One cycle: scope, method refs, participants, results by band, current and residual heat maps, top risks, changes since last cycle, treatment hand-off

ISMS & ISO/IEC 27001FullISO/IEC 27001:2022 + Amd 1:2024 clauses 6.1.2, 6.1.3, 8.2, 8.3 (cited only); ISO/IEC 27005:2022riskassessmentreport

How to use: Use it once per planned assessment cycle and for each significant targeted assessment. Fill the scope and method references first, then export counts from the dated risk register snapshot so every total matches. The main pitfall is a report whose band totals, heat map and top risk table disagree with each other or with the register.

Preview

Information Security Risk Assessment Report: [Organization name], [Cycle YYYY-N]

The report of one information security risk assessment cycle: what was assessed, how, by whom, what the results are by risk band, which risks matter most, what changed since the last cycle, and which treatment and acceptance decisions are handed on. It is the dated record of risk assessment results that ISO/IEC 27001:2022 + Amd 1:2024 clause 8.2 expects the organization to retain, produced with the method in DOC-ISMS-010 (clause 6.1.2) and feeding the risk treatment plan DOC-ISMS-013 (clauses 6.1.3 and 8.3). Guidance from ISO/IEC 27005:2022. Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Document IDDOC-ISMS-017
Version[1.0]
Status[Draft / In review / Approved / Superseded]
Owner[@isms-manager]
Approvers/reviewers[@ceo], [@ciso], [@risk-owners], [@internal-audit]
Last updatedYYYY-MM-DD
Classification[Confidential]
Standard and editionISO/IEC 27001:2022 + Amd 1:2024 (clauses 6.1.2, 8.2); ISO/IEC 27005:2022
Assessment cycle[2027-1, annual cycle]
Assessment period[YYYY-MM-DD to YYYY-MM-DD]
MethodDOC-ISMS-010 version [x.y]
CriteriaDOC-ISMS-015 version [x.y]
CatalogueDOC-ISMS-018 version [x.y]
Register snapshotDOC-ISMS-016 exported YYYY-MM-DD
Previous reportDOC-ISMS-017 version [x.y], cycle [2026-1]
Next scheduled reviewYYYY-MM-DD

Approvals

RoleNameDecisionDate
ISMS manager (author)[@isms-manager][Prepared]YYYY-MM-DD
CISO or security lead[@ciso][Reviewed]YYYY-MM-DD
Top management[@ceo][Approved; residual risks in section 11 referred to acceptance]YYYY-MM-DD

Revision history

VersionDateAuthorChange
0.9 (Example)2027-03-03[@isms-manager]Draft for risk owner validation
1.0 (Example)2027-03-15[@isms-manager]Approved by top management
[x.y]YYYY-MM-DD[@author][Change summary]

Contents

1. Executive summary

Example (Quillmere Health Systems, cycle 2027-1): The 2027 annual assessment covered the whole ISMS scope: clinical scheduling software, the managed scheduling service, two offices and the colocation suite. Forty-two risks were assessed against the approved criteria. With existing controls, 3 risks are Critical, 14 High, 17 Medium and 8 Low. Twenty-four risks are outside appetite: all Critical and High risks and 7 Medium risks in Averse categories. The three Critical risks are ransomware affecting the managed service (R-006), credential phishing leading to access to the scheduling database (R-001) and exploitation of the new hospital integration interface (R-039). Treatment is planned for 26 risks, which would leave no Critical risk and 4 High risks once the plan is complete. Top management is asked to approve the treatment plan and to decide on the acceptance of the 4 High residual risks and the 2 Medium residual risks in Averse categories listed in section 11.

Key figure (Example)Value
Risks assessed42 (38 last cycle)
Outside appetite (current)24 (3 Critical, 14 High, 7 Medium in Averse categories)
Risks to be treated26 (23 modify, 2 share, 1 avoid)
Expected residual after treatment0 Critical, 4 High, 20 Medium, 18 Low
Decisions requestedApprove DOC-ISMS-013 update; decide on 6 residual acceptances (4 High, 2 Medium in Averse categories)

