Feasibility Study: [Project or initiative name]

Full feasibility study that tests whether a proposed project can and should go ahead, assessed across the five TELOS dimensions: technical, economic, legal, operational and scheduling. It compares alternatives, scores each dimension against stated criteria, estimates costs, analyses risk and sensitivity, and ends with a clear go, conditional go or no-go recommendation. Replace every [bracketed] value and every row marked Example. Figures are illustrative; this is a format, not financial or legal advice.

Document control

FieldValue
Document ID[FS-YYYY-001]
Project[Project name]
Version[0.1]
Status[Draft / In review / Final]
Sponsor[@sponsor]
Study lead[@author]
Contributors[@finance], [@legal], [@it-architect], [@operations]
Study periodYYYY-MM-DD to YYYY-MM-DD
Last updatedYYYY-MM-DD

Approvals

RoleNameDecisionDate
Sponsor[@name][Accepted / Further work required]YYYY-MM-DD
Finance[@name][Cost estimates validated]YYYY-MM-DD
Legal and compliance[@name][Legal assessment reviewed]YYYY-MM-DD
Portfolio board[@name][Go / Conditional go / No-go]YYYY-MM-DD

Revision history

VersionDateAuthorChange summary
0.1YYYY-MM-DD[@name]Background, objectives and alternatives drafted
0.2YYYY-MM-DD[@name]Example: TELOS scoring and cost estimates added
1.0YYYY-MM-DD[@name]Example: Final, recommendation accepted by sponsor

Contents

1. Executive summary

This study assessed whether [organisation] should [proposed action]. [N] alternatives were evaluated across the TELOS dimensions. The highest-scoring alternative is [alternative], with a weighted score of [N.N] out of 5. The study recommends [Go / Conditional go / No-go].

AlternativeWeighted scoreEstimated costFeasible?
Example: A1 Do nothing2.150 capital, rising run costNo
Example: A2 Upgrade existing warehouse system3.15420,000Yes, with conditions
Example: A3 Cloud warehouse management system4.1610,000Yes

2. Background

[Describe the current situation, the business problem, the trigger for the study (growth, regulation, failure, opportunity), and any previous studies or decisions.]

Example: "Order volume at the Northern distribution centre grew 46% in two years. The current warehouse system is a 2012 on-premises product that cannot support wave picking or carrier integration, and peak-season backlogs reached 3.5 days in December."

3. Objectives and scope

3.1 Study objectives

  1. Determine whether [solution type] is technically achievable with [constraints].
  2. Estimate whole-life costs and benefits for each alternative.
  3. Identify legal, regulatory and contractual obstacles.
  4. Assess operational readiness and the impact on staff and processes.
  5. Establish whether delivery by [target date] is realistic.

3.2 Scope

  • In scope: [sites, processes, systems, user groups]
  • Out of scope: [areas not assessed, with reasons]
  • Constraints: [budget ceiling, deadlines, mandated technologies]
  • Assumptions: [for example, current headcount stays flat]

3.3 Decision criteria for the study outcome

The study outcome is decided by explicit thresholds agreed with the sponsor before any scoring starts. Writing them down early prevents the thresholds from drifting to fit a favoured answer.

OutcomeThreshold
GoWeighted score of 3.5 or more, no dimension scored below 3, positive NPV in the base case
Conditional goWeighted score of 3.0 or more, any dimension at 2 has a credible mitigation with an owner and a date
No-goWeighted score below 3.0, any dimension scored 1, or negative NPV in the base case

3.4 Stakeholders consulted

StakeholderInterestMethodDate
Example: Distribution centre managerThroughput and staffingInterview and site walkYYYY-MM-DD
Example: Finance business partnerCapital budget and paybackWorkshopYYYY-MM-DD
Example: Picking team leads (6)Day-to-day usabilityFocus group with handheld demoYYYY-MM-DD
[Stakeholder][Interest][Method][Date]

4. Alternatives and assessment method

4.1 Alternatives considered

IDAlternativeDescription
A1Do nothingContinue with current system and manual workarounds
A2[Alternative][Description]
A3[Alternative][Description]

4.2 Criteria, weights and scale

Each criterion is scored from 1 (not feasible) to 5 (fully feasible with low risk). The weighted score for alternative aa is:

Sa=∑dwd⋅sa,d,∑dwd=1S_a = \sum_{d} w_d \cdot s_{a,d}, \qquad \sum_d w_d = 1
DimensionWeight wdw_dKey criteria
Technical0.25Fit with architecture, maturity, integration effort, skills
Economic0.30NPV, payback, affordability
Legal0.15Regulatory compliance, contracts, data protection, licensing
Operational0.20Process fit, user acceptance, support model
Scheduling0.10Ability to meet the deadline, critical path risk

4.3 Scoring summary

DimensionWeightA1A2A3
Technical0.25234
Economic0.30234
Legal0.15344
Operational0.20234
Scheduling0.10235
Weighted score1.002.153.154.10

4.4 Evidence and data sources

Scores must rest on evidence rather than opinion. For each dimension, record what was examined and how reliable it is, so that a reviewer can see which scores are firm and which are judgement calls.

