ISMS Glossary Template (ISO/IEC 27001 Terms in Plain Language)
147 ISMS terms in original plain-language definitions by topic, clause or control references, linked templates, abbreviations, local term mapping
How to use: Use it when onboarding people to the ISMS and when writing policies so each term means the same thing everywhere. Fill the organisation-specific terms section first, such as who acts as top management. The main pitfall is copying ISO/IEC 27000 definitions into your documents instead of using your own consistent wording.
Preview
ISMS Glossary: [Organization name]
A plain-language glossary of 147 terms used when building, running, auditing and certifying an information security management system (ISMS) under ISO/IEC 27001:2022 + Amd 1:2024. Every definition is written in original words for learners and practitioners, with the clause or Annex A control where the term matters and the library template that puts it to work. It is not a copy of the terms in ISO/IEC 27000:2026; for the normative terms, read the official standard. It supports awareness and competence (clauses 7.2 and 7.3) and consistent use of terms across ISMS documents (clause 7.5). Replace every
[bracketed]value and every row marked Example.
Document control
| Field | Value |
|---|---|
| Document ID | LRN-ISMS-02 |
| Version | [1.0] |
| Status | [Draft / In review / Approved / Superseded] |
| Owner | [@isms-manager] |
| Approvers/reviewers | [@ciso], [@policy-owner] |
| Last updated | YYYY-MM-DD |
| Classification | [Internal] |
| Standard and edition | ISO/IEC 27001:2022 + Amd 1:2024; ISO/IEC 27000:2026 (terms referenced, not reproduced) |
| Number of terms | [Count after you add section 11 terms] |
| Referenced by | DOC-ISMS-001, DOC-ISMS-005, DOC-ISMS-008 |
| Next scheduled review | YYYY-MM-DD |
Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| ISMS manager | [@isms-manager] | [Prepared] | YYYY-MM-DD |
| CISO or security lead | [@ciso] | [Approved / Approved with changes] | YYYY-MM-DD |
Revision history
| Version | Date | Author | Change |
|---|---|---|---|
| 1.0 (Example) | 2026-11-01 | [@isms-manager] | First glossary, sections 3 to 9 |
| 1.1 (Example) | YYYY-MM-DD | [@isms-manager] | Organisation terms added in section 11 after the policy review |
Contents
- Purpose and use
- Conventions
- Core management system terms
- Risk terms
- Control and Annex A terms
- Operations, incident and continuity terms
- Measurement, audit and improvement terms
- Certification terms
- Privacy, cloud and related family terms
- Abbreviations
- Organisation-specific terms
- Size tiers: how the same terms map to different organisations
- Records and evidence
- References
1. Purpose and use
The glossary has three uses:
- Learning. Module M0 and M1 of
isms/isms-learning-pathuse it as the vocabulary reference. Section 3 holds the core terms to learn first. - Consistency. Policies, procedures and records use the terms as defined here. When a document needs a narrower meaning, it says so.
- Audit readiness. Staff who can explain terms such as "risk owner", "residual risk" or "nonconformity" in their own words do better in audit interviews than staff who recite a definition.
The glossary does not replace ISO/IEC 27000:2026, which holds the normative terms for the family. Where this glossary and the standard differ in nuance, the standard prevails for audit purposes.
2. Conventions
- Definitions are original. They explain the idea in plain words and sometimes add a practical example. They are not quotations.
- Where it matters gives the ISO/IEC 27001:2022 clause or Annex A control where the term is most relevant. "A.5.15" means Annex A control 5.15. Clause numbers refer to ISO/IEC 27001:2022 + Amd 1:2024 unless another standard is named.
- See also gives the library template, by
category/slug, that uses the term in practice. - Risk scale. Terms about risk levels use the library scale:
likelihood 1 to 5 times impact 1 to 5, score 1 to 25, bands Low 1-4,
Medium 5-9, High 10-16, Critical 17 to 25 (in practice 20 and 25)
(
compliance/risk-methodology).
