains, in original wording, what the control is for, how
> organisations of different sizes typically implement it, which records
> an auditor usually samples, the most common pitfalls, and which template
> in this library puts it to work. Use it to train control owners, prepare
> Statement of Applicability decisions (clause 6.1.3 d) and get ready for
> internal and certification audits. Replace every `[bracketed]` value and
> every row marked *Example*.

<!--
Guidance: How to use this template
- Use it when you onboard a new ISMS manager or control owner, when you
  draft or review the Statement of Applicability, and before an internal
  audit of the organizational theme.
- Fill the Document control table first, then section 13 (who studied
  which group and when) so the guide doubles as a competence record under
  clause 7.2. Then add your own notes under each control: which template
  you use, who owns it and where the evidence lives.
- Main pitfall: treating Annex A as a checklist to implement in full.
  Controls are selected from risk treatment (clause 6.1.3); Annex A is the
  reference list you compare against so that nothing necessary is
  overlooked. Every inclusion and exclusion needs a reason in the SoA.
- This guide gives control numbers with short labels written for this
  library. It does not reproduce the control text or the ISO/IEC 27002
  guidance. Buy the official standards to implement the controls.
- Related templates: `isms/isms-learning-path`, `isms/annex-a-people-physical-controls-guide`,
  `isms/annex-a-technological-controls-guide`, `compliance/statement-of-applicability`,
  `isms/control-evidence-matrix`, `isms/isms-policy-framework`, `isms/isms-self-test`.
-->

## Document control

<!-- Guidance: A learning guide is not required documented information, but once you use it to prove competence or to brief control owners, keep it under document control (clause 7.5) so readers know which edition of the standard it reflects. -->

| Field | Value |
|---|---|
| Document ID | LRN-ISMS-04 |
| Version | [1.0] |
| Status | [Draft / In review / Approved / Superseded] |
| Owner | [@isms-manager] |
| Approvers/reviewers | [@ciso], [@compliance-lead] |
| Last updated | YYYY-MM-DD |
| Classification | [Internal] |
| Standard and edition | ISO/IEC 27001:2022 + Amd 1:2024 Annex A (A.5.1 to A.5.37); ISO/IEC 27002:2022 |
| Controls covered | 37 organizational controls (A.5 theme) |
| Audience | [ISMS manager, control owners, internal auditors, new security staff] |
| Linked SoA | DOC-ISMS-011, version [x.y] |
| Next scheduled review | YYYY-MM-DD |

### Approvals

| Role | Name | Decision | Date |
|---|---|---|---|
| ISMS manager | [@isms-manager] | [Prepared] | YYYY-MM-DD |
| CISO or security lead | [@ciso] | [Approved / Approved with changes] | YYYY-MM-DD |

### Revision history

| Version | Date | Author | Change |
|---|---|---|---|
| 1.0 *(Example)* | 2026-11-01 | [@isms-manager] | First guide, aligned with ISO/IEC 27001:2022 + Amd 1:2024 |
| 1.1 *(Example)* | YYYY-MM-DD | [@isms-manager] | Local template references and owners added after SoA review |

## Contents

<!-- Guidance: Sections 1 and 2 explain how organizational controls fit the ISMS. Sections 3 to 10 walk through the controls in Annex A order, grouped by topic. Sections 11 to 13 turn the guide into a working and learning record. -->

1. Purpose and how to use this guide
2. How organizational controls fit the ISMS
3. Governance, roles and external contacts (A.5.1 to A.5.6)
4. Threat intelligence and projects (A.5.7, A.5.8)
5. Information and asset management (A.5.9 to A.5.14)
6. Identity and access management (A.5.15 to A.5.18)
7. Suppliers and cloud services (A.5.19 to A.5.23)
8. Incident management (A.5.24 to A.5.28)
9. Continuity (A.5.29, A.5.30)
10. Compliance, privacy and assurance (A.5.31 to A.5.37)
11. Size tiers: how the theme scales
12. Self-check questions
13. Records and evidence
14. References

## 1. Purpose and how to use this guide

<!-- Guidance: Say who the guide is for and how it is used in your organisation: induction reading, SoA workshop pack, audit preparation. Pitfall: a guide nobody is asked to read. Tie it to a training record so it earns its place. -->

The organizational theme is the largest of the four Annex A themes. It
holds 37 of the 93 controls and covers everything that is mainly decided
and run through policy, process, contracts and governance rather than
through technology or physical barriers. Most of these controls touch
several departments at once: HR, legal, procurement, IT operations,
engineering and top management all own at least one.

This guide serves three uses:

1. **Learning.** A new ISMS manager, control owner or internal auditor
   reads one group per session and answers the self-check questions in
   section 12. The study record in section 13 proves competence under
   clause 7.2.
2. **Designing.** During the SoA workshop, the team uses the "typical
   implementation" and "by tier" notes to decide whether a control is
   needed and how far to take it, then records the decision in
   `compliance/statement-of-applicability` (DOC-ISMS-011).
3. **Preparing for audit.** Before an internal audit or a certification
   audit, the control owner checks the "evidence an auditor samples" line
   against the records actually kept, using
   `isms/control-evidence-matrix` (DOC-ISMS-033).

Each control entry has the same six parts: intent (what the control is
for, in this library's own words), typical implementation, how it differs
by tier, evidence an auditor usually samples, common pitfalls, and the
templates that put it to work. The labels next to each control number are
short descriptive labels used across this library, not the official
titles. The official wording is in ISO/IEC 27001:2022 Annex A, and the
implementation guidance is in ISO/IEC 27002:2022.

## 2. How organizational controls fit the ISMS

<!-- Guidance: Use this section to explain the logic once, so that later entries can stay short. Auditors check that controls were selected through risk treatment and compared with Annex A, not copied in bulk. -->

ISO/IEC 27001 does not ask an organisation to implement every Annex A
control. It asks the organisation to assess risks (clause 6.1.2), choose
risk treatment options and determine the controls needed (clause 6.1.3),
then compare those controls with Annex A to check that nothing necessary
has been left out. The result is the Statement of Applicability: for every
one of the 93 controls, whether it is included, why, whether it is
implemented, and, for exclusions, why it is not needed.

In practice almost every organisation in scope of an ISMS includes all 37
organizational controls, because they describe basic management
practices that any organisation handling information needs. Exclusions
are rare and must be defensible. For example, an organisation with no
projects at all could not credibly exclude A.5.8, because almost every
organisation runs change initiatives of some kind.

