TOGAF EA Practitioner Scenario Workbook Template
Exam codes and format, readiness by ADM phase, six-step scenario method, phase and deliverable locator, six fictional scenarios, attempt and error logs
Як використовувати: Use it when you prepare for the scenario-based TOGAF EA Practitioner exam (OGEA-102, OGEA-103 or the OGEA-10B bridge). Learn the six-step method first, then work the fictional scenarios under 11-minute timing and log every ranking. The main pitfall is choosing the most technically complete option instead of the one that fits where the work stands.
Перегляд
Scenario Practice Workbook: TOGAF EA Practitioner ([Candidate or study group])
Practice log for the scenario-based part of the TOGAF Enterprise Architecture Practitioner certification (exam OGEA-102, or the Part 2 section of OGEA-103 and the Section 2 questions of the OGEA-10B bridge), aligned with the TOGAF Standard, 10th Edition. It gives a repeatable analysis method (locate the phase, name the stakeholders and concerns, find the governing artefacts, rank every answer option with a reason), six fictional practice scenarios written for this template, an error log and an open-book navigation plan. It contains no text from the TOGAF Standard or from any study guide: it uses only the names of ADM phases and deliverables. Study the content itself from your own licensed copy. Replace every
[bracketed]value and every row marked Example.
Document control
| Field | Value |
|---|---|
| Document ID | [TOGAF-WB-001] |
| Candidate or study group | [Name] |
| Target exam | [OGEA-102 / OGEA-103 / OGEA-10B] |
| Certification path | [Foundation held, Part 2 only / Combined / Bridge from TOGAF 9 Certified] |
| Edition studied | TOGAF Standard, 10th Edition ([licensed copy, update and corrigendum level]) |
| Training provider | [Accredited provider / Self-study] |
| Target exam date | YYYY-MM-DD |
| Version | [0.1] |
| Status | [Draft / In progress / Exam ready / Archived] |
| Owner | [@candidate] |
| Approvers/reviewers | [@mentor], [@study-partner] |
| Last updated | YYYY-MM-DD |
| Classification | [Personal / Internal] |
Approvals
| Role | Name | Decision | Date |
|---|---|---|---|
| Candidate | [@candidate] | [Ready to book / Not ready] | YYYY-MM-DD |
| Mentor or reviewer | [@mentor] | [Agree / Revise plan] | YYYY-MM-DD |
| Training budget owner | [@manager] | [Approve exam fee / Defer] | YYYY-MM-DD |
Revision history
| Version | Date | Author | Change summary |
|---|---|---|---|
| 0.1 | YYYY-MM-DD | [@candidate] | Exam facts recorded, readiness baseline |
| 0.2 | YYYY-MM-DD | [@candidate] | Example: Six practice scenarios attempted under timing |
| 1.0 | YYYY-MM-DD | [@candidate] | Example: Readiness gate met, exam booked |
Contents
1. Purpose and exam facts
Scenario questions test judgement rather than recall. Each presents an organisation, a situation in the architecture work and four candidate responses that all sound reasonable. The candidate who scores well is the one who reads the scenario as a practising architect would: where are we in the work, who cares about the outcome, which agreed artefact governs the next step, and which response moves the work forward without skipping governance. This workbook drills that reading habit with original scenarios.
1.1 Exam codes and paths
| Exam code | Exam | Who takes it |
|---|---|---|
| OGEA-101 | TOGAF Enterprise Architecture Part 1 | Candidates without TOGAF EA Foundation who take the parts separately |
| OGEA-102 | TOGAF Enterprise Architecture Part 2 | Candidates who hold TOGAF EA Foundation or have passed Part 1 |
| OGEA-103 | TOGAF Enterprise Architecture Combined Part 1 and Part 2 | Candidates taking both parts in one sitting |
| OGEA-10B | TOGAF Enterprise Architecture Bridge | Holders of TOGAF 9 Certified |
1.2 Format as stated in the Open Group datasheets
| Exam | Question type | Questions and time | Pass mark | Open book |
|---|---|---|---|---|
| Part 1 | Multiple choice | 40 questions, 60 minutes | 24 of 40 (60%) | No |
| Part 2 | Complex multiple-choice, scenario based | 8 questions, 90 minutes | 24 of 40 (60%) | Yes |
| Bridge | Section 1: 10 multiple-choice questions in 20 minutes; Section 2: 4 questions in 40 minutes | 14 questions, 60 minutes in total | 18 of 30 (60%) | Section 2 only |
All three exams are supervised and delivered at Pearson VUE test centres or online through OnVUE. Part 2 awards 40 marks across 8 questions, so a single question carries several marks; check the current examination rules from the Open Group for how marks are allocated between the options before you plan your answer strategy. Candidates who also complete the Learning Studies in an accredited course earn an additional Applied Practitioner badge.
