TOGAF Architecture Contract Template

Parties, scope, frozen baseline, contracted requirements, deliverables, acceptance criteria, checkpoints, dispensations, metrics, variations, RACI, signatures

АрхітектураПовнийTOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1): Phase G, Architecture Contractcontract

Як використовувати: Use it when a work package or supplier starts delivery and must commit to the approved architecture. Fill the parties, scope and frozen baseline first, then the contracted requirements and the checkpoints. The main pitfall is a contract that refers to current standards instead of fixed versions, so the baseline changes under the delivery party.

Перегляд

Architecture Contract: [Work package or project name]

Architecture Contract between the architecture function and one delivery party (an internal team or a supplier) for one work package or project, issued at the start of Phase G (Implementation Governance) of the Architecture Development Method in The TOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1). It names the parties, the scope and the approved architecture the delivery must follow, the requirements and standards that apply, the deliverables and evidence the party provides, the conformance and acceptance criteria, the checkpoints, what may be dispensed with and how, the metrics, change and escalation, duration and signatures. Replace every [bracketed] value and every row marked Example. This is a documentation format, not legal advice.

Document control

FieldValue
Document ID (contract ID)[AC-nn]
Work package or project[WP-nn, name]
Roadmap reference[Architecture Roadmap version, Transition Architecture name]
Delivery party[Team or supplier name]
Related statement of work[SOW-ID, if a supplier is involved]
Version[0.1]
Status[Draft / In review / Signed / Active / Varied / Closed / Terminated]
Owner (contract architect)[@contract-architect]
Approvers / reviewers[Architecture Board chair, delivery lead, business owner, procurement or legal for suppliers]
Effective dateYYYY-MM-DD
Planned endYYYY-MM-DD
Classification[Internal / Confidential / Commercial in confidence]
Last updatedYYYY-MM-DD

Approvals

RoleNameDecisionConditionsDate
Architecture Board chair[@chair][Approved / Approved with conditions / Rejected][Conditions]YYYY-MM-DD
Delivery lead (delivery party)[@delivery-lead][Accepted / Accepted with comments][Comments]YYYY-MM-DD
Business owner[@business-owner][Approved][Conditions]YYYY-MM-DD
Security architect[@security][Reviewed][Conditions]YYYY-MM-DD
Procurement or legal (supplier contracts)[@legal][Reviewed][Conditions]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]First draft from the approved roadmap and requirements specification
1.0YYYY-MM-DD[@name]Example: Signed by all parties; status Active
1.1YYYY-MM-DD[@name]Example: Variation VAR-01: interim CRM batch export allowed under DSP-2027-02 (outcome record ARB-2027-007)
1.2YYYY-MM-DD[@name]Example: Variation VAR-02 under change request ACR-2027-03 (ARB-2027-011): ARS-INT-04 added, baseline moved to Architecture Requirements Specification 1.1, change request conditions C2, C3 and C6 added as checkpoint evidence

Contents

1. Contract summary

ItemSummary
PurposeExample: Bind the delivery of WP-02 Customer data hub to the approved target data and application architecture
PartiesExample: Architecture Board (represented by the chair) and the WP-02 delivery party (vendor [Supplier name] with the internal data team)
BaselineExample: Architecture Definition Document 1.0, Architecture Requirements Specification 1.0 at signature (1.1 after VAR-02), principles catalogue 2.3
Key commitmentsExample: 10 contracted architecture requirements at signature (11 after VAR-02), 2 mandatory standards and 3 mandatory building blocks
CheckpointsExample: 4 (concept, design, pre-production, post-implementation)
Pre-agreed deviationsExample: None at signature; one dispensation added at the design review by variation VAR-01
TermExample: Signature to closure at the post-implementation review, planned YYYY-MM-DD