ISO/IEC 27002:2022 tags each control with five attribute types: control
type (preventive, detective or corrective), information security
properties (confidentiality, integrity, availability), cybersecurity
concepts, operational capabilities and security domains. You can use the
attributes to filter and report on your control set, for example to show
management how many of your controls are detective. The attributes are
optional, and you can define your own.

The flow below shows how a single organizational control moves from risk
to evidence. Every entry in sections 3 to 10 sits somewhere on this path.

```mermaid
flowchart LR
    R["Risk assessment (6.1.2)"] --> T["Risk treatment and control selection (6.1.3)"]
    T --> C["Comparison with Annex A"]
    C --> S["Statement of Applicability"]
    S --> I["Implement: policy, process, contract"]
    I --> E["Operate and keep records"]
    E --> A["Internal audit (9.2) and management review (9.3)"]
    A --> T
```

Three habits make the organizational theme much easier to run:

- **One owner per control.** Shared ownership means no ownership. Record
  the owner in the SoA and in the evidence matrix.
- **Policy plus proof.** A policy says what should happen. An auditor
  wants to see that it does happen: tickets, logs, signed forms, minutes.
- **Link, do not duplicate.** Many organizational controls depend on each
  other (A.5.9 inventory feeds A.5.12 classification, which feeds A.5.13
  labelling and A.5.14 transfer). Write each rule once and refer to it.

## 3. Governance, roles and external contacts (A.5.1 to A.5.6)

<!-- Guidance: These six controls set up the management frame for everything else. Questions to answer: who approved the policy set, who owns each role, where are conflicts of duty, who talks to regulators and peers? Auditor check: the approved policy, its review date, and evidence that people know their security responsibilities. -->

### A.5.1 Information security policies

- **Intent:** Without a written, management-backed position on security,
  every team invents its own rules and nobody can be held to them. This
  control gives staff one authoritative reference for what the
  organisation expects and shows that leadership stands behind it.
- **Typical implementation:** A short top-level policy signed off by top
  management, a policy index naming each topic policy with its owner and
  next review date, one intranet page where staff always find the current
  versions, an acknowledgement step at joining and yearly, and a review
  cycle (for example yearly, and also after a reorganisation, a major
  incident or a new regulation).
- **By tier:** Small: one policy plus 6 to 10 short topic policies.
  Medium: a full policy index with an owner per policy. Large: a group
  policy with site or business-unit standards beneath it.
- **Evidence an auditor samples:** Approved policy with signature or
  approval record, the policy index with review dates, acknowledgement
  records, minutes of the last review.
- **Common pitfalls:** Policies bought off the shelf that describe
  controls you do not run. Review dates that passed without a recorded
  review.
- **Templates:** `compliance/information-security-policy` (DOC-ISMS-001),
  `isms/isms-policy-framework` (DOC-ISMS-005).

### A.5.2 Security roles and responsibilities

- **Intent:** Security work that belongs to everyone tends to be done by
  no one. The point is that each security task, from approving access to
  reviewing logs, has a recognisable owner who knows it is theirs and
  has the authority to act.
- **Typical implementation:** A RACI across ISMS processes and key
  controls, security duties written into job descriptions, named deputies
  for critical roles.
- **By tier:** Small: one person holds several roles, with documented
  safeguards against conflicts. Medium: a full-time ISMS manager and a
  small security team. Large: a CISO, a security office and local
  security coordinators at each site.
- **Evidence an auditor samples:** RACI, job descriptions, appointment
  letters or minutes naming the ISMS manager, interviews with role
  holders.
- **Common pitfalls:** A RACI that names departments rather than roles,
  or roles that nobody holding them recognises.
- **Templates:** `isms/isms-roles-raci` (DOC-ISMS-006),
  `isms/isms-competence-training-matrix` (DOC-ISMS-026).

### A.5.3 Segregation of duties

- **Intent:** Prevent one person from being able to carry out and hide an
  error or misuse, by splitting duties that conflict.
- **Typical implementation:** A conflicting-duties matrix (for example
  requesting and approving access, writing and deploying code, raising and
  paying invoices), enforced through roles in systems, with compensating
  controls such as logging and independent review where splitting is not
  possible.
- **By tier:** Small: few people means compensating controls are common,
  such as peer review and monthly log review by someone else. Medium:
  role-based separation in key systems. Large: automated conflict checks
  in identity governance tooling.
- **Evidence an auditor samples:** The matrix, role definitions, a sample
  of approvals showing two different people, records of compensating
  reviews.
- **Common pitfalls:** Administrators who approve their own access
  requests. Compensating controls that are written down but never
  performed.
- **Templates:** `isms/access-control-policy` (DOC-ISMS-041),
  `isms/isms-roles-raci` (DOC-ISMS-006), `ops/access-review`.

### A.5.4 Management responsibilities for security

- **Intent:** Security fails quietly when line managers treat it as
  somebody else's job. This control puts every manager, not only the
  security team, in the position of setting the example, expecting good
  practice from their team and following up when it slips.
- **Typical implementation:** Security duties in manager job
  descriptions, manager briefings at policy launch, managers confirming
  team training completion and acting on non-compliance.
- **By tier:** Small: the leadership team briefs everyone directly.
  Medium: line managers receive a short briefing pack each year. Large:
  security objectives in management performance goals and a steering
  committee with business-unit heads.
- **Evidence an auditor samples:** Steering committee minutes, manager
  briefing records, examples of managers following up overdue training.
- **Common pitfalls:** Confusing this control with clause 5.1 leadership.
  Clause 5.1 is about top management; A.5.4 is about every manager.
- **Templates:** `isms/isms-steering-committee-charter` (DOC-ISMS-007),
  `isms/isms-roles-raci` (DOC-ISMS-006),
  `isms/employee-security-handbook` (DOC-ISMS-073).

### A.5.5 Contact with authorities

- **Intent:** Know in advance which authorities you may need to contact
  (regulators, data protection authorities, law enforcement, national
  CSIRTs, emergency services) and keep the contact routes current.
- **Typical implementation:** A contact list with authority, purpose,
  trigger, route and the internal role allowed to make contact, checked
  at least yearly and linked to incident and breach procedures.
- **By tier:** Small: one list owned by the ISMS manager. Medium: a list
  with legal and privacy leads as authorised contacts. Large: a list per
  country, aligned with each jurisdiction's reporting duties.
- **Evidence an auditor samples:** The contact list with last
  verification date, link from the incident response plan.
- **Common pitfalls:** A list that names people who have left the
  authority, or no rule on who in the organisation may speak to an
  authority.
- **Templates:** `isms/authority-special-interest-contacts`
  (DOC-ISMS-069), `compliance/incident-response-plan` (DOC-ISMS-020).

