TOGAF Architecture Vision Template (Phase A, Statement of Architecture Work)

Request summary, stakeholders and concerns, goals, drivers, scope, principles, baseline and target, KPIs, risks, capability, Statement of Architecture Work

Архітектура та системний дизайнПовнийThe TOGAF Standard, 10th Edition (2025 Update), ADM Phase Atogafvision

Як використовувати: Use it when an architecture engagement starts and the sponsor needs to agree why, what and how before Phases B to D. Fill the Request for Architecture Work summary, stakeholders and measurable goals first, then sign the Statement of Architecture Work once scope is stable. The main pitfall is detailing the target so far that later phases become a rubber stamp.

Перегляд

Architecture Vision: [Architecture engagement name]

Architecture Vision and Statement of Architecture Work for one architecture engagement, the main outputs of Phase A of the Architecture Development Method (ADM) in The TOGAF Standard, 10th Edition (2025 Update). It summarises the Request for Architecture Work, maps stakeholders and their concerns, states goals, drivers, scope and constraints, sketches the baseline and target, sets the value case and KPIs, assesses risk and capability, and closes with the agreed Statement of Architecture Work. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document ID[AV-ENG-001]
Engagement[Architecture engagement name]
ADM phasePhase A: Architecture Vision
Request for Architecture Work[RAW-YYYY-NN]
Architecture level[Strategic / Segment / Capability]
Version[0.1]
Status[Draft / In review / Approved / Superseded]
Owner (lead architect)[@lead-architect]
Sponsor[@sponsor]
Approvers / reviewers[Architecture Board, sponsor, domain architects]
Classification[Internal / Confidential]
Repository location[Architecture Repository path or ID]
Last updatedYYYY-MM-DD

Approvals

RoleNameDecisionConditionsDate
Sponsor[@sponsor][Approved / Approved with conditions / Rejected][Conditions]YYYY-MM-DD
Architecture Board chair[@chair][Decision][Conditions]YYYY-MM-DD
Lead architect[@lead-architect][Decision][Conditions]YYYY-MM-DD
Finance partner[@finance][Decision][Conditions]YYYY-MM-DD
Security architect[@security][Decision][Conditions]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]Request summary, stakeholder map, first draft of goals and scope
0.5YYYY-MM-DD[@name]Example: Value case, risks and capability assessment added; pre-review with sponsor
1.0YYYY-MM-DD[@name]Example: Approved by Architecture Board (outcome record ARB-2026-029) with condition C1

Contents

1. Request for Architecture Work summary

The Request for Architecture Work is the sponsor's formal ask that starts an ADM cycle. Summarise it here; keep the original in the repository.

FieldValue
Request ID[RAW-YYYY-NN]
Requested by[@sponsor, business unit]
Date receivedYYYY-MM-DD
Problem or opportunityExample: Claims customers wait 11 days on average for a decision; three policy systems hold conflicting customer records
Requested outcomeExample: A target architecture and roadmap for digital claims and a single customer view within 24 months
Budget envelopeExample: Up to USD 2.5 million capital over two financial years
Requested by dateYYYY-MM-DD
Known constraintsExample: Policy administration contract renews in 18 months; no new on-premises hardware
Related strategy[Strategy or plan name, version]

1.1 Differences from the request

State plainly where this vision changes the ask. Example: the request named a CRM replacement as the solution; Phase A reframes it as a customer data problem and leaves the product choice to Phase E, because the stakeholder interviews showed the pain is inconsistent data, not missing CRM features.

2. Stakeholders and concerns

2.1 Stakeholder register

IDStakeholderRoleKey concernsPowerInterestEngagement
SH-01 (Example)Chief Operating OfficerSponsorClaims cycle time, operating costHighHighManage closely: monthly steering
SH-02 (Example)Head of ClaimsBusiness ownerStaff productivity, customer complaintsHighHighManage closely: weekly working session
SH-03 (Example)Chief Information Security OfficerAssurancePersonal data protection, third-party riskHighMediumKeep satisfied: review at each gate
SH-04 (Example)Data Protection OfficerAssuranceLawful basis, retention, data subject rightsMediumHighKeep informed: privacy checkpoints
SH-05 (Example)Head of IT OperationsDeliverySupportability, run cost, skillsMediumHighKeep informed: architecture reviews
SH-06 (Example)Claims handlersUsersFewer screens, fewer re-keyed fieldsLowHighKeep informed: user research, demos
SH-07 (Example)PolicyholdersCustomersSpeed, transparency, channel choiceLowHighRepresented by customer research
[SH-nn][Stakeholder][Role][Concerns][High / Medium / Low][High / Medium / Low][Approach]

