Markdown Editor

ISMS Internal Audit Checklist Template (ISO/IEC 27001 clause 9.2)

Audit questions and evidence for clauses 4-10, Annex A audit trails and rotation, sample sizes, interview guide, finding grading (MAJ, MIN, OBS, OFI)

ISMS & ISO/IEC 27001FullISO/IEC 27001:2022 + Amd 1:2024 clause 9.2 (cited only); ISO 19011:2026; ISO/IEC 27007:2020internalauditchecklist

How to use: Use it when you prepare and run an internal ISMS audit. Fill the scope, criteria and sampling plan first, then work the clause questions and Annex A trails. The main pitfall is reading policies instead of sampling records, which cannot show the ISMS is effective.

Preview

ISMS Internal Audit Checklist: [Organization name]

A working checklist for internal audits of an information security management system (ISMS) under ISO/IEC 27001:2022 + Amd 1:2024, clause 9.2 (internal audit). It gives audit questions and the evidence to sample for clauses 4 to 10, a sampling approach for the 93 Annex A controls by theme, an interview guide and a grading scheme for findings (major nonconformity, minor nonconformity, observation, opportunity for improvement). Method follows the guidance of ISO 19011:2026 and ISO/IEC 27007:2020. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document IDDOC-ISMS-083
Version[1.0]
Status[Draft / In review / Approved / Superseded]
Owner[@audit-programme-manager]
Approvers/reviewers[@isms-manager], [@ciso or top management sponsor]
Last updatedYYYY-MM-DD
Classification[Internal / Confidential when completed]
Standard and editionISO/IEC 27001:2022 + Amd 1:2024 clause 9.2; guidance ISO 19011:2026 and ISO/IEC 27007:2020
Next scheduled reviewYYYY-MM-DD
Audit programme referenceDOC-ISMS-082, [programme period]
Audit reference (completed copy)[IA-YYYY-NN]
Audit scope (completed copy)[Clauses, Annex A themes, sites, processes]
Lead auditor (completed copy)[@lead-auditor]

Approvals

RoleNameDecisionDate
Audit programme manager[@audit-programme-manager][Prepared]YYYY-MM-DD
ISMS manager[@isms-manager][Reviewed]YYYY-MM-DD
Top management sponsor[@ceo or delegate][Approved]YYYY-MM-DD

Revision history

VersionDateAuthorChange
1.0 (Example)2027-01-20[@audit-programme-manager]First approved master checklist for the 2027 programme
1.1 (Example)2027-11-05[@audit-programme-manager]Added climate change question to 4.1 and 4.2 after Stage 2 feedback, adjusted sample sizes
[x.y]YYYY-MM-DD[@author][Change]

Contents

  1. Purpose, scope and audit criteria
  2. How to use the checklist
  3. Auditor independence and conduct
  4. Preparing the audit
  5. Clause 4: Context of the organization
  6. Clause 5: Leadership
  7. Clause 6: Planning
  8. Clause 7: Support
  9. Clause 8: Operation
  10. Clause 9: Performance evaluation
  11. Clause 10: Improvement
  12. Annex A sampling approach by theme
  13. Sample sizes and selection
  14. Interview guide
  15. Grading findings
  16. Closing meeting and handover
  17. Summary of results
  18. Size tiers
  19. Records and evidence
  20. References

1. Purpose, scope and audit criteria

This checklist supports one internal audit of the ISMS of [Organization name] as defined in the ISMS scope (DOC-ISMS-002). The audit determines whether the ISMS conforms to the organization's own requirements and to ISO/IEC 27001:2022 + Amd 1:2024, and whether it is effectively implemented and maintained.