### A.5.6 Contact with special interest groups

- **Intent:** Attackers share techniques, so defenders benefit from
  doing the same. Belonging to peer communities gives early warning of
  new threats, access to practical advice, and a way to benchmark your
  own practice against similar organisations.
- **Typical implementation:** A list of memberships with owner, purpose
  and how information received is used, plus rules on what may be shared
  externally.
- **By tier:** Small: one or two free communities and vendor advisories.
  Medium: membership of a sector information sharing group. Large:
  several memberships, with participation in working groups.
- **Evidence an auditor samples:** Membership records, examples of
  advisories received and acted on.
- **Common pitfalls:** Memberships that nobody reads, or sharing incident
  details without a sharing rule.
- **Templates:** `isms/authority-special-interest-contacts`
  (DOC-ISMS-069), `isms/threat-intelligence-procedure` (DOC-ISMS-045).

## 4. Threat intelligence and projects (A.5.7, A.5.8)

<!-- Guidance: A.5.7 is new in 2022 and auditors often probe it. Questions to answer: what sources do you use, who reads them, and what changed because of them? For A.5.8, can you show a project where security was considered before go-live? -->

### A.5.7 Threat intelligence (new in 2022)

- **Intent:** Risk assessments go stale as attackers change tactics. The
  aim is to turn raw news about attacks, campaigns and exploited
  weaknesses into decisions that matter to you: which risks have grown,
  which defences to adjust, and what to watch for.
- **Typical implementation:** Defined sources (vendor advisories,
  national CSIRT bulletins, sector groups, commercial feeds where
  justified), a regular triage meeting, and a log of actions taken, at
  strategic, tactical and operational levels.
- **By tier:** Small: monthly review of free sources by the ISMS manager.
  Medium: weekly triage by the security team with feeds into detection
  rules. Large: a dedicated function producing reports for management and
  indicators for the security operations centre.
- **Evidence an auditor samples:** Source list, triage log, examples of a
  risk register update or detection rule created from intelligence.
- **Common pitfalls:** Subscribing to feeds without any analysis, so
  there is information but no intelligence and no action.
- **Templates:** `isms/threat-intelligence-procedure` (DOC-ISMS-045),
  `isms/isms-threat-vulnerability-catalogue` (DOC-ISMS-018).

### A.5.8 Security in project management

- **Intent:** Security added after a project goes live is costly and
  often incomplete. This control makes sure risks are considered at the
  moments a project can still change course cheaply, whether it is a new
  system, an office move or a reorganisation.
- **Typical implementation:** A security checklist at project gates
  (initiation, design, pre-launch), security requirements in the project
  plan, risk assessment for significant projects, sign-off by the
  security role.
- **By tier:** Small: a one-page checklist in the ticket template.
  Medium: gates in the project methodology with a security reviewer.
  Large: a project office that will not close a gate without the
  security record.
- **Evidence an auditor samples:** Completed checklists for recent
  projects, security requirements in project documents.
- **Common pitfalls:** Applying the checklist only to IT projects, while
  office moves, mergers and new business processes go unchecked.
- **Templates:** `isms/project-information-security-checklist`
  (DOC-ISMS-046), `security/threat-model`.

## 5. Information and asset management (A.5.9 to A.5.14)

<!-- Guidance: These controls form a chain: inventory, acceptable use, return, classification, labelling, transfer. Questions to answer: does every important asset have an owner and a classification, and do handling rules follow from it? Auditor check: pick an asset from the inventory and trace it through the chain. -->

### A.5.9 Inventory of information and assets

- **Intent:** You cannot protect, assign or assess what you do not know
  you have. A maintained list of information and of the things that
  store or process it, each with an accountable owner, is the starting
  point for risk assessment and most other controls.
- **Typical implementation:** An inventory covering information assets,
  systems, devices, cloud services and key suppliers, each with owner,
  location, classification and criticality, reconciled with tool data on
  a schedule.
- **By tier:** Small: a spreadsheet plus the device management export.
  Medium: a configuration management database or GRC tool. Large:
  automated discovery per site, with OT assets in a separate register.
- **Evidence an auditor samples:** The inventory, owner assignments,
  last reconciliation record, a sample of assets checked against
  reality.
- **Common pitfalls:** Listing hardware only and missing information,
  SaaS services and data stores.
- **Templates:** `compliance/asset-inventory` (DOC-ISMS-012),
  `ops/cmdb-data-model`.

### A.5.10 Acceptable use of information and assets

- **Intent:** Tell people clearly how they may and may not use
  information and the assets that hold it.
- **Typical implementation:** An acceptable use policy acknowledged at
  joining and yearly, with handling rules linked to classification.
- **By tier:** Small: a two-page policy. Medium: a policy plus handling
  rules per classification level. Large: a group policy with local
  additions where law requires.
- **Evidence an auditor samples:** The policy, acknowledgement records
  for a sample of staff and contractors.
- **Common pitfalls:** Contractors and temporary staff never asked to
  acknowledge the policy.
- **Templates:** `compliance/acceptable-use-policy` (DOC-ISMS-040),
  `isms/information-labelling-handling-procedure` (DOC-ISMS-042).

### A.5.11 Return of assets

- **Intent:** When people leave or contracts end, laptops, tokens, keys
  and copies of information walk out with them unless someone asks for
  them back. This control closes that gap at every exit and every role
  change.
- **Typical implementation:** A leaver checklist that lists issued
  assets from the inventory, return confirmation, and follow-up for
  missing items, including information held on personal devices.
- **By tier:** Small: the ISMS manager and HR run the checklist. Medium:
  HR workflow triggers IT tasks. Large: automated leaver workflow across
  sites with courier returns for remote staff.
- **Evidence an auditor samples:** Completed leaver checklists matched to
  HR leaver lists, records of unreturned assets and actions taken.
- **Common pitfalls:** Forgetting information assets such as paper files,
  customer data in personal mailboxes, and hardware tokens.
- **Templates:** `isms/offboarding-security-checklist` (DOC-ISMS-053).

