# Decarbonisation and MACC Concept Card: [Your name, company or case, and date]

> An elective-level concept card for the economics of cutting greenhouse gas emissions: the scope 1, 2 and 3 baseline
> that every plan starts from, the marginal abatement cost curve (MACC) that ranks the measures by cost per tonne, the
> net present value (NPV) of each measure with and without an internal carbon price, and the choices that make a MACC
> honest or misleading (sequence, interactions, the scope 2 method and the quality of scope 3 data). It builds on
> mba/mba-stakeholder-esg-card, which teaches how the inventory is built, and on mba/mba-npv-irr-card, and does not
> re-teach either. It is for MBA students in a sustainability, energy or corporate finance elective and for managers
> who must defend a transition plan in front of a board or investors. Worked example A builds a nine-measure MACC for
> Northfield Outdoor Co. from the inventory in the stakeholder and ESG card, Worked example B is a half-solved MACC for
> Tallow Creek Medical Center, and Exercise C asks for a least-cost target plan and break-even carbon prices. Source
> basis: the GHG Protocol Corporate Standard (revised edition, 2004, updated by the Scope 2 Guidance, 2015) and the
> Corporate Value Chain (Scope 3) Standard (2011); IFRS S2 Climate-related Disclosures (ISSB, June 2023) with the
> December 2025 Amendments to Greenhouse Gas Emissions Disclosures; Weitzman (1974), Kesicki and Ekins (2012) and
> Gillingham and Stock (2018), written up in original words. Every company, measure, price and emission factor is
> fictional or illustrative, and every number was computed in Python. Replace every [bracketed] value and every row
> marked *Example*. This is a learning aid, not investment, engineering, legal, tax or reporting advice.

<!--
Guidance: How to use this template
- Read mba/mba-stakeholder-esg-card first. You need its scope definitions and its Northfield inventory: this card
  starts from that baseline (99,494.4 tCO2e, market-based).
- Read "The idea in plain language" and "Formulas and notation", then rebuild Worked example A in a blank workbook
  from the measure inputs alone. Check the cost per tonne of M1 before you copy the formulas down.
- Pay most attention to Step 4 (sequence and interactions). A MACC whose bars cannot be added up is the most common
  error in student work and in practice.
- Fill every [ ] in Worked example B, then do Exercise C without looking at the answer key.
- Dated facts (GHG Protocol editions, IFRS S2 and its amendments) are listed with their sources; re-check them on
  ghgprotocol.org and ifrs.org before you rely on them.
- Related templates: mba/mba-stakeholder-esg-card, mba/mba-sustainability-strategy-guide, mba/mba-npv-irr-card,
  mba/mba-capm-wacc-card, mba/mba-options-real-options-card, mba/mba-decision-trees-card,
  mba/mba-supply-chain-resilience-card, mba/mba-sourcing-procurement-card, mba/mba-corporate-governance-card,
  mba/mba-ethics-guide, mba/mba-formula-sheet, mba/mba-error-log, mba/pre-mba-excel-modeling-drills,
  finance/issb-sustainability-disclosure, finance/sustainability-double-materiality-assessment,
  finance/climate-transition-plan, finance/investment-appraisal, finance/eu-taxonomy-alignment-assessment,
  finance/green-bond-framework.
-->

## Document control

<!-- Guidance: Record the inventory year and the emission factor set you used. A MACC built on last year's factors is a different MACC. -->

| Field | Value |
|---|---|
| Learner | [Your name] |
| Elective, case or company | [Sustainability elective, case name, company] |
| Baseline inventory year and boundary | [Reporting year, operational or financial control] |
| Emission factor sources and dates | [Grid, residual mix, fuel and spend factors, with dates] |
| Discount rate and carbon price used | [Rate %, internal carbon price per tCO2e] |
| Model file and version | [File name, v0.1] |
| Reviewed by | [Learning team member, teaching assistant or sustainability lead] |
| Dated facts checked on | YYYY-MM-DD |
| Version | [0.1] |
| Last updated | YYYY-MM-DD |

## Contents

- [When to use it](#when-to-use-it)
- [The idea in plain language](#the-idea-in-plain-language)
- [Formulas and notation](#formulas-and-notation)
- [Standards and reporting (dated facts)](#standards-and-reporting-dated-facts)
- [Assumptions and limits](#assumptions-and-limits)
- [How companies use the MACC and an internal carbon price](#how-companies-use-the-macc-and-an-internal-carbon-price)
- [The build step by step](#the-build-step-by-step)
- [Worked example A (fully solved): Northfield Outdoor Co.](#worked-example-a-fully-solved-northfield-outdoor-co)
- [Worked example B (half solved): Tallow Creek Medical Center](#worked-example-b-half-solved-tallow-creek-medical-center)
- [Exercise C (unsolved): a least-cost target and break-even prices](#exercise-c-unsolved-a-least-cost-target-and-break-even-prices)
- [Connections to other cards](#connections-to-other-cards)
- [Common mistakes and misconceptions](#common-mistakes-and-misconceptions)
- [Self-test questions](#self-test-questions)
- [My notes and next steps](#my-notes-and-next-steps)
- [Sources and further reading](#sources-and-further-reading)
- [Answer key](#answer-key)

## When to use it

<!-- Guidance: A MACC is a ranking tool for a portfolio of measures. Use it when the question is "which measures, in which order, at what cost", not when the question is "should we have a target at all". -->

Use the tools on this card when:

- a board, an investor or a lender asks for a credible plan behind an emissions target, and the plan must show what
  each tonne costs and which measures pay for themselves;
- a sustainability team has a long list of measures (efficiency, fuel switching, renewable electricity, supplier
  programmes, product changes) and capital is limited, so the measures must be ranked;
- finance must decide whether to use an internal carbon price, at what level, and how it changes the hurdle a
  low-carbon project must clear;
- a company must disclose under IFRS S2 or a similar regime how it uses carbon prices in decisions and how its
  transition plan is resourced;
- a case asks whether a company's net-zero claim is backed by real abatement or mainly by contractual instruments.

