# Physical Security Policy: [Organization name]

> Topic-specific policy that sets the physical and environmental
> security rules for every site, room, piece of equipment and storage
> medium inside the ISMS scope. It supports ISO/IEC 27001:2022 + Amd
> 1:2024 Annex A theme A.7 (physical controls A.7.1 to A.7.14), with
> implementation guidance in ISO/IEC 27002:2022. Clear desk rules
> (A.7.7) and disposal records (A.7.14) have their own documents and
> are summarised here. Replace every `[bracketed]` value and every row
> marked *Example*.

<!--
Guidance: How to use this template
- Use it when the ISMS scope includes at least one office, plant,
  server room, colocation suite or any equipment the organization
  owns. Fully remote organizations still need it: laptops, home
  working and the cloud provider's data centres are physical topics.
- Fill section 4 (site register and zone model) first. Every other
  rule refers to a zone, so the zones must exist before the rules.
- The main pitfall is writing rules for a building you do not control.
  In a shared office or a colocation suite the landlord or provider
  runs the perimeter: write which controls are yours, which are theirs
  and how you get assurance (section 11).
- Read the official control text in ISO/IEC 27001:2022 Annex A and the
  guidance in ISO/IEC 27002:2022 before you decide what to apply. The
  short labels used here are descriptions, not the official titles.
- Related templates: `isms/clear-desk-clear-screen-policy`,
  `isms/equipment-disposal-reuse-record`,
  `isms/data-centre-colocation-assessment`, `isms/remote-working-policy`,
  `isms/endpoint-device-byod-policy`, `compliance/asset-inventory`,
  `compliance/statement-of-applicability`, `isms/control-evidence-matrix`.
-->

## Document control

<!-- Guidance: This is a controlled document under clause 7.5. A new site, a new secure area or a change of zone model is a new version with a new approval. -->

| Field | Value |
|---|---|
| Document ID | DOC-ISMS-055 |
| Version | [1.0] |
| Status | [Draft / In review / Approved / Superseded] |
| Owner | [@facilities-security-lead] |
| Approvers/reviewers | [@isms-manager], [@ciso], [@head-of-facilities], [@hr-lead] |
| Last updated | YYYY-MM-DD |
| Classification | [Internal] |
| Standard and edition | ISO/IEC 27001:2022 + Amd 1:2024, Annex A A.7.1 to A.7.14; ISO/IEC 27002:2022 |
| Next scheduled review | YYYY-MM-DD (at least annually and after any site change) |
| Sites covered | [Site register in section 4.1] |
| Parent policy | DOC-ISMS-001 Information security policy |
| Related documents | DOC-ISMS-056 Clear desk and clear screen policy; DOC-ISMS-057 Equipment disposal and reuse record; DOC-ISMS-079 Data centre and colocation assessment; DOC-ISMS-054 Remote working policy |

### Approvals

| Role | Name | Decision | Date |
|---|---|---|---|
| Policy owner | [@facilities-security-lead] | [Prepared] | YYYY-MM-DD |
| ISMS manager | [@isms-manager] | [Reviewed] | YYYY-MM-DD |
| Top management | [@coo] | [Approved / Approved with changes] | YYYY-MM-DD |

### Revision history

| Version | Date | Author | Change |
|---|---|---|---|
| 1.0 *(Example)* | YYYY-MM-DD | [@facilities-security-lead] | First issue for Stage 1 audit |
| 1.1 *(Example)* | YYYY-MM-DD | [@facilities-security-lead] | Added second office and colocation suite to the site register; CCTV retention changed to 30 days |

## Contents

<!-- Guidance: Sections 1 to 4 set scope, roles and zones. Sections 5 to 11 hold the rules by control group. Sections 12 to 16 make the policy auditable. -->