### A.5.12 Information classification

- **Intent:** Not all information deserves the same effort. Sorting it
  into a small number of levels, by how much harm its disclosure,
  corruption or unavailability would cause, lets the organisation spend
  protection where it matters and gives everyone a shared vocabulary.
- **Typical implementation:** A scheme with three or four levels, clear
  criteria and examples, owners who assign the level, and a review when
  information changes value.
- **By tier:** Small: three levels (public, internal, confidential).
  Medium: four levels with examples per department. Large: a group scheme
  mapped to customer and government schemes where needed.
- **Evidence an auditor samples:** The scheme, classified entries in the
  inventory, interviews showing people can apply it.
- **Common pitfalls:** Too many levels, so nobody uses them, or a scheme
  that covers confidentiality only.
- **Templates:** `data/data-classification-policy`,
  `compliance/asset-inventory` (DOC-ISMS-012).

### A.5.13 Information labelling

- **Intent:** Make classification visible so people and systems handle
  information correctly.
- **Typical implementation:** Labelling rules per level and format
  (documents, e-mail, files, physical media), automated labels where tools
  allow, and exceptions where labelling is impractical.
- **By tier:** Small: header and footer labels in templates. Medium:
  default labels in the productivity suite. Large: automated labelling
  linked to data leakage prevention.
- **Evidence an auditor samples:** Labelling procedure, samples of
  labelled documents, tool configuration.
- **Common pitfalls:** Requiring labels on everything, including public
  material, so the rule is ignored.
- **Templates:** `isms/information-labelling-handling-procedure`
  (DOC-ISMS-042).

### A.5.14 Information transfer

- **Intent:** Information is most exposed while it is on the move,
  whether attached to an e-mail, copied to a USB stick, carried by
  courier or mentioned in a phone call. The goal is that senders know
  which channel suits its sensitivity and that recipients are bound to
  protect it.
- **Typical implementation:** Transfer rules per classification, approved
  tools for file sharing and secure e-mail, agreements with external
  parties for regular transfers, and rules for couriers and verbal
  disclosure.
- **By tier:** Small: one approved sharing tool and encrypted e-mail.
  Medium: transfer agreements with key customers and suppliers. Large:
  managed file transfer and rules for cross-border transfers.
- **Evidence an auditor samples:** Transfer policy, agreements, tool
  logs, samples of transfers of confidential data.
- **Common pitfalls:** Ignoring verbal and physical transfers, and
  personal file-sharing accounts used for work.
- **Templates:** `isms/information-transfer-policy` (DOC-ISMS-043),
  `compliance/transfer-impact-assessment`.

## 6. Identity and access management (A.5.15 to A.5.18)

<!-- Guidance: Access control is the area auditors sample most. Questions to answer: are rules written, are identities tied to real people, are secrets protected, are rights reviewed and removed? Auditor check: a joiner, a mover and a leaver traced from HR record to system access. -->

### A.5.15 Access control rules

- **Intent:** Access decisions made case by case drift towards giving
  people everything. Written rules on who gets what, and why, give
  approvers a consistent basis and keep access to the minimum each role
  needs.
- **Typical implementation:** An access control policy with role
  definitions, approval rules, and rules for physical and logical access.
- **By tier:** Small: roles per main system in one policy. Medium: a role
  catalogue per application. Large: enterprise roles managed in identity
  governance tooling.
- **Evidence an auditor samples:** The policy, role definitions, a
  sample of user rights compared with role.
- **Common pitfalls:** Rules that say "least privilege" without defining
  roles, so every request is judged ad hoc.
- **Templates:** `isms/access-control-policy` (DOC-ISMS-041).

### A.5.16 Identity lifecycle management

- **Intent:** Every account is a door. The point is that each one can be
  traced to a real person or an approved system, exists only as long as
  that need exists, and never becomes an orphan that an attacker can
  reuse unnoticed.
- **Typical implementation:** Unique identities, joiner, mover and leaver
  processes tied to HR records, rules for shared and service accounts,
  periodic reconciliation.
- **By tier:** Small: single sign-on and a monthly check against the
  staff list. Medium: HR-driven provisioning. Large: automated lifecycle
  across directories and sites.
- **Evidence an auditor samples:** Joiner and leaver tickets, a
  reconciliation of accounts with HR records, service account register.
- **Common pitfalls:** Orphaned accounts in SaaS tools outside single
  sign-on, and shared accounts with no owner.
- **Templates:** `isms/access-control-policy` (DOC-ISMS-041),
  `ops/onboarding-checklist`, `isms/offboarding-security-checklist`
  (DOC-ISMS-053).

### A.5.17 Authentication information handling

- **Intent:** Passwords, keys and tokens are what attackers most want to
  steal. This control makes sure secrets are created, delivered, stored
  and replaced in a way that keeps them secret, and that people know how
  to look after the ones they hold.
- **Typical implementation:** Password and passphrase rules that favour
  length and screening against known breached passwords over composition
  rules and fixed-interval changes (change on suspected compromise, in
  line with NIST SP 800-63B-4), multi-factor authentication, a password
  manager, secure first-time credential delivery, rules for secrets in
  code.
- **By tier:** Small: password manager and multi-factor authentication
  everywhere. Medium: secrets vault for engineering. Large: phishing
  resistant authentication for privileged users.
- **Evidence an auditor samples:** Multi-factor coverage report, password
  manager enrolment, secret scanning results.
- **Common pitfalls:** Secrets committed to code repositories, and
  temporary passwords sent in plain e-mail.
- **Templates:** `isms/access-control-policy` (DOC-ISMS-041),
  `security/secrets-management-standard`.

### A.5.18 Access rights provisioning and review

- **Intent:** Access that was right when granted becomes wrong as people
  move, projects end and systems change. The purpose is to keep
  everyone's rights in step with their current job, through approval at
  the start, regular checks and prompt removal.
- **Typical implementation:** Approved requests, periodic reviews by
  system or information owners, prompt removal on leaving or role change.
- **By tier:** Small: quarterly reviews of 5 or 6 key systems. Medium:
  reviews per application with owner sign-off. Large: campaign-based
  reviews in tooling with evidence exports.
- **Evidence an auditor samples:** Signed reviews, removal tickets
  resulting from reviews, time from leaving to account removal.
- **Common pitfalls:** Reviews that approve everything with no changes,
  and no follow-up of removals found in the review.
- **Templates:** `ops/access-review`, `isms/access-control-policy`
  (DOC-ISMS-041).