1.3 Licence rule for this workbook
The TOGAF Standard is a licensed publication of The Open Group. This workbook uses only the names of ADM phases and deliverables. Do not paste text from the standard, a study guide or course material into it, and do not write summaries of it here. Where the method below says "check the standard", open your own licensed copy and record only a page or section pointer in section 9.
2. Readiness tracker by phase
| Area | Rating round 1 | Rating round 2 | Rating round 3 | Practice scenarios attempted | Main weakness |
|---|---|---|---|---|---|
| Preliminary Phase | [1 to 5] | [ ] | [ ] | [n] | [Weakness] |
| Phase A: Architecture Vision | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Phase B: Business Architecture | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Phase C: Information Systems Architectures (Data and Application) | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Phase D: Technology Architecture | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Phase E: Opportunities and Solutions | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Phase F: Migration Planning | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Phase G: Implementation Governance | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Phase H: Architecture Change Management | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Requirements Management | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Stakeholder management technique | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Architecture governance and contracts | [ ] | [ ] | [ ] | [n] | [Weakness] |
| Example: Phase G: Implementation Governance | 2 | 3 | 4 | 3 | Accepted deviations without a formal dispensation |
3. Scenario analysis method
The method below is original to this workbook. It does not restate the standard; it is a reading discipline for any scenario question.
| Step | Question to answer | What to write | Typical trap |
|---|---|---|---|
| 1 Locate | Which phase is the work in, and is that phase starting, under way or ending? | Phase name plus "start", "mid" or "close" | Treating the question as being about the phase that is mentioned last in the text |
| 2 Stakeholders | Who is named, what does each of them worry about, and who has authority to decide? | Two to five stakeholders with one concern each | Ignoring a stakeholder mentioned only once, such as a regulator or a works council |
| 3 Governing artefacts | Which documents or agreements already exist and bind the next step? | Names of agreed deliverables, principles, contracts or plans | Proposing to create something that the scenario says already exists |
| 4 Risk | What goes wrong if the architect acts too early, too late or outside governance? | One sentence | Ignoring time pressure or budget limits stated in the scenario |
| 5 Test options | Does each option fit the phase, address the key concerns and respect the governing artefacts? | A tick or cross per step for each option | Rewarding an option for length or detail |
| 6 Rank | Which option is best, which is second, which is a distractor and which is wrong? | Ranking with a reason per option | Choosing between two options without ranking the other two |
3.1 Option tests
Apply these tests to each option in step 5. They are judgement heuristics written for this workbook.
- Fit to state: an option that belongs to a later phase is usually premature; one that belongs to an earlier phase is usually redundant unless the scenario signals that earlier work is missing or invalid.
- Concern coverage: the best option addresses the concern of the stakeholder with decision authority and does not ignore the concern of a stakeholder with a veto (legal, regulator, security).
- Governance respect: an option that bypasses an agreed contract, principle or board is weak even when it would be faster.
- Reuse before create: an option that builds on artefacts already in the repository beats one that starts again.
- Proportion: an option that matches effort to the size of the problem beats one that launches a full new cycle for a small change, or one that patches a structural problem.
- Traceability: an option that keeps requirements, decisions and changes traceable beats one that relies on informal agreement.