2. Scope and context of this cycle

ItemValue (Example)
ISMS scopeDOC-ISMS-002 version 1.2: development and operation of clinical scheduling software and the managed scheduling service
Covered in this cycleWhole ISMS scope
Not coveredNone; the planned ISO/IEC 27701 privacy extension will be assessed in a separate privacy risk cycle
TypePlanned annual cycle (clause 8.2 planned interval)
Context changes consideredNew hospital integration interface (go-live 2027-02); second office opened; colocation contract renewed; new data protection obligations recorded in DOC-ISMS-014
Climate considerationFlood exposure of the colocation suite reviewed per DOC-ISMS-003 (clause 4.1 as amended in 2024)
Interested party requirementsHospital customer contracts (security schedules, breach notification), regulator guidance recorded in DOC-ISMS-003

3. Method and criteria

ElementReferenceNotes (Example)
MethodDOC-ISMS-010 version 3.0Event-based approach for the whole scope; asset-based for the scheduling platform and the integration interface
Risk criteria and appetiteDOC-ISMS-015 version 1.05 x 5 scale; bands Low 1 to 4, Medium 5 to 9, High 10 to 16, Critical 17 to 25 (in practice 20 and 25)
Scenario sourceDOC-ISMS-018 version 1.136 scenarios built from catalogue entries; 6 needed new entries
Existing controlsDOC-ISMS-011 version 1.3Current scores take existing controls into account
Deviations from methodNone[Describe any deviation and its approval]

Scoring conventions used in this report:

  • Current score: likelihood x impact with existing controls, as defined in DOC-ISMS-010 (called inherent in the register).
  • Target residual score: expected score once the treatment in DOC-ISMS-013 is implemented.
  • Ranking: by current score, then by impact for ties.

4. Participants and schedule

ParticipantRole in the assessment (Example)Sessions
ISMS managerFacilitator, method owner, authorAll
Security team (3)Technical analysis, threat inputAll
Head of EngineeringRisk owner: platform and integrationWorkshops 1, 2
Head of Service OperationsRisk owner: managed service and colocationWorkshops 2, 3
Chief Financial OfficerRisk owner: finance and suppliersWorkshop 3
HR DirectorRisk owner: people risksWorkshop 3
Data Protection OfficerPrivacy and legal inputWorkshops 1, 3
Clinical safety officerPatient safety impactWorkshop 1
Internal auditObserver for method consistencyWorkshop 2

5. Assets and scenarios assessed

Asset or process group (Example)Assets in DOC-ISMS-012Scenarios
Clinical scheduling platform (production)911
Hospital integration interface35
Corporate IT and SaaS suite68
Colocation suite and offices46
Suppliers and cloud services56
People and processes36
Total3042
Risks by category (DOC-ISMS-015 section 3) (Example)AppetiteCount
Confidentiality of customer and personal dataAverse11
Integrity of customer-facing data and results (including patient safety impact)Averse6
Availability of core servicesCautious7
Supplier and cloud dependencyCautious8
People and insider riskCautious3
Physical and environmental, including climate-related disruptionCautious4
Legal, regulatory and contractual complianceAverse2
Fraud (optional category added to DOC-ISMS-015)Averse1
Total42

New catalogue entries proposed in this cycle (sent to DOC-ISMS-018): abuse of the integration interface by a compromised hospital account, misrouting of appointment messages, and dependence on one interface engine supplier. (Example)

6. Results summary by band

BandScoreCurrent (Example)Target residual (Example)Previous cycle current (Example)
Critical17 to 25 (in practice 20 and 25)305
High10 to 1614415
Medium5 to 9172012
Low1 to 48186
Total424238

Outside appetite: 24 risks. All 3 Critical and 14 High risks are outside appetite because their categories are Averse or Cautious in DOC-ISMS-015 (no High risk falls in an Open category this cycle). In addition, 7 Medium risks sit in Averse categories (confidentiality of customer and personal data, integrity of customer-facing data, legal compliance, fraud); all 7 are treated (Modify row in section 10). One Cautious Medium risk (R-004, support supplier outage) is also modified to improve resilience, one Cautious Medium risk (R-002) is shared, and the 8 retained Medium risks are in Cautious categories and within tolerance. (Example)

7. Heat maps

7.1 Current (with existing controls) (Example)

Likelihood / Impact12345Row total
5000101
4003227
30256114
20346215
1002305
Total051418542

Check: Critical cells (L4 I5 = 2, L5 I4 = 1) give 3; High cells (L4 I3 = 3, L4 I4 = 2, L3 I4 = 6, L3 I5 = 1, L2 I5 = 2) give 14; Medium cells (L3 I2 = 2, L3 I3 = 5, L2 I3 = 4, L2 I4 = 6) give 17; Low cells (L2 I2 = 3, L1 I3 = 2, L1 I4 = 3) give 8.