2.2 Stakeholder map

The left column holds lower interest, the right column higher interest. Revisit the map at each phase gate; people move as the work becomes real.

2.3 Concerns to viewpoints

Each concern must be addressed by at least one view in the Architecture Definition Document. Record the intended view now so nothing is forgotten.

Concern IDConcernRaised byAddressed in (planned view)
CON-01 (Example)How fast can a claim be decided end to end?SH-01, SH-02Business process view, value stream view
CON-02 (Example)Where is customer personal data stored and who can see it?SH-03, SH-04Data entity and location view
CON-03 (Example)What does the target cost to run each year?SH-01, SH-05Technology view with cost overlay
CON-04 (Example)How many systems does a handler touch per claim?SH-06Application usage view
[CON-nn][Concern][SH-nn][View]

3. Business goals, drivers and constraints

3.1 Business drivers

IDDriverTypeSource
DRV-01 (Example)Competitors settle simple claims in under 48 hoursMarketCustomer research YYYY
DRV-02 (Example)Supervisory expectations on operational resilience of outsourced ITRegulatoryRegulator letter YYYY-MM-DD
DRV-03 (Example)End of vendor support for the legacy CRMTechnologyVendor notice
DRV-04 (Example)Operating cost per claim above industry medianFinancialBenchmark study YYYY
[DRV-nn][Driver][Market / Regulatory / Financial / Technology / Social][Source]

3.2 Business goals and objectives

Goal IDGoalObjective (measurable)Driver
BG-01 (Example)Faster claims decisionsDecide 70% of simple claims within 48 hours by YYYY-MMDRV-01
BG-02 (Example)One trusted view of the customerOne golden customer record per person across all policy lines by YYYY-MMDRV-01, DRV-03
BG-03 (Example)Lower cost to serveReduce operating cost per claim by 20% against the YYYY baselineDRV-04
BG-04 (Example)Resilient outsourced servicesDocumented exit plan and tested recovery for every critical third-party serviceDRV-02
[BG-nn][Goal][Objective with number and date][DRV-nn]

3.3 Constraints

IDConstraintTypeImpact on options
CNS-01 (Example)Capital budget capped at USD 2.5 millionFinancialFavours incremental replacement over big-bang
CNS-02 (Example)Customer personal data must remain in the EULegalLimits hosting regions and support locations
CNS-03 (Example)Policy administration contract renewal date YYYY-MM-DDContractualSets the latest date for the replatform decision
CNS-04 (Example)Claims operations freeze during the year-end peakOperationalNo cut-overs in [month]
[CNS-nn][Constraint][Financial / Legal / Contractual / Operational / Technical][Impact]

3.4 Assumptions

IDAssumptionOwnerValidate by
ASM-01 (Example)The existing cloud landing zone is approved for confidential data[@platform-lead]YYYY-MM-DD
ASM-02 (Example)Claims staff are available two days per sprint for design work[@head-of-claims]YYYY-MM-DD
[ASM-nn][Assumption][@owner]YYYY-MM-DD

4. Scope of the architecture

DimensionIn scopeOut of scope
Enterprise breadthExample: Retail motor and home claims, all EU marketsCommercial lines, life products
Business capabilitiesExample: Claims intake, assessment, settlement; customer managementUnderwriting, reinsurance
Architecture domainsExample: Business, data, application, technologyPhysical facilities
DepthExample: Capability and logical application level; physical design only for integrationDetailed solution design (left to projects)
Time horizonExample: Baseline as of YYYY-MM; target for YYYY-MM (24 months)Beyond 36 months
PartnersExample: Repair network and loss adjusters at interface levelPartner internal systems
[Dimension][In scope][Out of scope]

4.1 Architecture partitioning

If this engagement is one segment of a larger landscape, name the enterprise or strategic architecture it must conform to, and the neighbouring segments it must not overlap. Example: this segment conforms to the group strategic architecture SA-2026 and shares the customer domain with the parallel distribution segment; the customer data model is owned here and reused there.

