Wardley Map Template
Strategic question, users and needs, value chain, evolution assessment, quadrant map and map source, movement, inertia, options and gameplay, doctrine, decision, signposts
사용법: Use it when a sourcing, investment or timing decision needs shared context rather than opinions. Fill the strategic question, the users and needs, and the value chain first, then argue evolution positions with evidence before discussing options. The main pitfall is placing components by how new they feel inside the organisation instead of how evolved they are in the market.
미리보기
Wardley Map: [Strategic question] for [Organisation]
Strategy document built around one Wardley map: the user and the need that anchor it, the value chain of components that meets the need, an evolution assessment for each component, the expected movement and the forces behind it, inertia, the options and gameplay considered, a doctrine check, and the decision with signposts for review. Wardley mapping was created by Simon Wardley, who published his book Wardley Maps under the Creative Commons Attribution-ShareAlike 4.0 licence; this template uses the method's concept names only and is written in original words. Replace every
[bracketed]value and every row marked Example.
Document control
| Field | Value |
|---|---|
| Document ID | [WM-001] |
| Strategic question | [Should we build, buy or outsource route optimisation in the next 24 months?] |
| Organisation or scope | [Organisation, business unit or product line] |
| Map owner (decision owner) | [@decision-owner] |
| Facilitator | [@architect-or-strategist] |
| Version | [0.1] |
| Status | [Draft / In review / Approved / Superseded] |
| Approvers/reviewers | [@cto], [@coo], [@head-of-product] |
| Last updated | YYYY-MM-DD |
| Next scheduled review | YYYY-MM-DD |
| Classification | [Internal / Confidential] |
| Mapping session dates | YYYY-MM-DD, YYYY-MM-DD |
| Participants | [Names and roles of the people who mapped] |
| Map file | [Path to the map source, for example maps/route-optimisation.owm] |
Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| Decision owner | [@name] | [Approve / Approve with conditions / Reject] | YYYY-MM-DD |
| Chief architect | [@name] | [Decision] | YYYY-MM-DD |
| Finance partner | [@name] | [Decision] | YYYY-MM-DD |
| Owner of the most affected component | [@name] | [Decision] | YYYY-MM-DD |
Revision history
| Version | Date | Author | Change summary |
|---|---|---|---|
| 0.1 | YYYY-MM-DD | [@name] | First map from the discovery session |
| 0.2 | YYYY-MM-DD | [@name] | Example: Evolution positions challenged by operations and fleet teams |
| 1.0 | YYYY-MM-DD | [@name] | Example: Option O2 approved with signposts for review |
Contents
1. Strategic question and scope
1.1 Question
[One sentence. It should name a choice, a scope and a time horizon.]
Example: Kestrelmoor Freight runs 420 trucks across three regions and sells next-day pallet delivery to business shippers. Its route planning is a ten-year-old in-house tool that two engineers maintain. The board asks whether to rebuild route optimisation, buy a product, or hand planning to a fourth-party logistics (4PL) platform within 24 months.
1.2 Scope and horizon
| Item | Value |
|---|---|
| In scope | [Products, services, capabilities or markets on the map] |
| Out of scope | [What the map deliberately leaves out, and why] |
| Time horizon | [12 to 36 months is typical for an operational strategy question] |
| Decision deadline | YYYY-MM-DD |
| Inputs | [Strategy papers, capability map, tech radar, cost data, customer research] |
1.3 Why a map
A Wardley map places the components that serve a user need on two
dimensions: how visible each component is to the user (the vertical
position, following the chain of needs from top to bottom) and how
evolved it is (the horizontal position, from novel to commodity). The
map shows context that a list or a slide cannot: which components are
moving, which ones are dragging, where a choice about one component
constrains another, and where the organisation is investing in the
wrong kind of work. Use it when the question involves sourcing, timing,
investment or competitive position. Do not use it as a system
architecture diagram; the C4 model or a reference architecture serve
that purpose better (architecture/c4-architecture,
architecture/reference-architecture).
