Per-release task lists: planning, freeze, QA, security, docs, signing, release, post-release, rollback, waivers, sign-offs
使用方法: Copy once per release and fill the metadata table and rollback trigger first. Link evidence for every ticked item and record anything skipped in the waiver table. The main pitfall is ticking boxes without evidence or without a tested rollback.
预览
Release Checklist: [Product name] [vX.Y.Z]
Release checklist for a software version: metadata, then task lists for planning, code freeze, QA, security, documentation, packaging and signing, the release itself, post-release checks and rollback readiness, followed by sign-offs and communication. Copy it once per release and tick items as they are done. Replace every
[bracketed]value and every line marked Example.
| Field | Value |
|---|---|
| Product / component | [Product name] |
| Version | [vX.Y.Z] |
| Release type | [Major / Minor / Patch / Hotfix] |
| Release manager | [@name] |
| Planned release date | YYYY-MM-DD |
| Code freeze date | YYYY-MM-DD |
| Release branch / tag | [release/X.Y] / [vX.Y.Z] |
| Tracking issue | [link] |
| Status | [Planning / Frozen / In QA / Released / Rolled back] |
1. Planning
- Scope agreed: list of issues and PRs included, linked from the tracking issue.
- Version number chosen according to [Semantic Versioning]; breaking changes justify a major bump.
- Release dates confirmed with [product, support, operations].
- Owners assigned for QA, security, documentation and communication.
- Dependencies on other teams or services identified, with their release dates.
- Known risks recorded, for example: Example: database migration on a 40 GB table.
2. Code freeze
- Release branch
[release/X.Y]created from[main]at commit[sha]. - Branch protection applied; merges need [release manager] approval.
- All included PRs merged; nothing in review is labelled for this release.
- Feature flags for unfinished work are off by default.
- Version number updated in [package.json / pyproject.toml / build files].
- Dependency lockfile committed and unchanged since freeze, unless for a security fix.
3. Quality assurance
- CI green on the release branch: unit, integration and end-to-end suites ([CI run link]).
- Test coverage not below [80%] on changed modules.
- Regression test pass on supported platforms: [browsers / OS versions / devices].
- Upgrade test from the previous [two] versions, including data migration.
- Performance check against baseline: Example: p95 API latency within 10% of v2.3.
- Accessibility check of changed screens ([WCAG 2.2 AA]).
- Exit criteria met: [no open P1 or P2 defects / agreed exceptions listed below].
4. Security
- Dependency audit clean or exceptions approved ([tool, report link]).
- Static analysis (SAST) findings triaged; no new high or critical issues.
- Secrets scan clean on the release branch.
- Container or OS image scan clean for high and critical CVEs.
- Security review completed for changes to authentication, authorization, data handling or cryptography.
- Software bill of materials (SBOM) generated in [CycloneDX / SPDX] format.
5. Documentation
- CHANGELOG updated with Added, Changed, Deprecated, Removed, Fixed and Security entries.
- Release notes drafted for users, in plain language.
- Migration guide written for every breaking change, with before and after examples.
- API reference and configuration docs regenerated.
- Support and operations teams briefed on new behaviour and known issues.
6. Packaging and signing
- Artefacts built by CI from tag
[vX.Y.Z], not on a developer machine. - Builds are reproducible or the build environment is recorded.
- Artefacts signed ([Sigstore cosign / GPG / platform code signing]) and signatures verified.
- Checksums (SHA-256) published alongside artefacts.
- Build provenance attestation generated, for example [SLSA level 2].
- Package metadata correct: version, licence, homepage, minimum runtime.
7. Release
- Go/no-go meeting held; decision recorded in the sign-off table.
- Database migrations applied and verified ([migration log link]).
- Tag
[vX.Y.Z]pushed and GitHub release published with notes and checksums. - Packages published to [npm / PyPI / container registry / app stores].
- Deployment rolled out in stages: [5%] then [25%] then [100%], with health checks between stages.
- Status page or maintenance notice updated, if applicable.
8. Post-release
- Monitoring watched for [24 hours]: error rate, latency, crash rate, key business metrics.
- Smoke tests pass in production ([run link]).
- Support queue reviewed for new issues linked to the release.
- Release branch merged back to
[main]where needed. - Milestone closed and unfinished items moved to the next release.
- Retrospective scheduled for releases that had incidents or waivers.
9. Rollback readiness
Rollback trigger: Example: error rate above 2% for 10 minutes, or any data-integrity defect. Decision owner: [@name].
- Previous version artefacts available and deployable.
- Rollback procedure documented in [runbook link] and tested in staging.
- Migrations are backward compatible, or a down migration is tested.
- Feature flags allow disabling new features without redeploying.
- Estimated rollback time: [minutes].
10. Waivers
| Item | Reason | Risk | Approved by | Follow-up ticket |
|---|---|---|---|---|
| Example: 3.4 Performance check | Load environment unavailable | Low, patch touches no hot paths | @eng-lead | [OPS-412] |
| [Item] | [Reason] | [Risk] | [@name] | [link] |
11. Sign-offs
| Area | Name | Decision | Date |
|---|---|---|---|
| Engineering | [@name] | [Go / No-go] | YYYY-MM-DD |
| QA | [@name] | [Go / No-go] | YYYY-MM-DD |
| Security | [@name] | [Go / No-go] | YYYY-MM-DD |
| Product | [@name] | [Go / No-go] | YYYY-MM-DD |
| Operations / SRE | [@name] | [Go / No-go] | YYYY-MM-DD |
12. Communication
| Audience | Message | Channel | Owner | When |
|---|---|---|---|---|
| Internal teams | Release scope and timing | [#releases] | [@name] | T-2 days |
| Support | Known issues and FAQ | [Support wiki] | [@name] | T-1 day |
| Customers | Release notes | [Blog / email / in-app] | [@name] | Release day |
| Integrators | Breaking changes and migration guide | [Developer newsletter] | [@name] | T-14 days for majors |
Standard and licence note
Based on common industry practice for software release management, including Semantic Versioning, Keep a Changelog style entries and supply chain practices such as SBOMs and signed artefacts. Original text written for this collection. Template licence: MIT.
相关模板
Release Notes Template
Release notes: highlights, features, fixes, breaking changes with migration, deprecations, CVE fixes, upgrade steps
软件与工程Architecture Decision Record (ADR) Template
Lightweight Nygard-style ADR: status, context, decision, consequences, alternatives, related decisions, lifecycle and log
软件与工程AGENTS.md Template for AI Coding Agents
Repository instructions for AI coding agents: setup, build and test commands, conventions, architecture map, PR and security rules