Quality Improvement Report Template (SQUIRE 2.0)
QI project report by the 18 SQUIRE 2.0 items: aim, context, driver diagram, measures, run chart, PDSA log, limitations, sustainability plan
How to use: Use it when you write up a healthcare quality improvement project for a committee, learning event or journal. Fill the aim, measure definitions and PDSA log (appendix A) while the project runs, then the results and discussion. The main pitfall is reporting only the outcome numbers without the theory, context and study of the interventions that SQUIRE asks for.
Preview
Quality Improvement Report: [Project title]
Report template for a healthcare quality improvement (QI) project, written for an internal governance committee, a learning event or a journal submission. The numbered body sections follow the 18 items of SQUIRE 2.0 (Standards for QUality Improvement Reporting Excellence, Ogrinc et al., BMJ Quality and Safety 2016), grouped as the guideline groups them, with original wording written for this collection. Use it together with the official SQUIRE 2.0 checklist and its Explanation and Elaboration paper. The worked example (a fictional ward at a fictional hospital) shows how the sections connect. Replace every
[bracketed]value and every row marked Example. This is a reporting format, not clinical advice; check the current official guideline text and your organisation's governance, ethics and privacy rules.
Document control
| Field | Value |
|---|---|
| Document ID | [QIR-2026-007] |
| Project title | [Short title, same as section 1] |
| Version | [0.3] |
| Status | [Draft / In review / Approved / Submitted] |
| Owner | [@project-lead] |
| Executive sponsor | [@sponsor] |
| Approvers and reviewers | [@clinical-director], [@qi-lead], [@information-governance] |
| Governance route | [QI registration number / audit and QI committee / ethics decision reference] |
| Reporting period | [YYYY-MM-DD to YYYY-MM-DD] |
| Intended audience | [Committee / learning event / journal name] |
| Last updated | YYYY-MM-DD |
| Classification | [Internal / Public after approval] |
Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| Project lead | [@name] | [Approved] | YYYY-MM-DD |
| Executive sponsor | [@name] | [Approved] | YYYY-MM-DD |
| QI or clinical governance lead | [@name] | [Approved for release] | YYYY-MM-DD |
| Information governance reviewer (if publishing data) | [@name] | [Approved] | YYYY-MM-DD |
Revision history
| Version | Date | Author | Change summary |
|---|---|---|---|
| 0.1 | YYYY-MM-DD | [@name] | First draft: background, aim and measure definitions |
| 0.2 | YYYY-MM-DD | [@name] | Example: Added weeks 13 to 24 data and PDSA cycles 1 to 4 |
| 0.3 | YYYY-MM-DD | [@name] | Example: Added limitations and sustainability plan after committee comments |
Contents
- Title and abstract: 1. Title, 2. Abstract
- Introduction: 3. Problem description, 4. Available knowledge, 5. Rationale, 6. Specific aims
- Methods: 7. Context, 8. Interventions, 9. Study of the interventions, 10. Measures, 11. Analysis, 12. Ethical considerations
- Results: 13. Results
- Discussion: 14. Summary, 15. Interpretation, 16. Limitations, 17. Conclusions
- Other information: 18. Funding
- 19. SQUIRE 2.0 cross-reference, 20. Sustainability and spread plan, 21. Glossary and references, Appendix A. PDSA log, Appendix B. Data collection sheet
1. Title
[Improving outcome or process] in [setting] through [main change]: a quality improvement project
Example: Getting discharge medicines ready before 11:00 on an adult medical ward: a quality improvement project at Halvermoor District Hospital (fictional).
