Markdown Editor

Contingency Funding Plan Template (Bank Liquidity, CRD Art. 86)

Bank CFP: early-warning indicators, stress stages, survival horizon, counterbalancing capacity, central bank readiness, playbook, testing

Keuangan, Investasi & AkuntansiLengkapCRD Art. 86; Interagency Policy Statement (SR 10-6) and 2023 CFP addendum; 12 CFR 252.34(f) mapped as benchmarkcontingencyfundingplan

Cara menggunakan: Use it for a credit institution's annual liquidity contingency plan alongside the ILAAP. Fill the funding profile, the stressed outflows and the counterbalancing capacity table first, then set indicator thresholds and stage triggers that nest with the risk appetite and recovery indicators. The main pitfall is counting central bank or market funding that has never been tested operationally.

Pratinjau

Contingency Funding Plan: [Bank name] [Plan year]

Contingency funding plan (CFP) for a credit institution: the early-warning indicators that show liquidity stress building, the stress stages and who decides at each one, the stress scenarios and survival horizon, the counterbalancing capacity (funding sources and the cash each can raise, after haircuts, and how fast), central bank readiness, the action playbook, communication, intraday and intragroup liquidity, and the testing programme. It is the plan a regulated bank keeps under EU Directive 2013/36/EU (CRD) Article 86, the US Interagency Policy Statement on Funding and Liquidity Risk Management (2010, with the July 2023 addendum on contingency funding plans) and, for US bank holding companies and intermediate holding companies above the Regulation YY thresholds, 12 CFR 252.34(f). It is not a corporate treasury plan: non-financial groups use Liquidity and Funding Plan (finance/liquidity-funding-plan). Basel Committee and PRA material is cited by name and number only; obtain the standard or law for the normative text. Replace every [bracketed] value and every row marked Example. This is a document format, not financial, legal, regulatory or accounting advice.

Document control

FieldValue
Document ID[CFP-YYYY] Example: CFP-2027
Institution and perimeter[Legal entity / consolidated group] Example: Fernhollow Bank, consolidated, including the New York branch
Reference balance-sheet date[YYYY-MM-DD] Example: 2026-12-31
Currency and units[EUR million]
Related ILAAP[ILAAP ID and date] Example: ILAAP-2027
Related recovery plan[Recovery plan ID] Example: RP-2027
Last test[Date and type] Example: 2026-06-18, simulation exercise SIM-2026-01
Version[1.0]
Status[Draft / In review / Approved]
Owner[@group-treasurer]
Approvers/reviewers[@alco-chair], [@cro], [management body or board risk committee]
Last updatedYYYY-MM-DD
Classification[Confidential, restricted to CFP team and management body]
Next scheduled review[YYYY-MM-DD]

Approvals

RoleNameDecisionDate
Group treasurer (plan owner)[@name][Submitted]YYYY-MM-DD
Chief risk officer (independent review)[@name][Challenge completed]YYYY-MM-DD
Asset and liability committee (ALCO)[@chair][Recommend]YYYY-MM-DD
Board risk committee[@chair][Recommend]YYYY-MM-DD
Management body (board)[@chair][Approve]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]Indicators, scenarios and counterbalancing capacity refreshed to the reference date
0.2YYYY-MM-DD[@name]Findings from the annual simulation added to the playbook
1.0YYYY-MM-DD[@name]Approved by the management body

Contents

1. Purpose, scope and legal basis

1.1 Purpose

This plan sets out how [Bank name] identifies an emerging liquidity stress, decides on a response and raises or preserves liquidity quickly enough to keep meeting its payment obligations as they fall due, in normal and stressed conditions, without breaching regulatory minimums. The plan is a decision tool rather than a description of liquidity management in general: day-to-day funding, transfer pricing and the buffer calibration live in the ILAAP and the liquidity risk policy, and this document refers to them instead of repeating them.

The plan has three outcomes. First, an early and objective signal: indicators with thresholds that trigger escalation automatically, so that the bank does not wait for judgement to catch up with events. Second, prepared actions: a ranked list of funding and balance-sheet actions with sizes, lead times, owners and preconditions already checked. Third, rehearsed people: named roles, deputies and contact paths that have been tested in a simulation within the last twelve months.

