निर्माण प्रोजेक्ट मैनेजर किट
भवन प्रोजेक्ट पूरे करें: BIM निष्पादन योजना, निर्माण चरण योजना, RAMS, RFI, सबमिटल, साइट रिपोर्ट, वेरिएशन और हैंडओवर।
4 चरणों में 12 टेम्पलेट, उपयोग के क्रम में। किसी भी टेम्पलेट को एडिटर में खोलें, भरें और PDF, DOCX या HTML में एक्सपोर्ट करें।
योजना
Project Management Plan Template
पूर्णIntegrated plan: objectives, governance, scope, schedule, cost and EVM, quality, risk, procurement, change control, baselines, ISO 21502 and PMBOK 8 crosswalk
ISO 21502:2020 (structure); PMBOK Guide 8th ed. crosswalkBIM Execution Plan Template (ISO 19650)
पूर्णISO 19650 BIM execution plan: roles, EIR response, CDE workflow, naming and status codes, level of information need, TIDP and MIDP
ISO 19650-2:2018 clause 5; ISO 19650-1:2018; ISO 19650-5:2020; ISO 19650-6:2025; ISO 7817-1:2024Construction Phase Plan Template (CDM 2015, OSHA 1926)
पूर्णConstruction phase plan: dutyholders, site rules, significant hazards, Schedule 3 risks, welfare, emergency, incident reporting, inspections
UK CDM 2015 reg. 12, Schedules 2 and 3, HSE L153; US 29 CFR 1926 and 1904.39
साइट पर निष्पादन
Risk Assessment and Method Statement (RAMS) Template
मानकConstruction RAMS for one activity: risk rating, hazards with hierarchy of controls, step-by-step method, competence, plant, rescue, briefing record
HSE risk assessment steps (MHSWR 1999); OSHA 3071 job hazard analysis; 29 CFR 1926Construction RFI Log Template
संक्षिप्तConstruction request for information log: drawing and spec references, required-by dates, answers, cost and time impact, change links
Construction Submittal Register Template
संक्षिप्तSubmittal action codes, register of shop drawings, product data and samples with planned, due-back and needed-on-site dates, weekly review
Daily Site Report Template (Construction)
संक्षिप्तConstruction daily report: weather, labour and hours, plant, progress against programme, deliveries, inspections, safety events, delays
RAID Log Template (Risks, Assumptions, Issues, Dependencies)
पूर्णRisks, assumptions, issues, dependencies and constraints log with P x I scoring, validate-by and validated-on dates, heat map, ADC alignment, RACI and review cadence
निगरानी और नियंत्रण
Change Order and Variation Template (FIDIC, NEC4, AIA)
मानकConstruction change order or variation: instruction, cause, valuation build-up, time impact, approvals, running contract sum
FIDIC 2017 2nd eds (2022 reprint) Clause 13; NEC4 ECC clause 6; AIA G701-2017Change Request and Change Log Template
मानकProject change request with impact on scope, schedule, cost, quality and risk, options, CCB decision record, change log and flow
समापन और समीक्षा
Punch List and Handover Record Template (CDM, ISO 19650-6)
मानकConstruction completion: punch (snag) list with categories, commissioning evidence, O&M and handover set, health and safety file, sign-off, defects period
UK CDM 2015 reg. 12 and HSE L153 App. 4; ISO 19650-2:2018 5.7-5.8; ISO 19650-6:2025Project Closure Report Template
पूर्णClosure: objectives vs outcomes, scope, schedule and cost variances, quality, benefits handover, open items, contracts, archive, sign-off