2. Abstract
| Part | Content |
|---|---|
| Background | [The problem, its size locally and why it matters] |
| Local problem | [Baseline performance with the measure and period] |
| Methods | [Model for improvement, design (for example time series with run charts), measures, period] |
| Interventions | [Main changes and how many PDSA cycles] |
| Results | [Outcome measure before and after, signal on the run chart, balancing measure] |
| Conclusions | [What was learned and what happens next] |
Example: On Ward 6, a 28-bed adult medical ward, 41.6% (197 of 474) of planned discharges had their discharge medicines ready on the ward by 11:00 over a 12-week baseline. Using the Model for Improvement, a multidisciplinary team tested four changes in sequential PDSA cycles over 12 weeks: a ward pharmacist at the morning board round, a "tomorrow's discharges" list, prescribing on the day before discharge, and a ward medicines cupboard for common discharge items. The weekly proportion rose above the baseline median from week 13 and stayed above it for 12 consecutive weeks, a shift on the run chart. Over weeks 17 to 24 the proportion was 70.1% (225 of 321). The balancing measure, discharge prescriptions needing a pharmacist correction, was 17.7% at baseline and 18.4% in weeks 17 to 24. The changes are now standard work on Ward 6 and are being tested on two further wards.
Introduction
The four items below explain the problem, what was already known, why the team expected the changes to work, and what the project set out to achieve. Write them so that a reader from another organisation can judge whether the problem looks like theirs.
3. Problem description
[Describe the nature and significance of the local problem: what happens now, what should happen, how often the gap occurs, and the effect on patients, staff and flow.]
Example: Patients on Ward 6 who were medically fit to leave often waited on the ward for discharge medicines. Baseline data from 12 weeks (474 planned discharges) showed that 41.6% had medicines ready by 11:00. Late medicines delayed bed availability for patients waiting in the emergency department and the acute medical unit, and patients and families reported uncertainty about when they could leave.
4. Available knowledge
[Summarise relevant evidence and experience: published studies, national or professional guidance, previous local projects and benchmarking. State where the evidence is thin or comes from different settings.]
| Source (Example) | What it showed | Relevance to this project |
|---|---|---|
| [Published study or review on discharge medicines turnaround] | [Finding in original words] | [Similar ward type / different setting] |
| [Previous local project on another ward] | [Finding] | [Same pharmacy service, different staffing] |
| [Professional or national guidance] | [What it recommends] | [How it shaped measures or changes] |
5. Rationale
[Explain the informal or formal theory, framework or logic model that links the changes to the expected improvement, and the assumptions it rests on.]
Example: The team's theory was that medicines are late because the prescription is written on the morning of discharge, then queues in pharmacy with that day's other work. Moving prescribing to the day before, and giving the pharmacist early sight of likely discharges, should move the work out of the morning peak. The driver diagram below shows the aim, primary drivers, secondary drivers and change ideas (CH-01 to CH-04) that the PDSA log in appendix A tests.
6. Specific aims
[State the purpose of the project and of this report.]
Example: To increase the proportion of planned discharges from Ward 6 with discharge medicines ready on the ward by 11:00 from a baseline of 41.6% to 70% within 12 weeks of the first test of change, without an increase in discharge prescriptions needing pharmacist correction. This report describes the first 24 weeks (12 baseline, 12 improvement).
Methods
The six items below describe the setting, the changes, the approach to studying them, the measures, the analysis and the ethical review. Give enough detail that another team could repeat the work and judge how much of the result depends on local conditions.
7. Context
| Context element | Description (Example) |
|---|---|
| Setting | Ward 6, 28-bed adult general medical ward in a 410-bed district hospital (fictional) |
| Patient population | Adults admitted as emergencies; median length of stay [n] days |
| Staffing | Two consultant teams, one ward pharmacist 09:00 to 13:00 on weekdays |
| Pharmacy service | Central dispensary, discharge prescriptions processed in order of arrival |
| Information systems | Electronic prescribing; discharge prescription status visible on the ward board |
| Leadership and culture | Ward manager and matron sponsored the project; daily board round already established |
| Concurrent initiatives | Hospital-wide flow programme started in week 10 (see section 16) |
8. Interventions
Team. [List roles: project lead, clinicians, pharmacist, nursing, patient partner, data analyst, sponsor. Say how often the team met.]
| Change ID | Change | Who delivers it | When and how often | Start week |
|---|---|---|---|---|
| CH-01 (Example) | Ward pharmacist joins the 09:00 board round and flags likely discharges | Ward pharmacist | Weekdays | 13 |
| CH-02 (Example) | Nurse in charge updates a "tomorrow's discharges" list at 16:00 | Nurse in charge | Daily | 15 |
| CH-03 (Example) | Discharge prescription written the day before for patients on the list | Ward doctors | Daily by 18:00 | 16 |
| CH-04 (Example) | Ward cupboard stocked with pre-packed common discharge items | Pharmacy technician | Restocked twice weekly | 17 |
Describe also what did not change: the discharge criteria, the clinical decision about fitness for discharge and the prescribing rules stayed the same, so that any change in the measures can be attributed to the workflow changes.