1.2 Scope

ItemScope
Legal entities[Entities] Example: Fernhollow Bank (parent credit institution), Fernhollow Leasing and Fernhollow Payments (subsidiaries), New York branch
Currencies[Significant currencies] Example: EUR (about 91% of liabilities), USD (about 7%), other currencies below the significance threshold
Business lines[Lines] Example: retail banking, SME lending, treasury and markets (banking book only)
Exclusions and their rationale[Exclusions] Example: none; Fernhollow Leasing is funded entirely by the parent and Fernhollow Payments holds client funds safeguarded outside the bank's liquidity buffer; both are covered through the intragroup section

1.3 Legal and supervisory basis (as of 2026-10, check local law)

JurisdictionRequirement or expectationHow this plan responds
EUDirective 2013/36/EU (CRD) Article 86, in particular paragraph 11 on liquidity recovery (contingency) plans and their testing, as transposed nationallySections 4 to 12
EURegulation (EU) No 575/2013 (CRR) Articles 412 and 413 (LCR and NSFR) and Delegated Regulation (EU) 2015/61 (LCR)Section 3 starting position, section 7 buffer eligibility
EUEBA Guidelines on ICAAP and ILAAP information collected for SREP purposes (EBA/GL/2016/10); revised SREP guidelines EBA/GL/2026/06 (apply from 2027-01-01)Section 12 testing evidence and supervisory submission
EU, ECB-supervised banksECB Guide to the internal liquidity adequacy assessment process (ILAAP), November 2018Consistency with ILAAP scenarios and buffer
USInteragency Policy Statement on Funding and Liquidity Risk Management (Federal Reserve SR 10-6, 2010-03-17, revised 2023-08-01) and its Addendum on the importance of contingency funding plans (2023-07-28; OCC Bulletin 2023-25)Sections 7, 8 and 12 (discount window readiness and periodic test transactions)
US, bank holding companies with USD 100 billion or more12 CFR 252.34(f) (Regulation YY, subpart D): contingency funding plan with a quantitative assessment, a liquidity event management process, monitoring and testing; risk committee approval under 252.34(b). Foreign banking organisations follow the separate FBO subparts of Regulation YY, which apply only above their own asset thresholds (check the current thresholds)Not binding on Fernhollow Bank, a foreign bank whose total consolidated assets are well below USD 100 billion; used as a benchmark and mapped for illustration in section 12.4
US, OCC-supervised banksOCC rescinded its recovery planning guidelines (12 CFR 30 appendix E) by final rule of 2026-03-31, effective 2026-05-01 (OCC Bulletin 2026-10); the OCC still expects every bank it supervises to maintain a formal contingency funding plan covering a range of stress scenariosIf the New York branch is a federal (OCC-licensed) branch, the OCC continues to expect a CFP; a state-licensed branch follows New York State Department of Financial Services and Federal Reserve expectations, including SR 10-6 and the 2023 addendum. Appendix E never applied at Fernhollow's size; recovery planning sits in Recovery Plan (finance/recovery-plan) under EU law
UKPRA Supervisory Statement SS24/15 (the PRA's approach to supervising liquidity and funding risks)Name only; UK entities add PRA-specific requirements
InternationalBasel Committee, Principles for Sound Liquidity Risk Management and Supervision (2008), Principle 11 (contingency funding plan)Name and principle number only

2. Governance and decision rights

2.1 Roles

RoleHolder (Example)Responsibilities in the CFPDeputy
Management bodyBoard of directorsApproves the CFP annually; is informed within 24 hours of a Stage 2 declaration; decides on Stage 3 and recovery plan invocationBoard risk committee chair
Liquidity crisis committee (LCC)CEO (chair), CFO, CRO, group treasurer, head of retail, head of communications, general counselDeclares Stages 2 and 3, approves playbook actions above treasurer limits, approves external messagesCFO chairs if CEO unavailable
ALCOCFO (chair)Owns Stage 1 response, reviews indicators weekly in Stage 1Group treasurer
Group treasurerHead of treasuryPlan owner; monitors indicators daily; declares Stage 1; executes funding actionsDeputy treasurer
Chief risk officerCROIndependent challenge of indicators, scenarios and the CFP; reports to the board risk committeeHead of liquidity risk
Head of communicationsCommunicationsPrepares and releases depositor, media and market messages approved by the LCCInvestor relations lead
Supervisory liaisonHead of regulatory affairsNotifies and updates the competent authority and the central bankGeneral counsel
Operations and collateral managementChief operating officerMoves collateral, executes central bank operations, manages payment queuesHead of payments