1. Purpose, scope and applicability
2. Policy principles
3. Roles and responsibilities
4. Site register and security zones
5. Perimeters, entry controls and visitors (A.7.1, A.7.2)
6. Secure offices, rooms and working in secure areas (A.7.3, A.7.6)
7. Physical security monitoring (A.7.4)
8. Physical and environmental threats (A.7.5)
9. Equipment siting, utilities, cabling and maintenance (A.7.8, A.7.11, A.7.12, A.7.13)
10. Off-premises assets, storage media, disposal and clear desk (A.7.7, A.7.9, A.7.10, A.7.14)
11. Facilities run by third parties
12. Size tiers
13. Control mapping
14. Exceptions, compliance and review
15. Records and evidence
16. References

## 1. Purpose, scope and applicability

<!-- Guidance: Say which sites, rooms and equipment are covered and who must follow the policy. Questions to answer: does the scope match the ISMS scope (DOC-ISMS-002)? Are home workers and travelling staff covered? Pitfall: a policy that covers the head office only while the certificate scope lists three sites. -->

This policy sets the rules that keep people who have no business need
out of the places where [Organization name] holds information and
equipment, and that protect those places and that equipment against
fire, water, power loss, theft and tampering. It covers:

- every site listed in the site register (section 4.1), including
  shared offices, plants, warehouses and colocation suites;
- equipment owned or leased by the organization wherever it is used,
  including laptops, phones, removable media and network equipment;
- printed information and other non-electronic media;
- all employees, contractors, temporary staff, visitors, cleaners,
  maintenance engineers and suppliers who enter a site or handle
  equipment in scope.

Data centres operated by cloud providers are covered through supplier
assurance (A.5.19 to A.5.23) rather than through direct physical rules:
section 11 explains how. Out of scope: [list any site or area excluded
from the ISMS scope, with the reason recorded in DOC-ISMS-002].

## 2. Policy principles

<!-- Guidance: Five to eight principles that every rule below can be traced to. Pitfall: principles that are slogans. Each one should be testable on a site walk. -->

1. **Defence in depth.** Information and equipment are protected by
   layered zones. The more sensitive the asset, the more layers a
   person crosses to reach it.
2. **Least physical access.** Access to each zone is granted on a
   business need, approved by the zone owner and removed when the need
   ends.
3. **Every entry is attributable.** Entry to restricted and secure
   zones is logged to a person, not to a shared badge or code.
4. **Visitors are escorted.** Anyone without an access right is signed
   in, identified, badged and escorted in restricted zones.
5. **Risk-based protection.** Environmental and utility protection is
   sized to the risk assessment (DOC-ISMS-010), including climate
   related hazards identified under clause 4.1.
6. **Equipment is tracked through its life.** Every asset that holds
   information is in the asset inventory (DOC-ISMS-012) from receipt
   to verified sanitisation or destruction.
7. **Assurance where we do not operate.** Where a landlord, colocation
   provider or cloud provider runs the facility, the organization
   obtains and reviews evidence that the provider's controls work.

## 3. Roles and responsibilities

<!-- Guidance: Name roles, not people. Questions to answer: who approves access to each zone, who reviews badge logs, who owns CCTV? Pitfall: facilities and IT both assume the other reviews access logs. -->

| Role | Responsibilities |
|---|---|
| Top management | Approves this policy and the resources for physical protection |
| Policy owner (facilities security lead) | Maintains the policy, site register and zone model; runs the annual physical security review |
| ISMS manager | Links physical risks to the risk register, tracks findings, includes physical topics in internal audit and management review |
| Site manager (one per site) | Applies the policy at the site, owns the visitor log, coordinates landlord and building services |
| Zone owner | Approves access requests for the zone, reviews the access list each quarter |
| IT operations | Owns server rooms, network cabinets and cabling; manages equipment siting, maintenance and media handling |
| Security operations or monitoring lead | Reviews alarms, badge exceptions and CCTV as part of monitoring (A.7.4) |
| HR | Triggers badge issue and revocation through joiner, mover and leaver processes |
| All personnel | Wear badges, challenge unbadged people, prevent tailgating, report incidents and lost badges at once |
| Reception or security guard service | Signs in visitors, issues visitor badges, enforces escort rules |