3. Core management system terms
| Term | Plain-language meaning | Where it matters | See also |
|---|---|---|---|
| Information security | Keeping information confidential, accurate and complete, and available to the right people when needed | Whole standard | compliance/information-security-policy |
| Confidentiality | Information is kept away from anyone, or any system, that has no permission to read it | 6.1.2, A.5.12 | data/data-classification-policy |
| Integrity | Information can be trusted: nothing has been altered, lost or added without permission, and changes can be traced | 6.1.2, A.8.32 | ops/change-request |
| Availability | The people and systems that need information or a service can reach it and use it at the time they need it | 6.1.2, A.8.13, A.8.14 | isms/backup-policy |
| Information security management system (ISMS) | The set of policies, processes, roles, records and controls an organisation uses to manage information security risk in a planned, checked and improving way | 4.4 | isms/isms-manual |
| Management system | The way an organisation runs one area of work (quality, continuity, security) in a deliberate cycle: it sets aims and rules, does the work, checks results and adjusts | 4.4 | compliance/iso-map |
| Harmonized structure | The common clause layout (4 to 10) that ISO management system standards share, which makes integration easier | Clauses 4 to 10 | isms/integrated-management-27013 |
| Context of the organization | The internal and external conditions that affect what the ISMS must achieve and how | 4.1 | isms/isms-context-interested-parties |
| Issue (internal or external) | A condition, trend or fact inside or outside the organisation that can help or hinder the ISMS, such as a new regulation or staff turnover | 4.1 | isms/isms-context-interested-parties |
| Climate change issue | A decision, required since Amendment 1:2024, on whether climate change is relevant to the ISMS, for example through data centre resilience or supply chains | 4.1, 4.2 note | isms/isms-context-interested-parties |
| Interested party | Anyone with a stake in how the organisation protects information, because they can influence it or feel its results, such as customers, regulators or staff (also called a stakeholder) | 4.2 | isms/isms-context-interested-parties |
| Requirement | Something the organisation must or is expected to do, whether written down (a contract clause, a law) or simply taken for granted by customers and staff | 4.2 | compliance/legal-register |
| Scope | The boundary of the ISMS: which organisational units, locations, services, information and technology it covers, and the interfaces to what lies outside | 4.3 | compliance/ms-scope |
| Process | A repeatable way of working with a start, an end, an owner and something useful produced, such as access review or internal audit; the ISMS is a group of connected processes | 4.4 | isms/isms-process-map |
| Top management | The most senior leaders of the organisation, or of the part in scope, who make the final decisions and answer for the ISMS (for example the CEO and executive team) | 5.1 | isms/isms-steering-committee-charter |
| Information security policy | The top-level statement, approved by top management, that sets direction, objectives or how to set them, and the commitments to meet requirements and improve | 5.2 | compliance/information-security-policy |
| Topic-specific policy | A policy on one subject, such as access control or remote working, that sits under the top-level policy | A.5.1 | isms/isms-policy-framework |
| Role, responsibility and authority | Who does what (role), what they must achieve (responsibility) and what they may decide (authority) | 5.3 | isms/isms-roles-raci |
| Objective | A measurable result the ISMS aims for, such as "95% of staff complete training by June" | 6.2 | compliance/objectives-register |
| Documented information | The written or stored material the ISMS depends on, in any format (file, wiki page, ticket, recording): documents that describe how things are done and records that prove what happened | 7.5 | isms/isms-documented-information-register |
| Document | Documented information that describes intent or method (policy, procedure, standard); it is revised over time | 7.5.2 | compliance/controlled-document |
| Record | Documented information that proves something happened (log, signed form, minutes); it should not be changed after the fact | 7.5.3 | isms/control-evidence-matrix |
| Competence | Being able to do a role well in practice, not just knowing about it; shown by education, training or experience | 7.2 | isms/isms-competence-training-matrix |
| Awareness | Knowing the policy, how you contribute to the ISMS and what happens if you do not follow it | 7.3 | security/security-awareness-program |
| Externally provided process | A process, product or service that someone outside the organisation delivers and that matters to the ISMS, such as hosting or payroll | 8.1 | isms/supplier-register |