Do not use a MACC to decide whether to act at all on climate; that is a strategy and governance question (see
mba/mba-sustainability-strategy-guide and mba/mba-corporate-governance-card). Do not use it as the only test for a
large, lumpy or irreversible investment either: a heat pump for one building fits a MACC, a new plant design needs a
full NPV with scenarios and real options (mba/mba-options-real-options-card).

## The idea in plain language

<!-- Guidance: If you can explain the MACC, the carbon price and the link between them in three sentences, you understand the card. -->

Every decarbonisation plan starts from a baseline: the company's emissions in a reference year, split into scope 1
(direct emissions from sources it owns or controls), scope 2 (emissions from the electricity, heat and steam it buys)
and scope 3 (all other emissions in its value chain, in the 15 categories of the Scope 3 Standard). The baseline tells
you where the tonnes are. For a retailer or a brand, most of them are in scope 3, in the goods it buys; for a hospital
or a factory, scopes 1 and 2 matter more.

A measure is anything that reduces those emissions: an LED retrofit, an electric van, a renewable electricity
contract, a programme that helps suppliers cut their own energy use. Each measure has a cost (capital spent now,
operating costs or savings each year) and an abatement (tonnes of CO2e avoided each year). Dividing the annualised net
cost by the annual abatement gives the cost per tonne: the marginal abatement cost of that measure. Some measures have
a negative cost per tonne because the energy they save is worth more than they cost; they pay for themselves even
without any value on carbon.

The MACC sorts the measures from cheapest to most expensive per tonne and draws each one as a bar. The width of a bar
is the tonnes it abates, the height is its cost per tonne. Reading from left to right, you see how many tonnes the
company can cut at negative cost, how many more it can cut below any given price, and which last tonnes are very
expensive. The area of each bar is its annual cost.

The internal carbon price links the MACC to investment decisions. If the company values each tonne at a price $P$,
a measure with a cost per tonne below $P$ has a positive NPV once the avoided tonnes are counted. The break-even carbon
price of a measure is exactly its cost per tonne. So a carbon price of USD 100 per tonne says: do every measure to the
left of the point where the curve crosses 100.

Economists have argued about prices against quantities for half a century. Weitzman (1974) showed that a price
instrument (a tax or internal price) and a quantity instrument (a cap or a target) give different results when costs
are uncertain; companies often use both, a target for the total and a price to choose the measures. Kesicki and Ekins
(2012) list the weaknesses of MACCs: they ignore interactions between measures unless built carefully, they hide
uncertainty in single numbers, they leave out non-financial barriers and they are static. Gillingham and Stock (2018)
add that static cost per tonne can mislead for technologies whose costs fall as they spread, where an early, expensive
tonne buys learning that lowers the cost of later tonnes. A good MACC is therefore a starting point for a discussion,
not an answer.

## Formulas and notation

<!-- Guidance: Five relations carry the whole card. Learn the link between the cost per tonne and the break-even carbon price; it is the most examined point. -->

Capital recovery factor and equivalent annual cost (EAC) of the capital spent on measure $i$:

$$
CRF(r, n) = \frac{r}{1 - (1+r)^{-n}} \qquad EAC_i = K_i \cdot CRF(r, n_i)
$$

Marginal abatement cost of measure $i$, with annual change in operating cost $\Delta O_i$ (negative when the measure
saves money) and annual abatement $A_i$:

$$
MAC_i = \frac{EAC_i + \Delta O_i}{A_i}
$$

NPV of measure $i$ at an internal carbon price $P$ per tonne, with annuity factor $AF(r, n)$:

$$
NPV_i(P) = -K_i + \left(-\Delta O_i + P \cdot A_i\right) \cdot AF(r, n_i) \qquad AF(r, n) = \frac{1 - (1+r)^{-n}}{r}
$$

Break-even carbon price (set $NPV_i = 0$ and use $AF = 1/CRF$):

$$
P^{*}_i = \frac{K_i \cdot CRF(r, n_i) + \Delta O_i}{A_i} = MAC_i
$$

Abatement from an activity change, with activity $Q$ and emission factor $f$ before and after:

$$
A_i = Q_{before} \cdot f_{before} - Q_{after} \cdot f_{after}
$$

| Symbol | Meaning | Note |
|---|---|---|
| $K_i$ | Capital cost of the measure | Incremental capital: only the extra cost over the option the company would buy anyway |
| $n_i$ | Life of the measure in years | Asset life or contract term, whichever ends the abatement |
| $r$ | Discount rate | The company's hurdle rate for projects of this risk (mba/mba-capm-wacc-card) |
| $\Delta O_i$ | Annual change in operating cost | Energy, fuel, maintenance, premiums; negative for savings |
| $A_i$ | Annual abatement in tCO2e | Measured in the implementation sequence, so the bars add up |
| $MAC_i$ | Cost per tonne abated | Same currency as costs, per tCO2e |
| $P$, $P^{*}_i$ | Internal carbon price and break-even price | $P^{*}_i = MAC_i$ when abatement and costs are level |
| $f$ | Emission factor | kgCO2e per kWh, litre, tonne-km or currency unit |