2. Users and needs
The anchor is the user at the top of the map. Choose the user whose need the strategic question serves. Some maps need two anchors, for example the shipper and the regulator; keep it to two at most.
| Need ID | User | Need (in the user's words) | Type | Evidence |
|---|---|---|---|---|
| NEED-001 (Example) | Business shipper | "Book a pallet collection in under two minutes" | Table stakes | Customer interviews, booking funnel data |
| NEED-002 (Example) | Business shipper | "Know when the delivery will arrive, and trust it" | Differentiator | Lost-deal reasons, net promoter comments |
| NEED-003 (Example) | Business shipper | "Pay a predictable price per pallet" | Table stakes | Sales feedback |
| NEED-004 (Example) | Receiving warehouse | "Get deliveries inside the booked dock slot" | Differentiator | Complaints log |
| NEED-[NNN] | [User] | [Need] | [Table stakes / Differentiator] | [Source] |
Keep needs as outcomes. "A route optimisation engine" is a component, not a need; "deliveries arrive in the promised window" is a need.
3. Value chain
3.1 Components
A component can be an activity, a practice, data or knowledge. Give each one a stable ID so movement and decisions can refer to it.
| ID | Component | Kind | Depends on | Serves need | Provided by today | Visibility (0 to 1) |
|---|---|---|---|---|---|---|
| CMP-01 (Example) | Online booking | Activity | CMP-03, CMP-09 | NEED-001, NEED-003 | In-house web team | 0.85 |
| CMP-02 (Example) | Delivery time promise (ETA) | Activity | CMP-04, CMP-05, CMP-07 | NEED-002, NEED-004 | Planners by hand | 0.78 |
| CMP-03 (Example) | Pricing | Activity | CMP-09 | NEED-003 | Commercial team, spreadsheet rules | 0.72 |
| CMP-04 (Example) | Route optimisation | Activity | CMP-06, CMP-08 | NEED-002, NEED-004 | Legacy in-house tool | 0.58 |
| CMP-05 (Example) | ETA prediction model | Knowledge and activity | CMP-07, CMP-09 | NEED-002 | Not yet built | 0.55 |
| CMP-06 (Example) | Maps and geocoding | Data | CMP-10 | Via CMP-04 | Licensed map data | 0.35 |
| CMP-07 (Example) | Vehicle telematics | Data and activity | CMP-10 | Via CMP-02, CMP-05 | Telematics vendor | 0.32 |
| CMP-08 (Example) | Driver mobile app | Activity | CMP-10 | Via CMP-04 | In-house mobile team | 0.45 |
| CMP-09 (Example) | Shipment data platform | Data and practice | CMP-10 | Via CMP-01, CMP-03, CMP-05 | In-house data team | 0.25 |
| CMP-10 (Example) | Compute and storage | Activity | None on this map | All | Leased data centre racks | 0.10 |
| CMP-[NN] | [Component] | [Kind] | [IDs] | [Need IDs] | [Provider] | [0 to 1] |
3.2 Value chain diagram
The diagram shows dependency direction only (a component points to what it needs). The map in section 5 adds the evolution dimension.
4. Evolution assessment
4.1 Stages used in this template
The evolution axis runs from left (novel) to right (commodity). The four stage names below are the ones commonly used in Wardley mapping for activities. The numeric bands are a drawing convention used by this template and by common mapping tools, not a rule; agree the bands with the team and keep them stable between versions.
| Stage | Band on the axis | What you typically observe (original summary) |
|---|---|---|
| Genesis | 0.00 to 0.17 | Few examples exist, outcomes are uncertain, work is exploratory and failure is expected |
| Custom built | 0.17 to 0.40 | Several organisations have built their own; knowledge is growing but each build differs |
| Product (including rental) | 0.40 to 0.70 | Competing products exist with feature differences; buyers compare offerings |
| Commodity (including utility) | 0.70 to 1.00 | Widespread, well understood and standardised; bought on price, often metered |
For data and knowledge, many practitioners rename the stages (for example from unmodelled to modelled data, or from concept to accepted knowledge). Use renamed stages only if everyone in the session agrees on them.