## 4. Site register and security zones

<!-- Guidance: List every site, then define zones that apply to all sites. Questions to answer: which zone holds which assets? Who owns each zone? Pitfall: calling a cupboard with a switch a "server room" without the controls a server room needs. Auditor check: the zones on paper match what they see on the site walk. -->

### 4.1 Site register

| Site ID | Site | Type | Operated by | Highest zone | Site manager | In ISMS scope |
|---|---|---|---|---|---|---|
| SITE-001 *(Example)* | Head office, floor 3 | Leased shared office | Landlord (perimeter), organization (floor) | Z3 network cabinet room | [@office-manager] | Yes |
| SITE-002 *(Example)* | Colocation suite, cage 14 | Colocation | Provider (building, power, cooling), organization (cage and racks) | Z4 cage | [@it-ops-lead] | Yes |
| SITE-003 *(Example)* | Plant 2 | Owned industrial site | Organization | Z4 OT control room | [@plant-manager] | Yes |
| [SITE-NNN] | [name] | [type] | [operator] | [zone] | [@owner] | [Yes / No, reason] |

### 4.2 Zone model

| Zone | Name | Typical areas | Minimum entry control | Monitoring |
|---|---|---|---|---|
| Z0 | Public | Street, car park, shared lobby | None | Landlord or public CCTV where present |
| Z1 | Reception | Reception desk, visitor waiting area | Staffed reception or intercom during opening hours | Visitor log, CCTV on entrance |
| Z2 | General office | Open office, meeting rooms, kitchens | Personal badge; visitors escorted | Badge log; intruder alarm out of hours |
| Z3 | Restricted | Network cabinet rooms, HR file rooms, print rooms with confidential output, OT engineering rooms | Personal badge with role-based access list; visitors escorted at all times | Badge log reviewed monthly; door-held and forced alarms |
| Z4 | Secure | Server rooms, colocation cages, OT control rooms, safes for keys and media | Badge plus second factor (PIN or biometric) or key held by named custodians; access list approved by zone owner | Badge log reviewed weekly; CCTV on door and inside; alarms monitored |

```mermaid
flowchart LR
  Z0["Z0 Public"] --> Z1["Z1 Reception: sign-in"]
  Z1 --> Z2["Z2 General office: personal badge"]
  Z2 --> Z3["Z3 Restricted: role-based badge"]
  Z3 --> Z4["Z4 Secure: badge plus PIN or key"]
  Z1 -. "Visitor badge and escort" .-> Z2
```

Each move to a higher zone needs a separate access decision. Do not
let a Z2 badge open a Z3 door by default.

## 5. Perimeters, entry controls and visitors (A.7.1, A.7.2)

<!-- Guidance: Covers the boundary of each site and how people get through it. Questions to answer: is every external door controlled or alarmed? How are badges issued and revoked? Pitfall: fire exits propped open, delivery doors left unlocked. Auditor check: try a side door, ask for the leaver badge revocation evidence. -->

### 5.1 Perimeters (A.7.1)

- Define the perimeter of each site and each zone on a floor plan kept
  with the site register.
- External doors, ground-floor windows and roof access are secured,
  alarmed out of hours or both. Fire exits cannot be opened from the
  outside and raise a local or monitored alarm when opened.
- Delivery and loading areas are separated from Z2 and higher zones,
  so deliveries do not give access to the office.
- In shared buildings, record in section 11 which perimeter controls
  the landlord provides and how you check them.

### 5.2 Entry controls (A.7.2)

- Personal badges are issued only after HR confirms the start date and
  the onboarding checklist (`ops/onboarding-checklist`) is complete.
- Badges show no organization name or site address on the outside.
- Access rights follow the zone model. Z3 and Z4 rights are requested
  through a ticket, approved by the zone owner and reviewed each
  quarter (`ops/access-review`).
- Leavers' badges are disabled on the last working day, ideally by an
  automated feed from HR, and collected with other assets (A.5.11).
  Lost badges are reported and disabled the same day.
- Anti-tailgating: personnel do not hold doors to Z3 or Z4 for others.
  Where tailgating is a recorded risk, install turnstiles, mantraps or
  door-held alarms.
- Shared PIN codes and mechanical keys are a last resort. Where used,
  keep a key register, change codes at least [every 6 months] and after
  any leaver who knew them.