| Effectiveness | Whether something actually works: the plan was carried out and it delivered the result it was meant to deliver | 9.1, 9.3 | isms/isms-performance-report |
| Conformity | Doing what is required, either by the standard or by the organisation's own ISMS rules | 9.2 | isms/isms-internal-audit-checklist |
| Continual improvement | The ongoing habit of making the ISMS fit the organisation better and work better, step by step, not only after something goes wrong | 10.1 | isms/continual-improvement-register |
4. Risk terms
| Term | Plain-language meaning | Where it matters | See also |
|---|---|---|---|
| Risk | Something that might or might not happen and would change what the organisation is trying to achieve; in security, the chance that information is harmed and how bad that would be | 6.1 | compliance/risk-methodology |
| Risks and opportunities | ISMS-level things that could stop or help the ISMS reaching its outcomes, broader than risks to assets | 6.1.1 | isms/isms-context-interested-parties |
| Opportunity | A situation that could improve security or the ISMS, such as a platform migration that allows better logging | 6.1.1 | isms/continual-improvement-register |
| Information security risk | A risk of losing confidentiality, integrity or availability of information within the scope | 6.1.2 | compliance/risk-register |
| Risk assessment | The full exercise of spotting risks, sizing them and ranking them against the criteria; the three steps below | 6.1.2, 8.2 | isms/isms-risk-assessment-report |
| Risk identification | Listing what could go wrong: the scenario, what it affects, its cause and how it would happen | 6.1.2 c | isms/isms-threat-vulnerability-catalogue |
| Risk analysis | Working out how likely a risk is and how serious its consequences would be, to set a risk level | 6.1.2 d | compliance/risk-methodology |
| Risk evaluation | Checking each scored risk against the acceptance rules to see which ones need action and which come first | 6.1.2 e | compliance/risk-methodology |
| Risk criteria | The rules for assessing risk: scales, how to combine them, and when a risk is acceptable | 6.1.2 a | isms/isms-risk-appetite-criteria |
| Risk acceptance criteria | The part of the risk criteria that says which risk levels may be accepted and by whom | 6.1.2 a | isms/isms-risk-appetite-criteria |
| Risk appetite | Top management's stated comfort level with risk: where it will take chances to reach its goals and where it wants risk kept low | 6.1.2, 5.1 | isms/isms-risk-appetite-criteria |
| Risk owner | The named person who answers for a risk and can make decisions about it, including approving its treatment and accepting what remains | 6.1.2 c, 6.1.3 f | isms/isms-roles-raci |
| Asset | Something the organisation relies on and would suffer from losing or having damaged: information, systems, people, sites, services | A.5.9 | compliance/asset-inventory |
| Asset owner | The person accountable for an asset's protection throughout its life; often not the same person as the risk owner | A.5.9 | compliance/asset-inventory |
| Threat | Whoever or whatever could cause harm to information, such as a ransomware gang, a careless insider or a flood | 6.1.2 | isms/isms-threat-vulnerability-catalogue |
| Vulnerability | A gap or flaw in a system, process or control that makes harm easier, such as an unpatched server or a shared password | 6.1.2, A.8.8 | isms/vulnerability-remediation-tracker |
| Likelihood | How probable it is that a risk happens in a given period; scored 1 to 5 in the library scale | 6.1.2 d | compliance/risk-methodology |
| Consequence (impact) | How serious the outcome would be if the risk happened; scored 1 to 5 in the library scale | 6.1.2 d | compliance/business-impact-analysis |
| Level of risk (risk score) | The number that ranks a risk; in the library scale likelihood times impact, so likelihood 3 and impact 4 give 12, which is High | 6.1.2 d | compliance/risk-register |
| Inherent risk | The risk level before taking current controls into account; not all methods use it | 6.1.2 | compliance/risk-methodology |
| Residual risk | What is left of a risk once the chosen treatment is in place; risk owners must accept it | 6.1.3 f | isms/isms-risk-acceptance-record |
| Risk treatment | Deciding what to do about a risk and then doing it | 6.1.3, 8.3 | compliance/risk-treatment-plan |
| Risk treatment options | The main choices: reduce the risk with controls, retain it, avoid it by stopping the activity, or share it (for example with insurance or a supplier) | 6.1.3 a | compliance/risk-treatment-plan |
| Risk treatment plan | The plan that says which treatment actions happen, who does them, by when and with what resources | 6.1.3 e | compliance/risk-treatment-plan |
| Risk acceptance | A documented decision by the right person to keep a risk at its current level | 6.1.3 f | isms/isms-risk-acceptance-record |
| Risk register | The list of identified risks with their analysis, owner, treatment and status | 6.1.2, 8.2 | compliance/risk-register |