EvidenceUsed forReliability
Example: Six weeks of warehouse transaction logsThroughput baseline, benefit estimatesHigh
Example: Two vendor demonstrations and three reference callsTechnical and operational scoresMedium
Example: Internal legal memo on data transfersLegal scoreMedium, pending external review
[Evidence][Dimension or estimate][High / Medium / Low]

5. Technical feasibility

CriterionA2 findingA3 findingScore A2Score A3
Example: Integration with ERPCustom interface required, 3 monthsStandard connector available34
Example: Scalability to 2x peakRequires new hardwareElastic capacity25
Example: Internal skillsExisting team familiarTraining needed, 6 weeks43
[Criterion][Finding][Finding][1-5][1-5]

[Summarise technical risks and any proof-of-concept results.]

6. Economic feasibility

Net present value over TT years at discount rate rr:

NPV=∑t=1TBt−Ct(1+r)t−C0NPV = \sum_{t=1}^{T} \frac{B_t - C_t}{(1+r)^t} - C_0
MeasureA1A2A3
Initial cost C0C_0[amount][amount][amount]
Annual benefits BtB_t[amount][amount][amount]
Annual running costs CtC_t[amount][amount][amount]
NPV at [r%] over [T] years[amount][amount][amount]
Payback period[n/a][N years][N years]

[Explain the main benefit drivers, such as labour hours saved, throughput gains or avoided penalties, and their sources.]

7. Legal feasibility

AreaRequirement or issueImpact on alternativesAction
Example: Data protectionCustomer addresses processed by a cloud vendorA3 needs a data processing agreement and transfer assessmentLegal review by YYYY-MM-DD
Example: Existing contractCurrent vendor contract has 12-month noticeA3 cannot go live before notice period endsServe notice by YYYY-MM-DD
Example: Health and safetyNew picking layout changes walkwaysAll alternatives need a site risk assessmentH&S officer sign-off
[Area][Issue][Impact][Action]

8. Operational feasibility

CriterionFindingScore A2Score A3
Example: Process fitA3 supports wave picking natively; A2 needs workarounds34
Example: User acceptancePilot users rated A3 handheld flow 4.3 of 534
Example: Support modelA3 vendor provides 24x7 support; A2 relies on two staff24
[Criterion][Finding][1-5][1-5]

[Describe stakeholder views, training needs, and how operations continue during transition.]

9. Schedule feasibility

MilestoneA2 dateA3 dateConstraint
Example: Contract signedYYYY-MM-DDYYYY-MM-DDProcurement takes 8 weeks
Example: Go-live before peak freezeYYYY-MM-DDYYYY-MM-DDFreeze starts 1 October
[Milestone][Date][Date][Constraint]

The indicative schedule for the leading alternative is shown below.

10. Cost estimates

Cost itemTypeA2A3Basis of estimate
Example: Software licencesRecurring45,000120,000Vendor quotes, YYYY-MM
Example: Implementation servicesOne-off180,000260,000Fixed-price proposals
Example: Hardware and devicesOne-off140,00090,000Catalogue prices
Example: Internal staff timeOne-off95,000110,0001.2 FTE for 9 months
Example: Contingency (15%)One-off62,00070,000Policy rate
Total one-off[total][total]
Total recurring per year[total][total]

Estimate accuracy: [range, for example -15% to +30%], based on [estimating class or method].

11. Risk analysis

IDRiskAlternativeLikelihood (1-5)Impact (1-5)ScoreMitigationOwner
FR-01Example: Vendor cannot meet go-live before peak freezeA33515Contractual milestone with penalty; pilot by August@pm
FR-02Example: Legacy hardware fails during upgradeA23412Spare server, rollback plan@it-ops
FR-03[Risk][Alt][1-5][1-5][L x I][Mitigation][@owner]

12. Sensitivity analysis

VariableBase caseLow caseHigh caseNPV A3 lowNPV A3 highChanges ranking?
Example: Labour savings8 FTE5 FTE10 FTE140,000720,000No
Example: Licence price increase0%0%25%410,000290,000No
Example: Go-live delay0 months06 months410,000180,000Yes, A2 leads if delay over 9 months
[Variable][Base][Low][High][NPV][NPV][Yes / No]

Re-weighting check: [state whether the ranking holds when each TELOS weight is moved by plus or minus 0.10].

13. Conclusion and recommendation

DimensionVerdict for preferred alternative
Technical[Feasible / Feasible with conditions / Not feasible]
Economic[Verdict]
Legal[Verdict]
Operational[Verdict]
Scheduling[Verdict]

Recommendation: [Go / Conditional go / No-go] for [alternative].

[Explain in two or three paragraphs why the evidence supports this verdict, which dimension carries the most uncertainty, and what would have to change for the recommendation to reverse. Refer back to the switching points found in section 12 and the highest-scoring risks in section 11. If the verdict is no-go, state whether a smaller scope, a later date or a different alternative deserves a fresh study.]

  • Conditions: [for example, data processing agreement signed before contract award]
  • Next step: [for example, prepare full business case by YYYY-MM-DD]
  • Decision needed from: [forum and date]

14. Appendices

  • Appendix A: Detailed scoring worksheets [link]
  • Appendix B: Vendor quotations and references [link]
  • Appendix C: Proof-of-concept report [link]
  • Appendix D: Interview and workshop notes [link]

Standard and licence note

Based on the widely taught TELOS feasibility framework (technical, economic, legal, operational and scheduling) and common project appraisal practice. This template is original text written for this collection and reproduces no text from any textbook or standard. This is a document format, not financial or legal advice. Template licence: MIT.