Facility Management Plan Template (ISO 41001)

FM plan: context and demand, service scope, delivery model, maintenance strategy, compliance calendar, contracts, KPIs, budget, risk, energy, review

房地产与设施完整ISO 41001:2018 with Amd 1:2024facilitymanagementplan

使用方法: Use it when an owner, property manager or FM provider plans services for a site or portfolio for the year. Fill the stakeholder demand table and the maintenance strategy by asset criticality first. The main pitfall is renewing the current contracts and schedules without testing them against what occupiers and the owner need.

预览

Facility Management Plan: [Site, building or portfolio]

A facility management (FM) plan for one site or portfolio: the context and the demand the FM function serves, the service scope, the delivery model, the maintenance strategy, statutory compliance, contracts, performance indicators, budget, risk, sustainability and the review cycle. Structure aligned with ISO 41001:2018, Facility management, Management systems, Requirements with guidance for use (with Amendment 1:2024, climate action changes), whose requirements follow the common high-level structure of ISO management system standards (clauses 4 to 10). A second edition is in development (ISO/DIS 41001 in October 2026); check the current status before you rely on it. Replace every [bracketed] value and every row marked Example. This is a planning format, not legal, safety or engineering advice: statutory duties depend on the jurisdiction and the building, so check the current official rules with a qualified professional.

Document control

FieldValue
Document ID[FMP-QPB-2027]
Site or portfolio[Quelmont Park Building B]
Plan period[Example: 2027-01-01 to 2027-12-31, reviewed annually]
Version[1.0]
Status[Draft / Approved / Superseded]
Owner[Head of FM or property manager, @name]
Approvers[Asset manager for the owner, @name]
Management system[Example: Not certified; ISO 41001 used as a reference structure]
Last updatedYYYY-MM-DD
Classification[Internal]

Approvals

RoleNameDate
Owner's asset manager[@name]YYYY-MM-DD
Property manager[@name]YYYY-MM-DD
FM service provider account lead[@name]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]Draft from the condition report and the tenant survey
1.0YYYY-MM-DD[@name]Example: Approved with the 2027 service charge budget

Contents

Clause map

Plan sectionISO 41001:2018 clause (topic in original wording)
1, 24 Context: internal and external issues, needs of interested parties, scope, the FM system; Amendment 1:2024 adds whether climate change is a relevant issue
3, 45 Leadership: commitment, policy, roles and authorities
3, 116 Planning: risks and opportunities, objectives and plans to achieve them
4, 137 Support: resources, competence, awareness, communication, documented information
5, 6, 7, 88 Operation: planning and control of FM service delivery and of outsourced services
9, 149 Performance evaluation: monitoring and measurement, internal audit, management review
1410 Improvement: nonconformity, corrective action, continual improvement

1. Context and scope

ItemEntry
Buildings in scopeExample: Quelmont Park Building B, 3 storeys, 4,200 m2 net lettable, built 2004
OccupiersExample: 5 tenants (laboratory office, retail, print studio, dental clinic, insurance broker) and 1 vacant unit
Areas in scopeExample: Structure, envelope, roof, common parts, central plant, car park and landscaping
Out of scopeExample: Fit-out and equipment inside tenant demises, except where a lease makes the landlord responsible
External issuesExample: Tighter energy performance rules, rising contract labour costs, more frequent summer heat peaks
Internal issuesExample: Ageing roof, lifts and chillers (see real-estate/property-condition-assessment); one vacant unit to let
Climate relevanceExample: Yes: cooling load and flood-free access are relevant to occupiers and to the building's value

The scope must match the leases. Where a lease makes the tenant responsible for a system, the plan records that the tenant maintains it and how the landlord checks it (for example annual evidence of servicing for a tenant's own air conditioning that sits on the shared roof).

2. Stakeholders and demand

IDStakeholderNeeds and expectationsSourceRequirement in this plan
STK-01 (Example)Owner (Varrowby Property Fund)Protect value, control service charge, meet compliance dutiesAsset business planBudget cap, capex plan, compliance calendar
STK-02 (Example)Dovecroft Dental ClinicReliable power and water, clean entrance, accessible routeTenant meeting 2026-08Priority 1 response for utilities, accessible route checks
STK-03 (Example)Kestrimo LabsStable temperature in laboratory officeTenant survey 2026Comfort complaint KPI, chiller resilience
STK-04 (Example)Neighbouring siteRight of way across the car parkTitle (DD-T07)Keep the route clear during resurfacing
STK-05 (Example)Regulators and insurersStatutory inspections, fire safety, recordsLaw and policy termsSection 7 compliance calendar

3. FM policy and objectives

Example policy statement: Varrowby Property Fund provides safe, compliant, comfortable and efficient buildings for its occupiers, delivered at a fair and transparent cost, with energy use and waste reduced year on year. The FM team plans work from occupier needs and asset condition, measures performance openly and improves it.