| Event-based approach | Identifying risks from scenarios of what could happen (events and their sources), as described in ISO/IEC 27005:2022 | 6.1.2 | compliance/risk-methodology |
| Asset-based approach | Identifying risks by going through assets, their threats and vulnerabilities, as described in ISO/IEC 27005:2022 | 6.1.2 | compliance/asset-inventory |
| Risk exception | A time-limited, approved deviation from a policy or control, treated as an accepted risk with a review date | 6.1.3 f | security/security-exception-request |
5. Control and Annex A terms
| Term | Plain-language meaning | Where it matters | See also |
|---|---|---|---|
| Control | Anything put in place to make a risk smaller or easier to live with, such as a policy, a procedure, a technical setting or a physical barrier | 6.1.3 | compliance/statement-of-applicability |
| Annex A | The reference list of 93 information security controls in ISO/IEC 27001:2022, grouped in four themes, used to check that no necessary control is missed | 6.1.3 c | isms/annex-a-organizational-controls-guide |
| Control theme | One of the four Annex A groups: organizational (A.5, 37 controls), people (A.6, 8), physical (A.7, 14), technological (A.8, 34) | Annex A | isms/annex-a-technological-controls-guide |
| Statement of Applicability (SoA) | The record of which controls are necessary, why each is included, whether each is implemented, and why any Annex A control is excluded | 6.1.3 d | compliance/statement-of-applicability |
| Justification for exclusion | The reason an Annex A control is not needed, tied to the risk assessment or to the scope, not to convenience | 6.1.3 d | compliance/statement-of-applicability |
| Control attribute | A tag in ISO/IEC 27002:2022 used to group and filter controls; the five attributes are control type, information security properties, cybersecurity concepts, operational capabilities and security domains | ISO/IEC 27002:2022 | isms/control-framework-crosswalk |
| Preventive, detective, corrective | The control type attribute: stops an event, spots it, or limits and repairs its effects | ISO/IEC 27002:2022 | isms/annex-a-technological-controls-guide |
| Cybersecurity concepts | The attribute that maps a control to Identify, Protect, Detect, Respond or Recover (the five functions of NIST CSF 1.1; CSF 2.0 added Govern, which is not a 27002 value), which helps link ISO/IEC 27001 to NIST CSF style models | ISO/IEC 27002:2022 | compliance/nist-csf |
| Control owner | The person accountable for a control operating as designed and for producing its evidence | 5.3, 8.1 | isms/control-evidence-matrix |
| Compensating control | A different control used when the expected one cannot be applied, giving a similar reduction in risk | 6.1.3 | security/security-exception-request |
| Defence in depth | Layering several independent controls so one failure does not expose the information | 6.1.3 | security/zero-trust-architecture |
| Least privilege | Giving each person or system only the access needed for its task, and no more | A.5.15, A.8.2 | isms/access-control-policy |
| Need to know | Access to information is limited to people whose work requires it | A.5.15, A.8.3 | isms/access-control-policy |
| Segregation of duties | Splitting conflicting tasks between different people so one person cannot misuse or hide a misuse alone | A.5.3 | isms/isms-roles-raci |
| Information classification | Sorting information into levels (for example Public, Internal, Confidential) based on its sensitivity and value | A.5.12 | data/data-classification-policy |
| Labelling | Marking information with its classification so people and systems handle it correctly | A.5.13 | isms/information-labelling-handling-procedure |
| Threat intelligence | Collecting and analysing information about threats so decisions and controls stay current; new in 2022 | A.5.7 | isms/threat-intelligence-procedure |
| Configuration management | Defining, applying and monitoring secure settings for hardware, software, services and networks; new in 2022 | A.8.9 | isms/secure-configuration-baseline |
| Information deletion | Removing information when it is no longer needed, in a way that prevents recovery where required; new in 2022 | A.8.10 | data/data-retention-deletion-standard |
| Data masking | Hiding or replacing parts of data (for example with pseudonyms or partial values) to limit exposure; new in 2022 | A.8.11 | isms/data-masking-dlp-standard |
| Data leakage prevention | Measures that detect and stop sensitive information leaving through unauthorised routes; new in 2022 | A.8.12 | isms/data-masking-dlp-standard |
| Secure development life cycle | Building security into every phase of software and system development, from requirements to retirement | A.8.25 | isms/secure-development-policy |
| Secure coding | Writing code that follows safe practices and avoids known weakness patterns; new in 2022 | A.8.28 | security/secure-coding-standard |
| Cryptography | Using encryption, hashing and signatures, with managed keys, to protect information | A.8.24 | security/cryptography-standard |