## 7. Suppliers and cloud services (A.5.19 to A.5.23)

<!-- Guidance: Most organisations depend on suppliers for core services. Questions to answer: do you know all suppliers that touch your information, is each one assessed according to risk, are security terms in the contract, and do you monitor them? Auditor check: pick a critical supplier and ask for its assessment, contract clauses and last review. -->

### A.5.19 Security in supplier relationships

- **Intent:** Every supplier that touches your information or services
  extends your attack surface. The purpose is to understand what each
  supplier could put at risk before you depend on it, and to scale the
  scrutiny to that exposure.
- **Typical implementation:** A supplier register with risk tier, a
  pre-contract assessment scaled to risk, and rules for onboarding and
  offboarding suppliers.
- **By tier:** Small: register of 20 to 40 suppliers with a short
  questionnaire for critical ones. Medium: tiered assessments with
  assurance reports. Large: a third-party risk programme run with
  procurement.
- **Evidence an auditor samples:** Supplier register, assessments for
  critical suppliers, approval records.
- **Common pitfalls:** Assessing only new suppliers and never the
  long-standing ones.
- **Templates:** `isms/supplier-register` (DOC-ISMS-066),
  `compliance/supplier-security-assessment` (DOC-ISMS-067).

### A.5.20 Security in supplier agreements

- **Intent:** Expectations that are not in the contract are hard to
  enforce. This control turns your security needs into commitments a
  supplier has accepted, so you have a basis to ask for evidence, demand
  notification and act when something goes wrong.
- **Typical implementation:** Standard security clauses or a security
  schedule covering confidentiality, incident notification, audit
  rights, subcontracting, data return and deletion.
- **By tier:** Small: a security addendum for critical suppliers, and
  acceptance of standard terms for large providers with a recorded risk
  decision. Medium: clause library negotiated by legal. Large: contract
  templates per supplier category.
- **Evidence an auditor samples:** Signed agreements or accepted terms
  for a sample of suppliers, mapping to requirements.
- **Common pitfalls:** Signing large providers' standard terms without
  checking what they actually commit to.
- **Templates:** `isms/supplier-security-agreement-27036` (DOC-ISMS-068),
  `isms/confidentiality-nda` (DOC-ISMS-051).

### A.5.21 ICT supply chain security

- **Intent:** Your direct supplier is rarely the whole story: its
  products contain components, libraries and services from others. The
  aim is to manage risks hidden further down that chain, such as a
  compromised software dependency or a counterfeit part.
- **Typical implementation:** Requirements for suppliers to manage their
  own suppliers, software bills of materials, dependency scanning,
  provenance checks for software and hardware.
- **By tier:** Small: dependency scanning in the build pipeline. Medium:
  software bills of materials for released products. Large: supplier
  requirements cascaded through contracts, hardware provenance for OT.
- **Evidence an auditor samples:** Dependency scan results, software bill
  of materials, contract clauses on sub-suppliers.
- **Common pitfalls:** Treating open source components as outside the
  supply chain.
- **Templates:** `security/supply-chain-security`,
  `isms/supplier-security-agreement-27036` (DOC-ISMS-068).

### A.5.22 Supplier service monitoring and change

- **Intent:** A supplier that was sound at signing can weaken later
  through staff turnover, new subcontractors or cost cutting. Ongoing
  oversight catches that drift and makes sure changes to its service are
  assessed before they affect you.
- **Typical implementation:** Periodic review of critical suppliers
  (assurance reports, incidents, service levels), change notification
  rules, reassessment when services change.
- **By tier:** Small: yearly review of critical suppliers. Medium:
  quarterly service reviews for top suppliers. Large: continuous
  monitoring with risk ratings.
- **Evidence an auditor samples:** Review records, assurance report
  reviews with bridging letters where needed, actions on findings.
- **Common pitfalls:** Filing assurance reports without reading the
  exceptions and the complementary controls they expect you to run.
- **Templates:** `compliance/supplier-security-assessment`
  (DOC-ISMS-067), `isms/supplier-register` (DOC-ISMS-066).

### A.5.23 Security for cloud service use (new in 2022)

- **Intent:** Cloud services can be switched on in minutes by anyone
  with a payment card, and responsibilities are split with the provider
  in ways that are easy to misread. This control brings each cloud
  service under deliberate decisions, from choosing it through running
  it to leaving it.
- **Typical implementation:** A cloud policy with approval rules, the
  shared responsibility split per service, secure configuration, provider
  assurance review and exit planning.
- **By tier:** Small: one main cloud provider with a documented
  responsibility split and posture checks. Medium: approval process for
  new SaaS. Large: a cloud centre of excellence with landing zones and
  guardrails.
- **Evidence an auditor samples:** Cloud policy, register of cloud
  services, responsibility matrix, provider assurance review, exit plan.
- **Common pitfalls:** Assuming the provider is responsible for
  everything, and no plan for leaving a provider.
- **Templates:** `isms/cloud-services-security-policy` (DOC-ISMS-044),
  `isms/cloud-exit-plan` (DOC-ISMS-076), `isms/cloud-27017-controls`
  (DOC-ISMS-102).

## 8. Incident management (A.5.24 to A.5.28)

<!-- Guidance: These five controls describe one lifecycle: prepare, assess, respond, learn, preserve evidence. Questions to answer: is there a tested plan, a clear decision on what counts as an incident, a register and lessons learned? Auditor check: walk through the most recent incident from report to closure. -->

The five incident controls form a single lifecycle. The diagram shows the
order in which they normally apply. A.5.28 runs alongside the response,
not after it.

```mermaid
flowchart LR
    P["A.5.24 Plan and prepare"] --> D["A.5.25 Assess event and decide"]
    D -->|"Not an incident"| L1["Log and close"]
    D -->|"Incident"| R["A.5.26 Respond"]
    R --> E["A.5.28 Collect and preserve evidence"]
    R --> K["A.5.27 Learn and improve"]
    K --> P
```

### A.5.24 Incident management planning

- **Intent:** Decisions taken in the first hour of an incident are
  better when they were thought through beforehand. This control is
  about having the people, procedures, contacts and tools ready before
  anything happens.
- **Typical implementation:** An incident response plan with severity
  levels, roles, contact lists, playbooks for common scenarios, and a
  yearly exercise.
- **By tier:** Small: plan plus 3 playbooks and a tabletop exercise.
  Medium: on-call rota and service provider retainer. Large: a group
  plan with site plans and a crisis management link.
- **Evidence an auditor samples:** Approved plan, exercise report,
  on-call schedule, contact list.
- **Common pitfalls:** A plan never exercised, so contact details and
  roles are wrong when needed.
- **Templates:** `compliance/incident-response-plan` (DOC-ISMS-020),
  `security/tabletop-exercise`.