IDObjectiveMeasureTargetDueOwner
OBJ-01 (Example)Close all statutory compliance gapsOverdue inspections0 at each month end2027-03-31Property manager
OBJ-02 (Example)Cut common parts electricity usekWh versus 2026 baseline15% lower2027-12-31FM provider
OBJ-03 (Example)Improve occupier satisfactionAnnual survey score4.0 of 5 or higher2027-11-30Property manager
OBJ-04 (Example)Raise planned share of maintenancePlanned hours over all maintenance hours70% or higher2027-12-31FM provider

4. Roles and responsibilities

ActivityOwnerProperty managerFM providerTenants
Approve plan and budgetARCI
Statutory compliance calendarIARC
Planned maintenanceIARI
Reactive repairs in common partsIARC
Repairs inside demisesICCA, R
Supplier appointmentARCI
Service charge reconciliationIA, RCI
Major capital projectsARCI

R responsible, A accountable, C consulted, I informed. Record the competence each role needs (for example authorised persons for high voltage switching or fire system works) and how it is checked.

5. Service scope and delivery model

Service IDServiceTypeDelivered byService level
SRV-01 (Example)Building fabric and roof maintenanceHardHollin Facility ServicesPer maintenance strategy, section 6
SRV-02 (Example)Mechanical and electrical maintenanceHardHollin Facility ServicesPer maintenance strategy
SRV-03 (Example)LiftsHardSpecialist lift contractor (direct)Call-out within 4 hours, monthly service
SRV-04 (Example)Fire alarm, emergency lighting, sprinklersHardSpecialist fire contractor (direct)Servicing to manufacturer and national code
SRV-05 (Example)Cleaning, common parts and windowsSoftHollin Facility ServicesDaily common parts, quarterly windows
SRV-06 (Example)Reception and securitySoftHollin Facility ServicesStaffed 07:30 to 18:30 working days
SRV-07 (Example)Waste and recyclingSoftWaste contractorWeekly collection, monthly data
SRV-08 (Example)Landscaping and car parkSoftHollin Facility ServicesMonthly, plus winter readiness
SRV-09 (Example)Helpdesk and CAFMManagementHollin Facility Services24/7 phone, logging within 15 minutes

Example delivery model: one bundled hard and soft services contract, with lifts and fire systems contracted directly by the property manager for specialist oversight. The model was chosen because the building is too small for in-house staff and too complex for separate trade contracts without a coordinator.

6. Maintenance strategy

Asset classCriticalityStrategyBasis
Fire and life safety (Example)HighPlanned, statutory frequencyLaw and national code
Lifts (Example)HighPlanned monthly, modernise in year 4Condition report PCA-VT-01
Chillers (Example)HighCondition-based (refrigerant, vibration), replace in year 6PCA-HVAC-01
Roof (Example)MediumInspect twice a year, replace membrane in year 2PCA-ROOF-01
Common parts lighting (Example)LowReplace with LED in year 1, then run to failurePCA-ELEC-01
Decorations (Example)LowPlanned cycle, years 3 and 8PCA-INT-01, PCA-INT-02

6.1 Reactive priorities

PriorityDefinitionRespond withinMake safe or fix within
P1 (Example)Risk to life, security or loss of a critical service1 hour4 hours make safe
P2 (Example)Serious disruption to an occupier4 hours24 hours
P3 (Example)Routine fault1 working day5 working days
P4 (Example)Planned or cosmetic5 working daysNext planned visit