| Privileged access | Access that can change systems or security settings, such as administrator accounts, which needs tighter control | A.8.2 | security/privileged-access-standard |
6. Operations, incident and continuity terms
| Term | Plain-language meaning | Where it matters | See also |
|---|---|---|---|
| Information security event | Anything noticed that might point to a security problem, such as a suspicious e-mail or an unusual login; most turn out to be harmless | A.6.8, A.5.25 | isms/security-event-reporting-procedure |
| Information security incident | A security problem confirmed by triage as real or likely harm to the organisation or its information, so the response process starts | A.5.24 to A.5.26 | compliance/incident-response-plan |
| Incident management | The planned way of detecting, assessing, responding to and learning from incidents | A.5.24 to A.5.27 | isms/incident-register |
| Post-incident review | A structured review after an incident to find causes and improvements, without blame | A.5.27 | isms/post-incident-review |
| Digital evidence | Data collected in a way that keeps it reliable for disciplinary, legal or regulatory use | A.5.28 | security/forensic-evidence-record |
| Personal data breach | A security incident that affects personal data; laws such as the GDPR may set notification duties | A.5.34 | compliance/personal-data-breach-assessment |
| Business continuity | The ability to keep delivering key services at an acceptable level during and after a disruption; Annex A covers keeping security during disruption and ICT readiness | A.5.29, A.5.30 | compliance/business-continuity |
| ICT readiness for business continuity | Making sure technology can be restored in line with continuity needs; new in 2022 | A.5.30 | isms/ict-readiness-business-continuity-plan |
| Recovery time objective (RTO) | The target time to restore a service or system after a disruption | A.5.30 | compliance/business-impact-analysis |
| Recovery point objective (RPO) | The maximum acceptable amount of data loss, measured in time before the disruption | A.8.13 | isms/backup-policy |
| Backup | A copy of information kept so it can be restored after loss or damage, tested regularly | A.8.13 | isms/backup-restore-test-log |
| Change management | Controlling changes to systems and services so they are assessed, approved, tested and recorded | A.8.32 | ops/change-enablement-policy |
| Vulnerability management | Finding, rating and fixing technical weaknesses within set timeframes | A.8.8 | security/vulnerability-management-policy |
| Logging | Recording events such as logins, errors and administrator actions so they can be reviewed | A.8.15 | security/security-logging-standard |
| Monitoring activities | Watching networks, systems and applications for unusual behaviour and acting on it; new in 2022 | A.8.16 | isms/security-monitoring-procedure |
| Supplier | An organisation that provides products or services, from cloud hosting to cleaning, that may affect security | A.5.19 to A.5.22 | isms/supplier-register |
| ICT supply chain | The chain of suppliers and their suppliers behind the technology you use, including software components | A.5.21 | security/supply-chain-security |
| Cloud service | A service delivered over a network from shared, configurable resources; its security is shared between provider and customer; new control in 2022 | A.5.23 | isms/cloud-services-security-policy |
| Shared responsibility | The split of security duties between a cloud provider and its customer, which differs by service model | A.5.23 | isms/cloud-services-security-policy |
| Remote working | Working from outside the organisation's premises, with controls for devices, networks and surroundings | A.6.7 | isms/remote-working-policy |
| Secure area | A physical area with extra protection because of what it holds, such as a server room | A.7.1 to A.7.6 | isms/physical-security-policy |
7. Measurement, audit and improvement terms
| Term | Plain-language meaning | Where it matters | See also |
|---|---|---|---|
| Monitoring | Keeping an eye on how a process, control or system is doing, often continuously or at short intervals | 9.1 | isms/security-monitoring-procedure |
| Measurement | Putting a number on something, such as a percentage or a count, using a defined method | 9.1 | isms/isms-measurement-programme |
| Measure (metric, indicator) | A defined value with a formula, data source, frequency, target and owner | 9.1 | isms/isms-measurement-programme |
| Analysis and evaluation | Interpreting measurement results to judge performance and decide actions | 9.1 | isms/isms-performance-report |
| Audit | A planned, impartial and recorded examination that gathers evidence and judges it against agreed rules | 9.2 | compliance/internal-audit-program |
| Internal audit | An audit the organisation runs on its own ISMS (or pays an independent party to run) to check conformity and effectiveness | 9.2 | isms/isms-internal-audit-report |