### A.5.25 Assessing security events

- **Intent:** Not every alert or report is an incident, but treating all
  of them alike wastes effort or misses real attacks. The purpose is a
  consistent, recorded judgement on each event, so serious ones are
  escalated quickly and minor ones are not lost.
- **Typical implementation:** Triage criteria, a classification scheme,
  a record of each decision, escalation rules.
- **By tier:** Small: the ISMS manager triages with a simple decision
  table. Medium: security team triage within set times. Large: a
  security operations centre with tiered analysts.
- **Evidence an auditor samples:** Triage records showing the decision
  and who made it, classification criteria.
- **Common pitfalls:** No record of events judged "not an incident", so
  patterns are missed.
- **Templates:** `isms/security-event-reporting-procedure`
  (DOC-ISMS-023), `isms/incident-register` (DOC-ISMS-021).

### A.5.26 Responding to security incidents

- **Intent:** Improvised response tends to destroy evidence, miss
  notification duties and let attackers return. This control makes sure
  incidents are handled through a known, practised sequence from
  containment to recovery, with communication along the way.
- **Typical implementation:** Playbooks, an incident register, decision
  logs, notification rules for customers and authorities.
- **By tier:** Small: response led by the ISMS manager with an external
  responder on call. Medium: in-house team with defined service levels.
  Large: coordinated response across sites and legal entities.
- **Evidence an auditor samples:** Incident register, incident tickets,
  notification records where required.
- **Common pitfalls:** Closing incidents when service is restored
  without confirming the cause is removed.
- **Templates:** `compliance/incident-response-plan` (DOC-ISMS-020),
  `isms/incident-register` (DOC-ISMS-021),
  `compliance/personal-data-breach-assessment`.

### A.5.27 Learning from incidents

- **Intent:** An incident that teaches nothing is likely to happen
  again. The aim is to turn each significant incident into concrete
  improvements to controls, risk estimates and training.
- **Typical implementation:** Post-incident reviews for significant
  incidents, actions tracked to closure, trends reported to management
  review.
- **By tier:** Small: short review for every significant incident.
  Medium: blameless review format with actions in the improvement
  register. Large: trend analysis across sites.
- **Evidence an auditor samples:** Post-incident review records, actions
  and their closure, risk register updates.
- **Common pitfalls:** Reviews that blame individuals instead of finding
  control gaps.
- **Templates:** `isms/post-incident-review` (DOC-ISMS-022),
  `isms/continual-improvement-register` (DOC-ISMS-088).

### A.5.28 Evidence collection

- **Intent:** Evidence handled carelessly may be useless when you need
  it for a dismissal, a lawsuit, an insurer or a regulator. This control
  makes sure that, whenever an event may lead to such action, logs, disk
  images and records are gathered so their integrity can be
  demonstrated.
- **Typical implementation:** Evidence handling procedure, chain of
  custody form, log retention long enough to investigate, specialist
  support for forensic work.
- **By tier:** Small: a chain of custody form and an external forensic
  retainer. Medium: trained staff and forensic tooling. Large: a forensic
  capability with legal hold procedures per jurisdiction.
- **Evidence an auditor samples:** Procedure, completed custody forms,
  log retention settings.
- **Common pitfalls:** Rebuilding an affected system before evidence is
  captured.
- **Templates:** `security/forensic-evidence-record`,
  `compliance/incident-response-plan` (DOC-ISMS-020).

## 9. Continuity (A.5.29, A.5.30)

<!-- Guidance: The two continuity controls are often confused. A.5.29 keeps security in place during a disruption; A.5.30 makes ICT ready to recover within the times the business needs. Auditor check: recovery objectives from the business impact analysis and a test that shows they can be met. -->

### A.5.29 Security during disruption

- **Intent:** Under pressure, people are tempted to share passwords,
  skip approvals or move data to personal tools just to keep going. This
  control plans ahead so protection stays proportionate while the
  organisation is working in crisis mode.
- **Typical implementation:** Security measures written into continuity
  plans (access during emergencies, secure alternate sites, protected
  communications), with tests that include security.
- **By tier:** Small: security notes in the continuity plan. Medium:
  emergency access procedures and backup communication channels. Large:
  integration with an existing ISO 22301 management system.
- **Evidence an auditor samples:** Continuity plan sections on security,
  test reports, emergency access records.
- **Common pitfalls:** Emergency procedures that bypass access control
  with no logging or later review.
- **Templates:** `compliance/business-continuity` (DOC-ISMS-121),
  `isms/crisis-management-communications-plan` (DOC-ISMS-078).

### A.5.30 ICT readiness for business continuity (new in 2022)

- **Intent:** Business continuity plans assume that systems will come
  back in time. This control tests that assumption: the technology,
  people and procedures needed to restore ICT services are prepared and
  proven against the recovery targets the business has set.
- **Typical implementation:** Business impact analysis setting recovery
  time and recovery point objectives, ICT recovery plans, redundancy, and
  recovery tests with results compared with objectives.
- **By tier:** Small: a second cloud region as recovery site with a
  yearly failover test. Medium: recovery plans per service and a
  colocation recovery path. Large: recovery tiers per application linked
  to the group continuity programme.
- **Evidence an auditor samples:** Business impact analysis, recovery
  plans, test reports with achieved times.
- **Common pitfalls:** Recovery objectives set by IT without business
  input, or tests that never measure the achieved time.
- **Templates:** `isms/ict-readiness-business-continuity-plan`
  (DOC-ISMS-047), `compliance/business-impact-analysis` (DOC-ISMS-120),
  `ops/dr-test-report`.

## 10. Compliance, privacy and assurance (A.5.31 to A.5.37)

<!-- Guidance: These controls show that the ISMS knows its obligations and checks itself. Questions to answer: is there a maintained legal register, are records and personal data protected, is there independent review and routine compliance checking, are operating procedures written? Auditor check: the legal register review date and a sample of compliance checks with actions. -->

### A.5.31 Legal, regulatory and contractual requirements

- **Intent:** Laws, regulations and contracts impose security duties
  whether or not you know about them. The aim is a current, shared
  understanding of which obligations apply and how the organisation
  meets each one, so none is missed or discovered only during an
  investigation.
- **Typical implementation:** A register with requirement, source,
  owner, affected controls and review date, updated when laws or
  contracts change.
- **By tier:** Small: register built with outside counsel, reviewed
  twice a year. Medium: legal and privacy leads maintain it. Large: one
  register per country with a group summary.
- **Evidence an auditor samples:** Register, review records, link from
  requirements to controls.
- **Common pitfalls:** A list of law names with no statement of what
  each requires of the organisation.
- **Templates:** `compliance/legal-register` (DOC-ISMS-014).