4.2 Assessment per component
| ID | Component | Evolution (0 to 1) | Stage | Evidence for the position |
|---|---|---|---|---|
| CMP-01 (Example) | Online booking | 0.62 | Product | Several freight booking products exist; competitors use them |
| CMP-02 (Example) | Delivery time promise | 0.30 | Custom built | Few regional carriers publish reliable windows; each does it differently |
| CMP-03 (Example) | Pricing | 0.48 | Product | Rating engines are sold as products; rules are well understood |
| CMP-04 (Example) | Route optimisation | 0.60 | Product | Many vendors sell vehicle routing with comparable features and published benchmarks |
| CMP-05 (Example) | ETA prediction model | 0.28 | Custom built | Methods are known, but accuracy depends on own telematics history; no product fits regional pallet networks |
| CMP-06 (Example) | Maps and geocoding | 0.80 | Commodity | Metered APIs from many providers, price competition |
| CMP-07 (Example) | Vehicle telematics | 0.68 | Product, moving to commodity | Hardware standardised, data feeds via standard APIs |
| CMP-08 (Example) | Driver mobile app | 0.50 | Product | Driver app products exist; own app adds little |
| CMP-09 (Example) | Shipment data platform | 0.58 | Product | Cloud data platforms are products; the practice is established |
| CMP-10 (Example) | Compute and storage | 0.92 | Commodity | Utility cloud services, metered |
4.3 Disagreements recorded
| ID | Positions proposed | Who | Resolution |
|---|---|---|---|
| CMP-04 (Example) | 0.35 (operations) versus 0.60 (architecture) | Head of planning, chief architect | Operations saw the legacy tool as unique; market scan of eight vendors placed it at 0.60. Accepted 0.60, recorded as assumption A-02 |
| [ID] | [Positions] | [Names] | [Outcome and evidence] |
5. The map
5.1 Plotted positions
The chart plots each component at (evolution, visibility). Mermaid does not draw dependency lines or movement on a quadrant chart; read it with the value chain in section 3.2 and the movement in section 6.
5.2 Map source
Keep the map in a text format under version control. The block below
uses the syntax of the open-source OnlineWardleyMaps tool, where each
component is written as [visibility, evolution], -> is a dependency
and evolve shows intended movement. Check the tool's documentation
for the current syntax.
title Kestrelmoor Freight route planning map
anchor Business shipper [0.95, 0.63]
component Online booking [0.85, 0.62]
component Delivery time promise [0.78, 0.30]
component Pricing [0.72, 0.48]
component Route optimisation [0.58, 0.60]
component ETA prediction model [0.55, 0.28]
component Driver mobile app [0.45, 0.50]
component Maps and geocoding [0.35, 0.80]
component Vehicle telematics [0.32, 0.68]
component Shipment data platform [0.25, 0.58]
component Compute and storage [0.10, 0.92]
Business shipper->Online booking
Business shipper->Delivery time promise
Business shipper->Pricing
Online booking->Pricing
Online booking->Shipment data platform
Pricing->Shipment data platform
Delivery time promise->Route optimisation
Delivery time promise->ETA prediction model
Delivery time promise->Vehicle telematics
Route optimisation->Maps and geocoding
Route optimisation->Driver mobile app
ETA prediction model->Vehicle telematics
ETA prediction model->Shipment data platform
Maps and geocoding->Compute and storage
Vehicle telematics->Compute and storage
Driver mobile app->Compute and storage
Shipment data platform->Compute and storage
evolve Delivery time promise 0.45
evolve Vehicle telematics 0.78
inertia Route optimisation
5.3 First reading
Write three to five observations that the map makes visible. Each one should point at a component ID.
- Example: The differentiating need (NEED-002) depends on two custom-built components (CMP-02, CMP-05) and on CMP-04 and CMP-07, which are at the product stage. The company spends most engineering effort on CMP-04, the product, and none on CMP-05, the custom-built component that would make the promise reliable.
- Example: Compute (CMP-10) is a commodity run on leased racks. That ties two operations staff to undifferentiated work.
- Example: Telematics (CMP-07) is moving towards commodity; feeds are standard, which lowers the cost of the data that CMP-05 needs.