9. Study of the interventions
[Describe the approach chosen for assessing the impact of the interventions and for judging whether the observed effects were due to them. Include how you checked that each change was carried out as intended.]
Example: The team used the Model for Improvement with sequential PDSA cycles (appendix A). Impact was studied as a time series with weekly data plotted on a run chart against the baseline median. Fidelity was checked for each change: the pharmacist's attendance at board rounds (CH-01) and the completion of the 16:00 list (CH-02) were recorded on the ward board and counted weekly. Two short staff huddles after weeks 18 and 22 collected views on what helped and what got in the way.
10. Measures
| ID | Type | Operational definition | Source | Frequency |
|---|---|---|---|---|
| M1 (Example) | Outcome | Numerator: planned discharges with all discharge medicines on the ward by 11:00 on the day of discharge. Denominator: planned discharges from Ward 6 that week. Excludes self-discharge and transfers to other hospitals | Electronic prescribing timestamps and ward board | Weekly |
| M2 (Example) | Process | Numerator: planned discharges with the prescription signed by 18:00 the day before. Denominator: as M1 | Electronic prescribing | Weekly |
| M3 (Example) | Balancing | Numerator: discharge prescriptions needing a pharmacist correction before dispensing. Denominator: as M1 | Pharmacy intervention log | Weekly |
Data quality. [Describe how the data were validated: for example, the project lead checked 10 records a week against the paper ward board for the first four weeks, and the definition was fixed before baseline collection began.]
11. Analysis
[Describe the analytic methods used to draw inferences from the data, and how variation over time was handled.]
Example: M1, M2 and M3 were plotted weekly on run charts. The baseline median of M1 (42.3%) was calculated from weeks 1 to 12 and frozen, then extended across the improvement period. Non-random variation was judged with commonly used run chart rules (Perla, Provost and Murray, 2011): a shift (six or more consecutive points above or below the median, with points on the median neither breaking nor adding to the run), a trend (five or more consecutive points all going up or all going down), too few or too many runs, and an astronomical data point. Staff huddle notes were grouped into themes by two team members independently.
12. Ethical considerations
[State the ethical review route and outcome, data protection measures and any conflicts of interest.]
Example: The project was registered with the hospital's audit and QI office (reference [QI-2026-041]). Using the organisation's research decision tool, the office confirmed it was service improvement and did not need research ethics committee review. Only aggregate counts left the ward. The team declared no conflicts of interest.
13. Results
13.1 How the interventions evolved
[Describe the sequence of PDSA cycles and how each changed the next. The full log is in appendix A.]
Example: CH-01 began in week 13 with one consultant team and spread to both teams in week 14 after the first cycle showed that the pharmacist could cover both board rounds in 30 minutes. CH-02 was adapted in its second cycle: the list moved from a paper sheet to a column on the electronic ward board because the paper sheet was lost twice. CH-04 started in week 17 with 12 pre-packed items chosen from a month of dispensing data.
13.2 Outcome measure M1
| Period (Example) | Weeks | Discharges ready by 11:00 | Planned discharges | Proportion |
|---|---|---|---|---|
| Baseline | 1 to 12 | 197 | 474 | 41.6% |
| Testing changes | 13 to 16 | 86 | 161 | 53.4% |
| All changes in place | 17 to 24 | 225 | 321 | 70.1% |
| Total | 1 to 24 | 508 | 956 | 53.1% |
The run chart shows weekly M1 against the frozen baseline median. All 12 points from week 13 to week 24 sit above the median, which meets the shift rule (six or more consecutive points on one side). Weeks 12 to 21 also form a trend: ten consecutive points, each higher than the one before.