2. Parties and representatives

PartyOrganisationRepresentativeAuthorityContact
Architecture functionExample: Group Architecture Board[@chair]; day-to-day: [@contract-architect]Approves conformance, grants dispensations within the charter[e-mail]
Delivery partyExample: [Supplier name] and internal data team[@delivery-lead]Commits design and build of the work package[e-mail]
Business ownerExample: Head of Customer Operations[@business-owner]Owns the outcome and accepts residual risk[e-mail]
Sponsor (informed)Example: Chief Operating Officer[@sponsor]Resolves escalations at level 3[e-mail]
[Party][Organisation][@name][Authority][Contact]

If the delivery party is a consortium or uses subcontractors, name the party that is accountable for architecture conformance of all of them.

3. Scope of the contract

3.1 In scope

Scope itemDescriptionRoadmap link
SC-01 (Example)Customer data hub: golden record store and stewardship user interfaceWP-02, Transition Architecture 1
SC-02 (Example)Matching and survivorship service for three policy systemsWP-02
SC-03 (Example)Customer API on the enterprise API gatewayWP-02
SC-04 (Example)Customer-changed events on the enterprise event platformWP-02
SC-05 (Example)Initial load and reconciliation of customer data from policy systems A, B and CWP-02
[SC-nn][Item][WP, Transition Architecture]

3.2 Out of scope

Example: changes to the policy systems beyond their export interfaces; the handler workspace (WP-04); retirement of the legacy CRM, which is a separate work package with its own contract; reporting and analytics on customer data.

3.3 Interfaces with other contracts

Other contractShared elementRule
AC-01 (Example) Cloud and integration foundationAPI gateway and event platformAC-01 provides the platform; AC-02 must use it as delivered and may not deploy its own
AC-04 (Example) Handler workspaceCustomer APIAC-02 owns the API contract; changes need AC-04 consumer sign-off
[AC-nn][Element][Rule]

4. Architecture baseline referenced

RefDocumentVersion / dateLocationPrecedence
BL-01 (Example)This Architecture ContractCurrent version[Repository path]1
BL-02 (Example)Architecture Requirements Specification1.0 (baseline B1) at signature; 1.1 from VAR-02architecture/architecture-requirements-specification2
BL-03 (Example)Architecture Definition Document, data and application parts1.0architecture/architecture-definition-document3
BL-04 (Example)Architecture Principles Catalogue2.3architecture/architecture-principles4
BL-05 (Example)Technology standards list (radar snapshot)YYYY-MM-DDarchitecture/tech-radar4
BL-06 (Example)Security architecture2.0security/security-architecture4
BL-07 (Example)Integration reference architecture1.4architecture/reference-architecture5
[BL-nn][Document][Version][Location][Rank]

The delivery party confirms it has received and read every baseline document. Where a baseline item is ambiguous, the party raises a clarification (section 11.1) before acting on its own interpretation.

5. Architecture requirements and standards

5.1 Contracted architecture requirements

Requirement IDRequirement (short)Scope itemCriticalVerification method
ARS-DAT-03 (Example)Matching reaches at least 95% precision on a reviewed sample before a source is mastered by the hubSC-02YTest on full volume, signed by the data owner
ARS-DAT-01 (Example)One golden customer identifier used by all target applications; no local copies writable outside the hubSC-01YData model and access configuration review
ARS-DAT-04 (Example)Consent and its history recorded for each customer and purposeSC-01, SC-05YTest of consent changes, including migrated records
ARS-DAT-05 (Example)Every data entity has a named owner and a retention period, with deletion rules for personal dataSC-01YCatalogue report, configuration export and deletion test
ARS-APP-01 (Example)Functions exposed only through published APIs on the enterprise API gateway, with specifications in the registrySC-03YGateway configuration and specification registry
ARS-INT-01 (Example)Customer-changed events on the enterprise event platform carry the golden customer ID and a schema version, in the agreed envelopeSC-04NEvent catalogue, contract tests and sample messages
ARS-DAT-02 (Example)Customer data stored and processed only in EU regions of the approved landing zoneSC-01 to SC-05YInfrastructure as code and deployment records
ARS-SEC-01 (Example)Staff and service identities authenticate through the enterprise identity provider, with multi-factor authentication for usersSC-01, SC-03YIdentity configuration review
ARS-SEC-03 (Example)Hub service has a documented exit plan and a recovery tested against its tier 2 targetsSC-01 to SC-03YExit plan and recovery test report
ARS-TEC-03 (Example)Logs, metrics and traces sent to central observability, sufficient to measure the agreed service level objectivesSC-01 to SC-03NObservability catalogue, dashboard and SLO document
ARS-INT-04 (Example, added by VAR-02)During the interim period, changes captured from policy system A are published as the same customer events as the target API would produceSC-04, SC-05YContract tests passed against both sources (ACR-2027-03 condition C2)
[ARS-xxx-nn][Requirement][SC-nn][Y / N][Method]