Excel: with the capital in B2, life in C2, annual change in operating cost in D2 (USD thousand) and abatement in E2
(tCO2e), the equivalent annual cost is `=PMT(8%,C2,-B2)`, the cost per tonne in USD is
`=(PMT(8%,C2,-B2)+D2)*1000/E2`, and the NPV at a carbon price in G1 is `=-B2+PV(8%,C2,D2-G1*E2/1000)`. Sort the
table by cost per tonne and add a running total of abatement for the curve.

## Standards and reporting (dated facts)

<!-- Guidance: These are the documents that define the baseline and the disclosure. They change; record the date you checked each one. -->

| Item | Status as checked on 2026-10-30 | Source |
|---|---|---|
| GHG Protocol Corporate Accounting and Reporting Standard | Revised edition (2004); the standard's page states it was updated in 2015 with the Scope 2 Guidance, which requires scope 2 to be reported both location-based and market-based. Defines scopes 1, 2 and 3 and the organisational boundary approaches | [ghgprotocol.org/corporate-standard](https://ghgprotocol.org/corporate-standard) |
| GHG Protocol Corporate Value Chain (Scope 3) Standard | Released 2011; 15 upstream and downstream categories; a list of minor corrections dated May 2013 | [ghgprotocol.org/corporate-value-chain-scope-3-standard](https://ghgprotocol.org/corporate-value-chain-scope-3-standard) |
| IFRS S2 Climate-related Disclosures | Issued June 2023 by the ISSB; effective for annual reporting periods beginning on or after 1 January 2024 where a jurisdiction adopts it. Its metrics include scope 1, 2 and 3 emissions and how the entity uses internal carbon prices in decision-making | [ifrs.org, IFRS S2](https://www.ifrs.org/issued-standards/ifrs-sustainability-standards-navigator/ifrs-s2-climate-related-disclosures/) |
| Amendments to Greenhouse Gas Emissions Disclosures (Amendments to IFRS S2) | Issued December 2025; effective for annual reporting periods beginning on or after 1 January 2027, early application permitted; they ease how the GHG requirements are applied, particularly during implementation. Read the amendment text for the specific reliefs | [ifrs.org, project page](https://www.ifrs.org/projects/completed-projects/2025/amendments-to-disclosure-of-greenhouse-gas-emissions-s2/) |

The GHG Protocol has been consulting on revisions to parts of its standards; check ghgprotocol.org for the status of
any revised scope 2 or corporate guidance before you build a baseline for a filing. How IFRS S2 and the EU rules apply
in a given jurisdiction is set out in mba/mba-stakeholder-esg-card and finance/issb-sustainability-disclosure. This
section lists dated facts only; it is not reporting or legal advice. Check the current official text and a qualified
professional before you rely on it.

## Assumptions and limits

<!-- Guidance: State these on the cover of any MACC you show. Most disputes about a MACC are about an unstated convention, not an arithmetic error. -->

- **Level annual costs and abatement.** The card uses a constant annual saving and constant abatement over the life
  of each measure, so the cost per tonne equals the break-even carbon price. With rising energy prices or a
  decarbonising grid, compute the NPV year by year and divide by discounted tonnes instead.
- **Fixed implementation sequence.** Abatement is computed in the order the company would implement the measures:
  demand reduction and electrification first, the renewable electricity contract last, covering all remaining
  residual-mix load. The sorting by cost is for display only. Another sequence gives other bar widths (Step 4).
- **Market-based scope 2.** Electricity abatement is measured with the residual-mix factor of the stakeholder and ESG
  card (0.450 kgCO2e per kWh). Under the location-based method (0.380), the renewable contract abates nothing and the
  efficiency measures abate less. Show both when you present the plan.
- **Scope 3 abatement needs better data.** Northfield's purchased goods are estimated with a spend-based factor. A
  supplier programme that cuts a supplier's emissions does not change a spend-based estimate at all; only supplier-
  specific or hybrid data will show it. Measures M7 to M9 assume that data exists.
- **No financing, tax or subsidy effects.** Grants, tax credits, accelerated depreciation and green financing lower
  the cost of many measures; add them as separate lines with their source and date.
- **Single discount rate.** All measures use 8%. A riskier measure (an unproven technology, a supplier programme with
  uncertain uptake) deserves a higher rate or a scenario range.
- **No offsets or removals.** Carbon credits and removals are outside the MACC of the company's own emissions; report
  them separately and do not net them against the baseline.

