Bộ mẫu quản lý dự án xây dựng
Triển khai công trình: kế hoạch thực hiện BIM, kế hoạch giai đoạn thi công, RAMS, RFI, hồ sơ trình duyệt, báo cáo công trường, phát sinh và bàn giao.
12 mẫu trong 4 bước, theo thứ tự sử dụng. Mở mẫu bất kỳ trong trình soạn thảo, điền nội dung rồi xuất ra PDF, DOCX hoặc HTML.
Lập kế hoạch
Project Management Plan Template
Đầy đủIntegrated plan: objectives, governance, scope, schedule, cost and EVM, quality, risk, procurement, change control, baselines, ISO 21502 and PMBOK 8 crosswalk
ISO 21502:2020 (structure); PMBOK Guide 8th ed. crosswalkBIM Execution Plan Template (ISO 19650)
Đầy đủISO 19650 BIM execution plan: roles, EIR response, CDE workflow, naming and status codes, level of information need, TIDP and MIDP
ISO 19650-2:2018 clause 5; ISO 19650-1:2018; ISO 19650-5:2020; ISO 19650-6:2025; ISO 7817-1:2024Construction Phase Plan Template (CDM 2015, OSHA 1926)
Đầy đủConstruction phase plan: dutyholders, site rules, significant hazards, Schedule 3 risks, welfare, emergency, incident reporting, inspections
UK CDM 2015 reg. 12, Schedules 2 and 3, HSE L153; US 29 CFR 1926 and 1904.39
Thi công tại công trường
Risk Assessment and Method Statement (RAMS) Template
ChuẩnConstruction RAMS for one activity: risk rating, hazards with hierarchy of controls, step-by-step method, competence, plant, rescue, briefing record
HSE risk assessment steps (MHSWR 1999); OSHA 3071 job hazard analysis; 29 CFR 1926Construction RFI Log Template
GọnConstruction request for information log: drawing and spec references, required-by dates, answers, cost and time impact, change links
Construction Submittal Register Template
GọnSubmittal action codes, register of shop drawings, product data and samples with planned, due-back and needed-on-site dates, weekly review
Daily Site Report Template (Construction)
GọnConstruction daily report: weather, labour and hours, plant, progress against programme, deliveries, inspections, safety events, delays
RAID Log Template (Risks, Assumptions, Issues, Dependencies)
Đầy đủRisks, assumptions, issues, dependencies and constraints log with P x I scoring, validate-by and validated-on dates, heat map, ADC alignment, RACI and review cadence
Giám sát và kiểm soát
Change Order and Variation Template (FIDIC, NEC4, AIA)
ChuẩnConstruction change order or variation: instruction, cause, valuation build-up, time impact, approvals, running contract sum
FIDIC 2017 2nd eds (2022 reprint) Clause 13; NEC4 ECC clause 6; AIA G701-2017Change Request and Change Log Template
ChuẩnProject change request with impact on scope, schedule, cost, quality and risk, options, CCB decision record, change log and flow
Kết thúc và đánh giá
Punch List and Handover Record Template (CDM, ISO 19650-6)
ChuẩnConstruction completion: punch (snag) list with categories, commissioning evidence, O&M and handover set, health and safety file, sign-off, defects period
UK CDM 2015 reg. 12 and HSE L153 App. 4; ISO 19650-2:2018 5.7-5.8; ISO 19650-6:2025Project Closure Report Template
Đầy đủClosure: objectives vs outcomes, scope, schedule and cost variances, quality, benefits handover, open items, contracts, archive, sign-off