4. Phase and deliverable locator
| Phase or area | Scenario signals (practice wording) | Deliverable names to look for | Library template |
|---|---|---|---|
| Preliminary Phase | Organisation has no agreed way of doing architecture; principles absent; unclear who sponsors architecture work | Architecture Principles, Tailored Architecture Framework, Organizational Model for Enterprise Architecture, Request for Architecture Work | Architecture Principles (architecture/architecture-principles), Request for Architecture Work (architecture/request-for-architecture-work) |
| Phase A: Architecture Vision | A sponsor has asked for work; scope, goals and stakeholders need to be agreed before detailed work | Architecture Vision, Statement of Architecture Work, Communications Plan, Capability Assessment | TOGAF Architecture Vision (architecture/togaf-architecture-vision), Statement of Architecture Work (architecture/statement-of-architecture-work) |
| Phases B, C, D | Baseline and target descriptions are being developed; gaps across business, data, application and technology must be found | Architecture Definition Document, Architecture Requirements Specification, Architecture Building Blocks | Architecture Definition Document (architecture/architecture-definition-document), Architecture Requirements Specification (architecture/architecture-requirements-specification) |
| Phase E: Opportunities and Solutions | Target is agreed; the question is how to group work into deliverable packages and what to build, buy or reuse | Architecture Roadmap, Transition Architecture, Solution Building Blocks | Architecture Roadmap and Transition (architecture/architecture-roadmap-transition), Build vs Buy Analysis (architecture/build-vs-buy-analysis) |
| Phase F: Migration Planning | Packages exist; they must be sequenced, costed and agreed with portfolio and project management | Implementation and Migration Plan, Implementation Governance Model, Architecture Roadmap, Transition Architecture | Architecture Roadmap and Transition (architecture/architecture-roadmap-transition) |
| Phase G: Implementation Governance | Projects are building; deviations, compliance reviews and contracts are in play | Architecture Contract, Compliance Assessment, Change Request | Architecture Contract (architecture/architecture-contract), Architecture Compliance Assessment (architecture/architecture-compliance-assessment) |
| Phase H: Architecture Change Management | Something changed after implementation began or ended: regulation, technology, strategy | Change Request, Requirements Impact Assessment | Architecture Change Request (architecture/architecture-change-request) |
| Requirements Management | Requirements are new, changed or in conflict at any point in the cycle | Architecture Requirements Specification, Requirements Impact Assessment | Architecture Requirements Specification (architecture/architecture-requirements-specification) |
| Governance across the cycle | Who decides, how disputes and dispensations are handled | Architecture Contract, Compliance Assessment | Architecture Governance Charter (architecture/architecture-governance-charter) |
5. Stakeholder and concern worksheet
| ID | Scenario | Stakeholder | Concern (one line) | Authority | Can block? | Option that best answers this concern |
|---|---|---|---|---|---|---|
| STK-001 (Example) | PS-01 | Chief Operating Officer (sponsor) | Smart metering benefits within two years | Approves scope and funding | Yes | A |
| STK-002 (Example) | PS-01 | Regulator liaison | Billing accuracy rules must not be breached | Advises the board | Yes | A |
| STK-003 (Example) | PS-02 | Data protection officer | Patient data merged without a lawful basis | Can stop processing | Yes | B |
| STK-004 (Example) | PS-02 | Clinical directors | No downtime of patient administration during the merge | Strong influence | Partly | B |
| STK-005 (Example) | PS-04 | Programme director | Delivery date for the claims platform | Owns the project budget | Partly | C |
| [STK-NNN] | [PS-NN] | [Stakeholder] | [Concern] | [Authority] | [Yes / Partly / No] | [Option] |
For real engagements, keep stakeholders in the Stakeholder Register (project/stakeholder-register).
6. Fictional practice scenarios
Each scenario gives a context, a question and four options, followed by a model ranking and the reason for each position. The model ranking applies the method in section 3; argue with it in your log if your reasoning differs.
6.1 PS-01 Brightwater Water: starting the engagement
Example: Brightwater Water is a fictional regional water utility. Last year it set up a small architecture team, and the executive board approved a set of architecture principles and a governance board. The Chief Operating Officer now asks the architecture team to support a smart metering programme intended to cut leakage and automate billing. The finance director, the head of field operations and the regulator liaison each describe the scope differently: finance sees a billing project, operations sees a sensor network, the regulator liaison worries about billing accuracy rules. No document yet records what the engagement covers.
Question: what should the lead architect do next?
| Option | Response |
|---|---|
| A | Hold sessions with the sponsor and the named stakeholders to agree goals, scope, constraints and concerns, draft the Architecture Vision and seek approval of a Statement of Architecture Work |
| B | Ask the board to re-approve the architecture principles and define a tailored framework before any engagement starts |
| C | Begin documenting the baseline business processes for meter reading and billing so that the gaps are known early |
| D | Issue a request for information to meter vendors so that feasible solutions are understood before scope is fixed |
Model ranking: A, C, B, D. A fits the start of Phase A: a request exists, scope is disputed and stakeholders must agree before detailed work. C is useful work but belongs later; it would also proceed without an agreed scope. B repeats Preliminary work the scenario says is already done. D jumps to solutions and lets vendors shape scope, which ignores the regulator concern.