5.2 Principles that apply

Principle IDNameHow it applies here
DP-01 (Example)Data has one accountable owner and one master sourceThe hub is the only master for customer data
AP-01 (Example)Integrate through published interfacesNo new file transfers or direct database links
TP-01 (Example)Prefer managed services on approved platformsUse platform-managed database and messaging
SP-01 (Example)Secure by default, least privilege alwaysRole-based access to stewardship functions
[ID][Name][Application]

5.3 Mandatory standards and building blocks

ItemTypeVersion or ringNote
Example: API specification formatStandardOpenAPI [version] as listed in BL-05Specifications published to the registry
Example: Event envelopeStandardCloudEvents [version] as listed in BL-05Agreed attributes per the integration reference
Example: Group identity serviceBuilding blockProductionNo local user stores
Example: Enterprise event platformBuilding blockProduction, from AC-01No project-owned broker
Example: Central log and security monitoringBuilding blockProductionAll logs forwarded
[Item][Standard / Building block][Version][Note]

5.4 Areas left to the delivery party

State what the party may decide alone, so governance does not creep into design choices the architecture deliberately leaves open. Example: internal module structure, programming language within the adopt ring, test framework, user interface layout within the design system, and the choice of matching algorithm, provided ARS-DAT-03 is met. Record such decisions as decision records (architecture/adr-full) and share them at the next checkpoint.

6. Deliverables and evidence

Deliverable IDDeliverableContent expectedDue at checkpointFormat
DEL-01 (Example)Solution designComponents, interfaces, deployment, NFR allocation, traced to ARS IDsR2 Designarchitecture/high-level-design
DEL-02 (Example)Logical data model and data dictionaryEntities, owners, classification, retentionR2 Designarchitecture/data-dictionary
DEL-03 (Example)Interface specificationsAPI and event specifications in the registryR2 DesignSpecification files
DEL-04 (Example)Threat modelTrust boundaries, threats, controlsR2 Designsecurity/threat-model
DEL-05 (Example)Decision recordsOne per significant design decisionEach checkpointarchitecture/adr-full
DEL-06 (Example)Test evidenceMatching accuracy, performance, recovery, deletion testsR3 Pre-productionTest reports
DEL-07 (Example)Operational readiness packRunbooks, monitoring, support model, SLOsR3 Pre-productiondev/service-readiness
DEL-08 (Example)As-built architectureRealised models published to the repositoryR4 Post-implementationRepository models
[DEL-nn][Deliverable][Content][Rn][Format or template]

The architecture function returns comments on each deliverable within [5] working days of receipt. Silence after that period does not count as acceptance.

7. Conformance and acceptance criteria

7.1 Conformance rule

Conformance is assessed at each checkpoint with the Architecture Compliance Assessment, using its per-check rating scale (conformant, conformant with conditions, partially conformant, non-conformant, not evidenced, not applicable) and its roll-up rules. The board outcome follows the board charter: compliant, compliant with conditions, dispensation or non-compliant.