ItemValue
Audit reference[IA-YYYY-NN]
Audit objectives[e.g. confirm conformity of clauses 4 to 10, test the operation of sampled Annex A controls, follow up findings from IA-YYYY-NN]
Clauses in scope[4 to 10 / selected clauses]
Annex A themes in scope[A.5 / A.6 / A.7 / A.8, with the control rotation set from section 12.2]
Sites, services and teams[Head office, remote staff, cloud production, support team]
Record period sampledYYYY-MM-DD to YYYY-MM-DD
Audit criteriaISO/IEC 27001:2022 + Amd 1:2024; Statement of Applicability DOC-ISMS-011 version [x]; information security policy DOC-ISMS-001 and topic policies listed in DOC-ISMS-005; legal, regulatory and contractual requirements in DOC-ISMS-014
Method[On site / Remote / Blended]
Planned datesYYYY-MM-DD to YYYY-MM-DD

Annex A controls are audited against the Statement of Applicability and the organization's own policies and procedures. A control marked "Implemented" in the SoA that does not operate as described is a nonconformity against the organization's own requirements (which clause 9.2.1 makes part of every internal audit) and usually also against clause 8.1 or 8.3 (planned controls not operated, treatment plan not implemented).

2. How to use the checklist

Each row of sections 5 to 11 has five columns.

ColumnWhat to write
IDFixed question ID (IAC-NNN). Keep IDs stable between audits so trends can be compared
Clause and questionThe clause number and an audit question written in this template's words
Evidence to sampleDocuments, records, systems and people that answer the question; what to look at, not only what to ask for
ResultC (conforms), MAJ (major nonconformity), MIN (minor nonconformity), OBS (observation), OFI (opportunity for improvement), N/S (not sampled in this audit)
Notes and evidence IDsRecord IDs, dates, sample identifiers, interviewee role (not name), screenshots referenced by file name

Work through the evidence, not the question. A "yes" from an interviewee is a lead; the confirmation is a record, a configuration or an observation. When evidence is not available during the audit, record what was requested and when, and grade it only after the agreed deadline.

3. Auditor independence and conduct

Confirm before the audit starts:

CheckAnswerEvidence
No auditor audits a process they operate, designed or manage[Yes / No, mitigation]Audit team table in the report
The person who manages the audit programme does not audit clause 9.2 alone[Yes / No, mitigation][Second auditor or external reviewer named]
Each auditor has evidence of competence (training in ISO/IEC 27001 and audit technique, prior audits)[Yes / No]Competence matrix DOC-ISMS-026
Confidentiality of audit evidence agreed (where notes and screenshots are stored, who can read them)[Yes / No]Audit workspace location
Remote method agreed and tested when used (platform, screen sharing, no recording unless agreed)[Yes / No / Not used]Audit plan
Use of any AI-based tool to summarise evidence is agreed, outputs checked against source records[Yes / No / Not used]Audit plan

Conduct during the audit:

  • Ask open questions and ask to be shown, not told.
  • Record the role of each interviewee, not the name, in the completed checklist.
  • Do not suggest solutions during the audit; record an OFI when an improvement is worth noting.
  • Raise a potential nonconformity with the auditee when it is found, so facts can be confirmed before the closing meeting.
  • Stop and escalate to the ISMS manager if the audit uncovers an active security incident; incident handling comes first (DOC-ISMS-020).

4. Preparing the audit

4.1 Documents to request in advance

DocumentIDReceivedVersion and date
ISMS scopeDOC-ISMS-002[Yes / No][vx, date]
Context and interested partiesDOC-ISMS-003[Yes / No][vx, date]
Information security policyDOC-ISMS-001[Yes / No][vx, date]
Roles, responsibilities and RACIDOC-ISMS-006[Yes / No][vx, date]
Risk assessment methodologyDOC-ISMS-010[Yes / No][vx, date]
Risk register and latest risk assessment reportDOC-ISMS-016, DOC-ISMS-017[Yes / No][vx, date]
Risk treatment planDOC-ISMS-013[Yes / No][vx, date]
Statement of ApplicabilityDOC-ISMS-011[Yes / No][vx, date]
Objectives registerDOC-ISMS-024[Yes / No][vx, date]
Documented information registerDOC-ISMS-028[Yes / No][vx, date]
Measurement programme and latest performance reportDOC-ISMS-080, DOC-ISMS-081[Yes / No][vx, date]
Previous internal audit report and findings register extractDOC-ISMS-084, DOC-ISMS-086[Yes / No][vx, date]
Latest management review minutesDOC-ISMS-085[Yes / No][vx, date]
Control evidence matrixDOC-ISMS-033[Yes / No][vx, date]

4.2 Desk review questions

Read the documents before the audit and note questions to test on site:

  • Does the scope match what the organization actually sells and runs?
  • Do the SoA decisions trace to risks in the register and to treatment items in the plan?
  • Which risks are High or Critical, and which controls treat them? Sample those controls first.
  • Which findings from the previous audit and from the certification body are still open or were closed without effectiveness verification?
  • What changed since the last audit (new services, suppliers, sites, systems, organisational changes, incidents)?