2.2 Decision rights by stage

DecisionStage 0 (normal)Stage 1 (heightened monitoring)Stage 2 (liquidity stress)Stage 3 (severe stress)
Declare the stageNot applicableGroup treasurer, informs ALCO same dayLCCLCC, board informed immediately
Use counterbalancing capacity up to EUR [500] millionTreasurer within limitsTreasurerTreasurerTreasurer
Use counterbalancing capacity above EUR [500] millionALCOALCOLCCLCC
Change deposit pricing outside the pricing policyALCOALCOLCCLCC
Stop new lending in a business lineNot applicableNot applicableLCCLCC
External statementCommunications policyCommunications policyLCC approves textLCC approves text
Invoke the recovery planNot applicableNot applicableLCC may escalateBoard on LCC proposal

3. Liquidity risk profile and starting position

This section anchors the plan in the bank's actual funding structure. A CFP that is calibrated on generic outflow rates rather than the bank's own deposit base will either overstate or understate the risk. Describe the concentration of the funding base (largest depositors, uninsured balances, digital channels that allow very fast withdrawals, wholesale maturities) because these drive how quickly stress can develop. Since 2023, supervisors on both sides of the Atlantic have asked banks to consider faster, social-media-driven deposit runs than earlier calibrations assumed, so state the speed you assume and why.

3.1 Key metrics on the reference date

MetricValue (Example, 2026-12-31)Appetite or triggerSource
Total assets47,400Not applicableFinancial statements
Customer deposits33,000Not applicableFinancial statements
Liquidity buffer (HQLA after LCR haircuts)6,260Not applicableLCR report
Net liquidity outflows over 30 days (LCR)4,200Not applicableLCR report
Liquidity coverage ratio149.0% (6,260 / 4,200)Appetite 120%, early warning 130%, CFP activation 115%, recovery indicator 105%LCR report
Net stable funding ratio120.0%Appetite 110%, early warning 115%, CFP activation 107%, recovery indicator 102%NSFR report
Survival horizon, combined severe internal scenarioAbout 80 daysEarly warning 70 days, appetite 60 days, CFP activation 50 days, recovery indicator 30 daysSection 6
CET1 ratio (for context)15.0% (3,000 / 20,000)Recovery indicator 11.0%Capital report
Share of deposits above the deposit guarantee limit22%MonitorDeposit data
Top 20 depositors as a share of deposits4.1%At most 6%Concentration report
Short-term wholesale funding maturing within 90 days2,400At most [3,000]Maturity ladder

3.2 Funding profile

SourceAmount (Example)Share of liabilities and equityBehaviour under stress
Retail deposits, stable (insured, established relationship)18,00038.0%Sticky; outflow assumption low
Retail deposits, less stable (uninsured, online savings)6,00012.7%Rate- and news-sensitive
SME and corporate deposits (operational and non-operational)9,00019.0%Moderate to high outflow; concentrated in some large SME clients
Senior preferred bonds (residual maturity over one year)5,00010.5%Contractual; EUR 1,500 million matures in 2028
Short-term wholesale funding (under one year)3,0006.3%First to run
Other liabilities2,4005.1%Not funding
Regulatory capital instruments and equity4,0008.4%Permanent
Total47,400100.0%

Check: 18,000 + 6,000 + 9,000 + 5,000 + 3,000 + 2,400 + 4,000 = 47,400, matching the ILAAP funding profile. Customer deposits in section 3.1 (EUR 33,000 million) are the sum of the three deposit rows. Central bank funding is zero on the reference date; available capacity is in section 8. Shares are rounded to one decimal place.

4. Early-warning indicators and triggers

Early-warning indicators (EWIs) are the first line of the plan. They should be forward-looking, observable at least daily for the fast ones, and calibrated so that an amber reading gives the bank time to act before the LCR or the internal survival horizon is hit. Group them into internal funding indicators, market indicators and macro or systemic indicators. For each, set an amber threshold (escalate and analyse) and a red threshold (propose a stage change). Breaches are judged together: one red indicator on a noisy series may be explained, while several amber readings in the same family are a pattern.

Calibrate thresholds from the bank's own history (for example the worst five-day deposit change in the last ten years), from peer episodes and from the stress scenarios in section 6. Document the calibration in the annex and repeat it annually. The same indicators, or a subset with tighter thresholds, feed the recovery indicators in Recovery Plan (finance/recovery-plan), so align the definitions.