7.2 Acceptance criteria at closure

IDCriterionEvidence
ACC-01 (Example)Every critical requirement in section 5.1 is rated conformantPre-production and post-implementation assessments
ACC-02 (Example)Every non-critical requirement is conformant or covered by a closed conditionCondition log
ACC-03 (Example)No dispensation is active, or each active one has an owner, expiry and funded exit planDispensation register
ACC-04 (Example)As-built models are in the repository and match productionRepository check against deployment records
ACC-05 (Example)Architecture debt incurred is recorded in the tech debt register with an ownerarchitecture/tech-debt-register
[ACC-nn][Criterion][Evidence]

7.3 Consequences of non-conformance

Example: A non-compliant outcome at R2 stops build of the affected scope items until a reworked design is assessed. A non-compliant outcome at R3 prevents go-live. For a supplier, the consequences in the statement of work apply (section 14). Neither party may treat a missed checkpoint as an implied pass.

8. Checkpoints and review schedule

CheckpointWhenEvidence dueAssessed byTier
R1 Concept (Example)Before funding of detailed design (completed, ARB-2027-004)Options and fit with roadmapDelegated architect2
R2 Design (Example)End of design, before build (2027-04-12; decided under ARB-2027-007)DEL-01 to DEL-05Full board1
R3 Pre-production (Example)Before go-live (2027-07-19)DEL-06, DEL-07, closure of R2 conditionsFull board1
R4 Post-implementation (Example)About 6 months after go-live (2028-01-17)DEL-08, operational dataDelegated architect2
[Rn][When][DEL-nn][Who][Tier]

Ad hoc reviews may be called by either party when a material change (section 11) or a serious incident affects the architecture.

9. Dispensations and permitted deviations

9.1 Pre-agreed deviations

Deviation IDRequirement or principlePermitted deviationLimitExpiry
Example: None at signatureNot applicableNot applicableNot applicableNot applicable
[DEV-nn][ID][Deviation][Limit]YYYY-MM-DD

9.2 Who may grant what

Type of deviationDecided byMaximum term
Non-critical requirement, no security or personal data impactBoard chair alone, on the contract architect's recommendation, reported to the boardUp to [6] months
Critical requirement, any security or personal data impact, or a term over 6 monthsFull Architecture Board; the security member must agree where security risk rises, and the data protection officer is consulted where personal data is affectedUp to [12] months, per the charter
Second renewal of any dispensationExecutive, on the board's recommendationPer the charter
Change to scope, baseline version or checkpoint datesContract variation (section 11.2)Not applicable

9.3 Dispensations granted under this contract

Dispensation IDRequirement or principleReasonGrantedExpiresExit planStatus
DSP-2027-02 (Example)AP-01Interim nightly batch export to the legacy CRM until its retirement; decided by the full board because the term exceeds 6 months and personal data is copied outside the hub; security member agreed, data protection officer consulted2027-04-192028-01-18 (9 months)Delete the job when the CRM retires in WP-07; one renewal expectedActive
[DSP-YYYY-NN][ID][Reason]YYYY-MM-DDYYYY-MM-DD[Plan][Active / Expired / Closed]

10. Quality and fitness metrics

Metric IDMeasureTarget (Example)SourceFrequencyLinked requirement
MET-01 (Example)Share of customer records with one golden IDAt least 98%Hub data quality dashboardWeekly from go-liveARS-DAT-01, ARS-DAT-03
MET-02 (Example)Interfaces not passing through the API gateway0Gateway inventory versus network flow logsEach releaseARS-APP-01
MET-03 (Example)Resources holding customer data deployed outside the approved landing zone or EU regions0Cloud audit logs and policy compliance reportMonthlyARS-DAT-02
MET-04 (Example)Personal data records past retention date0Retention job reportMonthlyARS-DAT-05
MET-05 (Example)Customer API availability against SLOAt least 99.9% per monthMonitoringMonthlyARS-TEC-03
[MET-nn][Measure][Target][Source][Frequency][ARS ID]

Where possible, implement these as automated checks in the delivery pipeline (architecture/fitness-functions) so conformance is visible between checkpoints.