| Audit programme | The multi-year or annual schedule of audits: what is audited, when, how and by whom, weighted by importance and previous results | 9.2.2 | compliance/internal-audit-program |
| Audit criteria | What the audit compares evidence against: the standard, policies, contracts, laws | 9.2.2 b | isms/isms-internal-audit-checklist |
| Audit evidence | What the auditor sees, reads or hears and can check, such as a log, a signed approval or an interview answer | 9.2 | isms/stage-2-audit-evidence-index |
| Audit finding | The auditor's conclusion on a point: conformity, nonconformity or an opportunity for improvement | 9.2 | isms/audit-findings-register |
| Objectivity and impartiality | Auditors judge evidence fairly and do not audit their own work | 9.2.2 c | compliance/internal-audit-program |
| Nonconformity | A gap where something required is not done, whether required by the standard or by the organisation's own ISMS | 10.2 | compliance/capa-nonconformity |
| Correction | Immediate action to fix a specific nonconformity, such as removing one leaver's account | 10.2 a | compliance/capa-nonconformity |
| Corrective action | A fix aimed at why the problem happened, so the same gap stays closed, such as automating account removal | 10.2 b, c | compliance/capa-nonconformity |
| Root cause | The underlying reason a problem happened, found by asking why until the answer is something you can change | 10.2 b | isms/post-incident-review |
| Effectiveness review | Checking, after time has passed, that a corrective action really prevented recurrence | 10.2 d | isms/audit-findings-register |
| Opportunity for improvement | A point where the ISMS meets requirements but could work better; recorded but not a nonconformity | 9.2, 10.1 | isms/continual-improvement-register |
| Management review | Top management's planned review of the ISMS, covering set inputs and leading to decisions on improvement and change | 9.3 | compliance/management-review |
8. Certification terms
| Term | Plain-language meaning | Where it matters | See also |
|---|---|---|---|
| Certification | Independent confirmation by a certification body that a management system meets a standard, shown by a certificate | ISO/IEC 17021-1:2015 | isms/certification-audit-explained |
| Certification body (CB) | An organisation that audits and certifies management systems | ISO/IEC 17021-1:2015 | isms/certification-body-selection |
| Accreditation body | An organisation that checks that certification bodies are competent and impartial | ISO/IEC 17021-1:2015 | isms/certification-body-selection |
| Accredited certification | Certification issued by a certification body accredited for that standard, ideally by an accreditation body that is a signatory of the Global ACI MRA (formerly the IAF MLA); check the IAF CertSearch database | ISO/IEC 27006-1:2024 | isms/certification-body-selection |
| Stage 1 audit | The first part of the initial audit: the CB reviews documents, readiness and scope, and plans Stage 2 | ISO/IEC 17021-1:2015 | isms/stage-1-readiness-pack |
| Stage 2 audit | The second part of the initial audit: the CB checks that the ISMS is implemented and effective | ISO/IEC 17021-1:2015 | isms/stage-2-audit-evidence-index |
| Major nonconformity | A serious gap, such as a required process missing or failing across the board, that makes the auditor doubt the ISMS can deliver what it should; the CB decides the grading | ISO/IEC 17021-1:2015 | isms/certification-findings-action-plan |
| Minor nonconformity | A real but contained gap, such as one missed review, that does not on its own put the ISMS's results in doubt; the CB decides the grading | ISO/IEC 17021-1:2015 | isms/certification-findings-action-plan |
| Certification decision | The CB's decision to grant, maintain, renew or withdraw a certificate, made by people who did not conduct the audit | ISO/IEC 17021-1:2015 | isms/certification-audit-explained |
| Certification cycle | The three-year life of a certificate: initial audit, surveillance audits in the following years, recertification before expiry | ISO/IEC 17021-1:2015 | isms/certification-cycle-plan |
| Surveillance audit | An audit at least once each calendar year (except recertification years) to confirm the ISMS still works; the first is due no later than 12 months after the certification decision | ISO/IEC 17021-1:2015 | isms/surveillance-readiness-health-check |
| Recertification audit | The audit, planned and completed before the certificate expires, that renews the certificate for another cycle | ISO/IEC 17021-1:2015 | isms/certification-cycle-plan |
| Audit time | The number of auditor days the CB plans, set from ISO/IEC 27006-1 using the number of people doing work under the organisation's control and complexity factors | ISO/IEC 27006-1:2024 | isms/certification-body-selection |
| Multi-site sampling | Rules that let a CB audit a sample of similar sites instead of every site, under ISO/IEC 27006-1 and IAF MD 1:2023, now re-issued by Global ACI as Global ACI-TECH-3-001 (check the current issue) | ISO/IEC 27006-1:2024 | isms/scope-extension-multisite-plan |
