Markdown Editor

MVP Experiment Plan Template (Riskiest Assumption Test)

Lean MVP experiment: risk-ranked assumptions, falsifiable hypothesis, MVP type, success and kill criteria, run plan, results, decision

スタートアップ標準Lean Startup (Ries 2011), build-measure-learnmvpexperimentplan

使い方: Use it when you want to test a startup's riskiest assumption before building. Fill the assumption ranking and write success and kill criteria before running anything. The main pitfall is measuring opinions instead of behaviour, or moving the goalposts after the data arrives.

プレビュー

MVP Experiment Plan: [Product or idea]

A plan for testing a startup's riskiest assumption with the smallest possible product before building the full thing: the assumptions ranked by risk, the hypothesis in falsifiable form, the MVP type chosen, the metric and success and kill criteria fixed in advance, the run plan, results, and the persevere, pivot or stop decision. Structure aligned with the build-measure-learn loop and minimum viable product practice described in Eric Ries, The Lean Startup (2011). Replace every [bracketed] value and every row marked Example. The example is fictional.

Document control

FieldValue
Document ID[EXP-NNN]
Version[0.1]
Status[Planned / Running / Concluded]
Owner[@founder]
Reviewers[@co-founder], [@advisor]
Last updatedYYYY-MM-DD
ClassificationInternal
Relatedstartup/customer-discovery, business/lean-canvas

Revision history

VersionDateAuthorChange
0.1YYYY-MM-DD[@founder]Example: Criteria agreed before launch
1.0YYYY-MM-DD[@founder]Example: Results and decision recorded

1. Assumptions and riskiest assumption

IDAssumptionTypeImpact if wrong (1 to 5)Evidence today (1 to 5, 5 = strong)Risk = impact x (6 minus evidence)
ASM-01 (Example)Independent bicycle shops will pay monthly for stock forecastsDesirability, viability5125
ASM-02 (Example)Shop point-of-sale data can be exported weeklyFeasibility4312
ASM-03 (Example)Shops can be reached at trade shows at low costViability3212
ASM-04 (Example)Forecasts beat the owner's own reorder habitDesirability4216

Riskiest assumption to test now: Example: ASM-01.

2. Hypothesis

We believe that [customer segment] will [observable behaviour] at [threshold] within [period], because [reason from discovery].

Example: "We believe that independent bicycle shops with 1 to 3 locations will pay a 150 USD pilot fee for six weeks of hand-made stock forecasts, with at least 6 of 12 invited shops paying within two weeks of the offer, because 9 of 15 discovery interviews named overstock of slow-moving parts as a top-three problem."

3. MVP type

MVP typeTestsCost and speedChosen
Landing page or fake doorInterest, message, channelVery cheap, days[ ]
Concierge (service by hand)Willingness to pay, value deliveredCheap, weeks, does not scaleExample: [x]
Wizard of Oz (looks automated, run by people)Value and usability of the future productMedium[ ]
Pre-sale or letter of intentWillingness to payCheap[ ]
Single-feature productRetention on the core jobHigher, needs code[ ]

Example: Concierge MVP. A founder builds each shop's forecast in a spreadsheet from its exported sales data and sends a reorder list every Monday for six weeks. In parallel, a fake-door page tests the channel (ASM-03) as a separate experiment, EXP-002.

4. Metrics, success and kill criteria

ItemValue
Primary metricExample: Shops paying the 150 USD pilot fee, out of 12 invited
Success (persevere)Example: 6 or more of 12 pay
Kill (stop or pivot)Example: 2 or fewer pay
Inconclusive zoneExample: 3 to 5 pay: rerun with 12 more shops and a changed offer
Secondary metricsExample: Shops acting on at least half of weekly reorder lists; pilot shops asking to continue after week 6
GuardrailExample: Founder time under 10 hours a week
Sample and durationExample: 12 shops, offer open 2 weeks, pilot 6 weeks
BudgetExample: Founder time plus 300 USD for data cleaning tools

5. Run plan

StepActionOwnerDate
1Invite 12 shops from discovery list with the same written offer[@ceo]YYYY-MM-DD
2Collect fees and sales exports[@ceo]YYYY-MM-DD
3Send weekly forecasts for 6 weeks, log usage[@cto]YYYY-MM-DD
4Exit interview with every shop[@ceo]YYYY-MM-DD
5Results review against criteriaBoth foundersYYYY-MM-DD

6. Results

MetricCriterionResult (Example)
Shops paying the pilot fee6 or more of 127 of 12 (58%)
Plausible range for the paying rateInformation onlyAbout 32% to 81% (95% Wilson interval, n = 12)
Shops acting on at least half of reorder listsSecondary5 of 7
Asked to continue after week 6Secondary6 of 7
Founder timeUnder 10 hours a weekAbout 8 hours a week

Example: Separate experiment EXP-002 (fake door): 36 of 400 visitors from trade-show follow-ups booked a demo (9%, about 6.6% to 12.2% at 95%).

7. Decision and next experiment

ItemValue
DecisionExample: Persevere: success criterion met
What we learnedExample: Shops pay for the outcome; owners trust a list more than a dashboard
Next riskiest assumptionExample: ASM-04, forecasts beat the owner's reorder habit, tested with a 12-week accuracy comparison
Follow-on workExample: Price test and automated data import, feeding the revenue assumptions in startup/financial-projections

8. References

  • Eric Ries, The Lean Startup (Crown Business, 2011): minimum viable product and the build-measure-learn loop. Publisher and book information: https://theleanstartup.com/book
  • Related templates: startup/customer-discovery, startup/pivot-memo, business/lean-canvas, business/value-proposition-canvas, product/ab-test-plan, product/opportunity-solution-tree.

Standard and licence note

Structure aligned with the minimum viable product and build-measure- learn practice described in Eric Ries's The Lean Startup (2011). The book is named and cited only; no text is copied and all wording here is original. Official text: the publisher's edition, purchase or licensed access via https://theleanstartup.com/book. The example company and its figures are fictional. Template licence: MIT.

関連テンプレート