4.3 Sampling plan

PopulationSizeSample sizeSelection methodSample identifiers
Leavers in the record period (Example)99 (all)Whole population, smallHR leaver list rows 1 to 9
Changes to production (Example)21410Random by change ID, plus 2 emergency changes chosen by judgementCHG-0312, CHG-0388, [list]
Supplier records (Example)315Judgement: the 3 critical suppliers plus 2 randomSUP-004, SUP-011, [list]
[Population][n][n][Random / Judgement / Whole population][IDs]

5. Clause 4: Context of the organization

IDClause and questionEvidence to sampleResultNotes and evidence IDs
IAC-0014.1: Has the organization identified the internal and external issues that affect what the ISMS must achieve, and recorded whether climate change is a relevant issue?DOC-ISMS-003 and its last review date; the climate change decision and its reasoning; two issues traced into the risk register[ ][ ]
IAC-0024.2: Are interested parties and their relevant requirements identified, with a decision on which are addressed through the ISMS (including any climate-related requirements)?Interested parties table; legal register DOC-ISMS-014; one customer contract and one supplier contract checked against the register[ ][ ]
IAC-0034.3: Is the scope documented with its boundaries, interfaces and dependencies, and does it match reality?DOC-ISMS-002; sample 3 systems from the asset inventory DOC-ISMS-012 and confirm they are in or out as the scope says; exclusions justified[ ][ ]
IAC-0044.4: Can the ISMS manager show how the ISMS processes fit together (for example a process map with owners), and is that picture kept current as processes change?Process map DOC-ISMS-004; interview two process owners on inputs, outputs and handovers[ ][ ]

6. Clause 5: Leadership

IDClause and questionEvidence to sampleResultNotes and evidence IDs
IAC-0055.1: Can top management give real examples from the record period of leading the ISMS: decisions that tie security to business plans, budget or people granted, managers backed when they enforced security, and improvements they pushed for?Steering committee minutes DOC-ISMS-007 for the record period; budget approval DOC-ISMS-031; interview the CEO or delegate on objectives and recent security decisions[ ][ ]
IAC-0065.2: Is the top-level security policy approved, written for this organization rather than copied, used as the starting point for objectives, explicit about meeting obligations and improving over time, and known to staff and reachable by those who need it?DOC-ISMS-001 approval record; publication location; communication record; ask 3 staff where to find it[ ][ ]
IAC-0075.3: Does everyone with a security role know it and what they may decide, and is it clear who tells top management how the ISMS is performing?DOC-ISMS-006; two job descriptions or appointment letters; evidence of performance reporting to management[ ][ ]

7. Clause 6: Planning

IDClause and questionEvidence to sampleResultNotes and evidence IDs
IAC-0086.1.1: Did ISMS planning start from the context and stakeholder analysis, and do the resulting actions on risks and opportunities sit inside normal processes, with a way to tell whether they worked?Planning record or ISMS plan; link from DOC-ISMS-003 to the risk register; one opportunity with an owner and outcome[ ][ ]
IAC-0096.1.2: Is there a defined and applied risk assessment process, with written criteria for accepting risks and for running assessments, so that two assessments of the same situation would give the same answer; does each risk have an owner, a scored likelihood and impact, a resulting level and a priority?DOC-ISMS-010 approval; DOC-ISMS-016; recompute the score of 5 sampled risks against the scale; confirm each has a named owner[ ][ ]
IAC-0106.1.3: Does risk treatment follow a written method: for each risk a chosen option, the controls it needs, a cross-check against Annex A so nothing is missed, an SoA that explains each decision, a plan the risk owners signed and their sign-off on what remains?DOC-ISMS-013; DOC-ISMS-011; risk acceptance records DOC-ISMS-019; trace 5 risks to SoA rows and to treatment items; check acceptance authority against DOC-ISMS-015[ ][ ]
IAC-0116.2: Do objectives exist where they matter, trace back to the policy and the risk results, carry a measure where one makes sense, get tracked and shared, and come with a plan naming actions, resources, an owner, a date and how success will be judged?DOC-ISMS-024; latest status of each objective; one objective traced to its measurement in DOC-ISMS-081[ ][ ]
IAC-0126.3: When the ISMS itself changed in the period, was the change thought through and scheduled in advance rather than discovered afterwards?DOC-ISMS-025; one recent change to the ISMS (new site, new policy, reorganisation) and how it was planned. No documented information is required by this clause; ask for whatever shows the planning[ ][ ]