## How companies use the MACC and an internal carbon price

<!-- Guidance: Know which reader asks which question, and which output answers it. -->

| Reader | Question | Output they look at |
|---|---|---|
| Board and sustainability committee | Can we meet the target, at what cost, and what is left over? | Cumulative abatement against the target, total annual cost, residual emissions |
| Chief financial officer | Which projects clear the hurdle, and how does a carbon price change the list? | NPV at zero and at the internal price, break-even carbon prices |
| Operations and procurement | What do we do first, and what do we need from suppliers? | Measure list in implementation order, supplier data requirements |
| Investors and lenders | Is the transition plan credible and funded? | Share of abatement from own measures against contractual instruments, capital plan |
| Auditors and assurance providers | Is the baseline right and is the abatement measurable? | Inventory method, factors, data quality per measure |

Companies use internal carbon prices in three main forms. A **shadow price** is added to the cash flows of a project
appraisal only; no money changes hands, but projects that emit more look worse. An **internal fee** charges business
units for their emissions and funds a pool for low-carbon projects; it changes behaviour because it hits budgets. An
**implicit price** is the cost per tonne of what the company actually did, computed after the fact; it tests whether
stated prices are applied. A shadow price is easy to set high and ignore; a fee is harder to set but harder to ignore.
IFRS S2 asks whether and how an entity applies a carbon price in decisions, so an unused shadow price becomes visible.

## The build step by step

<!-- Guidance: Build in this order. Steps 3 and 4 are where most MACCs go wrong. -->

```mermaid
flowchart TD
    A["Baseline: scope 1, scope 2 location and market, scope 3 by category"] --> B["Long list of measures with owners"]
    B --> C["Inputs per measure: capital, life, operating change, activity change, factors"]
    C --> D["Fix the implementation sequence and compute abatement in that order"]
    D --> E["Cost per tonne: equivalent annual cost plus operating change, divided by abatement"]
    E --> F["Sort by cost per tonne and draw the curve"]
    F --> G["NPV at zero and at the internal carbon price"]
    G --> H["Compare cumulative abatement with the target"]
    H --> I{"Target met at acceptable cost?"}
    I -->|"No"| J["Add measures, change sequence or revisit the target"]
    J --> D
    I -->|"Yes"| K["Plan: capital budget, owners, data needs, residual emissions"]
```

1. **Baseline.** Take the inventory with both scope 2 methods and scope 3 by category. Record factors and their dates.
2. **Long list.** Collect measures from operations, facilities, logistics, procurement and product teams; give each an
   owner and an ID.
3. **Inputs.** For each measure, record incremental capital, life, annual operating change and the activity change
   (kWh, litres, tonne-km, spend) with the factors before and after.
4. **Sequence.** Decide the order in which measures would be implemented, compute each abatement against the emissions
   left after the earlier ones, and check that the total equals baseline minus the planned end state.
5. **Cost per tonne.** Annualise capital with the capital recovery factor, add the operating change, divide by tonnes.
6. **Curve.** Sort and draw, with bar width equal to abatement.
7. **Carbon price.** Compute NPV at zero and at the internal price; list the break-even price of each measure.
8. **Target check.** Compare cumulative abatement with the target; the remainder is residual emissions to explain.

## Worked example A (fully solved): Northfield Outdoor Co.

<!-- Guidance: Rebuild the measure table from the inputs before reading the solution. Every number below can be checked with the Excel formulas given. -->

*Example* situation: Northfield Outdoor Co., the fictional outdoor-gear retailer of mba/mba-stakeholder-esg-card, has
a market-based baseline of 99,494.4 tCO2e: scope 1 926.4 (natural gas 338.6, fleet diesel 562.8, refrigerant 25.1),
scope 2 market-based 1,728.0 (location-based 2,432.0) and scope 3 96,840.0 in three categories (purchased goods
88,200.0, upstream transport 5,280.0, commuting 3,360.0). The board asks for a list of measures, their cost per tonne
and the effect of an internal carbon price of USD 100 per tonne. The discount rate is 8%.

### Step 1: measure inputs (*Example*)

Prices: electricity USD 0.12 per kWh, diesel USD 1.40 per litre, natural gas USD 0.05 per kWh. Factors as in the
stakeholder and ESG card: residual-mix electricity 0.450, diesel 2.68 per litre, natural gas 0.183 per kWh,
refrigerant blend 2,088 per kg (all kgCO2e).

| ID | Measure (*Example*) | Scope | Activity change | Abatement (tCO2e a year) |
|---|---|---|---|---|
| M1 | LED lighting and controls, stores and DC | 2 | Electricity -1,200,000 kWh | 540.00 |
| M2 | Route optimisation, long-haul trucks | 1 | Diesel -14,400 litres (12% of 120,000) | 38.59 |
| M3 | Electric vans for urban deliveries | 1 and 2 | Diesel -90,000 litres, electricity +260,000 kWh | 124.20 |
| M4 | Low-GWP refrigerant retrofit | 1 | 12 kg leak at factor 150 instead of 2,088 | 23.26 |
| M5 | Heat pumps replacing gas heating in the DC | 1 and 2 | Gas -1,000,000 kWh, electricity +333,333 kWh | 33.00 |
| M6 | Renewable electricity contract for the remaining residual-mix load | 2 | 3,233,333 kWh moved from residual mix to zero | 1,455.00 |
| M7 | Modal shift, upstream transport road to rail and sea | 3, cat 4 | 25% of category 4 | 1,320.00 |
| M8 | Supplier energy-efficiency programme, top suppliers | 3, cat 1 | 4% of category 1 | 3,528.00 |
| M9 | Recycled and lower-impact fabric for core lines | 3, cat 1 | USD 40 m of fabric spend with a 30% lower factor | 5,040.00 |

Abatement formulas: M1 `=1200000*0.45/1000`; M2 `=14400*2.68/1000`; M3 `=(90000*2.68-260000*0.45)/1000`; M4
`=12*(2088-150)/1000`; M5 `=(1000000*0.183-333333*0.45)/1000` (the heat pump delivers three units of heat per unit of
electricity); M6 `=(3840000-1200000+260000+333333)*0.45/1000`; M7 `=5280*25%`; M8 `=88200*4%`; M9
`=40000000*0.42*30%/1000`.