4.1 Indicator catalogue

IDIndicatorFrequencyAmberRedOwner
EWI-001 (Example)Net retail deposit outflow over 5 business days, as % of retail depositsDaily2.0%4.0%Treasury
EWI-002 (Example)Net outflow of uninsured deposits over 1 business dayDailyEUR 150mEUR 300mTreasury
EWI-003 (Example)LCR (internal daily estimate)DailyBelow 130% (early warning; appetite 120%)Below 115% (CFP activation)Liquidity risk
EWI-004 (Example)Survival horizon under the combined severe scenarioWeeklyBelow 70 days (early warning)Below 60 days (appetite breach; Stage 2 is automatic below 50 days)Liquidity risk
EWI-005 (Example)Rollover rate of maturing wholesale unsecured funding over 10 daysDailyBelow 80%Below 60%Treasury
EWI-006 (Example)Increase in early withdrawals of term deposits, week on weekWeekly+50%+100%Retail
EWI-007 (Example)Unencumbered HQLA, absoluteDailyBelow EUR 6,000mBelow EUR 5,000mTreasury
EWI-008 (Example)Five-year senior CDS or secondary bond spread versus peer indexDaily+75 bp+150 bpMarket risk
EWI-009 (Example)Share price fall over 5 trading days, relative to banking indexDaily-15%-25%Investor relations
EWI-010 (Example)Credit rating actionEventNegative outlookDowngrade by one notch or moreTreasury
EWI-011 (Example)Margin and collateral calls received on derivatives and repoDailyEUR 100m in a dayEUR 200m in a dayCollateral management
EWI-012 (Example)Peak intraday liquidity usage as % of available intraday liquidityDaily50% (ILAAP early warning, LIQ-006)60% (ILAAP limit, LIQ-006)Payments
EWI-013 (Example)Negative media or social media volume about the bankDailyTwo times the 30-day averageFive times the 30-day averageCommunications
EWI-014 (Example)USD funding gap over 30 days (New York branch and USD assets)DailyBelow zero after USD bufferBelow minus USD 200mTreasury
EWI-015 (Example)Systemic stress: euro area interbank spread (unsecured versus secured overnight)Daily+25 bp over 20-day average+50 bpMarket risk
EWI-016 (Example)Encumbrance ratio (encumbered assets over total assets)Monthly22%26%Treasury

4.2 Breach handling

When an indicator turns amber, the owner confirms the data within two hours, records the reading in the EWI log and informs the group treasurer. The treasurer decides whether the reading reflects a data problem, a known one-off (such as a large customer moving funds on a pre-announced date) or a genuine signal. Two or more amber readings in the same family, or one red reading, trigger a proposal to declare Stage 1 or Stage 2 as set out in section 5. Each decision not to escalate is written in the log with its rationale, so that later review can test whether the bank ignored a warning.

Log IDDateIndicatorReadingAssessmentDecision and owner
EWL-2026-014 (Example)2026-06-12EWI-002EUR 180mTwo corporate clients moved tax payments; confirmed with relationship managersNo escalation; recheck next day, [@treasurer]

5. Stress stages and escalation

The stages turn indicator readings into an organisational response. Entry criteria should be objective enough to be applied at 07:00 by the treasurer on duty, with judgement used to move faster rather than to delay. Exit criteria matter too: leaving a stage too early is a common error after a first wave of outflows calms down.

StageEntry criteria (Example)RhythmDefault actionsExit criteria
Stage 0, normalNo red indicator, at most one amberDaily monitoring, weekly ALCO packBusiness as usual within the liquidity risk policyNot applicable
Stage 1, heightened monitoringTwo amber in one family, or LCR estimate below 130%, or survival horizon below 70 days, or one red indicator explained as not yet systemic for the bankDaily treasury call, ALCO at least weeklyPre-position collateral with the central bank, refresh counterbalancing capacity daily, prepare communication lines, slow non-essential asset growthAll indicators green or amber-explained for 10 business days
Stage 2, liquidity stress (CFP activation)Two or more red indicators, or LCR estimate below 115%, or NSFR below 107%, or survival horizon below 50 days (a breach of the 60-day appetite alone is a red EWI-004 reading and a Stage 1 escalation to ALCO)LCC daily, board informed within 24 hours, supervisor informed the same dayExecute playbook actions A1 to A6 (section 9), activate communication plan, daily reporting to the supervisor if requestedLCR back above 130% and no red indicator for 20 business days, decided by the LCC
Stage 3, severe stressLCR below 105% (recovery indicator) or projected below 100% within 10 days, or NSFR below 102%, or survival horizon below 30 days, or loss of access to wholesale marketsLCC continuous, board on callExecute all remaining actions, central bank operations at scale, consider invoking the recovery planRecovery plan governance decides

6. Stress scenarios and survival horizon

6.1 Scenario set

The bank runs the three internal scenarios of the ILAAP (idiosyncratic and market-wide over 120 days, combined over 90 days), in addition to the regulatory LCR. The idiosyncratic scenario assumes a loss of confidence in the bank alone (for example after a large fraud loss and a two-notch downgrade). The market-wide scenario assumes a general funding market disruption with falling collateral values. The combined severe scenario overlays both and is the binding scenario for the internal survival horizon limit.