8. Clause 7: Support

IDClause and questionEvidence to sampleResultNotes and evidence IDs
IAC-0137.1: Has the organization worked out what people, budget and tools the ISMS needs, and were they actually provided?DOC-ISMS-031; staffing of the ISMS manager and security roles; any resourcing issue raised at management review and its outcome[ ][ ]
IAC-0147.2: For each role that affects security, is the needed skill level written down, are gaps closed by training, hiring or coaching, is it checked that this worked, and is there a record?DOC-ISMS-026; sample 5 people in security roles and check the evidence of their competence and of training effectiveness[ ][ ]
IAC-0157.3: Do sampled staff know the policy exists, how their own work helps security and what the consequences are if they ignore the rules?Interview 5 staff from different teams; awareness programme records; onboarding records for 3 recent joiners[ ][ ]
IAC-0167.4: Is there a communication plan for the ISMS that says what goes to whom, when and through which channel?DOC-ISMS-027; two communications sent in the record period and their audience[ ][ ]
IAC-0177.5.1: Are all the records the standard calls for in place, plus the extra documents the organization chose to keep?DOC-ISMS-028 checked against the list of required documented information; any gaps[ ][ ]
IAC-0187.5.2: Do new and revised documents carry an ID, owner and version, use a workable format and go through review and approval before release?Sample 5 controlled documents: ID, version, owner, approval record (see compliance/controlled-document)[ ][ ]
IAC-0197.5.3: Can people find the current version when they need it, is it protected from loss and unauthorised change, are old versions withdrawn and records kept and destroyed on schedule, and are outside documents (contracts, vendor manuals) handled the same way?Document repository permissions; superseded versions withdrawn; retention rules; one external document (contract or standard) under control[ ][ ]

9. Clause 8: Operation

IDClause and questionEvidence to sampleResultNotes and evidence IDs
IAC-0208.1: Are ISMS processes run against set criteria, are planned changes managed, are unplanned changes looked at for side effects, and are outsourced activities that touch security kept under control?Change records (sample from 4.3); supplier register DOC-ISMS-066; supplier assessments DOC-ISMS-067 for sampled suppliers; operating procedures DOC-ISMS-049[ ][ ]
IAC-0218.2: Were risk assessments run on schedule and again after significant changes, and are their results kept?Dates of risk assessments in the period; DOC-ISMS-017; one significant change and evidence that its risks were assessed[ ][ ]
IAC-0228.3: Is the treatment plan moving forward as approved, with evidence of what has been done?DOC-ISMS-013 status; 5 treatment items checked: due date, status, evidence of completion[ ][ ]

10. Clause 9: Performance evaluation

IDClause and questionEvidence to sampleResultNotes and evidence IDs
IAC-0239.1: Is there a measurement plan saying what is measured, by whom, how often and when results are reviewed; are results kept; and does someone draw conclusions on how well the ISMS works?DOC-ISMS-080; the last two DOC-ISMS-081 reports; evidence of analysis and decisions from the results[ ][ ]
IAC-0249.2.1: Were internal audits held when the programme said, and did they test both conformity (with our own rules and with ISO/IEC 27001) and whether the ISMS really works day to day?Audit programme DOC-ISMS-082 versus audits performed; previous audit reports[ ][ ]
IAC-0259.2.2: Does the audit programme say how often, how and by whom audits are done and reported; does each audit have its criteria and scope; were auditors free of conflicts; did results reach management; and is the evidence kept?DOC-ISMS-082; auditor independence for each audit; distribution of reports; DOC-ISMS-086[ ][ ]
IAC-0269.3.1: Did top management hold its ISMS review when scheduled?Management review minutes DOC-ISMS-085; schedule in DOC-ISMS-032[ ][ ]
IAC-0279.3.2: Did the review cover the expected agenda: open actions from last time, what changed inside and outside, performance figures and trends, feedback from stakeholders, the state of risks and treatment, and ideas for improvement?Agenda and minutes compared with the input list; supporting reports[ ][ ]
IAC-0289.3.3: Are the decisions from the review (improvements, changes to the ISMS) written down?Decisions and actions in the minutes; status of actions in the action log[ ][ ]