11. Change control and escalation

11.1 Clarifications

Either party may ask for a clarification of a baseline item. The contract architect answers within [3] working days and records the answer in the clarification log; a clarification that changes a requirement is a variation instead.

Clarification IDQuestionAnswerDate
CLR-01 (Example)Does ARS-APP-01 cover internal batch reconciliation jobs?Yes, if they read hub data from outside the hub's own runtimeYYYY-MM-DD
[CLR-nn][Question][Answer]YYYY-MM-DD

11.2 Variations

A variation changes the scope, baseline version, requirements, checkpoints or term. The requesting party raises an architecture change request (architecture/architecture-change-request); the board assesses the impact and either approves a variation to this contract or directs a new architecture cycle when the change is larger than this work package. For a supplier, the commercial change procedure in the statement of work runs in parallel (project/change-control).

Variation IDChangeReasonApproved byDateContract version
VAR-01 (Example)Interim CRM batch export permitted under DSP-2027-02CRM has no API and is retired only in WP-07Architecture Board (ARB-2027-007)2027-04-191.1
VAR-02 (Example)ARS-INT-04 added for the interim policy system A feed; baseline moved to ARS 1.1Change request ACR-2027-03Architecture Board (ARB-2027-011)2027-06-071.2
[VAR-nn][Change][Reason][Approver]YYYY-MM-DD[x.y]

11.3 Escalation

LevelWhoTriggerTime limit
1Contract architect and delivery leadDisagreement on a rating, finding or clarification[5] working days
2Architecture BoardLevel 1 unresolved, or a request to overturn an outcomeNext board meeting
3SponsorBoard cannot decide, or business impact above [threshold][10] working days

Escalation follows the board charter. Work continues during escalation unless the dispute concerns a critical requirement, in which case the affected scope item pauses until level 2 decides.

12. Roles and responsibilities

R = responsible, A = accountable, C = consulted, I = informed.

ActivityContract architectArchitecture BoardDelivery leadBusiness ownerSecurity architect
Draft and maintain the contractRACCC
Provide deliverables and evidenceIIA, RIC
Assess conformance at checkpointsRACIR (security checks)
Recommend and grant dispensations within the charterR (recommends)A (chair or board decides)CC (risk acceptance)C
Approve variationsCACCC
Track metrics and conditionsRIRIC
Accept residual architecture riskCCIAC
Close the contractRACCI

For organisation-wide decision rights, see the RACI template (business/raci).

13. Risks, assumptions and dependencies

IDTypeDescriptionOwnerValidate by or mitigationStatus
RSK-01 (Example)RiskPolicy system C data quality too poor to meet ARS-DAT-03[@data-owner]Profiling before R2; cleansing budget held in reserveOpen
RSK-02 (Example)RiskSupplier product release changes its integration model[@contract-architect]Product roadmap review at each checkpointOpen
ASM-01 (Example)AssumptionAPI gateway and event platform from AC-01 are in production before build starts[@platform-lead]YYYY-MM-DDOpen
DEP-01 (Example)DependencyLegacy CRM retirement date agreed by its owner[@crm-owner]YYYY-MM-DD; needed to set DSP-2027-02 exitOpen
[ID][Risk / Assumption / Dependency][Description][@owner][Date or mitigation][Status]

Carry project-level items into the RAID log (project/raid-log).