6. Movement and forces
Components evolve from left to right as supply and demand competition spread them. Wardley calls the recurring forces that act on every map "climatic patterns"; the published catalogue is long, and this template names only the handful a team most often needs. Read the source for the full set and describe the forces in your own words.
| ID | Component | Expected movement over the horizon | Force behind it (own words) | Evidence | Confidence |
|---|---|---|---|---|---|
| MOV-01 (Example) | CMP-07 Vehicle telematics | 0.68 to 0.78 | Competition among vendors and standard data APIs push it towards utility pricing | Three vendors moved to per-vehicle monthly fees this year | High |
| MOV-02 (Example) | CMP-02 Delivery time promise | 0.30 to 0.45 | Shippers now expect tracked windows from parcel networks and carry that expectation to pallet freight | Tender requirements from four large shippers | Medium |
| MOV-03 (Example) | CMP-04 Route optimisation | 0.60 to 0.65 | Mature products add features; differences narrow | Market scan, analyst notes | Medium |
| MOV-04 (Example) | CMP-05 ETA prediction model | Stays custom built | Accuracy depends on proprietary telematics history | Pilot results from one region | Medium |
| MOV-[NN] | [ID and name] | [From to] | [Force] | [Evidence] | [High / Medium / Low] |
Points to consider for each component:
- Commoditisation: as a component becomes a commodity, new higher order components become possible on top of it.
- Co-evolution of practice: when an activity becomes a utility, the way people work with it changes too (for example, operations practice changed when compute became a utility).
- Efficiency enabling new demand: a cheaper component often raises total consumption rather than lowering total spend.
- Competitor moves: a competitor or supplier can accelerate the evolution of a component, for example by releasing it as open source.
7. Inertia and constraints
| ID | Component | Source of inertia or constraint | Effect | Owner | Mitigation idea |
|---|---|---|---|---|---|
| INR-01 (Example) | CMP-04 Route optimisation | Ten years of custom rules for depot cut-off times in the legacy tool | Planners distrust a product that does not reproduce every rule | Head of planning | Run a shadow comparison for four weeks before switching |
| INR-02 (Example) | CMP-10 Compute and storage | Racks leased until YYYY-MM-DD | Paying twice if moved early | Infrastructure lead | Move new workloads first; let the lease expire |
| INR-03 (Example) | CMP-08 Driver mobile app | Union agreement on driver device changes | Change needs consultation | HR business partner | Start consultation early, keep the app look unchanged in phase 1 |
| INR-[NN] | [ID] | [Source] | [Effect] | [@owner] | [Idea] |
Constraints that are not inertia (legal, safety, budget) belong here too. Name the source and its date; for regulated subjects, check the current official text and a qualified professional.
8. Options and gameplay
8.1 Options
The method also catalogues deliberate moves, called gameplays (for example using open approaches to speed up commoditisation, or building on a utility to free effort for novel work). Describe each option in your own words and name any gameplay it relies on.
| Option | Description | Map effect | Gameplay used (own words) |
|---|---|---|---|
| O1 (Example) | Rebuild route optimisation in-house and keep the legacy rules | Invests in a product-stage component as if it were custom built | None; continues the current path |
| O2 (Example) | Buy a route optimisation product, move compute to a cloud utility, and build the ETA prediction model in-house | Treats CMP-04 and CMP-10 by their stage and puts own effort into CMP-05, which drives the differentiating need | Use commodity and product components to free effort for the custom-built differentiator |
| O3 (Example) | Outsource planning to a 4PL platform | Moves CMP-02, CMP-04 and CMP-05 outside the company | Exit the activity; rely on a partner's scale |
| O[N] | [Description] | [Effect] | [Gameplay] |
8.2 Cost over the horizon
| Option | Cost basis (Example) | Three-year cost (EUR million) |
|---|---|---|
| O1 (Example) | Seven-person routing team at EUR 0.70 million a year for three years | 2.10 |
| O2 (Example) | Product licence EUR 0.18 million a year for three years (0.54), integration 0.21, three-person ETA model team at EUR 0.30 million a year for three years (0.90) | 1.65 |
| O3 (Example) | Platform fee EUR 0.42 million a year for three years (1.26), migration 0.34 | 1.60 |
8.3 Comparison
Scores run from 1 (poor) to 5 (strong). The weighted score is the sum of weight times score, divided by 100. Agree weights before scoring.