11. Clause 10: Improvement

IDClause and questionEvidence to sampleResultNotes and evidence IDs
IAC-02910.1: Is there evidence that the ISMS is getting better over time: improvements delivered, and trends in findings and incidents moving the right way?DOC-ISMS-088; two improvements implemented in the period and their benefit; trend in findings and incidents[ ][ ]
IAC-03010.2: When something went wrong, was it contained and fixed, was the root cause found, were similar cases elsewhere checked, did the fix prevent a repeat, and is all of this recorded?DOC-ISMS-086; 3 corrective action records DOC-ISMS-087 including at least one from an incident (DOC-ISMS-021, DOC-ISMS-022); effectiveness verification evidence[ ][ ]

12. Annex A sampling approach by theme

12.1 Audit trails by theme

Each trail follows one piece of work through several controls. Control labels are this library's short descriptions, as in compliance/statement-of-applicability, not the official titles.

TrailThemeControls coveredWhat to sampleTypical evidence
TR-01 GovernanceA.5A.5.1 policies, A.5.2 roles, A.5.3 segregation of duties, A.5.4 management responsibilitiesPolicy approvals and reviews, one role conflict checkPolicy index DOC-ISMS-005, RACI DOC-ISMS-006
TR-02 Information lifecycleA.5, A.8A.5.9 inventory, A.5.12 classification, A.5.13 labelling, A.5.14 transfer, A.8.10 deletion5 assets from the inventory: owner, classification, handling in practiceDOC-ISMS-012, DOC-ISMS-042, deletion records
TR-03 Joiner, mover, leaverA.5, A.6, A.8A.5.16 identity lifecycle, A.5.18 access rights, A.6.1 screening, A.6.2 terms of employment, A.6.5 duties after leaving, A.5.11 return of assets, A.8.2 privileged accessJoiners and leavers from the sampling plan, from HR record to account change and asset returnHR records, identity provider logs, DOC-ISMS-053 checklists
TR-04 Supplier and cloudA.5A.5.19 to A.5.22 supplier controls, A.5.23 cloud servicesCritical suppliers: assessment, contract clauses, monitoringDOC-ISMS-066, DOC-ISMS-067, DOC-ISMS-068
TR-05 IncidentA.5, A.6A.5.24 to A.5.28 incident controls, A.6.8 event reportingTwo incidents and one minor event, from report to lessons learnedDOC-ISMS-021, DOC-ISMS-022
TR-06 ContinuityA.5, A.8A.5.29 security during disruption, A.5.30 ICT readiness, A.8.13 backup, A.8.14 redundancyLast restore test and last continuity exerciseDOC-ISMS-047, DOC-ISMS-071
TR-07 ComplianceA.5A.5.31 legal requirements, A.5.34 privacy, A.5.35 independent review, A.5.36 compliance checksLegal register entries, one privacy record, last independent reviewDOC-ISMS-014, DOC-ISMS-048
TR-08 PeopleA.6A.6.3 awareness and training, A.6.4 disciplinary process, A.6.6 confidentiality, A.6.7 remote workingTraining records, signed confidentiality agreements, remote working rules in practiceDOC-ISMS-026, DOC-ISMS-051, DOC-ISMS-054
TR-09 Physical walk-throughA.7A.7.1 to A.7.14 physical controls applicable to the sites in scopeWalk the office, server or network rooms, storage and disposal points; observeVisitor log, badge records, DOC-ISMS-055, DOC-ISMS-057
TR-10 Endpoint and configurationA.8A.8.1 endpoints, A.8.7 malware, A.8.9 configuration, A.8.19 software installation5 devices from the device inventory: compliance state, baseline, protectionMDM report, DOC-ISMS-058, DOC-ISMS-060
TR-11 Vulnerability and changeA.8A.8.8 vulnerabilities, A.8.32 change management, A.8.31 environment separationChanges from the sampling plan; 5 critical vulnerabilities and their remediation datesDOC-ISMS-072, change records
TR-12 Logging and monitoringA.8A.8.15 logging, A.8.16 monitoring, A.8.17 clock synchronizationAlert-to-ticket trace for 3 alerts; log retention checkDOC-ISMS-064, SIEM or log platform
TR-13 Network and cryptographyA.8A.8.20 to A.8.23 network controls, A.8.24 cryptographyFirewall rule review record, TLS and encryption settings, key registerDOC-ISMS-063, DOC-ISMS-070
TR-14 DevelopmentA.8A.8.25 to A.8.29 secure development, A.8.4 source code access, A.8.33 test information3 releases: requirements, review, testing, approvalDOC-ISMS-065, pull request records
TR-15 Data protection technologyA.8A.8.11 masking, A.8.12 leakage prevention, A.8.3 access restriction, A.8.5 authenticationDLP alerts, masked test data, MFA coverage reportDOC-ISMS-062, identity provider report