### A.5.32 Intellectual property rights

- **Intent:** Respect intellectual property, including software licences
  and third-party content, and protect your own.
- **Typical implementation:** Software licence inventory, open source
  licence policy and scanning, rules on copying content, protection of
  own source code and designs.
- **By tier:** Small: licence list and open source scanning in the
  pipeline. Medium: software asset management. Large: licence compliance
  programme with procurement.
- **Evidence an auditor samples:** Licence inventory, open source scan
  results, approval of exceptions.
- **Common pitfalls:** Unlicensed tools installed by users and open
  source licences with obligations nobody checked.
- **Templates:** `compliance/legal-register` (DOC-ISMS-014),
  `compliance/asset-inventory` (DOC-ISMS-012),
  `isms/outsourced-development-security` (DOC-ISMS-077).

### A.5.33 Protection of records

- **Intent:** Some records must survive for years and remain
  trustworthy: contracts, financial entries, audit trails, HR files. The
  purpose is that such records stay complete, authentic and retrievable
  for as long as law, contracts or the business require, and are
  disposed of properly afterwards.
- **Typical implementation:** A retention schedule, storage with access
  control and integrity protection, controlled disposal at the end of
  retention.
- **By tier:** Small: retention rules in the documented information
  register. Medium: retention settings in document and e-mail systems.
  Large: records management function with legal holds.
- **Evidence an auditor samples:** Retention schedule, storage settings,
  disposal records.
- **Common pitfalls:** Keeping everything forever, which creates privacy
  and discovery risk.
- **Templates:** `isms/isms-documented-information-register`
  (DOC-ISMS-028), `data/data-retention-deletion-standard`.

### A.5.34 Privacy and PII protection

- **Intent:** Personal data carries legal duties, and mishandling it
  causes real harm to people. This control ensures the organisation
  knows which privacy obligations apply to the personal data it handles
  and builds the security measures needed to honour them.
- **Typical implementation:** A privacy programme with records of
  processing, data protection impact assessments, processor agreements,
  data subject request handling and breach procedures.
- **By tier:** Small: processor obligations from customer agreements
  tracked in one register. Medium: privacy lead with impact assessments
  and a plan for a privacy information management system. Large: a
  privacy office per region.
- **Evidence an auditor samples:** Records of processing, impact
  assessments, processor agreements, request logs.
- **Common pitfalls:** Treating privacy as a legal topic only, with no
  link to the security controls that protect personal data.
- **Templates:** `compliance/gdpr-ropa`, `compliance/dpia`,
  `isms/pims-27701-scope-roles` (DOC-ISMS-100).

### A.5.35 Independent review of security

- **Intent:** People who design and run controls are poorly placed to
  spot their own blind spots. A fresh look by someone independent,
  repeated over time and after major change, gives management an
  objective view of whether the approach to security still works.
- **Typical implementation:** Independent reviews by internal audit, an
  external assessor or a peer from another unit, with findings reported
  to management.
- **By tier:** Small: an external reviewer once a year. Medium: internal
  audit plus an external review every year or two. Large: group internal
  audit and external assessments per site.
- **Evidence an auditor samples:** Review reports, reviewer independence,
  actions on findings.
- **Common pitfalls:** A review carried out by the person who designed
  the controls.
- **Templates:** `isms/independent-security-review-checklist`
  (DOC-ISMS-048), `isms/audit-findings-register` (DOC-ISMS-086).

### A.5.36 Compliance with security policies and standards

- **Intent:** Policies drift from practice over time. Routine checks by
  managers and control owners reveal where actual behaviour or
  configuration has departed from the rules, so the gap is corrected or
  formally accepted rather than tolerated silently.
- **Typical implementation:** Scheduled compliance checks by control
  owners and managers, technical compliance scans, an exception process
  with expiry dates.
- **By tier:** Small: quarterly checks on a short list. Medium: control
  self-assessment by owners. Large: continuous control monitoring with
  dashboards per site.
- **Evidence an auditor samples:** Check results, exceptions register,
  corrective actions.
- **Common pitfalls:** Permanent exceptions with no expiry or risk
  owner.
- **Templates:** `isms/independent-security-review-checklist`
  (DOC-ISMS-048), `security/security-exception-request` (DOC-ISMS-122),
  `isms/control-evidence-matrix` (DOC-ISMS-033).

### A.5.37 Documented operating procedures

- **Intent:** Operations that depend on memory break when the expert is
  on holiday or has left. Written, current instructions for routine and
  recovery tasks let any competent operator perform them correctly and
  consistently.
- **Typical implementation:** Runbooks for backups, patching, user
  administration, monitoring and recovery, under version control, with
  owners and review dates.
- **By tier:** Small: runbooks in the engineering wiki. Medium:
  controlled procedures per service. Large: standard procedures per site
  with local variations recorded.
- **Evidence an auditor samples:** A sample of procedures, review dates,
  operators who can find and follow them.
- **Common pitfalls:** Procedures that exist only in one engineer's
  head, or documents that no longer match the system.
- **Templates:** `isms/security-operating-procedure` (DOC-ISMS-049).

## 11. Size tiers: how the theme scales

<!-- Guidance: Show the reader how the same controls look at different sizes, using the library's three fictional settings. The tiers are this library's working tiers (small under 50 people, medium 50 to 500, large over 500 or several sites), not official definitions. -->

The controls are the same for every organisation. What changes with size
is formality, tooling, the number of owners and how evidence is produced.
The table shows how the three fictional settings used across this library
approach the organizational theme. All rows are *Example*.

| Aspect | Quillmere Analytics Ltd (small) *(Example)* | Quillmere Health Systems (medium) *(Example)* | Quillmere Group (large) *(Example)* |
|---|---|---|---|
| Profile | 46 staff (38 employees, 8 contractors), one office plus remote, one cloud provider in two regions | 320 staff, two offices and one colocation suite | 2,400 staff, 6 sites in 4 countries, OT and IT |
| Who runs the theme | Part-time ISMS manager (0.5 FTE, Head of Engineering Operations) with HR and the CEO | Full-time ISMS manager and 3-person security team, legal and privacy leads | CISO and 14-person security office, site coordinators, integrated management system |
| Policy set | One policy plus 8 short topic policies | Policy index with about 20 topic policies, each with an owner | Group policy, group standards, site procedures |
| Suppliers and cloud | Register of critical suppliers, cloud responsibility split for one provider | Tiered supplier assessments, colocation provider reviewed on site | Third-party risk programme with procurement in every country |
| Incidents | Plan, 3 playbooks, external responder on retainer | On-call rota, in-house triage | Group security operations centre, site incident leads |
| Continuity | Second cloud region as recovery site, yearly failover test | Recovery plans per service, colocation recovery path | Reuse of the ISO 22301 programme, recovery tiers per application |
| Compliance | Legal register built with outside counsel | Legal register kept by legal and privacy leads | Register per country with group summary |
| Certification target | 27001 in 6 months | 27001 in 10 months, 27701 the year after | 27001 for the group in 15 months, phased by site |