14. Supplier provisions

TopicWhat to agreeWhere it lives
IncorporationThe commercial agreement references this contract and its version, or attaches itStatement of work, [clause]
Evidence and audit rightsAccess to designs, configuration, test results and environments for assessment[Clause]
RemediesWhat happens on a non-compliant outcome: rework at whose cost, withheld acceptance, service credits[Clause]
Intellectual propertyOwnership of models, specifications and decision records produced[Clause]
SubcontractorsFlow-down of architecture obligations[Clause]
Security and privacySupplier security assessment and data processing termscompliance/supplier-security-assessment, [DPA reference]
Exit and handoverTransfer of as-built documentation, code and configuration at the end[Clause]

This section is a checklist for the people who draft commercial terms, not a substitute for them. This is a documentation format, not legal advice.

15. Duration, termination and closure

ItemRule
StartExample: On signature by all parties in section 16
Normal endExample: When the board confirms ACC-01 to ACC-05 at checkpoint R4
Early terminationExample: Work package cancelled by the portfolio board; delivery party replaced; the board decides a new architecture cycle supersedes this scope
Obligations that surviveExample: Active dispensations and their exit plans transfer to the service owner; recorded debt remains in the register
Closure recordBoard outcome record ID, date, and links to the final assessment and post-implementation review (project/post-implementation-review)

After closure, the operating service is reviewed through the periodic architecture health check (architecture/architecture-health-check).

16. Signatures

PartyNameRoleVersion signedSignatureDate
Architecture function[@chair]Architecture Board chair[1.0][Signature or approval record]YYYY-MM-DD
Delivery party[@delivery-lead][Delivery lead, supplier representative][1.0][Signature]YYYY-MM-DD
Business owner[@business-owner][Role][1.0][Signature]YYYY-MM-DD
Contract architect (witness)[@contract-architect]Architect[1.0][Signature]YYYY-MM-DD

17. Glossary and references

17.1 Glossary

TermMeaning in this document
Architecture ContractThe agreement between the architecture function and a delivery party on what is built, which architecture applies and how conformance is checked
Architecture functionThe board and architects who govern conformance for the organisation
Delivery partyThe internal team or supplier that designs and builds the work package
Baseline (contract)The approved documents and versions frozen at signature that the delivery must follow
CheckpointA scheduled review at which conformance is assessed
ClarificationAn interpretation of a baseline item that does not change the contract
VariationA formal change to the contract that creates a new version
DispensationA time-limited, risk-accepted permission to depart from a requirement or principle
Fitness functionAn automated measure that shows whether an architecture characteristic still holds
[Term][Meaning]

17.2 References

IDReferenceVersion / date
REF-01The TOGAF Standard, 10th Edition (The Open Group, catalogue C220), incorporating Technical Corrigendum 1 (U254, 15 May 2025)19 May 2025
REF-02Architecture Board Charter (architecture/architecture-governance-charter)[x.y]
REF-03Architecture Compliance Assessment (architecture/architecture-compliance-assessment)[x.y]
REF-04Architecture Requirements Specification (architecture/architecture-requirements-specification)[x.y]
REF-05Architecture Roadmap and Transition Architectures (architecture/architecture-roadmap-transition)[x.y]
REF-06Statement of Architecture Work (architecture/statement-of-architecture-work)[x.y]
REF-07Statement of work with the supplier (business/statement-of-work)[x.y]
REF-08Architecture Change Request (architecture/architecture-change-request)[x.y]

Standard and licence note

Structure aligned with The TOGAF Standard, 10th Edition (2025 release with Technical Corrigendum 1), published by The Open Group: the Architecture Contract issued in Phase G (Implementation Governance) of the Architecture Development Method, with the Architecture Board, compliance review and Phase H (Architecture Change Management). TOGAF and ArchiMate are registered trademarks of The Open Group. This template uses only the names of phases and deliverables; all text is original, including the clauses, rating references, delegation limits, metrics and supplier checklist, and no definitions, tables or other text from the standard are reproduced. This is a documentation format, not legal advice. Check the current edition at opengroup.org and obtain the standard for its full guidance. Template licence: MIT.