### Step 2: cost per tonne and NPV (USD thousand unless stated)

| ID | Capital | Life (years) | Annual operating change | EAC | Annual net cost | Cost per tonne (USD) | NPV at USD 0 | NPV at USD 100 |
|---|---|---|---|---|---|---|---|---|
| M1 | 900 | 10 | -144.00 | 134.13 | -9.87 | -18.28 | 66.25 | 428.60 |
| M2 | 60 | 5 | -8.16 | 15.03 | 6.87 | 177.95 | -27.42 | -12.01 |
| M3 | 1,300 | 8 | -109.80 | 226.22 | 116.42 | 937.35 | -669.02 | -597.65 |
| M4 | 120 | 10 | 0.00 | 17.88 | 17.88 | 768.99 | -120.00 | -104.40 |
| M5 | 650 | 15 | -10.00 | 75.94 | 65.94 | 1,998.16 | -564.41 | -536.16 |
| M6 | 0 | 10 | 38.80 | 0.00 | 38.80 | 26.67 | -260.35 | 715.97 |
| M7 | 0 | 10 | -60.00 | 0.00 | -60.00 | -45.45 | 402.60 | 1,288.34 |
| M8 | 0 | 10 | 400.00 | 0.00 | 400.00 | 113.38 | -2,684.03 | -316.72 |
| M9 | 0 | 10 | 1,200.00 | 0.00 | 1,200.00 | 238.10 | -8,052.10 | -4,670.22 |

Operating changes: M1 saves `=1200000*0.12/1000` = 144.00; M2 saves 20.16 of diesel and pays a 12.00 software fee;
M3 saves 126.00 of diesel and 15.00 of maintenance and buys 31.20 of electricity; M5 saves 50.00 of gas and buys 40.00
of electricity; M6 pays a premium of USD 0.012 per kWh, `=3233333*0.012/1000` = 38.80; M7 saves 150.00 of freight and
adds 90.00 of inventory carrying cost; M8 is a co-funded programme of 400.00 a year; M9 is a 3% premium on 40,000 of
fabric spend.

Check M1 in Excel: EAC `=PMT(8%,10,-900)` = 134.13; cost per tonne `=(134.13-144)*1000/540` = -18.28; NPV at USD 100
`=-900+PV(8%,10,-(144+100*540/1000))` = 428.60.

### Step 3: the curve

Sorted by cost per tonne, with the running total of abatement:

| Rank | ID | Cost per tonne (USD) | Abatement | Cumulative abatement | Clears USD 100? |
|---|---|---|---|---|---|
| 1 | M7 | -45.45 | 1,320.00 | 1,320.00 | Yes |
| 2 | M1 | -18.28 | 540.00 | 1,860.00 | Yes |
| 3 | M6 | 26.67 | 1,455.00 | 3,315.00 | Yes |
| 4 | M8 | 113.38 | 3,528.00 | 6,843.00 | No |
| 5 | M2 | 177.95 | 38.59 | 6,881.59 | No |
| 6 | M9 | 238.10 | 5,040.00 | 11,921.59 | No |
| 7 | M4 | 768.99 | 23.26 | 11,944.85 | No |
| 8 | M3 | 937.35 | 124.20 | 12,069.05 | No |
| 9 | M5 | 1,998.16 | 33.00 | 12,102.05 | No |

```vega-lite
{
  "$schema": "https://vega.github.io/schema/vega-lite/v5.json",
  "description": "Northfield Outdoor Co. marginal abatement cost curve, Example values computed in Python",
  "width": 460,
  "height": 260,
  "data": {
    "values": [
      {"id": "M7", "x0": 0.0, "x1": 1320.0, "mac": -45.45},
      {"id": "M1", "x0": 1320.0, "x1": 1860.0, "mac": -18.28},
      {"id": "M6", "x0": 1860.0, "x1": 3315.0, "mac": 26.67},
      {"id": "M8", "x0": 3315.0, "x1": 6843.0, "mac": 113.38},
      {"id": "M2", "x0": 6843.0, "x1": 6881.59, "mac": 177.95},
      {"id": "M9", "x0": 6881.59, "x1": 11921.59, "mac": 238.1},
      {"id": "M4", "x0": 11921.59, "x1": 11944.85, "mac": 768.99},
      {"id": "M3", "x0": 11944.85, "x1": 12069.05, "mac": 937.35},
      {"id": "M5", "x0": 12069.05, "x1": 12102.05, "mac": 1998.16}
    ]
  },
  "mark": {"type": "rect", "stroke": "white"},
  "encoding": {
    "x": {"field": "x0", "type": "quantitative", "title": "Cumulative abatement (tCO2e a year)"},
    "x2": {"field": "x1"},
    "y": {"field": "mac", "type": "quantitative", "title": "Cost per tonne (USD per tCO2e)"},
    "y2": {"datum": 0},
    "color": {"field": "id", "type": "nominal", "title": "Measure"},
    "tooltip": [{"field": "id", "type": "nominal"}, {"field": "mac", "type": "quantitative", "format": ",.2f"}]
  }
}
```