7.2 Target residual (after planned treatment) (Example)

Likelihood / Impact12345Row total
5000000
4000000
3003205
20659222
10048315
Total061219542

Check: High cells (L3 I4 = 2, L2 I5 = 2) give 4; Medium cells (L3 I3 = 3, L2 I3 = 5, L2 I4 = 9, L1 I5 = 3) give 20; Low cells (L2 I2 = 6, L1 I3 = 4, L1 I4 = 8) give 18.

8. Top risks

RankRisk IDScenario (cause, event, consequence)Catalogue refsCurrent L x ICurrentTreatmentTarget residualOwner
1 (Example)R-006Unpatched systems and reachable backups let ransomware stop the managed service for daysTHR-002, VUL-002, VUL-0064 x 520 CriticalModify2 x 4 = 8 Medium[@head-of-service-operations]
2 (Example)R-001Phishing captures staff credentials that reach the scheduling database, exposing patient appointment dataTHR-001, VUL-001, VUL-0034 x 520 CriticalModify1 x 4 = 4 Low[@head-of-engineering]
3 (Example)R-039A flaw in the new hospital integration interface is exploited, altering or exposing schedulesTHR-004, VUL-0025 x 420 CriticalModify2 x 4 = 8 Medium[@head-of-engineering]
4 (Example)R-003Loss of laptops holding local exports of patient schedulesTHR-015, VUL-0054 x 416 HighModify2 x 2 = 4 Low[@it-manager]
5 (Example)R-022A departing administrator exports customer dataTHR-006, VUL-0134 x 416 HighModify2 x 4 = 8 Medium[@hr-director]
6 (Example)R-010Compromise of the managed hosting supplier with administrative accessTHR-009, VUL-0103 x 515 HighModify and share2 x 5 = 10 High[@cfo]
7 (Example)R-008Power failure at the colocation suite stops the managed serviceTHR-018, VUL-0113 x 412 HighModify2 x 4 = 8 Medium[@head-of-service-operations]
8 (Example)R-017Corrupted schedules lead to missed clinical appointmentsTHR-020, VUL-0152 x 510 HighModify (detection and manual fallback; score unchanged)2 x 5 = 10 High[@clinical-safety-officer]

9. Changes since the last cycle

Movement (Example)CountDetail
Risks in previous cycle38Cycle 2026-1 baseline
Closed or merged2R-012 retired (legacy fax referral process decommissioned); R-027 merged into R-005
Continuing risks36
of which score decreased9Treatment completed: MFA for remote access, disk encryption on 90% of laptops, backup isolation phase 1
of which score increased4R-008 (more customers on the managed service), R-010 (supplier given wider access), R-022, R-031
of which unchanged23
New risks6R-039 to R-044, mainly from the integration interface and the second office
Risks in this cycle4236 continuing plus 6 new

Critical risks fell from 5 to 3: three former Critical risks moved to High after the remote access MFA rollout, laptop encryption and backup isolation phase 1, and R-039 is new. (Example)

10. Treatment decisions handed to the risk treatment plan

OptionCount (Example)BandsRecorded in
Modify (reduce)233 Critical, 12 High, 8 MediumDOC-ISMS-013, new or updated RTP entries
Share (transfer)21 High (with modify), 1 MediumDOC-ISMS-013 with insurance or contract reference
Avoid11 HighDecision to keep the legacy reporting export disabled
Retain (accept within criteria)168 Medium, 8 LowRisk register acceptance fields
Total423 Critical, 14 High, 17 Medium, 8 Low

Note: R-010 is counted once, under Share, because its main decision is to share part of the consequence through a contract and insurance, combined with technical measures.

Statement of Applicability changes proposed: A.8.12 data leakage prevention moves from Partial to Planned implementation for the integration interface; A.5.21 ICT supply chain evidence to be updated. (Example)

11. Risks referred for acceptance

Risk IDTarget residualApproval level requiredReason treatment stops here (Example)Acceptance record
R-010 (Example)2 x 5 = 10 HighTop managementSupplier access is necessary for the managed service; impact remains severe if the supplier is breachedACC-011
R-017 (Example)2 x 5 = 10 HighTop managementClinical impact of corrupted schedules cannot be reduced further by software alone; hospitals keep manual fallbackACC-012
R-029 (Example)3 x 4 = 12 HighTop managementLegacy component replacement scheduled in 2028; compensating monitoring until thenACC-013
R-033 (Example)3 x 4 = 12 HighTop managementSingle interface engine supplier; exit plan in progressACC-014
R-022 (Example)2 x 4 = 8 MediumTop management (Medium in an Averse category, DOC-ISMS-015 section 9 rule 1)Administrators need bulk export for customer support; approval workflow and export alerts reduce but do not remove the riskACC-015
R-039 (Example)2 x 4 = 8 MediumTop management (Medium in an Averse category, DOC-ISMS-015 section 9 rule 1)Likelihood rests on the pre-go-live test; reassess after three months of operation (section 12)ACC-016