### 5.3 Visitors

- Visitors sign in at reception with name, organization, host, time in
  and time out. Electronic visitor systems must protect visitor
  personal data and keep it only for [90 days] unless an incident
  requires longer.
- Visitors wear a visible visitor badge and are escorted in Z2. In Z3
  and Z4 an authorised person escorts them at all times and the visit
  is logged in the zone log.
- Visitors sign or accept the site rules (and a confidentiality
  agreement, DOC-ISMS-051, where they may see confidential
  information).
- Maintenance engineers and cleaners with regular access are treated
  as personnel with a limited badge, screened according to
  DOC-ISMS-050 where the risk requires.
- Uncollected visitor badges at the end of the day are disabled and
  followed up with the host.

## 6. Secure offices, rooms and working in secure areas (A.7.3, A.7.6)

<!-- Guidance: Covers how rooms are protected and how people behave in Z3 and Z4. Questions to answer: are sensitive rooms discreet? What is banned inside secure areas? Pitfall: a server room used as a store room. Auditor check: walk into the server room and look for boxes, unlocked racks and personal phones on top of servers. -->

### 6.1 Securing offices, rooms and facilities (A.7.3)

- Sensitive rooms carry no sign that shows their purpose. Internal
  directories and floor plans that show Z3 and Z4 rooms are classified
  Internal or higher.
- Rooms where confidential discussions take place are not overlooked
  from outside. Use blinds or window film where screens or whiteboards
  face a public area.
- Z3 and Z4 rooms stay locked when not occupied. Keys and access cards
  for these rooms are held by named custodians.
- Printers that handle confidential output use pull printing or sit in
  a Z3 print room.

### 6.2 Working in secure areas (A.7.6)

- Only work that needs the secure area takes place there. No lone
  working in Z4 without a check-in arrangement where safety requires.
- No food, drink, combustible packaging or personal storage in server
  rooms and OT control rooms.
- Photography and video recording in Z4 require the zone owner's
  approval. Personal recording devices are restricted where
  [classification or contract] requires it.
- Unattended secure areas are locked and checked. Empty secure areas
  are inspected [monthly] for unused equipment and stored material.
- Third-party engineers in Z4 are escorted unless they hold an approved
  unescorted right recorded in the access list.

## 7. Physical security monitoring (A.7.4)

<!-- Guidance: A.7.4 is new in the 2022 edition. Questions to answer: what is monitored (alarms, CCTV, badge events), who watches it, how long is footage kept, and how does it feed incident management? Pitfall: cameras that record but nobody reviews, or footage kept far longer than the purpose needs, which creates a privacy problem. Auditor check: ask for the last alarm and what happened next. -->

Watching the sites matters because locks and badges only work if
someone notices when they fail, and visible monitoring also puts people
off trying. It combines the following sources, chosen per zone in
section 4.2:

| Source | What it detects | Reviewed by | Review frequency | Retention |
|---|---|---|---|---|
| Intruder alarm | Entry outside opening hours | Alarm receiving centre or on-call | On each alarm | Alarm log [12 months] |
| Door alarms (forced, held open) | Forced doors, tailgating, propped doors | Security operations | On each alarm, trend monthly | [12 months] |
| Badge access logs | Who entered which zone and when | Zone owner (Z3 monthly, Z4 weekly) | As in zone model | [12 months] |
| CCTV | Entry and activity at entrances and Z4 doors | Security operations on alert or incident | On alert, spot check [monthly] | [30 days] unless held for an investigation |
| Guard patrols (larger sites) | Physical anomalies, unlocked doors | Site manager | Each shift report | [12 months] |
| Environmental sensors | Temperature, humidity, water, smoke in Z4 | IT operations | Continuous with alerts | [12 months] |