Reading: two measures (M7 and M1) pay for themselves and abate 1,860.00 tonnes; at USD 100 a third (M6) joins, for
3,315.00 tonnes. Everything the company can do on this list abates 12,102.05 tonnes, 12.2% of the market-based baseline
(`=12102.05/99494.4`), for an annual net cost of 1,776.04 thousand. Scopes 1 and 2 fall by 2,214.05 tonnes, 83.4% of
their baseline of 2,654.40, leaving 440.35 tonnes of residual emissions: gas heating in the stores (155.55), the
long-haul diesel still burned after route optimisation (283.01) and refrigerant leakage at the new factor (1.80), with
0.01 of rounding carried from the inventory. The
large scope 3 tonnes sit in M8 and M9, which cost more than the internal price; the decision is whether to raise the
price for supplier measures, to fund them as strategy (brand, regulation, customer demand) or to accept a slower path.

### Step 4: sequence and interactions

The curve looks as if heat pumps (M5) and electric vans (M3) are the worst measures. That is partly a sequence
artefact. Both were computed before the renewable contract, so the electricity they add is counted at the residual-mix
factor. If the renewable contract were signed first, the electricity they use would be zero-emission under the
market-based method:

| Measure | Abatement before M6 | Cost per tonne before M6 | Abatement if charged on renewable electricity | Cost per tonne |
|---|---|---|---|---|
| M3 electric vans | 124.20 | 937.35 | 241.20 | 482.67 |
| M5 heat pumps | 33.00 | 1,998.16 | 183.00 | 360.32 |

The total does not change: the tonnes move from M6 to M3 and M5. That is the rule to remember. Bars in a MACC can be
added only if every abatement is computed against what is left after the measures before it. A MACC built from
stand-alone estimates double-counts (here, the electricity of M3 and M5 would be both added by them and removed by M6),
and its total can exceed the baseline. Under the location-based method the picture changes again: M6 abates nothing,
M1 abates 456.00 (`=1200000*0.38/1000`), and electrification is judged on the grid average.

### Step 5: an internal fee on top of the shadow price

The board also considers an internal fee of USD 25 per tonne on scopes 1 and 2 (market-based), charged to business
units and paid into a low-carbon fund. On the baseline of 2,654.40 tonnes the fund collects 66.36 thousand a year
(`=25*2654.4/1000`). At USD 25 the renewable contract still has a negative NPV (-16.27), but at the shadow price of USD
100 used for appraisal it is clearly positive. The fee and the shadow price do different jobs: the fee changes budgets
and funds projects, the shadow price ranks them.

## Worked example B (half solved): Tallow Creek Medical Center

<!-- Guidance: Fill each [ ] using the formulas of Worked example A. Use 8% and the lives given. -->

*Example* situation: Tallow Creek Medical Center, the fictional 380-bed not-for-profit regional hospital of the MBA
library, considers three measures. Electricity costs USD 0.13 per kWh and the market-based factor is 0.40 kgCO2e per kWh.

| ID | Measure (*Example*) | Capital (USD k) | Life | Annual operating change (USD k) | Abatement (tCO2e) | EAC | Cost per tonne (USD) |
|---|---|---|---|---|---|---|---|
| B1 | Anaesthetic gas switch and low-flow technique | 40 | 5 | -12.00 | 310.00 | 10.02 | [ ] |
| B2 | LED lighting, wards and car park | 500 | 10 | [ ] | `=700000*0.4/1000` = [ ] | 74.51 | -58.88 |
| B3 | Solar PV on car-park canopies | 2,400 | 25 | `=-1500000*0.13/1000+20` = [ ] | 600.00 | [ ] | 83.05 |

Questions to answer:

1. Rank the three measures. Which pay for themselves without a carbon price? [ ]
2. Compute the NPV of B3 at a carbon price of USD 50. Hint: `=-2400+PV(8%,25,-(175+50*600/1000))`. [ ]
3. B1 is small in capital but large in tonnes. Why do anaesthetic gases matter so much in a hospital inventory, and
   what non-financial barrier could slow the measure? [ ]

## Exercise C (unsolved): a least-cost target and break-even prices

<!-- Guidance: Use the measure table of Worked example A. For C2, recompute M6 for the smaller residual load. -->

C1. What internal carbon price makes the heat pumps (M5) break even under the sequence of Worked example A, and what
price if they run on renewable electricity? What does the gap tell the board about the order of the plan?

C2. The board sets an *Example* target of a 50% cut in scopes 1 and 2 (market-based) against the baseline of 2,654.40
tonnes, at the lowest annual cost, without M3 and M5. Which measures do you choose, what is the abatement and what is
the annual net cost? Remember that M6 must be recomputed: without M3 and M5, the residual-mix load is 2,640,000 kWh.

C3. In one paragraph, explain why a plan whose cuts in scopes 1 and 2 come mainly from a renewable electricity contract
can be both correct under the GHG Protocol and weak as a transition story, and what you would show next to it.