ScenarioNarrative (Example)Key assumptions
SCN-L01 idiosyncraticOperational loss of EUR 450m disclosed, two-notch downgrade, intense media coverageElevated retail and corporate outflows, wholesale rollover 0%, collateral calls on downgrade
SCN-L02 market-wideSovereign and bank spread widening across the euro area, money markets close for unsecured term fundingLower HQLA market values, higher repo haircuts, moderate deposit outflows
SCN-L03 combined severeBoth at once, front-loaded in the first two weeksThe outflow rates in section 6.2

6.2 Combined severe scenario (SCN-L03), cumulative to day 90

Cash-flow lineBalance (Example)Outflow or inflow rateAmount at day 90
Retail deposits, stable18,0005%900
Retail deposits, less stable6,00020%1,200
SME and corporate deposits (operational and non-operational)9,00040%3,600
Short-term wholesale funding maturing within 90 days2,400100%2,400
Drawdowns of committed credit and liquidity facilities4,20015%630
Collateral calls after a two-notch downgradeNot applicableContract terms420
Total outflows9,150
Maturing interbank placements10050% (half rolled to protect relationships)-50
Net cumulative outflow at day 909,100

Check: 900 + 1,200 + 3,600 + 2,400 + 630 + 420 = 9,150; 9,150 minus 50 = 9,100. The undrawn committed facilities of EUR 4,200 million are the same off-balance-sheet amount as in the ILAAP NSFR and reverse stress calculations. Of the EUR 3,000 million short-term wholesale funding, EUR 2,400 million matures within the 90 days and is assumed not to roll. Loan repayments are assumed to be fully re-lent to protect the franchise, so they add no net inflow. The SME and corporate run-off reflects the concentration of rate-sensitive SME deposits noted in the ILAAP. A real plan models each deposit segment and each maturity separately and documents the source of every rate.

6.3 Survival horizon

Time bucketCumulative net outflow (Example)Counterbalancing capacity, HQLA onlyGap, HQLA onlyCounterbalancing capacity, HQLA plus pre-positioned central bank collateralGap, full capacity
Day 72,1006,2604,1608,5006,400
Day 304,9006,2601,3608,5003,600
Day 607,2006,260-9408,5001,300
Day 909,1006,260-2,8408,500-600

The survival horizon is measured on the full counterbalancing capacity of EUR 8,500 million (Tiers A and B in section 7), as in the ILAAP Report (finance/ilaap-report). Between day 60 and day 90 cumulative outflows grow by 1,900; the remaining surplus of 1,300 is used after 30 x 1,300 / 1,900 = 20.5 days, so the survival horizon is about 80 days (60 + 20.5). That meets the risk appetite of 60 days with a margin of about 20 days but is shorter than the 90-day scenario, which is why section 9 lists actions that add capacity early in Stage 1. On HQLA alone the gap turns negative between day 30 and day 60: outflows grow by 2,300 in that period and the remaining 1,360 is used after 30 x 1,360 / 2,300 = 17.7 days, about day 48. This figure is reported for information so that the management body sees how much the plan relies on pre-positioned central bank collateral.

7. Funding sources and counterbalancing capacity

Counterbalancing capacity (CBC) is the cash the bank can generate from its assets and funding options within a given time. Distinguish three tiers. Tier A is the liquidity buffer itself (HQLA held in the treasury's control, unencumbered, and in the right legal entity and currency). Tier B is central bank credit on eligible non-HQLA collateral that has been pre-positioned. Tier C is market actions that take weeks and depend on market conditions, such as new covered bond issuance or a securitisation. Only Tier A counts toward the LCR, but the CFP uses all three with realistic timing.

IDSourceMarket or nominal value (Example)Stress haircutNet liquidityTime to cashPreconditions
CBC-01 (Example)Central bank reserves above minimum reserve needs2,0000%2,000Same dayNone
CBC-02 (Example)Level 1 government bonds, repo or outright sale3,6000% (LCR), stress repo haircut tested at 2%3,6001 to 2 daysRepo lines or central bank operations available; tested quarterly
CBC-03 (Example)Level 2A covered bonds held60015% (LCR)5102 to 3 daysRepo counterparties or sale
CBC-04 (Example)Level 2B high-quality RMBS held20025% (LCR)1503 to 5 daysRepo counterparties or sale
Tier A subtotal6,4006,260Matches the LCR buffer in section 3.1
CBC-05 (Example)Credit claims pre-positioned with the central bank3,20030% (assumed blended valuation haircut)2,2402 to 5 business days after mobilisationCollateral eligibility confirmed, legal documentation in place
Tier B subtotal3,2002,240
CBC-06 (Example)Inaugural covered bond issuance (programme established, cover pool of prime mortgages)1,000Not applicable1,0002 to 4 weeksMarket open, cover pool eligibility, rating agency confirmation
CBC-07 (Example)Securitisation of prime mortgages for repo or sale1,500Not applicable1,5008 to 12 weeksData tape ready, structuring mandate, investor appetite
CBC-08 (Example)Sale of corporate bond portfolio (non-HQLA)30020%2401 weekMarket liquidity; loss absorbed in capital
Tier C subtotal2,8002,740Not counted in the survival horizon
Total12,40011,240