6.2 PS-02 Kestrel Health: conflicting concerns in the target design
Example: Kestrel Health is a fictional hospital group formed by merging two trusts, each with its own patient administration system. An approved Statement of Architecture Work asks for a single target architecture within nine months. During business and data architecture work, the clinical directors insist that no patient administration downtime is acceptable, while the data protection officer warns that combining patient records from both trusts needs a documented lawful basis and a data minimisation review. The application team has already proposed choosing the larger trust's system.
Question: how should the architect proceed with the target architecture?
| Option | Response |
|---|---|
| A | Adopt the larger trust's system as the target now, since it covers most patients, and treat data protection as a project task |
| B | Record both concerns as architecture requirements, develop target data and application options that address them, assess gaps and trade-offs with both stakeholders, and capture the outcome in the Architecture Definition Document and the Architecture Requirements Specification |
| C | Escalate to the governance board and pause until the clinical and data protection leads agree between themselves |
| D | Develop the technology architecture first, because hosting and availability determine whether zero downtime is achievable |
Model ranking: B, C, D, A. B is mid-cycle work in Phases B and C: it turns concerns into requirements, keeps options open and records the result in the agreed deliverables. C is a reasonable fallback if analysis fails, but pausing before analysis is premature. D addresses only one concern and reverses the natural dependency of technology on data and application decisions. A pre-empts the architecture and ignores a stakeholder who can stop the processing.
6.3 PS-03 Corvane Mutual: budget cut after the target is agreed
Example: Corvane Mutual is a fictional insurer. Its board approved an Architecture Definition Document for a new policy and claims platform with a three-year roadmap. A month later, the budget is cut by 30 percent. The portfolio office asks the architecture team what can still be delivered and in what order. Several work packages depend on a new customer data hub.
Question: what is the best response?
| Option | Response |
|---|---|
| A | Keep the approved target, re-prioritise and re-sequence the work packages by business value and dependency (keeping the customer data hub early), define revised transition architectures, and agree an updated Architecture Roadmap and Implementation and Migration Plan with the portfolio office |
| B | Reduce the target architecture to fit the new budget and reissue the Architecture Definition Document without stakeholder review |
| C | Restart the engagement from the Architecture Vision because the business case has changed |
| D | Let each project manager decide which features to drop within their own budget |
Model ranking: A, C, B, D. A works in Phases E and F with the portfolio office, keeps the agreed target as the direction and respects dependencies. C is defensible only if the cut invalidates the business goals; the scenario does not say so, so it is disproportionate. B changes an approved deliverable without governance. D loses architectural control and breaks the dependency on the data hub.
6.4 PS-04 Corvane Mutual: a delivery partner deviates
Example: Implementation of the Corvane Mutual claims platform is under way. An Architecture Contract with the delivery partner requires event-based integration through the enterprise integration platform. A compliance review finds that the partner has built direct database links between the claims and billing systems to meet a deadline. The programme director argues that the deadline matters more.
Question: what should the architect do?
| Option | Response |
|---|---|
| A | Accept the deviation informally because the deadline is fixed and the links can be replaced later |
| B | Stop the project until the partner removes the database links |
| C | Record the non-compliance in a Compliance Assessment, take it to the governance board, which may grant a time-limited dispensation with conditions and a remediation date, and update the contract and roadmap accordingly |
| D | Change the target architecture to allow direct database links, because the delivery reality has shown that events are impractical |
Model ranking: C, B, D, A. C is Phase G governance: it uses the existing contract, makes the deviation visible, lets the authorised body decide and keeps remediation traceable. B upholds the architecture but ignores a legitimate business concern and the board's role. D treats one project's shortcut as a reason to change the enterprise target without a change process. A hides the deviation and creates unmanaged technical debt.
6.5 PS-05 Larch Rail: a regulation changes after go-live
Example: Larch Rail is a fictional train operator that completed a ticketing modernisation last year. A new accessibility regulation now requires every ticket channel to support assisted booking and to record accessibility requests for audit. The change affects the mobile app, the booking API and the customer data model, but not the core fare engine.
Question: how should the architecture team respond?
| Option | Response |
|---|---|
| A | Raise a Change Request, assess the impact on the existing architecture and requirements, and decide through governance whether the change can be handled within the current architecture or needs a new architecture cycle |
| B | Start a full new architecture engagement from the Preliminary Phase |
| C | Ask the mobile team to add the feature in the next release, as it is mainly a user interface change |
| D | Wait until the next planned architecture review before considering the regulation |
Model ranking: A, C, B, D. A fits Phase H: it assesses impact before choosing the scale of response, and it keeps requirements traceable. C would deliver part of the change quickly but misses the API and data model impact and the audit record. B is disproportionate for a bounded change. D risks non-compliance with a legal deadline.