Rules:

- Monitoring systems are protected against tampering and their clocks
  are synchronised with the organization's time source (A.8.17) so
  that badge, CCTV and system logs can be correlated.
- CCTV is placed and signed in line with applicable privacy law (for
  example GDPR in the EU) and does not cover private areas such as
  washrooms. A privacy assessment (`compliance/dpia`) is done before a
  new CCTV system is installed where the law requires.
- Physical security alerts that may affect information are reported
  through DOC-ISMS-023 and handled under DOC-ISMS-020.
- Monitoring results feed the measurement programme: alarms per month,
  door-held events, unreviewed access lists and time to revoke leaver
  badges.

## 8. Physical and environmental threats (A.7.5)

<!-- Guidance: Covers fire, flood, extreme heat, storms, earthquakes, power events, civil unrest and deliberate attack. Amd 1:2024 asks you to decide whether climate change is a relevant issue (4.1): if it is, flood and heat risks at each site belong in this section and in the risk register. Pitfall: a site risk assessment done once at move-in and never updated. -->

- Assess physical and environmental threats for each site when it is
  added and at least every [2 years], recording risks in the risk
  register (DOC-ISMS-016). Consider location (flood plains, coastal
  storm exposure, seismic zones, wildfire areas), building type,
  neighbours and the history of incidents.
- Where the context review (DOC-ISMS-003) finds climate change to be a
  relevant issue, include rising flood, heat and storm risks and how
  they affect cooling, power and staff access.
- Fire: detection in all zones; suppression in Z4 suitable for
  electrical equipment; extinguishers checked as local fire rules
  require; fire drills with the result recorded.
- Water: no water pipes above Z4 equipment where avoidable; leak
  detection under raised floors and near cooling units; equipment kept
  off the floor in flood-prone areas.
- Heat and humidity: environmental monitoring with alert thresholds in
  Z4 (section 9.2).
- Deliberate attack and unrest: entry controls (section 5), glazing
  and lighting proportionate to the site risk.
- Business continuity: site loss scenarios are part of the business
  impact analysis (`compliance/business-impact-analysis`) and ICT
  readiness plan (DOC-ISMS-047).

## 9. Equipment siting, utilities, cabling and maintenance (A.7.8, A.7.11, A.7.12, A.7.13)

<!-- Guidance: Covers where equipment sits and what keeps it running. Questions to answer: what happens when mains power fails? Who can touch the cabling? When was the UPS last tested? Pitfall: maintenance contracts that exist on paper while the UPS batteries are five years past replacement. Auditor check: maintenance log for UPS, cooling and fire suppression. -->

### 9.1 Equipment siting and protection (A.7.8)

- Servers, network devices and OT controllers sit in Z3 or Z4 in
  locked racks or cabinets.
- Screens that show confidential information are placed so they
  cannot be read from public areas or through windows.
- Equipment is kept away from water, heat sources, direct sunlight and
  heavy foot traffic.

### 9.2 Supporting utilities (A.7.11)

| Utility | Minimum requirement | Test | Owner |
|---|---|---|---|
| Power | UPS sized for [15 minutes] of Z4 load; generator where the BIA recovery time needs it | UPS self-test [monthly], load test [annually], generator run [monthly] | [@it-ops-lead] |
| Cooling | Capacity with redundancy for Z4 rooms; alert at [27 C] inlet temperature *(Example threshold, align with equipment specification)* | Service [twice a year] | [@facilities] |
| Telecoms | Two diverse network links for sites that host production or OT | Failover test [annually] | [@network-lead] |
| Water and drainage | Leak detection in Z4 | Sensor test [twice a year] | [@facilities] |

### 9.3 Cabling security (A.7.12)

- Power and data cabling between zones runs in conduits, trunking or
  ceiling spaces that are not accessible from Z0 or Z1.
- Patch panels and network cabinets are locked and labelled with codes
  that do not reveal their purpose to an outsider.
- Unused network ports in Z1 and meeting rooms are disabled or placed
  on a guest network (DOC-ISMS-063).
- Cabling changes are made through change management
  (`ops/change-request`) and cable plans are kept current.