12. Limitations and assumptions

  • Likelihood ratings for the integration interface rely on the pre-go-live penetration test; reassess after three months of operation. (Example)
  • Financial impact thresholds use the revenue forecast of [YYYY]; if revenue changes by more than [20]%, recalibrate.
  • Supplier risks rely on supplier self-assessments for 2 of 5 critical suppliers; independent evidence is requested.
  • The privacy extension (ISO/IEC 27701:2025) is out of this cycle and assessed separately.

13. Size tiers

AspectSmall: Quillmere Analytics Ltd (Example)Medium: Quillmere Health Systems (Example)Large or multi-site: Quillmere Group (Example)
Typical number of risks20 to 3040 to 60Group report of 60 to 100 risks plus one annex per site
WorkshopsTwo half-day sessions led by the part-time ISMS managerThree workshops over three weeksSite workshops at each of 6 sites, then a group consolidation workshop
ParticipantsCEO, Head of Engineering Operations, two engineersRisk owners, security team, DPO, clinical safetySite managers, OT engineers, CISO's security office, divisional risk owners
Report length6 to 10 pages15 to 25 pagesGroup summary of about 20 pages plus site annexes
ApprovalCEOCEO with steering committeeGroup executive committee; site annexes approved by site directors
FrequencyAnnual plus targeted assessmentsAnnual plus targeted assessmentsAnnual group cycle; site cycles phased as sites join the scope

14. Records and evidence

RecordProvesOwnerLocation (Example)Retention (Example)
This approved reportRisk assessment results retained (8.2)ISMS managerDocument management system, DOC-ISMS-0173 cycles minimum
Register snapshot at the report dateCounts are reproducibleISMS managerDOC-ISMS-016 exportSame as report
Workshop attendance and notesRisk owners took part (6.1.2 c)ISMS managerISMS working folder3 years
Risk owner validation e-mails or ticketsOwners agreed scoresRisk ownersTicketing system3 years
Updated treatment planResults handed to treatment (6.1.3, 8.3)ISMS managerDOC-ISMS-0133 years
Acceptance recordsResidual risks above the risk owner's authority accepted at the right levelTop managementDOC-ISMS-019Life of risk plus 3 years
Management review minuteResults reported (9.3)Steering committee secretaryDOC-ISMS-0856 years

15. References

ReferenceEditionUse
ISO/IEC 27001:2022 + Amd 1:20243rd edition 2022; Amd 1 2024-02-23Clauses 4.1, 6.1.2, 6.1.3, 8.2, 8.3
ISO/IEC 27005:20224th editionApproaches and reporting guidance
ISO 31000:2018Current; a revision is in progressRisk treatment options

Internal documents: DOC-ISMS-002 scope, DOC-ISMS-003 context, DOC-ISMS-010 method, DOC-ISMS-011 SoA, DOC-ISMS-012 asset inventory, DOC-ISMS-013 treatment plan, DOC-ISMS-015 criteria, DOC-ISMS-016 register, DOC-ISMS-018 catalogue, DOC-ISMS-019 acceptance records.

Related templates: compliance/risk-methodology, isms/isms-risk-appetite-criteria, compliance/risk-register, isms/isms-threat-vulnerability-catalogue, compliance/risk-treatment-plan, isms/isms-risk-acceptance-record, compliance/statement-of-applicability, compliance/asset-inventory, compliance/management-review.

Standard and licence note

Structure aligned with ISO/IEC 27001:2022 + Amd 1:2024 (clauses 6.1.2, 6.1.3, 8.2 and 8.3) and ISO/IEC 27005:2022. Clause numbers are cited only; the report structure, conventions, figures and examples are original text written for this template, and all figures are worked examples. No ISO or IEC text is reproduced, and you need the official standards to interpret the requirements. Check the current editions before use. This template does not promise certification; certification decisions belong to the accredited certification body.

Template licence: MIT.

Related templates