Dashed line: baseline median (42.3%). Solid grey line: aim (70%). The weekly counts behind each point are in appendix B.
13.3 Process and balancing measures
| Measure (Example) | Baseline (weeks 1 to 12) | Weeks 17 to 24 | Comment |
|---|---|---|---|
| M2 prescriptions signed by 18:00 the day before | [n of 474, %] | [n of 321, %] | [Signal on run chart?] |
| M3 prescriptions needing pharmacist correction | 84 of 474 (17.7%) | 59 of 321 (18.4%) | No signal on the run chart; no evidence of harm from earlier prescribing |
| CH-01 fidelity: board rounds with pharmacist present | not applicable | [n of n weekdays] | [Gaps during annual leave] |
13.4 Context, unintended consequences and missing data
[Describe how context interacted with the changes, any unexpected benefits or problems, and how much data was missing and why.]
Example: The hospital flow programme started in week 10, before the first change, and introduced a daily site meeting that did not involve Ward 6 pharmacy staff; M1 did not change in weeks 10 to 12. Staff reported an unexpected benefit: earlier conversations with patients about their medicines. Data for two days in week 20 were missing because of an electronic prescribing outage; those discharges were excluded from both numerator and denominator.
Discussion
The four items below summarise the findings, interpret them against other work and the costs, set out the limitations and state the conclusions and next steps.
14. Summary
[Summarise the key findings, their relevance to the rationale and aims, and the particular strengths of the project.]
Example: Moving discharge prescribing to the day before, with early pharmacist involvement, was followed by a sustained rise in the proportion of discharges with medicines ready by 11:00 from 41.6% to 70.1%, meeting the aim in weeks 19 to 24 without a rise in prescription corrections. The project's strength is that it measured fidelity for each change and a balancing measure from the start.
15. Interpretation
[Discuss the nature of the association between the interventions and the outcomes, comparison with other work, the effect on people and systems, reasons for any differences from what was expected, and costs, opportunity costs and trade-offs.]
| Question | Answer (Example) |
|---|---|
| Does the timing of the signal fit the changes? | The rise began in week 13 with CH-01 and steepened after CH-03 in week 16 |
| How does this compare with published work? | [Similar or different, with reasons] |
| What did it cost? | 4 hours of pharmacist time a week moved from the dispensary; [cost of pre-packed stock] |
| What trade-offs appeared? | Dispensary queue for other wards [rose / unchanged]; monitored by the pharmacy manager |
16. Limitations
[List the limits to generalisability, factors that might have limited internal validity, and the efforts made to minimise them.]
Example: The design is a single-ward time series without a control ward, so a concurrent hospital-wide effect cannot be excluded; the flow programme that began in week 10 is the main alternative explanation. The absence of change in weeks 10 to 12 and the step pattern that follows the change dates make it less likely. The definition of a planned discharge relied on the ward board, which was updated by many staff.
17. Conclusions
[State the usefulness of the work, how it will be sustained, the potential for spread to other settings, implications for practice and further study, and suggested next steps.]
Example: The four changes are now standard work on Ward 6. The team will monitor M1 monthly for six months and is testing CH-01 and CH-03 on two surgical wards with different pharmacy cover.
Other information
Add here any information required by the target journal or committee that does not fit the SQUIRE items, such as patient partner involvement or data availability statements.
18. Funding
[List sources of funding that supported this work and the role, if any, of the funder in the design, implementation, interpretation and reporting.]
Example: No external funding. Staff time was provided by the hospital within normal duties. The pre-packed stock for CH-04 was funded from the pharmacy budget.