6.6 PS-06 Larch Rail: a requirement changes in the middle of the cycle
Example: During application architecture work for a new freight booking service at Larch Rail, the commercial director announces that freight customers must be able to book through partner platforms, not only through the Larch portal. Data architecture is nearly complete; technology architecture has not started.
Question: what should happen to this new requirement?
| Option | Response |
|---|---|
| A | Add it to the technology architecture when that work starts, since partner access is an integration concern |
| B | Record it in the Architecture Requirements Specification, assess its impact on the business, data and application work already done, and agree with stakeholders any rework before continuing |
| C | Treat it as out of scope and refer it to a future engagement because the Statement of Architecture Work did not mention partners |
| D | Rework the Architecture Vision immediately and seek new approval of the whole engagement |
Model ranking: B, D, C, A. B is requirements management in action: it captures the change, checks its effect on completed work and keeps stakeholders aligned. D may become necessary if the change alters the engagement goals, but impact should be assessed first. C may be right if the sponsor confirms it is out of scope, yet dismissing it without assessment ignores the commercial director. A defers a change that affects business and data decisions already in progress.
7. Attempt log
| Attempt ID | Date | Scenario | Phase located | My ranking | Reference ranking | Top choice correct? | Time (minutes) | Error type (section 8) |
|---|---|---|---|---|---|---|---|---|
| ATT-001 (Example) | YYYY-MM-DD | PS-01 | Phase A, start | A, B, C, D | A, C, B, D | Yes | 9 | ERR-03 |
| ATT-002 (Example) | YYYY-MM-DD | PS-02 | Phases B and C, mid | B, D, C, A | B, C, D, A | Yes | 13 | ERR-05 |
| ATT-003 (Example) | YYYY-MM-DD | PS-04 | Phase G, mid | A, C, B, D | C, B, D, A | No | 12 | ERR-04 |
| ATT-004 (Example) | YYYY-MM-DD | PS-05 | Phase H, start | A, C, B, D | A, C, B, D | Yes | 8 | None |
| [ATT-NNN] | YYYY-MM-DD | [PS-NN] | [Phase, state] | [Ranking] | [Ranking] | [Yes / No] | [n] | [ERR-NN] |
Summary measures to track per round: share of top choices correct, share of full rankings matching, average time per scenario and the most frequent error type.
8. Error pattern analysis
| Error type | Description | Remedy | Count round 1 | Count round 2 |
|---|---|---|---|---|
| ERR-01 Wrong phase | Placed the scenario in the wrong phase or the wrong state of a phase | Re-run step 1 and underline every time and status word in the scenario | [n] | [n] |
| ERR-02 Missed stakeholder | Ignored a stakeholder who can block the outcome | List every named role before reading options | [n] | [n] |
| ERR-03 Redundant work | Preferred an option that repeats work the scenario says is done | Check step 3 for artefacts that already exist | [n] | [n] |
| ERR-04 Governance bypass | Preferred a fast option that skips a contract, board or principle | Apply the governance respect test | [n] | [n] |
| ERR-05 Disproportion | Chose a full restart for a small change, or a patch for a structural problem | Apply the proportion test | [n] | [n] |
| ERR-06 Solution first | Chose vendor or technology action before the architecture supports it | Ask whether the scope and target are agreed yet | [n] | [n] |
| ERR-07 Time overrun | Correct reasoning but ran out of time | Practise under the 11-minute budget; skim options before the full context | [n] | [n] |
Example: after round 1 the log shows ERR-04 three times and ERR-03 twice; the next study block focuses on Phase G scenarios and on the Architecture Contract and Compliance Assessment deliverables in the licensed copy.
9. Open-book navigation plan
| Topic I may need to check | Where in my licensed copy (pointer only) | Time to find (seconds) | Checked on |
|---|---|---|---|
| Phase A objectives and steps | [Volume, section number] | [n] | YYYY-MM-DD |
| Phases B, C, D steps and gap analysis technique | [Pointer] | [n] | YYYY-MM-DD |
| Phase E and F steps | [Pointer] | [n] | YYYY-MM-DD |
| Phase G and Architecture Contract | [Pointer] | [n] | YYYY-MM-DD |
| Phase H and change handling | [Pointer] | [n] | YYYY-MM-DD |
| Requirements Management | [Pointer] | [n] | YYYY-MM-DD |
| Stakeholder management technique | [Pointer] | [n] | YYYY-MM-DD |
| Deliverable descriptions | [Pointer] | [n] | YYYY-MM-DD |
| Architecture levels and the Architecture Landscape | [Pointer] | [n] | YYYY-MM-DD |
Navigation rules: use the open book to confirm a judgement you have already made with the method, not to discover the answer. If a lookup takes longer than two minutes, answer from your ranking and move on.