Check the arithmetic: Tier A 2,000 + 3,600 + 510 + 150 = 6,260; Tier B 2,240 (3,200 x 70%); Tier C 1,000 + 1,500 + 240 = 2,740; total 6,260 + 2,240 + 2,740 = 11,240. The survival horizon in section 6.3 uses Tiers A and B (8,500), because Tier C depends on markets that may be closed in the combined severe scenario.

For every source, record the evidence that it works: the date of the last repo with each counterparty, the last central bank operation, the last cover pool eligibility check. Supervisors increasingly test monetisation in practice, not on paper, and the 2023 US addendum explicitly asks banks that rely on the discount window to keep operational readiness, including periodic test transactions.

8. Central bank facilities and operational readiness

FacilityEligibility (Example)Collateral pre-positionedOperational stepsLast test
Eurosystem open market operations and marginal lending facility (via the national central bank)Counterparty status confirmedEUR 3,200m credit claims; EUR 3,600m government bonds availableCollateral mobilisation via the national central bank's collateral system, bid submission in the tender platform2026-05-21 test bid, EUR 50m one-week
Federal Reserve discount window (New York branch)Eligible as a US branch of a foreign bank; documentation in placeUSD 150m US Treasury securities pledgedBorrowing request through the Reserve Bank's discount window procedures2026-04-09 test transaction, USD 5m overnight
Emergency liquidity assistanceAt the discretion of the national central bank; not counted in the planNot applicableContact protocol onlyNot tested by design

Readiness checklist for each facility: legal agreements signed and current; collateral eligibility rechecked monthly; valuation and haircut data loaded; named staff trained with access rights in the collateral and tender systems; cut-off times listed in the playbook; a test transaction performed within the last [12] months; and the accounting and disclosure consequences of drawing understood by the CFO. Note that the use of emergency liquidity assistance is a central bank decision and is excluded from the counterbalancing capacity so that the plan does not rely on it.

9. Action playbook

IDActionLiquidity effect (Example)Lead timeStageOwnerSide effects and conditions
A1 (Example)Pre-position additional collateral with the central bankMoves capacity from Tier C toward Tier B1 to 4 weeksStage 1Collateral managementRequires loan-level data quality
A2 (Example)Repo of Level 1 government bondsUp to EUR 3,600m1 to 2 daysStage 1TreasuryLow signalling; uses existing lines
A3 (Example)Participate in Eurosystem operations at larger sizeUp to EUR 2,240m on non-HQLA collateral1 weekStage 2TreasuryVisible in central bank statistics only in aggregate
A4 (Example)Slow or pause new lending in selected segmentsEUR 150m a month of avoided outflow1 to 2 weeksStage 2Head of retail and SMEFranchise impact; communicate to sales staff
A5 (Example)Targeted deposit pricing for term deposits within LCC limitsEUR 300m to 600m inflow over 30 daysDaysStage 2ALCOMargin cost; avoid headline price signalling
A6 (Example)Draw committed facilities received from other banks, if any[Amount]DaysStage 2TreasuryFernhollow Bank has none in the example
A7 (Example)Issue covered bonds from cover pool headroomEUR 1,000m2 to 4 weeksStage 2 or 3TreasuryMarket access; rating agency
A8 (Example)Sell corporate bond portfolioEUR 240m1 weekStage 3TreasuryRealised loss reduces CET1
A9 (Example)Securitise prime mortgagesEUR 1,500m8 to 12 weeksStage 3Treasury and structuringStart preparation in Stage 1
A10 (Example)Restrict intragroup upstreaming or downstreaming as allowed by lawPreserves entity liquidityImmediateStage 2Treasury and legalCheck local ring-fencing rules

Execution rules: every action carries an execution record (date, amount, counterparty, approval reference); the treasurer updates the counterbalancing capacity table after each action; actions that reduce capital (asset sales at a loss) are coordinated with the CFO and the capital plan in the ICAAP Report (finance/icaap-report); and actions listed in the recovery plan as recovery options are not double counted between the two plans.

