Construction Submittal Register Template
Submittal action codes, register of shop drawings, product data and samples with planned, due-back and needed-on-site dates, weekly review
Anleitung: Use it at the start of a construction job to track every submittal the specifications require. Fill planned rows from the specifications first, working back from the needed-on-site date. The main pitfall is ordering or installing before the submittal returns with an action code that allows it.
Vorschau
Submittal Register: [Project name]
A register for tracking construction submittals (shop drawings, product data, samples, test reports and other documents the contractor submits for the design team's review) from planned date through review to the final action. Based on common construction contract administration practice. Replace every
[bracketed]value and every row marked Example. Contract terms decide what needs review and how long review takes; this is not legal advice.
| Field | Value |
|---|---|
| Project | [Project name and number] |
| Contract | [Form of contract and clause that governs submittals] |
| Contractor | [Company] |
| Reviewer of record | [Architect / engineer / contract administrator] |
| Contract review period | [Example: 10 working days per submission] |
| Register owner | [@document-controller] |
| Last updated | YYYY-MM-DD |
1. Action codes
| Code | Meaning (Example) | Next step |
|---|---|---|
| A | No exceptions taken | Proceed |
| B | Make corrections noted | Proceed, incorporate comments; no resubmission unless asked |
| C | Revise and resubmit | Do not proceed; resubmit |
| D | Rejected | Do not proceed; submit a new proposal |
| I | For information only, no review | File |
Many contracts state that review does not relieve the contractor of responsibility for meeting the contract documents. Check what your contract says about the effect of review.
2. Register
| Submittal no. | Rev | Spec section | Description | Type | Planned submit | Actual submit | Due back | Returned | Code | Needed on site | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|
| SUB-001 (Example) | 0 | 05 12 00 | Structural steel connections | Shop drawings | 2026-11-02 | 2026-11-04 | 2026-11-18 | 2026-11-17 | C | 2027-01-11 | Resubmit |
| SUB-001 (Example) | A | 05 12 00 | Structural steel connections | Shop drawings | 2026-11-25 | 2026-11-24 | 2026-12-08 | 2026-12-04 | B | 2027-01-11 | Released for fabrication |
| SUB-002 (Example) | 0 | 08 71 00 | Door hardware sets | Product data | 2026-12-01 | n/a | 2026-12-15 | n/a | n/a | 2027-03-01 | Not yet submitted |
| SUB-003 (Example) | 0 | 09 91 23 | Interior paint colours | Samples | 2027-01-15 | n/a | 2027-01-29 | n/a | n/a | 2027-04-05 | Not yet submitted |
| SUB-[NNN] | [0] | [Section] | [Description] | [Type] | YYYY-MM-DD | YYYY-MM-DD | YYYY-MM-DD | YYYY-MM-DD | [Code] | YYYY-MM-DD | [Status] |
Example project: the fictional Fernhollow Library and Learning
Centre (code FHL), as in construction/rfi-log. Due back =
actual (or planned) submission date plus 10 working days.
3. Weekly review
- Overdue submissions (planned date passed, not submitted): [list].
- Overdue reviews (due back passed, not returned): [list, escalate per contract].
- Items at risk (needed on site within lead time plus review time): [list, with mitigation].
- Resubmissions open: [list].
Standard and licence note
Based on common construction contract administration practice for submittal management. Specification section numbers in the example use the MasterFormat numbering pattern published by CSI and CSC (official text: CSI, purchase or licensed access: https://www.csiresources.org/). All text and the fictional example are original. Template licence: MIT.
Ähnliche Vorlagen
BIM Execution Plan Template (ISO 19650)
ISO 19650 BIM execution plan: roles, EIR response, CDE workflow, naming and status codes, level of information need, TIDP and MIDP
BauwesenChange Order and Variation Template (FIDIC, NEC4, AIA)
Construction change order or variation: instruction, cause, valuation build-up, time impact, approvals, running contract sum
BauwesenConstruction Phase Plan Template (CDM 2015, OSHA 1926)
Construction phase plan: dutyholders, site rules, significant hazards, Schedule 3 risks, welfare, emergency, incident reporting, inspections