10. Exam-day plan
| Step | Time budget per scenario (Part 2) | Action |
|---|---|---|
| 1 | 1 minute | Read the question line, then skim the four options to see what they disagree about |
| 2 | 4 minutes | Read the scenario; write the phase, stakeholders, governing artefacts and risk |
| 3 | 4 minutes | Test each option and rank all four |
| 4 | 1 minute | Optional lookup in the licensed copy to confirm a doubt |
| 5 | About 1 minute | Record the answer and move on |
Example: 8 scenarios x 11 minutes = 88 minutes, leaving 2 minutes of the 90 for a final check of flagged items. For the bridge Section 2, 4 questions in 40 minutes gives 10 minutes each; trim step 4.
Readiness gate before booking:
| Criterion | Target | Current | Met |
|---|---|---|---|
| Every area in section 2 rated 3 or higher | 12 of 12 | [n] | [Yes / No] |
| Scenarios attempted under timing | At least 20, including self-written ones | [n] | [Yes / No] |
| Top choice correct in the last two rounds | [Target you set, e.g. 75%] | [x%] | [Yes / No] |
| Average time per scenario | 11 minutes or less | [n] | [Yes / No] |
| Personal open-book index tested | Every topic found in under 60 seconds | [n] | [Yes / No] |
11. Glossary and references
11.1 Glossary
| Term | Meaning in this workbook |
|---|---|
| ADM | Architecture Development Method, the TOGAF cycle of phases named in section 2 |
| Scenario question | Question built on a described organisation and situation, with four candidate responses |
| Ranking | Ordering all four options from best to worst with a reason for each |
| Governing artefact | A deliverable or agreement already approved that constrains the next step |
| Stakeholder concern | An interest or worry that a stakeholder needs the architecture to address |
| Dispensation | A governed, usually time-limited permission to deviate from an agreed architecture |
| Open book | The candidate may consult a permitted copy of the standard during the exam |
11.2 References
| Reference | Version or date checked | Use |
|---|---|---|
| The Open Group, TOGAF Certification Portfolio page, opengroup.org/certifications/togaf | Checked 2026-10-23 | Exam codes and certification paths |
| The Open Group, TOGAF Enterprise Architecture Practitioner datasheet, linked from the certification page | Checked 2026-10-23 | Part 1 and Part 2 format and pass marks |
| The Open Group, TOGAF Enterprise Architecture Practitioner Bridge datasheet, linked from the certification page | Checked 2026-10-23 | Bridge format and pass mark |
| The Open Group publications catalogue, The TOGAF Standard, 10th Edition (C220), publications.opengroup.org | Checked 2026-10-23 | Edition name only |
| Your licensed copy of the TOGAF Standard, 10th Edition | [Update and corrigendum level] | All content study |
Standard and licence note
Structure aligned with the certification structure published by The Open Group for the TOGAF Enterprise Architecture Practitioner certification (exam codes OGEA-101, OGEA-102, OGEA-103 and OGEA-10B, format facts as stated in the datasheets linked from the certification page on 2026-10-23) and with the TOGAF Standard, 10th Edition. TOGAF and ArchiMate are registered trademarks of The Open Group. This template uses only the names of ADM phases and deliverables; all text, including the analysis method and the six fictional scenarios, is original and was written without reference to the text of the standard or any study guide. This template is not affiliated with or endorsed by The Open Group. Check the current certification page, datasheets and examination rules before use. Template licence: MIT.
Схожі шаблони
Google Cloud Professional Cloud Architect Case Study Workbook Template
Exam facts, guide section weights, self-assessment, case study register, 11-step analysis frame, pillar check, security, migration, cost, practice log
АрхітектураTOGAF Architecture Vision Template (ADM Phase A)
Request summary, stakeholders and concerns, goals, drivers, scope, principles, baseline and target, KPIs, risks, capability, Statement of Architecture Work
АрхітектураArchitecture Decision Record Template (Tyree-Akerman, Y-Statement)
Detailed ADR – Tyree & Akerman fields (assumptions, constraints, positions, argument, implications, related items) plus Y-statement