### 9.4 Equipment maintenance (A.7.13)

- Maintain equipment according to the supplier's recommended intervals
  and record each service in a maintenance log.
- Only authorised engineers perform maintenance. Remote maintenance
  sessions are approved and logged.
- Before equipment leaves the site for repair, remove or sanitise
  storage media, or use a supplier contract that covers confidentiality
  and on-site media retention.
- After maintenance, check that the equipment works and that no
  unauthorised changes were made.

## 10. Off-premises assets, storage media, disposal and clear desk (A.7.7, A.7.9, A.7.10, A.7.14)

<!-- Guidance: Summarise the rules here and point to the detailed documents. Questions to answer: are laptops encrypted? How is removable media controlled? Who signs the disposal certificate? Pitfall: duplicating the endpoint policy and then letting the two drift apart. -->

- **Clear desk and clear screen (A.7.7):** rules, checks and metrics
  are in DOC-ISMS-056 (`isms/clear-desk-clear-screen-policy`).
- **Assets used off-premises (A.7.9):** laptops and phones are
  encrypted and managed (DOC-ISMS-058); equipment is never left
  unattended in vehicles or public places; equipment taken to high-risk
  destinations follows the travel rules in DOC-ISMS-054. Equipment that
  stays off-premises permanently (home office equipment) is listed in
  the asset inventory with its location type.
- **Storage media (A.7.10):** removable media is allowed only where
  [business need, approved list]; confidential information on removable
  media is encrypted; media is labelled according to DOC-ISMS-042 and
  stored in a locked Z3 cabinet or safe; media in transit uses
  approved couriers with tracking.
- **Secure disposal or reuse (A.7.14):** before reuse or disposal,
  storage is sanitised or destroyed and the result recorded in
  DOC-ISMS-057 (`isms/equipment-disposal-reuse-record`), following
  `data/data-retention-deletion-standard` for retention decisions.

## 11. Facilities run by third parties

<!-- Guidance: Most organizations depend on a landlord, a colocation provider or a cloud provider for part of A.7. Questions to answer: which A.7 controls are inherited, and what evidence proves they operate? Pitfall: marking A.7 controls "not applicable" in the SoA because "the cloud provider does it". The control is applicable; it is met through supplier assurance. -->

| Facility type | Who operates what | How assurance is obtained |
|---|---|---|
| Shared office building | Landlord runs lobby, perimeter doors, building alarm, fire systems; organization runs its floor | Lease clauses, landlord security summary, annual walk-through, fire certificate copy |
| Colocation suite | Provider runs building, power, cooling, fire, perimeter and reception; organization runs cage, racks and its access list | Assessment with DOC-ISMS-079 (`isms/data-centre-colocation-assessment`), provider certificates and reports, monthly access list reconciliation |
| Public cloud | Provider runs all physical controls of its data centres | Provider ISO/IEC 27001 certificate and independent reports reviewed under DOC-ISMS-044 and the supplier assessment (`compliance/supplier-security-assessment`) |

Record inherited controls in the SoA (DOC-ISMS-011) as applicable,
with the provider's evidence as the reference.

## 12. Size tiers

<!-- Guidance: Show how the same policy scales. The tiers are the library's working tiers, not official definitions. Pitfall: a small company copying enterprise rules (guards, mantraps) it will never operate, which creates nonconformities. -->