Controls that no trail covers in a given audit go into the rotation in section 12.2.

12.2 Rotation across the certification cycle

Cover every applicable control at least once in the three-year certification cycle, and re-sample the controls that treat High and Critical risks in every audit year. This is good practice and what certification bodies expect to see; the standard asks only that the programme takes into account the importance of the processes and the results of previous audits.

Before the initial certification audit, the rotation alone may not be enough. Certification bodies usually expect one full internal audit of the ISMS and one management review before Stage 2 (CB practice, not a clause); the full internal audit covers all of clauses 4 to 10 and a sample from every Annex A theme in the SoA, including A.7 where physical controls apply. Confirm the expected coverage with your certification body and, if needed, add a short readiness check of the themes the first-year rotation does not reach.

YearApplicable controls covered (Example: Quillmere Analytics Ltd, 88 applicable of 93, 5 excluded)Re-sampled every year
202730 (trails TR-01, TR-03, TR-04, TR-05, TR-10, TR-11 plus rotation)A.5.15 to A.5.18, A.8.8, A.8.13, A.8.24
202829 (trails TR-02, TR-06, TR-08, TR-12, TR-13 plus rotation)Same set, updated after the risk assessment
202929 (trails TR-07, TR-09, TR-14, TR-15 plus rotation)Same set, updated after the risk assessment
Total88

12.3 Per-control test record

Use one row per sampled control.

ControlSoA statusTest performedSampleResultEvidence IDs
A.5.18 (Example)ImplementedLeaver access removed within 1 business day, as the access control policy requires9 of 9 leaversMIN: 2 of 9 removed after 4 and 6 daysHR leaver list, identity provider audit log export
A.8.13 (Example)ImplementedRestore test performed quarterly and results reviewed4 of 4 quartersCDOC-ISMS-071 rows 2027-Q1 to Q4
[A.N.N][status][test][n of N][result][IDs]

13. Sample sizes and selection

Choose the method and write it in the sampling plan (section 4.3):

  • Whole population when it is small (for example under 10 items) or when every item is high risk.
  • Judgement-based when the auditor targets the items most likely to reveal problems: emergency changes, privileged accounts, critical suppliers, items from the period just after a reorganisation.
  • Random when the population is large and uniform; use a recorded random method (random number generator with the seed or list noted).
  • Data analytics when the full population is available as data, for example comparing the whole HR leaver list with the identity provider export.

The sizes below are an Example internal rule for judgement-based sampling. They are not taken from any standard; adjust them to your risk and record the rule in the audit programme.

Population size (Example rule)Sample sizeIncrease when
1 to 9All items
10 to 503 to 5The control treats a High or Critical risk, or the last audit found a problem
51 to 2505 to 10As above, or a change in process during the period
Over 25010 to 25, or full population by data analyticsAs above

If the first sample shows an exception, extend the sample before grading to learn whether it is isolated or systemic, and record both counts.