5. Architecture principles

The enterprise principles are maintained in the Architecture Principles Catalogue (architecture/architecture-principles). The table lists the principles that will shape the options most strongly here.

Principle IDNameWhy it matters for this engagementExpected tension
BP-02 (Example)Reuse before buy before buildSeveral claims products already exist in the portfolioBusiness preference for a bespoke portal
DP-01 (Example)Data has one accountable owner and one master sourceThe core of goal BG-02Three policy systems each claim mastery today
AP-01 (Example)Integrate through published interfacesRemoves point-to-point file transfersLegacy policy system offers no APIs
TP-01 (Example)Prefer managed services on approved platformsLowers run cost (BG-03)Data residency constraint CNS-02
SP-01 (Example)Secure by default, least privilege alwaysPersonal and health data in claimsPartner access for loss adjusters
[ID][Name][Relevance][Tension]

Any principle that cannot be met is handled through a dispensation under the Architecture Board charter (architecture/architecture-governance-charter).

6. Baseline and target summary

6.1 Baseline (current state)

Example: Claims are registered by phone or e-mail into the claims system, re-keyed into one of three policy systems to check cover, and paid through the finance system. Customer details are held separately in each policy system and in the legacy CRM, with nightly file transfers between them.

6.2 Target (future state)

Example: Policyholders register claims online or through partners; simple claims are triaged and decided automatically against one customer and policy view served by a customer data hub through published APIs. Handlers work complex claims in a single workspace.

6.3 Size of the change

DomainChange summaryIndicative gap IDs
BusinessExample: New straight-through decision path for simple claims; role change for handlersGAP-B-01, GAP-B-02
DataExample: Golden customer record; retire three local customer storesGAP-D-01
ApplicationExample: Portal, handler workspace and data hub new; legacy CRM eliminatedGAP-A-01, GAP-A-02
TechnologyExample: API gateway and event streaming on the managed cloud platformGAP-T-01

7. Value proposition and KPIs

7.1 Value proposition

StakeholderValue deliveredGoal
Example: PolicyholdersSimple claims decided in two days instead of eleven; status visible onlineBG-01
Example: Claims handlersOne workspace instead of five systems; no re-keyingBG-01, BG-03
Example: COOLower cost per claim; resilient services with tested exit plansBG-03, BG-04
Example: DPOKnown location and owner for every customer data elementBG-02
[Stakeholder][Value][BG-nn]

7.2 Key performance indicators

KPI IDKPIBaselineTargetDateData sourceOwner
KPI-01 (Example)Share of simple claims decided within 48 hours12%70%YYYY-MMClaims platform reports[@head-of-claims]
KPI-02 (Example)Customer records with a single golden ID0%98%YYYY-MMData hub quality dashboard[@data-owner]
KPI-03 (Example)Operating cost per claimUSD 140USD 112YYYY-MMFinance cost model[@finance]
KPI-04 (Example)Critical third-party services with tested exit plan1 of 66 of 6YYYY-MMThird-party register[@risk-owner]
[KPI-nn][KPI][Baseline][Target]YYYY-MM[Source][@owner]

Track realisation after delivery in the benefits plan (project/benefits-realization-plan); the business case itself belongs in business/business-case.

8. Risks and mitigations

Risk IDRiskLikelihoodImpactMitigationResidualOwner
RSK-01 (Example)Policy administration vendor cannot deliver APIs before contract renewalMediumHighRun an API proof of concept in month 3; prepare replatform optionMedium[@lead-architect]
RSK-02 (Example)Handlers resist automated decisionsMediumMediumCo-design triage rules with handlers; publish override statisticsLow[@head-of-claims]
RSK-03 (Example)Data quality in policy system C too poor to matchHighHighProfile data in Phase C; budget a cleansing work packageMedium[@data-owner]
RSK-04 (Example)Competing programmes take the same integration teamMediumHighReserve capacity through the portfolio boardMedium[@sponsor]
[RSK-nn][Risk][H / M / L][H / M / L][Mitigation][H / M / L][@owner]

Use the enterprise risk method (compliance/risk-methodology) for the scales, and carry open items into the project RAID log (project/raid-log).