19. SQUIRE 2.0 cross-reference
| SQUIRE group | Item | Topic (short name) | Where in this report |
|---|---|---|---|
| Title and abstract | 1 | Title | Section 1 |
| Title and abstract | 2 | Abstract | Section 2 |
| Introduction | 3 | Problem description | Section 3 |
| Introduction | 4 | Available knowledge | Section 4 |
| Introduction | 5 | Rationale | Section 5 |
| Introduction | 6 | Specific aims | Section 6 |
| Methods | 7 | Context | Section 7 |
| Methods | 8 | Intervention(s) | Section 8 |
| Methods | 9 | Study of the intervention(s) | Section 9 |
| Methods | 10 | Measures | Section 10 |
| Methods | 11 | Analysis | Section 11 |
| Methods | 12 | Ethical considerations | Section 12 |
| Results | 13 | Results | Section 13 |
| Discussion | 14 | Summary | Section 14 |
| Discussion | 15 | Interpretation | Section 15 |
| Discussion | 16 | Limitations | Section 16 |
| Discussion | 17 | Conclusions | Section 17 |
| Other information | 18 | Funding | Section 18 |
20. Sustainability and spread plan
| Element | Plan (Example) |
|---|---|
| Standard work | CH-01 to CH-04 written into the ward operating procedure [document ID] |
| Measure owner after handover | Ward manager reviews M1 monthly; pharmacy manager reviews M3 monthly |
| Trigger for review | Six consecutive weekly points below 60%, or any month with M3 above 25% |
| Spread | Test on Wards 3 and 9 from [YYYY-MM-DD]; adapt CH-01 to afternoon pharmacist cover |
| Learning shared | Hospital QI event [YYYY-MM-DD]; summary in the pharmacy newsletter |
21. Glossary and references
21.1 Glossary
| Term | Meaning |
|---|---|
| Balancing measure | A measure that checks whether a change has caused a problem elsewhere in the system |
| Driver diagram | A diagram linking an aim to the factors (drivers) that influence it and the change ideas that act on them |
| Fidelity | The extent to which a change was delivered as intended |
| PDSA | Plan, Do, Study, Act: a cycle for testing a change on a small scale and learning from it |
| Run chart | A plot of a measure over time with its median, read with rules for non-random variation |
| Shift | A run of six or more consecutive points on one side of the median, a signal of non-random change |
| SQUIRE | Standards for QUality Improvement Reporting Excellence |
21.2 References
- Ogrinc G, Davies L, Goodman D, Batalden P, Davidoff F, Stevens D. SQUIRE 2.0 (Standards for QUality Improvement Reporting Excellence): revised publication guidelines from a detailed consensus process. BMJ Qual Saf. 2016;25(12):986-992. doi:10.1136/bmjqs-2015-004411. Published simultaneously in several journals.
- SQUIRE 2.0 Explanation and Elaboration. BMJ Qual Saf. 2016;25(12):e7. Listed on the EQUATOR Network page: https://www.equator-network.org/reporting-guidelines/squire/
- Langley GJ, Moen RD, Nolan KM, Nolan TW, Norman CL, Provost LP. The Improvement Guide: A Practical Approach to Enhancing Organizational Performance. 2nd edition. Jossey-Bass; 2009. Model for Improvement summary: https://www.ihi.org/library/model-for-improvement
- Perla RJ, Provost LP, Murray SK. The run chart: a simple analytical tool for learning from variation in healthcare processes. BMJ Qual Saf. 2011;20(1):46-51. doi:10.1136/bmjqs.2009.037895.
- [Local and published sources cited in sections 4 and 15]
Related templates in this collection: healthcare/pdsa-cycle for each
test of change, healthcare/clinical-audit for criterion-based audit
before and after a project, healthcare/root-cause-analysis when the
project starts from a serious incident, business/kpi-scorecard for
ongoing monitoring and project/lessons-learned for the close-out
review.