| Scope extension | Adding sites, services or units to an existing certificate, usually at a surveillance audit or a special audit | ISO/IEC 17021-1:2015 | isms/scope-extension-multisite-plan |
| Certification mark | The logo a CB lets certified organisations use (and any accreditation symbol, only under the accreditation body's rules), under strict rules (never on products as if they were certified) | ISO/IEC 17021-1:2015 | isms/certification-mark-usage |
| Transition | The period for moving certificates to a new edition; certificates to ISO/IEC 27001:2013 expired at the end of the transition, 2025-10-31 | ISO/IEC 27001:2022 | isms/certification-cycle-plan |
9. Privacy, cloud and related family terms
| Term | Plain-language meaning | Where it matters | See also |
|---|---|---|---|
| Personally identifiable information (PII) | Information that can identify a person directly or indirectly; many laws call it personal data | A.5.34 | compliance/gdpr-ropa |
| PII controller | The organisation that decides why and how PII is processed | A.5.34, ISO/IEC 27701:2025 | isms/pims-27701-scope-roles |
| PII processor | An organisation that handles PII for a controller's purposes and as the controller directs, such as a SaaS provider | A.5.34, ISO/IEC 27701:2025 | isms/cloud-pii-27018-processor |
| Privacy information management system (PIMS) | A management system for privacy; ISO/IEC 27701:2025 is now a stand-alone, certifiable standard | ISO/IEC 27701:2025 | isms/pims-27701-statement-of-applicability |
| Cloud service provider | The party that makes cloud services available; ISO/IEC 27017:2026 gives cloud-specific control guidance | A.5.23 | isms/cloud-27017-controls |
| Cloud service customer | The party that uses cloud services and keeps responsibility for its own configuration and data | A.5.23 | isms/cloud-services-security-policy |
| Integrated management system | One management system that meets several standards (for example ISO 9001, ISO 22301, ISO/IEC 27001) with shared processes | Clauses 4 to 10 | isms/integrated-management-27013 |
| AI management system (AIMS) | A management system for the responsible development or use of AI under ISO/IEC 42001:2023 | ISO/IEC 42001:2023 | isms/iso-27001-42001-integrated-soa |
| Operational technology (OT) | Systems that monitor or control physical processes, such as plant control systems, with different availability and safety priorities from IT | 4.3, A.8.20 | isms/energy-27019-controls |
10. Abbreviations
| Abbreviation | Meaning |
|---|---|
| AIMS | AI management system (ISO/IEC 42001) |
| BCMS | Business continuity management system (ISO 22301) |
| CAPA | Corrective and preventive action, used here for nonconformity and corrective action records |
| CB | Certification body |
| CIA | Confidentiality, integrity, availability |
| DLP | Data leakage prevention |
| EDR | Endpoint detection and response |
| Global ACI | Global Accreditation Cooperation Incorporated, which replaced IAF and ILAC on 2026-01-01 |
| Global ACI MRA | Global ACI recognition arrangement for accreditation bodies (formerly the IAF MLA) |
| IAF | International Accreditation Forum (merged into Global ACI on 2026-01-01) |
| IAF MD | IAF mandatory document, being re-issued as Global ACI technical documents |
| IAF MLA | IAF multilateral recognition arrangement, now the Global ACI MRA |
| ISMS | Information security management system |
| KPI | Key performance indicator |
| MDM | Mobile device management |
| MFA | Multi-factor authentication |
| NC | Nonconformity |
| OFI | Opportunity for improvement |
| OT | Operational technology |
| PII | Personally identifiable information |
| PIMS | Privacy information management system (ISO/IEC 27701) |
| RACI | Responsible, accountable, consulted, informed |
| RPO | Recovery point objective |
| RTO | Recovery time objective |
| RTP | Risk treatment plan |
| SIEM | Security information and event management |
| SoA | Statement of Applicability |
11. Organisation-specific terms
| Term used here | Maps to ISMS term | Meaning in our organisation | Used in |
|---|---|---|---|
| Executive Leadership Team (Example) | Top management | CEO, CFO, CTO and COO acting together for the whole company | DOC-ISMS-001, DOC-ISMS-085 |
| Service owner (Example) | Risk owner and asset owner | Manager accountable for a customer-facing service, its risks and its assets | DOC-ISMS-016, DOC-ISMS-012 |
| Security ticket (Example) | Information security event | Any report raised through the security queue, before triage decides whether it is an incident | DOC-ISMS-023 |
| Restricted (Example) | Highest classification level | Customer health data and keys; only named roles may access it | data/data-classification-policy |
| [Local term] | [ISMS term] | [meaning] | [documents] |
12. Size tiers: how the same terms map to different organisations
The library's working tiers are small (under 50 people), medium (50 to 500) and large or multi-site (over 500 or several sites).