9. Capability and readiness assessment

9.1 Business capabilities affected

CapabilityCurrent maturity (1 to 5)Target maturityChange needed
Example: Claims intake24Digital and partner channels, structured data at first contact
Example: Claims assessment34Rule-based triage, automated cover check
Example: Customer information management24Golden record, ownership, quality monitoring
Example: Partner management33Interface changes only
[Capability][1 to 5][1 to 5][Change]

The enterprise capability model is maintained in the Business Capability Map (architecture/business-capability-map); use the same capability names.

9.2 Transformation readiness

FactorRating (1 to 5)EvidenceAction if low
Example: Vision clarity and sponsor commitment4Sponsor chairs steering; budget ring-fencedNot required
Example: Business ability to absorb change2Claims team also runs a regulatory remediationPhase the rollout by claim type
Example: Delivery capacity and skills3Integration skills scarcePartner for API work; train two engineers
Example: Data readiness2Duplicate rate above 15% in one sourceData quality work package early
Example: Funding certainty4Year 1 approved, year 2 indicativeGate year 2 on KPI-01 progress
[Factor][1 to 5][Evidence][Action]

9.3 Architecture capability for this engagement

AspectCurrent stateGap and action
Example: Architecture teamLead architect plus one data architectAdd a part-time security architect
Example: Repository and toolingModelling tool in place; no claims domain modelsModel baseline in the first four weeks
Example: GovernanceArchitecture Board meets monthlyAdd an extra review at the end of Phase C
[Aspect][Current state][Action]

10. Statement of Architecture Work

FieldValue
Statement ID[SAW-YYYY-NN]
Answers request[RAW-YYYY-NN]
Engagement periodYYYY-MM-DD to YYYY-MM-DD
Approved budget for architecture work[USD amount]

10.1 Scope of the work

The work covers the scope in section 4 and the ADM phases listed here. Phases G and H will run under the Architecture Board once implementation starts.

ADM phaseIn this engagementMain output
Phase A: Architecture VisionYesThis document
Phase B: Business ArchitectureYesBusiness part of the Architecture Definition Document
Phase C: Information Systems ArchitecturesYes (data and application)Data and application parts of the Architecture Definition Document
Phase D: Technology ArchitectureYesTechnology part of the Architecture Definition Document
Phase E: Opportunities and SolutionsYesWork packages and Transition Architectures
Phase F: Migration PlanningYesArchitecture Roadmap, Implementation and Migration Plan
Phase G: Implementation GovernanceHand-offArchitecture Contracts, compliance reviews
Phase H: Architecture Change ManagementHand-offChange process under the board
Requirements ManagementContinuousArchitecture Requirements Specification

10.2 Approach and tailoring

[Describe how the ADM is tailored for this engagement: iterations, depth per domain, techniques used and any agile cadence.] Example: two iterations of Phases B to D (a two-week outline pass, then a six-week detailed pass), business scenarios for claims journeys, gap analysis per domain, and a fortnightly demo of models to the claims team.

10.3 Roles and responsibilities

RoleNameResponsibilityTime commitment
Sponsor[@sponsor]Owns the outcome; resolves business conflicts; signs acceptance2 hours per month
Lead architect[@lead-architect]Owns all deliverables and the planFull time
Business architect[@name]Phase B models and business scenariosFull time, weeks 1 to 8
Data architect[@name]Phase C data models and quality assessment50%
Application architect[@name]Phase C application models and portfolio impact50%
Technology architect[@name]Phase D platform and integration50%, weeks 5 to 12
Security architect[@name]Security and privacy requirements across domains20%
Architecture Board[Chair @name]Reviews at the gates in section 10.4Scheduled reviews

Use a RACI (business/raci) if more detail is needed.