7. Statutory compliance

IDDutyExample basis (check the current text)FrequencyCompetent personEvidenceNext due
CMP-F01 (Example)Fire risk assessment of common partsNational fire safety law, for example the Regulatory Reform (Fire Safety) Order 2005 in England and WalesAnnual reviewFire risk assessorReport and action logYYYY-MM-DD
CMP-F02 (Example)Fire alarm and emergency lighting servicingNational code and insurer termsPer codeFire contractorCertificatesYYYY-MM-DD
CMP-L01 (Example)Lift thorough examinationNational lifting equipment rulesPer law, often 6 or 12 monthsInsurer's engineerExamination reportYYYY-MM-DD
CMP-W01 (Example)Water hygiene risk assessment and monitoringNational guidance on legionella controlPer risk assessmentWater hygiene specialistLogbookYYYY-MM-DD
CMP-E01 (Example)Fixed electrical installation testingNational wiring rulesPer rules, often 5 years for officesElectrical contractorTest certificateYYYY-MM-DD
CMP-G01 (Example)Gas appliance and boiler safetyNational gas safety rulesAnnualRegistered gas engineerCertificateYYYY-MM-DD
CMP-A01 (Example)Asbestos managementNational asbestos rulesRe-inspect annuallyAsbestos surveyorRegister and planYYYY-MM-DD
CMP-EN1 (Example)Energy performance certificate and inspections of air conditioningEU example: Directive (EU) 2024/1275 as transposed nationallyPer national lawEnergy assessorCertificateYYYY-MM-DD

Report the calendar status every month (section 9). An overdue statutory item is escalated to the owner's asset manager on the day it becomes overdue.

8. Contracts and suppliers

Contract IDSupplierServicesTermAnnual valuePerformance mechanismRenewal decision due
FMC-01 (Example)Hollin Facility ServicesSRV-01, 02, 05, 06, 08, 092025-01-01 to 2027-12-31See budget section 10KPI scorecard, service credits up to 5% of monthly fee2027-06-30
FMC-02 (Example)Lift contractorSRV-032026-04-01, 3 years9,600Call-out times, uptime2028-09-30
FMC-03 (Example)Fire systems contractorSRV-042026-01-01, 2 years6,500Certificates on time2027-07-31
FMC-04 (Example)Waste contractorSRV-07Rolling, 3 months' notice9,000Recycling rate reportAnnual

Use procurement/contract-register for the full register, legal-lite/sla-outline for service level schedules, and business/vendor-evaluation-scorecard when re-tendering.

9. Performance indicators and reporting

KPI IDIndicatorDefinitionTargetSourceFrequency
KPI-01 (Example)Statutory complianceShare of compliance items in date100%Compliance calendarMonthly
KPI-02 (Example)P1 responseP1 requests attended within 1 hour95% or higherCAFMMonthly
KPI-03 (Example)Fix within targetRequests fixed within the priority's target90% or higherCAFMMonthly
KPI-04 (Example)Planned maintenance completionPlanned tasks done in the month they were due95% or higherCAFMMonthly
KPI-05 (Example)Planned sharePlanned hours over all maintenance hours70% or higherCAFMQuarterly
KPI-06 (Example)Occupier satisfactionSurvey mean score4.0 of 5 or higherAnnual surveyAnnual
KPI-07 (Example)EnergyCommon parts kWh against baseline15% lower by year endMetersMonthly
KPI-08 (Example)CostActual service charge spend against budgetWithin 3%LedgerQuarterly

Use business/kpi-scorecard for the reporting layout.

10. Budget

10.1 Service charge budget

LineBasisAnnual cost
Planned preventive maintenance, hard services (Example)4,200 m2 at 1458,800
Reactive maintenance allowance (Example)2026 actual plus 10%22,000
Lift maintenance (Example)2 lifts at 4,8009,600
Fire and life safety servicing (Example)Contract FMC-036,500
Cleaning, common parts and windows (Example)Contract FMC-0138,000
Reception and security (Example)Contract FMC-0145,000
Waste and recycling (Example)Contract FMC-049,000
Landscaping and car park (Example)Contract FMC-017,500
Utilities, common parts (Example)Meter data, 2026 tariff34,000
CAFM licence and helpdesk (Example)Contract FMC-013,600
FM provider management fee (Example)Contract FMC-0118,000
Total252,000

Example: the total is 60 per m2 of net lettable area. A 1,000 m2 unit such as U-101 pays 23.81%, or 60,000 a year, on account. The owner bears the share of the vacant 500 m2 unit U-202 (30,000 a year) while it is empty, as the valuation of the building assumes.

10.2 Capital expenditure

Capital projects come from the property condition assessment and are approved through finance/capex-request. Example: the 10-year forecast is 591,900 at current prices plus a 10% contingency, with the LED upgrade (50,400) in year 1 and the roof membrane (133,000) in year 2. Whether a capital cost can be recovered through the service charge depends on each lease; check the leases before you budget it.