## Connections to other cards

<!-- Guidance: The MACC sits between the inventory, the finance cards and the strategy guide. Use these links to go deeper. -->

| Card or template | Connection |
|---|---|
| mba/mba-stakeholder-esg-card | Builds the baseline inventory this card starts from; scope definitions and both scope 2 methods |
| mba/mba-sustainability-strategy-guide | The elective guide: targets, transition plans and climate strategy |
| mba/mba-npv-irr-card, mba/mba-capm-wacc-card | NPV, annuities and the discount rate used for each measure |
| mba/mba-options-real-options-card, mba/mba-decision-trees-card | Waiting, learning and staging for large or uncertain measures |
| mba/mba-sourcing-procurement-card, mba/mba-supply-chain-resilience-card | Supplier programmes and material changes behind scope 3 measures |
| mba/mba-corporate-governance-card | Board oversight of targets and incentive links |
| finance/issb-sustainability-disclosure, finance/climate-transition-plan | Where the plan and the carbon price are disclosed |
| finance/investment-appraisal, finance/green-bond-framework | Capital approval and financing of the measures |

## Common mistakes and misconceptions

<!-- Guidance: Audit your own curve against this list before anyone else sees it. -->

1. **Adding stand-alone abatement estimates.** Interacting measures counted separately double-count; the total can
   exceed the baseline. Fix the sequence first.
2. **Using total instead of incremental capital.** An electric van replacing a van that would be bought anyway costs
   only the premium over the diesel van.
3. **Forgetting the added electricity of electrification.** Heat pumps and electric vehicles move emissions from scope 1
   to scope 2; abatement is the difference.
4. **Reporting only the market-based scope 2.** The GHG Protocol requires both methods; a plan that only works on the
   market-based method should say so.
5. **Expecting a supplier programme to move a spend-based inventory.** Spend factors do not respond to supplier
   improvements; plan the data change with the measure.
6. **Treating a negative cost per tonne as free money.** Barriers (split incentives between landlord and tenant,
   management attention, disruption, hidden costs) explain why such measures are not already done.
7. **Mixing annual and lifetime figures.** Cost per tonne is annual cost over annual tonnes, or lifetime cost over
   lifetime tonnes, never one over the other.
8. **Ignoring the sign convention.** A saving is a negative operating change; a sign error turns the best measure into
   the worst.
9. **Setting an internal carbon price nobody uses.** A shadow price that no decision applies is a disclosure risk, not
   a tool.
10. **Netting offsets against the baseline.** Credits and removals are reported separately from the company's own
    abatement.
11. **Reading a static MACC as permanent.** Costs fall with scale and learning; refresh the curve each year.

## Self-test questions

<!-- Guidance: Answer from memory, then check the answer key. Repeat after two days. -->

1. Define scopes 1, 2 and 3 in one sentence each.
2. What does the width of a MACC bar show, and what does its area show?
3. Show that the break-even carbon price of a measure with level costs equals its cost per tonne.
4. Why does M1 have a negative cost per tonne, and what is its NPV at zero carbon price?
5. Which three measures clear an internal carbon price of USD 100 in Worked example A, and how many tonnes do they abate?
6. Why does the heat pump's cost per tonne fall from 1,998.16 to 360.32 when it runs on renewable electricity?
7. What happens to M6's abatement under the location-based method, and why?
8. Name two differences between a shadow price and an internal fee.
9. Why might a supplier energy programme not appear in Northfield's reported scope 3, even if it works?
10. What did Weitzman (1974) show about prices against quantities, in one sentence?
11. Name two limits of MACCs from Kesicki and Ekins (2012).
12. What is the capital recovery factor at 8% over 10 years, and what is the EAC of 900?

## My notes and next steps

<!-- Guidance: Log each build with the time and the errors you found. Re-check the dated facts each time you reuse the card. -->

| Date | Model or exercise | Time (minutes) | Errors found | Next step |
|---|---|---|---|---|
| *Example:* YYYY-MM-DD | Worked example A from blank sheet | 60 | Added M3 at its stand-alone abatement | Rebuild Step 4 with a fixed sequence |
| [YYYY-MM-DD] | [ ] | [ ] | [ ] | [ ] |

## Sources and further reading

<!-- Guidance: Primary works first, then official pages for dated facts, then textbooks by name only. -->

Primary works:

- Weitzman, M. L. (1974). Prices vs. quantities. *The Review of Economic Studies*, 41(4), 477-491.
  https://doi.org/10.2307/2296698
- Kesicki, F. and Ekins, P. (2012). Marginal abatement cost curves: a call for caution. *Climate Policy*, 12(2),
  219-236. https://doi.org/10.1080/14693062.2011.582347
- Gillingham, K. and Stock, J. H. (2018). The cost of reducing greenhouse gas emissions. *Journal of Economic
  Perspectives*, 32(4), 53-72. https://doi.org/10.1257/jep.32.4.53

Official pages for dated facts (checked 2026-10-30):

- GHG Protocol, Corporate Accounting and Reporting Standard (revised edition), https://ghgprotocol.org/corporate-standard
- GHG Protocol, Corporate Value Chain (Scope 3) Standard (2011),
  https://ghgprotocol.org/corporate-value-chain-scope-3-standard
- IFRS Foundation, IFRS S2 Climate-related Disclosures (June 2023),
  https://www.ifrs.org/issued-standards/ifrs-sustainability-standards-navigator/ifrs-s2-climate-related-disclosures/
- IFRS Foundation, Amendments to Greenhouse Gas Emissions Disclosures (Amendments to IFRS S2), December 2025,
  https://www.ifrs.org/projects/completed-projects/2025/amendments-to-disclosure-of-greenhouse-gas-emissions-s2/

Further reading (by name only): the global greenhouse gas abatement cost curve published by McKinsey & Company
(*Pathways to a Low-Carbon Economy*, 2009), which made the MACC format widely known; Berk and DeMarzo, *Corporate
Finance*, for annuities and NPV.