| Criterion | Weight | O1 | O2 | O3 |
|---|---|---|---|---|
| Strengthens the differentiating need (NEED-002) | 30 | 2 | 4 | 1 |
| Time to value | 20 | 1 | 4 | 5 |
| Three-year cost (section 8.2) | 25 | 2 | 3 | 3 |
| Risk and inertia (section 7) | 15 | 2 | 4 | 2 |
| Learning and option value | 10 | 3 | 4 | 1 |
| Weighted score (Example) | 100 | 1.90 | 3.75 | 2.45 |
The score supports the discussion; it does not replace it. If the result depends on one weight, show the sensitivity and record it.
9. Doctrine check
Wardley describes doctrine as universal principles that help any organisation regardless of its map, grouped in phases. Read the published list at the source and assess yourself against it. The table below uses short, original paraphrases of common themes; extend it with the principles that matter for your question.
| ID | Theme (own words) | Current state | Gap for the chosen option | Action |
|---|---|---|---|---|
| DOC-01 (Example) | Know who the users are and what they need | Strong for shippers, weak for receiving warehouses | NEED-004 rests on complaints only | Interview ten receiving warehouses |
| DOC-02 (Example) | Use methods suited to the stage (explore novel work, standardise commodity work) | Same waterfall process for all work | ETA model needs short experiments | Run CMP-05 as a separate team with weekly releases |
| DOC-03 (Example) | Remove duplication and bias | Two address cleansing routines in booking and planning | Cost and errors | Use one geocoding service (CMP-06) |
| DOC-04 (Example) | Think small: small teams with clear purpose | Platform team owns everything from racks to apps | Overload | Split into product team and platform team (architecture/team-api) |
| DOC-05 (Example) | Use a common language for strategy | Maps used only by architects | Decisions argued from slides | Present this map at the steering board |
| DOC-[NN] | [Theme] | [State] | [Gap] | [Action] |
10. Decision and plan
10.1 Decision
| Field | Value |
|---|---|
| Decision | [Option chosen] |
| Decided by | [@decision-owner] |
| Date | YYYY-MM-DD |
| Reason in map terms | [Which components move, which need it strengthens] |
| Related decision record | [ADR or decision log ID, see architecture/architecture-decision-log] |
Example: O2 approved. Route optimisation and compute are sourced by their stage (product and utility); engineering effort moves to the ETA prediction model, the custom-built component behind the differentiating need. Recorded as ADR-031.
10.2 Sourcing per component
| ID | Component | Stage | Sourcing after decision | Team method |
|---|---|---|---|---|
| CMP-04 (Example) | Route optimisation | Product | Buy, configure | Vendor management, configuration |
| CMP-05 (Example) | ETA prediction model | Custom built | Build in-house | Small product team, experiments |
| CMP-10 (Example) | Compute and storage | Commodity | Rent as a utility | Platform team, cost management |
| CMP-08 (Example) | Driver mobile app | Product | Buy at contract renewal | Vendor management |
| [ID] | [Component] | [Stage] | [Build / Buy / Rent / Outsource] | [Method] |
10.3 First moves
| ID | Move | Owner | Due | Linked to |
|---|---|---|---|---|
| ACT-01 (Example) | Select route optimisation product through a scored evaluation | [@head-of-planning] | YYYY-MM-DD | CMP-04, architecture/technology-selection |
| ACT-02 (Example) | Staff the ETA prediction team (three people) | [@cto] | YYYY-MM-DD | CMP-05 |
| ACT-03 (Example) | Plan cloud move of new workloads before lease end | [@infrastructure-lead] | YYYY-MM-DD | CMP-10, INR-02 |
| ACT-[NN] | [Move] | [@owner] | YYYY-MM-DD | [IDs] |
11. Assumptions, risks and signposts
| ID | Assumption or risk | Linked to | Signpost that would trigger review | Check frequency |
|---|---|---|---|---|
| A-01 (Example) | Shippers will pay for reliable delivery windows | NEED-002, MOV-02 | Win rate on tenders citing windows falls below the baseline for two quarters | Quarterly |
| A-02 (Example) | Route optimisation is a product (0.60), not custom built | CMP-04, section 4.3 | The shadow comparison shows the product misses more than an agreed share of depot rules | Once, after pilot |