Appendix A. PDSA log
| Cycle | Change | Plan and prediction | Do (what happened) | Study (result vs prediction) | Act |
|---|---|---|---|---|---|
| PDSA-01 (Example) | CH-01 | Pharmacist at one team's board round for 5 days; predict at least 5 likely discharges flagged | Attended 5 of 5 days; 9 discharges flagged | 9 flagged, more than predicted; 7 of the 9 had medicines by 11:00 | Adopt; extend to both teams |
| PDSA-02 (Example) | CH-02 | Paper list at 16:00 for 1 week; predict list complete 4 of 5 days | Complete 3 of 5 days; sheet lost twice | Worse than predicted; paper unreliable | Adapt: move list to electronic ward board |
| PDSA-03 (Example) | CH-02, CH-03 | Electronic list plus day-before prescribing for 1 week; predict 50% signed by 18:00 | Doctors prescribed for 14 of 22 listed patients | 64% signed by 18:00, above prediction | Adopt; add to doctors' handover |
| PDSA-04 (Example) | CH-04 | Ward cupboard with 12 pre-packed items for 2 weeks; predict 20% of discharges use it | Used for 19 of 81 discharges | 23%, close to prediction; one stock-out | Adopt; restock twice weekly |
Appendix B. Data collection sheet
| Week | M1 numerator | M1 denominator | M1 % | Notes |
|---|---|---|---|---|
| 1 | 15 | 38 | 39.5 | Baseline |
| 2 | 18 | 41 | 43.9 | |
| 3 | 14 | 36 | 38.9 | |
| 4 | 17 | 40 | 42.5 | |
| 5 | 15 | 39 | 38.5 | |
| 6 | 19 | 42 | 45.2 | |
| 7 | 16 | 37 | 43.2 | |
| 8 | 15 | 40 | 37.5 | |
| 9 | 19 | 43 | 44.2 | |
| 10 | 16 | 38 | 42.1 | Hospital flow programme starts |
| 11 | 18 | 41 | 43.9 | |
| 12 | 15 | 39 | 38.5 | Baseline median frozen: 42.3% |
| 13 | 19 | 40 | 47.5 | CH-01 starts (PDSA-01) |
| 14 | 20 | 42 | 47.6 | CH-01 both teams |
| 15 | 22 | 38 | 57.9 | CH-02 starts (PDSA-02) |
| 16 | 25 | 41 | 61.0 | CH-03 starts (PDSA-03) |
| 17 | 26 | 39 | 66.7 | CH-04 starts (PDSA-04) |
| 18 | 29 | 43 | 67.4 | Staff huddle 1 |
| 19 | 28 | 40 | 70.0 | |
| 20 | 26 | 37 | 70.3 | Two days excluded (system outage) |
| 21 | 30 | 42 | 71.4 | |
| 22 | 29 | 41 | 70.7 | Staff huddle 2 |
| 23 | 28 | 39 | 71.8 | |
| 24 | 29 | 40 | 72.5 |
Example data: every row above is fictional. Totals: weeks 1 to 12, 197 of 474; weeks 13 to 16, 86 of 161; weeks 17 to 24, 225 of 321.
Standard and licence note
Structure aligned with SQUIRE 2.0 (Standards for QUality Improvement Reporting Excellence), Ogrinc G and colleagues, BMJ Quality and Safety 2016;25(12):986-992, published simultaneously in several journals and listed by the EQUATOR Network. This template uses the SQUIRE item numbers and short item names only; every heading explanation, guidance note and example is original text, and no checklist wording is reproduced. Use the official SQUIRE 2.0 checklist and the Explanation and Elaboration paper when you submit, and check the EQUATOR Network page for the current version. The Model for Improvement is cited from Langley and colleagues (Associates in Process Improvement) and the run chart rules from Perla, Provost and Murray (2011). The organisation, ward and all figures in the examples are fictional. This is a reporting format, not clinical advice; follow your organisation's governance, ethics and privacy rules and consult qualified professionals. Template licence: MIT.
Related templates
Patient Safety Incident Report Template
Incident report and learning review: immediate actions, WHO ICPS classification and harm, family involvement, learning response, findings, safety actions
HealthcarePDSA Cycle Worksheet Template
One PDSA test of change: Model for Improvement aim and measures, driver diagram, plan with prediction, do, study, act, ramp of cycles, run chart with rules
HealthcareNursing Care Plan Template (ADPIE)
Nursing care plan by the nursing process: assessment, diagnoses (problem, etiology, signs), SMART goals, interventions, evaluation