## Answer key

<!-- Guidance: Every number below comes from the calculation script. Check your workbook against these to two decimals. -->

Worked example B: B1 annual net cost `=10.02-12` = -1.98, cost per tonne -6.39; B2 operating change
`=-700000*0.13/1000` = -91.00, abatement 280.00, annual net cost -16.49; B3 operating change -175.00, EAC
`=PMT(8%,25,-2400)` = 224.83, annual net cost 49.83. Ranking: B2 (-58.88), B1 (-6.39), B3 (83.05); B1 and B2 pay for
themselves. NPV of B3 at USD 50: -211.67 (at zero, -531.91), so B3 needs a carbon price above 83.05 or a subsidy.
Anaesthetic gases are potent greenhouse gases released directly to air, so a small volume carries many tonnes; the
barriers are clinical habit, training, the supply of equipment and the need for clinical leadership to own the change.

Exercise C:

- C1: the break-even price equals the cost per tonne: USD 1,998.16 under the sequence of Worked example A, USD 360.32
  on renewable electricity. The gap says to contract renewable electricity before or with electrification, and to
  judge electrification on the electricity it will actually use.
- C2: the target needs 1,327.20 tonnes (`=50%*2654.4`). M1 (540.00, cost per tonne -18.28) plus M6 recomputed for
  2,640,000 kWh (abatement 1,188.00, annual premium 31.68, cost per tonne 26.67) give 1,728.00 tonnes, a 65.1% cut,
  for an annual net cost of 21.81 thousand (`=-9.87+31.68`). M2 and M4 are not needed.
- C3: under the market-based method, contractual instruments that meet the Scope 2 quality criteria legitimately cut
  scope 2. But the location-based figure, the physical grid and scope 1 do not change, and investors increasingly ask
  how much of a plan is own operational change. Show both scope 2 methods, the share of abatement from contracts and
  the measures that cut scope 1 and scope 3.

Self-test:

1. Scope 1: direct emissions from owned or controlled sources. Scope 2: emissions from purchased electricity, heat,
   steam and cooling. Scope 3: all other indirect emissions in the value chain, in 15 categories.
2. Width: annual abatement in tonnes. Area: annual net cost (cost per tonne times tonnes).
3. Set $NPV = -K + (-\Delta O + P \cdot A) \cdot AF = 0$, divide by $AF$ and use $1/AF = CRF$: $P = (K \cdot CRF + \Delta O)/A$.
4. The electricity saving (144.00 a year) exceeds the equivalent annual cost of the capital (134.13); NPV 66.25.
5. M7, M1 and M6, for 3,315.00 tonnes.
6. The electricity it uses no longer carries the residual-mix factor, so abatement rises from 33.00 to 183.00 tonnes
   while the cost stays the same.
7. It falls to zero: the location-based method uses the grid average regardless of contracts.
8. A shadow price changes appraisals only and moves no money; a fee charges business units and funds projects, and so
   affects budgets.
9. A spend-based factor multiplies spend by an industry average, so a cleaner supplier with the same prices shows no
   change; supplier-specific data is needed.
10. When costs are uncertain, a price and a quantity instrument lead to different outcomes, and which is better depends
    on the relative slopes of marginal costs and marginal benefits.
11. Any two of: interactions ignored, uncertainty hidden, non-financial barriers left out, static view of costs,
    inconsistent baselines.
12. `=8%/(1-1.08^-10)` = 0.1490; EAC `=PMT(8%,10,-900)` = 134.13.

## Revision history

<!-- Guidance: Add a row each time you change the baseline, the factors or a convention. -->

| Version | Date | Author | Change summary |
|---|---|---|---|
| 0.1 | YYYY-MM-DD | [Your name] | First build of Worked example A from the inputs |
| 0.2 | YYYY-MM-DD | [Your name] | *Example:* Added location-based view and fee scenario |

## Standard and licence note

Based on the GHG Protocol Corporate Accounting and Reporting Standard (revised edition, with the 2015 Scope 2
Guidance), the GHG Protocol Corporate Value Chain (Scope 3) Standard (2011), IFRS S2 Climate-related Disclosures (June
2023) and its December 2025 Amendments to Greenhouse Gas Emissions Disclosures, and the primary works listed above, with
dated facts checked on 2026-10-30 on the official pages named in the sources. The text, the model, the numbers and the
exercises are original; no standard text, consultancy material or published case is copied. Northfield Outdoor Co.,
Tallow Creek Medical Center and every price, factor and measure in this card are fictional or illustrative. The
template is independent and not affiliated with or endorsed by the GHG Protocol, the IFRS Foundation or any company.
Check the current official text of each standard and a qualified professional before you rely on it.
Template licence: MIT.