10.4 Plan and milestones

MilestoneDeliverablePlanned dateGate
M1 (Example)Architecture Vision and this Statement approvedYYYY-MM-DDBoard gate 1
M2 (Example)Architecture Definition Document and Architecture Requirements Specification approvedYYYY-MM-DDBoard gate 2
M3 (Example)Architecture Roadmap and Implementation and Migration Plan approvedYYYY-MM-DDBoard gate 3
[Mn][Deliverable]YYYY-MM-DD[Gate]

10.5 Acceptance criteria

IDCriterionEvidence
ACC-01 (Example)Every concern in section 2.3 is addressed by at least one named viewConcern to view table in the Architecture Definition Document
ACC-02 (Example)Every gap is assigned to a work package with an ownerConsolidated gaps table in the roadmap
ACC-03 (Example)Each KPI in section 7.2 has an agreed baseline measurementSigned baseline report
ACC-04 (Example)Security and privacy architects sign off the target data architectureApproval record
[ACC-nn][Criterion][Evidence]

10.6 Change to this statement

Changes to scope, budget or dates of more than [10%] require the sponsor's approval and a new version of this section. Smaller changes are agreed by the lead architect and recorded in the revision history.

11. Communications plan

AudienceMessageChannelFrequencyOwner
Example: Sponsor and steeringProgress, decisions needed, risksSteering meetingMonthly[@lead-architect]
Example: Claims teamJourney designs, demos, feedbackShow and tellFortnightly[@business-architect]
Example: IT operationsPlatform choices, run impactArchitecture reviewAt each gate[@technology-architect]
Example: Whole organisationWhy the change, what it means for staffIntranet articleQuarterly[@communications]
[Audience][Message][Channel][Frequency][@owner]

12. Decisions requested and next steps

The Architecture Board and sponsor are asked to:

  1. Approve the scope in section 4 and the principles emphasis in section 5.
  2. Accept the KPIs in section 7.2 as the measures of success.
  3. Accept the residual risks in section 8 or direct further mitigation.
  4. Approve the Statement of Architecture Work in section 10, including the budget and the three board gates.

On approval, the team starts Phases B to D and records results in the Architecture Definition Document. Significant decisions made along the way are captured as architecture decision records (architecture/adr-full).

13. Glossary and references

13.1 Glossary

TermMeaning in this document
ADMArchitecture Development Method, the iterative method at the centre of the TOGAF Standard
Architecture VisionPhase A deliverable that describes the intended outcome and value at a high level
Request for Architecture WorkThe sponsor's formal request that starts an architecture engagement
Statement of Architecture WorkThe agreement on scope, approach, plan and acceptance of the architecture work
BaselineThe architecture as it exists at the start of the engagement
TargetThe architecture the enterprise intends to reach at the end of the time horizon
CapabilityWhat the business does or can do, independent of who does it and how
[Term][Meaning]

13.2 References

IDReferenceVersion / date
REF-01The TOGAF Standard, 10th Edition (The Open Group), 2025 UpdateJune 2025
REF-02Architecture Principles Catalogue (architecture/architecture-principles)[x.y]
REF-03Business Capability Map (architecture/business-capability-map)[x.y]
REF-04Architecture Definition Document (architecture/architecture-definition-document)[x.y]
REF-05Architecture Roadmap and Transition Architectures (architecture/architecture-roadmap-transition)[x.y]
REF-06Architecture Board Charter (architecture/architecture-governance-charter)[x.y]
REF-07[Corporate strategy or business plan][x.y]

Standard and licence note

Structure aligned with The TOGAF Standard, 10th Edition (2025 Update), published by The Open Group: Phase A of the Architecture Development Method and its outputs (Architecture Vision, Statement of Architecture Work, Communications Plan, Capability Assessment), answering a Request for Architecture Work. Only phase and deliverable names are used; this template is original text and reproduces no definitions, tables or other text from the standard. TOGAF is a registered trademark of The Open Group. Check the current edition and any technical corrigenda at opengroup.org and obtain the standard for its full guidance. Template licence: MIT.