14. Interview guide

RolePurposeExample questions
Top management (CEO or delegate)5.1, 5.3, 6.2, 9.3What are this year's security objectives and how do you know they are on track? What was the last security decision you made, and on what information? How did you decide the ISMS budget?
ISMS manager4.4, 6.1, 7.5, 9.1, 10Walk me through how a new risk gets into the register. Show me the last measurement report and what changed because of it. Which findings are overdue, and why?
Risk owner6.1.2, 6.1.3, 8.3Which risks do you own? Show me where you accepted a residual risk. What is the status of the treatment items for your risks?
Control owner (for each sampled control)Annex A, 8.1Show me how this control works today. What records does it produce? What happens when it fails?
HRA.6.1, A.6.2, A.6.4, A.6.5Show me the screening record for this joiner. How does IT learn that someone has left?
IT or cloud operationsA.8 trailsShow me the alert for this event and the ticket that followed. Show me the baseline for this server and how drift is detected.
Supplier or procurement ownerA.5.19 to A.5.23How is a new supplier assessed? Show me the security clauses in this contract and the last review of this supplier.
Staff member (sample across teams)7.3, A.6.3, A.6.8Where is the security policy? What would you do if you clicked a suspicious link? How do you share a confidential file with a customer?

Technique: start with what the person does, then ask for the record. Use silence and follow-up questions instead of leading questions. Note the answer, then confirm it with evidence before grading.

15. Grading findings

GradeCodeUse when (this library's working definitions)Required response
Major nonconformityMAJSomething the ISMS depends on is missing or no longer works, so the auditor could not rely on the ISMS to deliver what it is for; a cluster of minor findings on the same requirement that point to a pattern also countsCorrection and corrective action record DOC-ISMS-087, root cause, plan approved by the ISMS manager, effectiveness verified by the auditor
Minor nonconformityMINA requirement is not met in an isolated case that does not, on its own, undermine the ISMSCorrective action record DOC-ISMS-087 with root cause and effectiveness check
ObservationOBSThe requirement is met at present, but the evidence shows a weakness that could lead to a nonconformity if left aloneOwner decides on action; reviewed at the next audit
Opportunity for improvementOFIThe requirement is met; the auditor sees a way to make the ISMS more effective or efficientLogged in DOC-ISMS-088 for evaluation

Write each nonconformity in three parts: the requirement (clause, control or policy section), the evidence (what was seen, with IDs) and the statement of nonconformity (what is missing). Add the extent: "2 of 9 sampled leavers" tells the reader more than "some leavers".

16. Closing meeting and handover

At the closing meeting:

  1. Thank the auditees and restate the scope, criteria and sampling.
  2. Present each finding with its grade and evidence; confirm the facts.
  3. Present positive practices observed.
  4. State any limits on the audit (evidence not available, systems not accessible, time lost).
  5. Agree dates: report issue, corrective action plans, follow-up verification.
  6. Record attendance by role.
ItemAgreed value
Closing meeting dateYYYY-MM-DD
Attendees (roles)[ISMS manager, process owners, top management delegate]
Report dueYYYY-MM-DD (Example: 10 working days after closing)
Corrective action plans dueYYYY-MM-DD (Example: 30 days after report)
Follow-up verification[Next audit / dedicated follow-up on YYYY-MM-DD]

17. Summary of results

ClauseQuestionsCMAJMINOBSOFIN/S
4 Context4[n][n][n][n][n][n]
5 Leadership3[n][n][n][n][n][n]
6 Planning5[n][n][n][n][n][n]
7 Support7[n][n][n][n][n][n]
8 Operation3[n][n][n][n][n][n]
9 Performance evaluation6[n][n][n][n][n][n]
10 Improvement2[n][n][n][n][n][n]
Total30[n][n][n][n][n][n]
Annex A controls sampled[n][n][n][n][n][n]

A question can carry an OFI as well as a C, so record OFIs separately when you check the totals.