10. Communication plan

Communication can stabilise or accelerate a run. Prepare messages in advance for each audience and approve them in principle at each annual review, so that only facts need to be filled in. Keep messages factual and consistent across channels, and make sure front-line staff receive the same message as the press at the same time.

AudienceChannelPrepared materialApproverTiming in Stage 2
Retail depositorsWebsite, app banner, branch staff briefingHolding statement, deposit guarantee explanation, FAQLCCWithin 4 hours of declaration if outflows are public
Corporate and SME clientsRelationship managersTalking points, escalation path for large withdrawalsHead of corporate banking with LCCSame day
Wholesale counterparties and investorsInvestor relations calls, market disclosure if requiredFactual update on liquidity positionCFO and LCC; disclosure counselAs required by market disclosure law
Rating agenciesTreasurer and CFOLiquidity pack (sections 3 and 7)CFOWithin 24 hours
Competent authority and central bankSupervisory liaisonNotification template, daily liquidity reportCROSame day as declaration
StaffIntranet, managers' briefingInternal note, media enquiry ruleCEO officeSame day

11. Intraday, currency and intragroup liquidity

11.1 Intraday liquidity

Monitor the largest intraday net cumulative outflow, the timing of critical payments, the intraday credit available from the central bank against collateral, and the share of payments made after their usual time. Under stress, counterparties may delay their payments to the bank while expecting the bank's payments on time, so the plan sets a payment prioritisation order (time-critical obligations such as settlement system and central bank payments first) and names who may throttle discretionary outgoing payments.

11.2 Significant currencies

CurrencyStress gap over 30 days (Example)Buffer in that currencyFX swap market relianceAction if gap opens
EUR-4,6006,010NoneSection 9
USD-300250 (EUR equivalent of the USD buffer)EUR/USD swaps for the remainderPre-agree swap lines, use Federal Reserve discount window at the New York branch

11.3 Intragroup liquidity

Document each intragroup facility, its legal capacity, any regulatory or tax restriction on transfer (large exposure limits, local liquidity requirements for branches and subsidiaries, ring-fencing), and the operational steps to move funds. In the example the leasing subsidiary is funded by the parent through a committed intragroup line of EUR 1,200 million, and the New York branch is subject to US requirements that may limit how quickly liquidity can be returned to the head office.

12. Testing and maintenance

12.1 Testing programme

Test IDTypeScope (Example)FrequencyLast performedResult
TST-01 (Example)Simulation exerciseLCC decision-making in a 48-hour idiosyncratic run scenario with injected media eventsAnnual2026-06-18Passed with 4 findings
TST-02 (Example)Operational test, central bankTest bid in Eurosystem operationsAnnual minimum2026-05-21Passed
TST-03 (Example)Operational test, discount windowTest transaction at the New York branchAnnual minimum2026-04-09Passed
TST-04 (Example)Repo market accessSmall repo with each core counterpartyQuarterly2026-09-15Passed, one counterparty line reduced
TST-05 (Example)Data and reportingProduce the daily stress dashboard within 2 hours of requestSemi-annual2026-07-02Failed first attempt, passed on retest
TST-06 (Example)Contact pathReach every LCC member and deputy out of hoursSemi-annual2026-08-30Passed

12.2 Findings log

Finding IDTestFindingActionOwnerDueStatus
CFP-F-2026-01 (Example)TST-01Media holding statement took 5 hours to approvePre-approve a shorter template for Stage 2Head of communications2026-09-30Closed
CFP-F-2026-02 (Example)TST-01Deposit outflow data by channel only available next dayBuild intraday outflow report for online savingsTreasury data lead2026-12-31Open
CFP-F-2026-03 (Example)TST-05Stress dashboard depended on one analystDocument and cross-trainHead of liquidity risk2026-11-30Open
CFP-F-2026-04 (Example)TST-01Unclear authority to pause SME lendingAdded to decision rights table 2.2Group treasurer2026-07-31Closed

12.3 Maintenance triggers

Update the plan within [30] days when: the annual ILAAP is approved; a test produces a material finding; the funding mix changes by more than [10] percentage points in any line; a new legal entity, branch or significant currency is added; a central bank changes collateral rules that affect more than [10]% of Tier B; or regulation changes (for example the application of revised SREP guidelines EBA/GL/2026/06 from 2027-01-01).