Practical advice per tier:

- **Small.** Combine roles, but write down who reviews whose work to keep
  segregation credible (A.5.3). Use the cloud provider's assurance
  reports for A.5.19 to A.5.23 and spend your effort on the parts you
  control.
- **Medium.** Name one owner per control and give each owner an evidence
  list from `isms/control-evidence-matrix`. The supplier and privacy
  controls usually need the most new work, especially where the
  organisation is a processor for customers.
- **Large or multi-site.** Decide which controls are run centrally and
  which locally, and record it. Reuse existing management system
  processes (document control, internal audit, continuity) rather than
  building parallel ISMS versions.

## 12. Self-check questions

<!-- Guidance: Use these questions at the end of a study session, in an SoA workshop or before an audit interview. Record answers in the study record in section 13. For a longer graded test, use the separate self-test template. -->

Answer each question in your own words, then compare with the control
entry above.

1. Why does ISO/IEC 27001 ask you to compare your selected controls with
   Annex A instead of implementing all of Annex A?
2. A small team cannot separate deployment and approval duties. What
   does A.5.3 expect instead, and what record would prove it?
3. What is the difference between leadership in clause 5.1 and
   management responsibilities in A.5.4?
4. Name three sources you would use for threat intelligence (A.5.7) and
   one action that intelligence could trigger.
5. Which four controls form the chain from knowing an asset to moving it
   safely, and in which order do they depend on each other?
6. What does an auditor look for when sampling access reviews under
   A.5.18?
7. A critical supplier will not sign your security addendum. What
   options do you have under A.5.20, and how do you record the decision?
8. What is the difference between A.5.29 and A.5.30?
9. Why should events judged "not an incident" still be recorded?
10. Who can carry out an independent review under A.5.35 in a
    46-person company?

## 13. Records and evidence

<!-- Guidance: List the records that show this guide is used and the theme is understood. Keep the study record, because it supports competence evidence under clause 7.2. Control evidence itself belongs in the control evidence matrix, not here. -->

This guide produces two kinds of records. First, records of learning,
which support clause 7.2 competence evidence for ISMS roles. Second,
local annotations that connect each control to your own documents, which
help keep the SoA and evidence matrix consistent. The evidence that each
control operates is tracked in `isms/control-evidence-matrix`
(DOC-ISMS-033), not in this guide.

| Record | Owner | Where kept | Retention |
|---|---|---|---|
| Study record (table below) | ISMS manager | [Learning platform or ISMS folder] | [Duration of employment plus 1 year] |
| Self-check answers or workshop notes | Learner, reviewed by ISMS manager | [ISMS folder] | [3 years or one certification cycle] |
| Local control annotations (owner, template, evidence location) | ISMS manager | This document, section notes | Until superseded, previous versions kept per DOC-ISMS-028 |
| Competence entry for ISMS roles | HR or ISMS manager | `isms/isms-competence-training-matrix` (DOC-ISMS-026) | [Per HR retention schedule] |

Study record:

| ID | Learner | Role | Sections studied | Date completed | Self-check result | Reviewed by |
|---|---|---|---|---|---|---|
| LRN-A5-001 *(Example)* | [@control-owner-1] | IT operations lead | 3, 6, 10 | 2027-02-15 | 9 of 10 answered correctly, follow-up on A.5.35 | [@isms-manager] |
| LRN-A5-002 *(Example)* | [@control-owner-2] | Procurement lead | 2, 7 | 2027-02-22 | 10 of 10 | [@isms-manager] |
| LRN-A5-003 | [@learner] | [role] | [sections] | YYYY-MM-DD | [result] | [@reviewer] |

## 14. References

<!-- Guidance: Cite standards by number and edition. Buy the official documents: this guide paraphrases only. Check each edition on iso.org before relying on it. -->

| Standard | Edition | Link |
|---|---|---|
| ISO/IEC 27001 | 2022 + Amd 1:2024 | https://www.iso.org/standard/82875.html ; Amd 1: https://www.iso.org/standard/88435.html |
| ISO/IEC 27002 | 2022 | https://www.iso.org/standard/75652.html |
| ISO/IEC 27005 | 2022 | https://www.iso.org/standard/80585.html |
| ISO/IEC 27035-1 (incident management) | 2023 | https://www.iso.org/standard/78973.html |
| ISO/IEC 27036-1 (supplier relationships) | 2021 | https://www.iso.org/standard/82905.html |
| ISO/IEC 27037 (digital evidence) | 2012 | https://www.iso.org/standard/44381.html |
| ISO/IEC 27031 (ICT readiness) | 2025 | https://www.iso.org/standard/80975.html |
| ISO/IEC 27701 (privacy information management) | 2025 | https://www.iso.org/standard/85819.html |
| ISO 22301 (business continuity) | 2019 + Amd 1:2024 | https://www.iso.org/standard/75106.html |
| NIST SP 800-63B-4 (authentication guidance, cited in A.5.17) | Final, July 2025 | csrc.nist.gov (check the current revision) |

Related templates: `isms/isms-learning-path`, `isms/isms-glossary`,
`isms/iso-27001-clauses-explained`, `isms/annex-a-people-physical-controls-guide`,
`isms/annex-a-technological-controls-guide`, `isms/isms-self-test`,
`compliance/statement-of-applicability`, `isms/control-evidence-matrix`,
`isms/isms-policy-framework`, `compliance/risk-methodology`.

## Standard and licence note

Structure aligned with ISO/IEC 27001:2022 + Amd 1:2024 Annex A (controls
A.5.1 to A.5.37) and with the control guidance in ISO/IEC 27002:2022. The
intents, implementation notes, tier advice, pitfalls and questions are
original text written for this library. No ISO or IEC control text,
guidance, official titles, tables or definitions are reproduced; the
labels next to control numbers are short descriptive labels, and you need
the official standards, sold by ISO, IEC and national standards bodies,
to implement the controls. Editions change: check the current edition of
each standard on iso.org before you rely on this guide. This guide does
not promise certification, which is decided by an accredited
certification body. Template licence: MIT.