Product Backlog Template (Scrum)

Product Goal, ordered backlog with type, rationale, refinement state and estimates, refinement rhythm, optional Definition of Ready, range forecast, health checks

제품 및 프로젝트표준Scrum Guide 2020backlog

사용법: Use it when you snapshot or review a Scrum Product Backlog with the team or stakeholders. Fill the Product Goal first, then order items by value toward it and keep one to two Sprints Ready. The main pitfall is a huge unordered list that nobody reads.

미리보기

Product Backlog: [Product name]

A Product Backlog in the sense of the Scrum Guide 2020 (Schwaber and Sutherland, the current revision as of October 2026): the one ordered list of work the Scrum Team draws from, which keeps changing as the team learns what the product needs next, and whose commitment is the Product Goal. This template adds common practice the Scrum Guide does not prescribe (refinement states, estimates in story points, an optional Definition of Ready and a range forecast). Replace every [bracketed] value and every row marked Example.

Document control

FieldValue
Product[Product name] Example: Tallow Notes, team workspaces
Product Owner[@product-owner]
Scrum Team[Team name]
Snapshot dateYYYY-MM-DD
Backlog tool and link[Tool, link to live backlog]
Definition of Done[Link to product/definition-of-done document]

Revision history

VersionDateAuthorChange
1.0YYYY-MM-DD[@product-owner]Snapshot for [Sprint Review / stakeholder review]

1. Product Goal

FieldValue
Product Goal[Future state of the product]
Measure of success[Metric, baseline, target]
Link to strategy[Strategy, bet or OKR]
Status[Active / Fulfilled / Abandoned]
Example: Product GoalA new team succeeds together in its first week: the second member is editing within 7 days
Example: MeasureActivation of new workspaces from 31% to 40% by 2027-06-30
Example: LinkBet B1 in product/product-vision-strategy, outcome in product/opportunity-solution-tree

2. Ordered backlog

OrderIDItemTypeValue or rationaleRefinement stateEstimate (points)Cumulative points
[1][PBI-NNN][Item title][Feature / Bug / Tech / Discovery / Compliance][Why now][New / Refining / Ready][N][N]
1 (Example)PBI-101Choose a starter space by team type when creating a workspaceFeatureValidated by AT-01 (52% chose a starter)Ready55
2 (Example)PBI-102Edit pinned starter notes in placeFeatureAT-02: two of six missed the edit buttonReady38
3 (Example)PBI-103Invite colleagues from inside any noteFeatureShortens path from note to invitationReady513
4 (Example)PBI-107Fix duplicate note after offline edit on two devicesBugSync guardrail G1 at riskReady215
5 (Example)PBI-108Keyboard focus order on the invite dialogBugAccessibility (WCAG 2.2 focus order)Ready318
6 (Example)PBI-106Build an offline evaluation set for question searchDiscoveryBet B2 needs a quality baseline before betaReady523
7 (Example)PBI-104Export the workspace audit log as CSVFeatureBet B3, asked by paid teamsRefining831
8 (Example)PBI-105Move a workspace to EU data residencyFeatureBet B3, needs storage design spike firstRefining1344
9 (Example)PBI-110Show "what changed since you were last here" to returning membersFeatureOPP-2, not yet sizedNewnot sizednot summed

Detail for each item (description, acceptance criteria, notes) lives in the item itself; see product/user-story and product/epic for the formats.

3. Refinement

FieldValue
Refinement rhythm[Example: two 60-minute sessions per two-week Sprint]
Participants[Product Owner, Developers, invited experts]
Ready buffer target[Example: 1.5 Sprints of Ready items]
Current Ready buffer[Example: 23 points Ready (items 1 to 6), about one Sprint at 22.7 average]

Refinement states used in this backlog:

StateMeaning
NewCaptured, not yet discussed by the team
RefiningBeing clarified, split or sized; open questions remain
ReadyMeets the team's Definition of Ready (section 4), small enough to finish within one Sprint

4. Definition of Ready (optional)

An item is Ready when:

  • It is linked to the Product Goal or marked as maintenance.
  • It has a clear description of who benefits and why.
  • Acceptance criteria are written and agreed by the Product Owner and Developers.
  • It is sized by the Developers and small enough to finish within one Sprint.
  • Dependencies and needed designs are known, and none blocks the start.
  • Privacy, security and accessibility needs are identified where relevant.

5. Forecast

FieldValue
Recent velocity (last three Sprints)[N, N, N] Example: 21, 24, 23 points
Average[N] Example: 22.7 points per Sprint
Two-Sprint range[low to high] Example: 42 (2 x 21) to 48 (2 x 24), average 45.3

Example reading: items 1 to 6 (23 points) are slightly more than one Sprint at the average pace (22.7) and fit only at the high pace (24); product/sprint-planning therefore plans items 1 to 5 (18 points) against about 21 points of capacity and leaves PBI-106 for the following Sprint. Items 1 to 8 (44 points) fit within two Sprints at the average pace (45.3) but not at the low pace (42), so PBI-105 is likely in Sprint 2 and possibly in Sprint 3. Communicate it as "two to three Sprints".

6. Backlog health checks

CheckAnswer
Does every item in the top 20 serve the Product Goal or maintenance?[Yes / No]
Is the Ready buffer within target?[Yes / No]
Are items older than [six months] reviewed or archived?[Yes / No, count]
Are bugs and technical work visible in the same order, not in a separate list?[Yes / No]
Can a stakeholder see why the top items are in that order?[Yes / No]

Related templates and references

Standard and licence note

Structure aligned with the Product Backlog and Product Goal as described in the Scrum Guide 2020, which is published under CC BY-SA 4.0. This template cites the Guide by name and does not copy its text; all wording is original. Definition of Ready, story points, velocity and range forecasting are common practice, not part of Scrum. Check the current Scrum Guide at scrumguides.org. Template licence: MIT.