12.4 Requirement coverage map

RequirementPlan sectionEvidence
CRD Art. 86(11): liquidity contingency plan with strategies, implementation measures and testing4 to 12Approved plan, test reports
12 CFR 252.34(f)(2)(i) quantitative assessment6 and 7Scenario and CBC tables
12 CFR 252.34(f)(2)(ii) event management process2, 5, 9 and 10Decision rights, stages, playbook, communication
12 CFR 252.34(f)(2)(iii) monitoring with early-warning indicators4EWI catalogue and log
12 CFR 252.34(f)(2)(iv) testing12Test programme and findings log
Interagency 2023 addendum: discount window readiness8Test transaction record

The 12 CFR 252.34(f) rows are mapped for illustration only: Regulation YY subpart D binds US bank holding companies with USD 100 billion or more of assets, and Fernhollow's New York branch is below the Regulation YY liquidity thresholds for foreign banking organisations, so it follows SR 10-6 and the 2023 addendum. A bank that is in scope keeps this map as evidence for its examiners. | Basel Principles for Sound Liquidity Risk Management, Principle 11 | Whole plan | Name and number only |

13. Glossary and references

13.1 Glossary

TermMeaning in this plan
Contingency funding plan (CFP)The documented strategy, indicators, actions and roles for handling a liquidity stress
Counterbalancing capacity (CBC)Liquidity the bank can generate from assets and funding actions within a stated time, after stress haircuts
Early-warning indicator (EWI)A monitored metric with thresholds that signal a possible liquidity stress before regulatory ratios are affected
HQLAHigh-quality liquid assets eligible for the LCR buffer under Delegated Regulation (EU) 2015/61
LCRLiquidity coverage ratio: liquidity buffer divided by net liquidity outflows over 30 calendar days of stress
NSFRNet stable funding ratio: available stable funding divided by required stable funding
Survival horizonThe number of days until cumulative net stressed outflows exceed the counterbalancing capacity
Pre-positioningDelivering collateral to the central bank before it is needed so that credit can be drawn quickly
EncumbranceAssets pledged or otherwise not freely available to raise liquidity
Liquidity crisis committee (LCC)The decision body for Stages 2 and 3

13.2 References

ReferenceVersion or date checkedUse
Directive 2013/36/EU (CRD), Article 86Consolidated text, checked 2026-10-25 by referenceLiquidity risk and contingency plan requirement
Regulation (EU) No 575/2013 (CRR), Articles 412 and 413; Delegated Regulation (EU) 2015/61Check consolidated textLCR and NSFR
EBA/GL/2016/10, ICAAP and ILAAP information for SREPCheck eba.europa.euSupervisory information
EBA/GL/2026/06, revised SREP and supervisory stress testing guidelinesFinal report 2026-06-26, applies 2027-01-01Supervisory assessment of liquidity and recovery capacity
ECB Guide to the ILAAPNovember 2018Consistency of scenarios and buffer
Interagency Policy Statement on Funding and Liquidity Risk Management (SR 10-6)2010-03-17, revised 2023-08-01US expectations
Addendum: Importance of Contingency Funding Plans (OCC Bulletin 2023-25)2023-07-28Discount window readiness and CFP updates
12 CFR 252.34 (Regulation YY, subpart D)Checked 2026-10-25CFP elements for in-scope US bank holding companies; benchmark only here
OCC Bulletin 2026-10, rescission of recovery planning guidelinesFinal rule 2026-03-31, effective 2026-05-01Continuing CFP expectation
Basel Committee, Principles for Sound Liquidity Risk Management and Supervision2008Name and principle number only
PRA SS24/15Name onlyUK entities
Related templates: ILAAP Report (finance/ilaap-report), Recovery Plan (finance/recovery-plan), Stress Testing Programme (finance/stress-testing-programme), Risk Appetite Statement (finance/risk-appetite-statement), IRRBB Policy and Report (finance/irrbb-policy-and-report), Business Continuity Plan (compliance/business-continuity)Not applicableCross-references

Standard and licence note

Based on Directive 2013/36/EU Article 86, Regulation (EU) No 575/2013, EBA guidelines cited by number, the US Interagency Policy Statement on Funding and Liquidity Risk Management with its 2023 addendum, 12 CFR 252.34 and OCC Bulletin 2026-10 (US federal works in the public domain; EU texts reused with acknowledgement of the source). The Basel Committee principles and the PRA supervisory statement are cited by name and number only; no text from them is reproduced. The structure, indicators, thresholds and all wording are original to this template. Fernhollow Bank and every figure are fictional and are not a calibration recommendation. Check the current official version of each cited text and your national transposition before use. Template licence: MIT.

Templat terkait