11. Risk, health and safety, and continuity

Risk IDRiskLikelihoodImpactTreatmentOwner
FMR-01 (Example)Chiller failure during a heatwaveMediumHighCondition monitoring, hire chiller agreement, replacement in year 6FM provider
FMR-02 (Example)Roof leak into U-201HighMediumTwice-yearly inspection, repair budget, replacement in year 2Property manager
FMR-03 (Example)Fire alarm faults cause false alarms or missed alarmsMediumHighImmediate repair PCA-FIRE-01, weekly testsFire contractor
FMR-04 (Example)FM contractor failureLowHighStep-in clause, parent guarantee, retender planProperty manager
FMR-05 (Example)Contractor injury on siteLowHighPermit to work, risk assessments and method statements, inductionFM provider

Use compliance/risk-register for the full register and compliance/business-continuity for continuity plans. Contractors working on site follow the site's permit to work and safety rules.

12. Energy and sustainability

ItemEntry
Baseline (Example)2026 common parts electricity and gas, from monthly meter reads
Projects (Example)LED upgrade year 1; chiller replacement specified for efficiency in year 6; building controls tuning in year 1
Waste (Example)Recycling rate reported monthly by the waste contractor
Climate adaptation (Example)Cooling resilience plan for heatwaves; roof drainage check before the wet season
Tenant collaboration (Example)Share energy data each quarter; joint review at the annual tenant meeting

See compliance/iso-50001-energy-review for an energy review and compliance/iso-14001-environmental-aspects for environmental aspects.

13. Information, data and the asset register

Data setSystemOwnerMinimum content
Asset register (Example)CAFMFM providerAsset ID, location, type, make and model, install date, condition, criticality, maintenance regime
Work orders (Example)CAFMFM providerRequest, priority, times, cost, cause, asset ID
Compliance records (Example)CAFM document storeProperty managerCertificates, reports, actions, due dates
Drawings and manuals (Example)Document storeProperty managerAs-built drawings, operation and maintenance manuals
Leases and service charge data (Example)Property management systemProperty managerAbstracts (real-estate/lease-abstract), apportionments

At the end of a contract, the FM provider hands back all data in an agreed open format. Write this into the contract.

14. Audit, review and improvement

ActivityFrequencyWhoOutput
Monthly performance meeting (Example)MonthlyProperty manager, FM providerKPI report, action log
Quarterly owner review (Example)QuarterlyOwner's asset managerBudget and risk update
Internal audit of compliance records (Example)Twice a yearIndependent auditorFindings and corrective actions
Management review of this plan (Example)AnnualAll approversRevised plan, objectives and budget
Action IDSourceNonconformity or improvementCorrective actionOwnerDueStatus
CA-01 (Example)Audit 2026-06Two lift reports filed lateUpload within 5 days of the visit, monthly checkFM provider2026-12-31Open

15. Glossary and references

TermMeaning
FMFacility management: the services that support the people and activities in the buildings
Hard servicesServices to the building fabric and its systems
Soft servicesServices to the people and spaces, such as cleaning and security
PPMPlanned preventive maintenance
CAFMComputer-aided facility management system
Service chargeCosts of shared services that the owner recovers from tenants under the leases
DemiseThe part of the building let to a tenant

References (checked 2026-10-30):

  • ISO 41001:2018, Facility management, Management systems, Requirements with guidance for use, with Amendment 1:2024 (climate action changes); consolidated national adoption EVS-EN ISO 41001:2018+A1:2024 listed by the Estonian Centre for Standardisation. ISO open data lists the 2018 edition as due for revision, with a second edition at draft international standard stage (ISO/DIS 41001) in October 2026; check the current edition.
  • Directive (EU) 2024/1275 on the energy performance of buildings (recast), in force 28 May 2024, transposition by 29 May 2026.
  • Related templates: compliance/iso-55001-samp, real-estate/property-condition-assessment, real-estate/rent-roll-arrears, real-estate/lease-abstract, finance/capex-request, personal/home-maintenance-log for a household-scale log.

Standard and licence note

Structure aligned with ISO 41001:2018 (Facility management, Management systems, Requirements with guidance for use) and its Amendment 1:2024. The standard is copyrighted: this template names its clause numbers and topics only and is written in original wording; it does not reproduce requirements or definitions. Official text: ISO, purchase or licensed access: https://www.iso.org/standard/68021.html (also sold by national standards bodies). Fire safety and EU energy rules are named as dated examples only. Check the current official texts and use a qualified professional. Template licence: MIT.