18. Size tiers

AspectSmall: Quillmere Analytics Ltd (46 staff)Medium: Quillmere Health Systems (320 staff)Large or multi-site: Quillmere Group (2,400 staff, 6 sites)
Who auditsOne external contract auditor, or a trained staff member from finance paired with them; the 0.5 FTE ISMS manager cannot audit their own workPool of 3 trained internal auditors from other departments, lead auditor from quality or internal auditGroup audit team in the security office plus site auditors from other sites; integrated with ISO 9001 and ISO 22301 audits
Audit patternOne full audit per year covering clauses 4 to 10 and the year's Annex A rotation (Example: 3 auditor days)Four audits per year by process area (governance and risk, people and suppliers, technology, performance and improvement)Central clauses audited yearly at HQ; each site audited at least once in the cycle, sites with OT and higher risk every year
Sample sizesWhole population common for small populations (9 leavers); rule in section 13 for larger ones (5 of 31 suppliers)Rule in section 13Rule in section 13 plus data analytics across sites
InterviewsMost staff are reachable; interview 5 across teams10 to 15 across both offices and the colocation operations teamPer site, plus group functions; local language interviews where needed
Annex A focusCloud, endpoints, access, suppliers; A.7 limited to one officeAdds colocation (A.7), health customer contract requirements, privacy controlsAdds OT network controls, multi-country legal requirements, site physical security
ReportingOne report to the CEO and steering committeeReport per audit, summary to management reviewSite reports, group consolidated report, CISO to group management review

19. Records and evidence

RecordProvesOwnerLocationRetention (Example)
Completed checklist (this file, per audit)Audit was performed against defined criteria with sampled evidenceLead auditorISMS audit folder, read-only after report issueCurrent certification cycle plus 3 years
Sampling plan and sample listsSamples were selected by a stated methodLead auditorSame folderSame
Evidence files (exports, screenshots) referenced by IDFindings can be re-checkedLead auditorSame folder, access restrictedSame
Opening and closing meeting attendanceAuditees were informed and facts confirmedLead auditorSame folderSame
Auditor independence and competence check (section 3)Objectivity and impartialityAudit programme managerDOC-ISMS-026 and audit folderSame
Internal audit reportResults reported to relevant managementAudit programme managerDOC-ISMS-084Same
Findings register entriesFindings tracked to closureISMS managerDOC-ISMS-086Same

20. References

ReferenceEdition and status (as of November 2026)Use
ISO/IEC 27001:2022 + Amd 1:2024Current; Amd 1 published 2024-02-23Clauses 4 to 10, Annex A, clause 9.2
ISO/IEC 27002:2022CurrentControl guidance used to design control tests
ISO 19011:2026Current, published 2026-05-27Audit programme, conducting audits, auditor competence, sampling and remote methods
ISO/IEC 27007:2020Current; a revision is in progress, check for a newer edition. Written against ISO 19011:2018ISMS-specific audit guidance
ISO/IEC TS 27008:2019Current; under revisionAssessing information security controls
ISO/IEC 17021-1:2015CurrentMajor and minor nonconformity concepts in certification audits
compliance/internal-audit-programDOC-ISMS-082Programme this checklist serves
isms/isms-internal-audit-reportDOC-ISMS-084Report format
isms/audit-findings-registerDOC-ISMS-086Findings tracking
compliance/capa-nonconformityDOC-ISMS-087Corrective action records
isms/continual-improvement-registerDOC-ISMS-088Opportunities for improvement
compliance/statement-of-applicabilityDOC-ISMS-011Control labels and applicability
isms/control-evidence-matrixDOC-ISMS-033Where control evidence lives

Standard and licence note

Structure aligned with ISO/IEC 27001:2022 + Amd 1:2024 (clauses 4 to 10, clause 9.2 and Annex A), with audit method following ISO 19011:2026 and ISO/IEC 27007:2020. The audit questions, trails, sampling rule, grading definitions and examples are original wording written for this template; they are not the text of the clauses, controls or guidance, and no ISO or IEC text, tables or definitions are reproduced. Audit against the official standard, which is copyrighted and sold by ISO, IEC and national standards bodies. Check the current editions before use: ISO/IEC 27007 and ISO/IEC TS 27008 are under revision. This template does not promise certification; certification decisions belong to the accredited certification body. Template licence: MIT.

Related templates