| Topic | Small: Quillmere Analytics Ltd | Medium: Quillmere Health Systems | Large: Quillmere Group |
|---|---|---|---|
| Sites | One leased office plus remote staff; production on one public cloud provider in two regions | Two offices and one colocation suite | 6 sites in 4 countries: HQ, 3 plants, 1 service centre, 1 data centre |
| Zones used | Z0 to Z3 (network cabinet room is Z3); no Z4 on site | Z0 to Z4 (colocation cage is Z4) | Z0 to Z4 at every site; OT control rooms are Z4 |
| Entry control | Landlord badge for the building, own badge for the floor, key register for the cabinet room | Badge system across both offices; colocation provider biometric plus own cage lock | Group badge platform, turnstiles at HQ and plants, guards at plants and the data centre |
| Monitoring (A.7.4) | Landlord CCTV at the lobby, own door alarm on the cabinet room, badge log reviewed monthly by the ISMS manager | Own CCTV at office entrances, provider CCTV in the colocation hall, weekly Z4 log review by the security team | Central security operations reviewing alarms across sites, CCTV at all perimeters, guard patrols |
| Environmental | Landlord fire systems; small UPS for the network cabinet | UPS in both offices; colocation power, cooling and fire covered by provider assessment | Generators, redundant cooling and gas suppression at the data centre; site flood and heat assessments per plant |
| Third-party assurance | Cloud provider certificate and reports reviewed annually | Colocation assessment annually with a site visit, cloud reports annually | Data centre self-assessment plus assessments of any colocation used by country units |
| Policy owner | ISMS manager (0.5 FTE) with the office manager | Facilities lead with the 3-person security team | Group physical security manager in the CISO's security office, site managers per site |

## 13. Control mapping

<!-- Guidance: One row per A.7 control, so the SoA and the evidence matrix can point here. Keep the labels short and in your own words. Auditor check: every Applicable row in the SoA for A.7 points to a section here and to a record. -->

| Control | Short label | Section | Primary records |
|---|---|---|---|
| A.7.1 | Physical security perimeters | 5.1 | Floor plans, perimeter inspection |
| A.7.2 | Physical entry controls | 5.2, 5.3 | Badge issue and revocation records, visitor log, access reviews |
| A.7.3 | Securing offices, rooms and facilities | 6.1 | Site walk checklist |
| A.7.4 | Physical security monitoring (new in 2022) | 7 | Alarm log, badge log reviews, CCTV retention record |
| A.7.5 | Protection against physical and environmental threats | 8 | Site threat assessment, fire drill records |
| A.7.6 | Working in secure areas | 6.2 | Zone access list, secure area inspection |
| A.7.7 | Clear desk and clear screen | 10, DOC-ISMS-056 | Clear desk check results |
| A.7.8 | Equipment siting and protection | 9.1 | Rack and room inspection |
| A.7.9 | Assets used off-premises | 10, DOC-ISMS-058 | Asset inventory, encryption compliance report |
| A.7.10 | Storage media | 10 | Media register, courier records |
| A.7.11 | Supporting utilities | 9.2 | UPS, generator and cooling test records |
| A.7.12 | Cabling security | 9.3 | Cable plans, change records |
| A.7.13 | Equipment maintenance | 9.4 | Maintenance log |
| A.7.14 | Secure disposal or re-use of equipment | 10, DOC-ISMS-057 | Disposal and reuse log, certificates |

## 14. Exceptions, compliance and review

<!-- Guidance: Explain how deviations are approved and how compliance is checked. Pitfall: informal exceptions such as "the cleaners have the master key" that nobody recorded. -->

- Exceptions are requested with the security exception request
  (`security/security-exception-request`, DOC-ISMS-122) and approved at
  the authority the risk methodology (DOC-ISMS-010 section 2.4) sets for
  the residual risk: the risk owner for Low; the risk owner and
  department head for Medium (top management if the risk category is
  Averse, DOC-ISMS-015 section 9 rule 1); top management with a
  treatment decision for High, recorded in the risk acceptance record
  (DOC-ISMS-019). Critical residual risk is not approvable as an
  exception: treat it or stop the activity. Maximum duration is 12
  months for Low or Medium and 6 months for High; at expiry the
  exception is reassessed, and a renewal is a new decision (DOC-ISMS-122
  section 7).
- Compliance is checked by an annual physical security walk-through
  per site using section 13 as the checklist, by the access reviews in
  section 5.2 and by internal audit (DOC-ISMS-082).
- Breaches of this policy are handled through the disciplinary
  process for security breaches (DOC-ISMS-052).
- The policy owner reviews this policy at least annually and after a
  new site, a significant physical incident, a change of landlord or
  provider, or a change in the risk assessment.

