Kit funktionale Sicherheit Automotive
Sicherheits- und Cybersecurity-Analysen für Fahrzeuge: ISO 26262 HARA, SOTIF, ISO/SAE 21434 TARA und FMEA, nur als zitierte Struktur.
8 Vorlagen in 3 Schritten, in der Reihenfolge der Nutzung. Öffnen Sie eine Vorlage im Editor, füllen Sie sie aus und exportieren Sie sie als PDF, DOCX oder HTML.
Bewertungen
Hazard Analysis and Risk Assessment (HARA) Template (ISO 26262)
StandardAutomotive HARA: item definition, hazard identification, hazardous events with S/E/C rationale, ASIL, safety goals with safe state and FTTI, SOTIF/PAS 8800/TARA pointers
ISO 26262-3:2018; ISO 21448:2022; ISO/PAS 8800:2024SOTIF Analysis Template (ISO 21448)
VollständigISO 21448 SOTIF file: ODD, acceptance criteria, functional insufficiencies, triggering conditions, V&V targets, known and unknown scenarios
ISO 21448:2022Software Requirements Specification Template (ISO/IEC/IEEE 29148)
VollständigFull SRS per ISO/IEC/IEEE 29148:2018 for contract or multi-team work: interfaces, functions, quality attributes, verification matrix, traceability
ISO/IEC/IEEE 29148:2018 (Edition 3 at DIS)
Sicherheit
Automotive TARA Template (ISO/SAE 21434, UN R155)
VollständigVehicle cybersecurity TARA: item definition, assets, damage scenarios, SFOP impact, attack paths, feasibility, risk values, treatment, goals, R155 Annex 5 check
ISO/SAE 21434:2021 (cite-only); UN R155, R156PSIRT Vulnerability Handling Procedure Template (ISO/IEC 30111, CVSS v4)
VollständigProducer-side PSIRT procedure: intake, verification, CVSS v4.0, EPSS, KEV and SSVC triage, remediation targets, advisory and VEX, CVE/CNA, CRA Art. 14, metrics
ISO/IEC 30111:2019 (structure); CVSS v4.0; CISA SSVC; CNA Rules 4.2.0; EU CRA Art. 14SBOM and VEX Policy Template (CISA 2026, CycloneDX, SPDX)
VollständigSBOM production, signing, VEX rules, distribution, supplier SBOMs, retention, exceptions, metrics, CISA 2026 to CycloneDX and SPDX field map
CISA 2026 SBOM Minimum Elements; CycloneDX 1.7; SPDX 3.0.1; CISA VEX
Verifikation
Software FMEA Template (IEC 60812)
VollständigSoftware failure modes, effects, causes, controls, S/O/D scales, RPN and action priority, actions and re-scoring
IEC 60812:2018Verification and Validation Plan Template (IEEE 1012)
VollständigV&V plan: integrity level scheme, tasks per life-cycle phase, minimum tasks by level, independence, anomalies, reporting, schedule
IEEE 1012-2024