| Term | Small: Quillmere Analytics Ltd (46 staff) | Medium: Quillmere Health Systems (320 staff) | Large: Quillmere Group (2,400 staff, 6 sites) |
|---|---|---|---|
| Top management | CEO and CTO | Executive team, with a security steering committee | Group board and executive committee; site directors for site matters |
| ISMS manager | Head of Engineering Operations, 0.5 FTE | Full-time ISMS manager | CISO, with a 14-person security office |
| Risk owner | Founders and the two engineering leads | Service and department heads | Group function heads and site directors |
| Control owner | Often the same person for several controls | Named per control, supported by a 3-person security team | Named per control and per site, with group standards |
| Internal audit | Independent external auditor engaged for the audit | Two trained auditors from the quality team | Audit pool across sites, coordinated with ISO 9001 and ISO 22301 audits |
| Interested parties | Customers, the cloud provider, investors, staff | Hospitals, regulators, patients through the hospitals, staff | Customers, regulators in 4 countries, workers' representatives, insurers |
| Scope | Whole company and platform | Software, managed service, two offices, colocation suite | Phased by site, starting with HQ and the data centre |
13. Records and evidence
| Record | Shows | Kept by | Where | Retention (Example) |
|---|---|---|---|---|
| Approved glossary versions | Terms are controlled and consistent across documents (7.5) | ISMS manager | [Document system] | Current plus previous 3 versions |
| Policy reviews that checked terms | Documents use the glossary consistently | Policy owners | [Review records] | 3 years |
| Awareness material using the glossary | Staff learned key terms (7.3) | ISMS manager | [Learning system] | 3 years |
| Self-test results on vocabulary | Learners understood the terms | ISMS manager | [Learner log in isms/isms-learning-path] | Employment plus 2 years |
Map these records in isms/control-evidence-matrix (DOC-ISMS-033).
14. References
| Standard | Edition | Link |
|---|---|---|
| ISO/IEC 27000 | 2026 (terms reduced compared with 2018) | https://www.iso.org/standard/84257.html |
| ISO/IEC 27001 | 2022 + Amd 1:2024 | https://www.iso.org/standard/82875.html and https://www.iso.org/standard/88435.html |
| ISO/IEC 27002 | 2022 | https://www.iso.org/standard/75652.html |
| ISO/IEC 27005 | 2022 | https://www.iso.org/standard/80585.html |
| ISO/IEC 27006-1 | 2024 | https://www.iso.org/standard/82908.html |
| ISO/IEC 17021-1 | 2015 | https://www.iso.org/standard/61651.html |
| ISO/IEC 27701 | 2025 | https://www.iso.org/standard/85819.html |
| ISO/IEC 27017 | 2026 | https://www.iso.org/standard/82878.html |
| ISO/IEC 42001 | 2023 | https://www.iso.org/standard/81230.html |
| ISO 31000 | 2018 | https://www.iso.org/standard/65694.html |
| ISO 19011 | 2026 | https://www.iso.org/standard/88984.html |
IAF mandatory documents (such as IAF MD 1:2023 on multi-site certification) have been re-issued by Global Accreditation Cooperation Incorporated (Global ACI), which replaced IAF and ILAC on 2026-01-01; IAF MD 1 is now Global ACI-TECH-3-001. Check the current issue on the Global ACI website.
Related templates: isms/isms-learning-path,
isms/iso-27001-clauses-explained, isms/isms-self-test,
isms/iso-27000-family-map, isms/isms-manual,
compliance/risk-methodology, compliance/statement-of-applicability.
Standard and licence note
Structure aligned with ISO/IEC 27001:2022 + Amd 1:2024 and the vocabulary of the ISO/IEC 27000 family as described in ISO/IEC 27000:2026. Every definition and explanation is original text written in plain language; no ISO or IEC definitions, notes or term entries are reproduced, and the official terms in ISO/IEC 27000:2026 and in each standard prevail. You need the official standards to implement or audit an ISMS. Editions change: check the current edition on iso.org before you rely on this glossary. This is a learning aid, not certification or legal advice. Template licence: MIT.
Related templates
Access Control Policy Template (ISO/IEC 27001 A.5.15)
Access principles, role catalogue, joiner mover leaver SLAs, MFA and NIST SP 800-63B-4 password rules, privileged and service accounts, reviews, metrics
ISMS & ISO/IEC 27001Annex A Organizational Controls Guide Template (ISO/IEC 27001 A.5)
A.5.1 to A.5.37 in own words: intent, typical implementation, tier notes, evidence auditors sample, pitfalls, linked templates, self-check, study record
ISMS & ISO/IEC 27001Annex A People and Physical Controls Guide Template (ISO/IEC 27001 A.6, A.7)
A.6.1 to A.6.8 and A.7.1 to A.7.14 in own words: intent, tier notes, evidence, pitfalls, physical boundary decision for cloud and colocation, self-check, study record