| R-01 (Example) | A competitor releases an open ETA service, commoditising CMP-05 | CMP-05 | Public release or partner announcement | Monthly scan |
| [ID] | [Statement] | [IDs] | [Signpost] | [Frequency] |
11.1 Traceability
| Need | Components | Movement | Option element | Action | Signpost |
|---|---|---|---|---|---|
| NEED-002 (Example) | CMP-02, CMP-04, CMP-05, CMP-07 | MOV-01, MOV-02, MOV-04 | O2: build CMP-05, buy CMP-04 | ACT-01, ACT-02 | A-01, A-02, R-01 |
| NEED-001 (Example) | CMP-01, CMP-03, CMP-09 | None | No change | None | None |
| [Need] | [IDs] | [IDs] | [Element] | [IDs] | [IDs] |
12. Glossary and references
12.1 Glossary
| Term | Meaning in this document |
|---|---|
| Anchor | The user whose need sits at the top of the map |
| Value chain | The chain of components needed to meet the anchor's need, ordered by visibility |
| Visibility | How directly the user sees or touches a component (vertical position) |
| Evolution | How far a component has moved from novel to commodity in its market (horizontal position) |
| Genesis | Stage of novel, uncertain components with few examples |
| Custom built | Stage where organisations build their own versions |
| Product | Stage of competing products, including rental |
| Commodity | Stage of standard, widespread components, often sold as a utility |
| Inertia | Resistance to change caused by past investment, contracts, skills or beliefs |
| Climatic pattern | A force that affects every map regardless of the organisation's choices |
| Gameplay | A deliberate move to change the map in the organisation's favour |
| Doctrine | Universal principles of good practice that apply regardless of the map |
| Signpost | An observable event that triggers a review of the decision |
12.2 References
| Reference | Version or date checked | Use |
|---|---|---|
| Simon Wardley, Wardley Maps (book, CC BY-SA 4.0), free editions listed at learnwardleymapping.com/book/ | Checked 2026-10-30 | Concept names: map, anchor, value chain, evolution stages, climatic patterns, gameplay, doctrine (no text used) |
| OnlineWardleyMaps, open-source mapping tool, onlinewardleymaps.com | Checked YYYY-MM-DD | Text syntax of the map source in section 5.2 |
Related templates: architecture/build-vs-buy-analysis, architecture/solution-options-analysis, architecture/technology-selection, architecture/tech-radar, architecture/business-capability-map, architecture/context-map, business/swot, mba/mba-technology-strategy-guide | Current versions | Detailed option analysis, capability IDs and strategy context |
| [Internal strategy or market research] | [Version] | [Use] |
Standard and licence note
Structure aligned with the Wardley mapping method created by Simon Wardley and described in his book Wardley Maps, which he published under the Creative Commons Attribution-ShareAlike 4.0 International licence (CC BY-SA 4.0). This template uses only the method's concept names (map, anchor, value chain, visibility, evolution and its four stage names, inertia, climatic patterns, gameplay and doctrine). It does not reproduce the book's text, figures, the evolution cheat sheet, the list of climatic patterns, the gameplay catalogue or the doctrine table; every explanation, table and example here is original, so the ShareAlike condition does not attach to this template. If you adapt text or figures from the book into your own copy, attribute Simon Wardley and release those adapted parts under CC BY-SA 4.0. The numeric evolution bands are a drawing convention of this template, not part of the method. Kestrelmoor Freight is fictional. Check the current edition of the book at learnwardleymapping.com before use. Template licence: MIT.
관련 템플릿
Business Capability Map and Heatmap Template
Capability modelling rules, L1 to L3 hierarchy, definitions catalogue, maturity and importance scoring, heatmap, value stream and app mapping
아키텍처DDD Context Map Template
Map bounded contexts and their DDD relationships (ACL, OHS, conformist, shared kernel), team ties and evolution plan
아키텍처Team Interaction Map Template (Team Topologies)