## 15. Records and evidence

<!-- Guidance: List the records that prove the policy operates. Every record has an owner, a location and a retention period. Link each to the control evidence matrix. Auditor check: pick two rows and ask to see the record for last quarter. -->

| Record | Owner | Location | Retention | Proves |
|---|---|---|---|---|
| Site register and floor plans | Policy owner | [Document system] | Current plus superseded versions [3 years] | A.7.1, A.7.3 scope |
| Badge issue and revocation records | HR and site manager | [Badge system] | [Employment plus 1 year] | A.7.2 |
| Quarterly Z3 and Z4 access reviews | Zone owner | [Ticket system] | [3 years] | A.7.2, A.7.6 |
| Visitor log | Reception | [Visitor system] | [90 days] unless needed for an incident | A.7.2 |
| Alarm and door event log | Security operations | [Alarm system] | [12 months] | A.7.4 |
| CCTV footage and access to it | Security operations | [Recorder] | [30 days]; extracts held with the incident record | A.7.4 |
| Site threat and environmental assessments | Policy owner | [Risk register] | [3 years] | A.7.5 |
| UPS, generator, cooling and fire test records | IT operations and facilities | [Maintenance system] | [3 years] | A.7.11, A.7.13 |
| Disposal and reuse log, certificates | IT operations | DOC-ISMS-057 | [Per retention schedule] | A.7.14 |
| Provider assessments and reports | Supplier owner | DOC-ISMS-079 | [Contract plus 3 years] | Section 11 |

Map these records in the control evidence matrix (DOC-ISMS-033,
`isms/control-evidence-matrix`) and list them in the documented
information register (DOC-ISMS-028).

## 16. References

<!-- Guidance: Cite editions exactly and check for newer editions before each review. -->

| Reference | Edition | Use |
|---|---|---|
| ISO/IEC 27001:2022 + Amd 1:2024 | 2022, Amd 1 published 2024-02-23 | Annex A theme A.7; clause 4.1 climate change determination. https://www.iso.org/standard/82875.html and https://www.iso.org/standard/88435.html |
| ISO/IEC 27002:2022 | 2022 | Guidance for A.7 controls. https://www.iso.org/standard/75652.html |
| ISO/IEC 27040:2024 | 2024 | Storage security, including sanitisation. https://www.iso.org/standard/80194.html |
| NIST SP 800-88 Rev. 2, Guidelines for Media Sanitization | September 2025 | Sanitisation programme and methods (see DOC-ISMS-057) |

Related templates: `compliance/information-security-policy`,
`compliance/ms-scope`, `compliance/asset-inventory`,
`compliance/risk-register`, `compliance/statement-of-applicability`,
`compliance/business-impact-analysis`, `ops/onboarding-checklist`,
`ops/access-review`, `ops/change-request`,
`isms/clear-desk-clear-screen-policy`,
`isms/equipment-disposal-reuse-record`,
`isms/data-centre-colocation-assessment`, `isms/remote-working-policy`,
`isms/endpoint-device-byod-policy`, `isms/control-evidence-matrix`.

## Standard and licence note

Structure aligned with ISO/IEC 27001:2022 (including Amd 1:2024) Annex
A theme A.7 and the guidance in ISO/IEC 27002:2022. Only control
numbers and short descriptive labels are used; the rules, zone model,
tables and examples are original wording, and no ISO/IEC text is
reproduced. You need the official standards to apply the controls:
ISO/IEC 27001 at https://www.iso.org/standard/82875.html and ISO/IEC
27002 at https://www.iso.org/standard/75652.html. Check the current
edition and amendments before use. Quillmere names are fictional.
Template licence: MIT.