Construction Project Manager Kit
Deliver building projects: BIM execution plan, construction phase plan, RAMS, RFIs, submittals, site reports, variations and handover.
12 templates in 4 steps, in the order you use them. Open any template in the editor, fill it in and export it to PDF, DOCX or HTML.
Planning
Project Management Plan Template
FullIntegrated plan: objectives, governance, scope, schedule, cost and EVM, quality, risk, procurement, change control, baselines, ISO 21502 and PMBOK 8 crosswalk
ISO 21502:2020 (structure); PMBOK Guide 8th ed. crosswalkBIM Execution Plan Template (ISO 19650)
FullISO 19650 BIM execution plan: roles, EIR response, CDE workflow, naming and status codes, level of information need, TIDP and MIDP
ISO 19650-2:2018 clause 5; ISO 19650-1:2018; ISO 19650-5:2020; ISO 19650-6:2025; ISO 7817-1:2024Construction Phase Plan Template (CDM 2015, OSHA 1926)
FullConstruction phase plan: dutyholders, site rules, significant hazards, Schedule 3 risks, welfare, emergency, incident reporting, inspections
UK CDM 2015 reg. 12, Schedules 2 and 3, HSE L153; US 29 CFR 1926 and 1904.39
Site delivery
Risk Assessment and Method Statement (RAMS) Template
StandardConstruction RAMS for one activity: risk rating, hazards with hierarchy of controls, step-by-step method, competence, plant, rescue, briefing record
HSE risk assessment steps (MHSWR 1999); OSHA 3071 job hazard analysis; 29 CFR 1926Construction RFI Log Template
LeanConstruction request for information log: drawing and spec references, required-by dates, answers, cost and time impact, change links
Construction Submittal Register Template
LeanSubmittal action codes, register of shop drawings, product data and samples with planned, due-back and needed-on-site dates, weekly review
Daily Site Report Template (Construction)
LeanConstruction daily report: weather, labour and hours, plant, progress against programme, deliveries, inspections, safety events, delays
RAID Log Template (Risks, Assumptions, Issues, Dependencies)
FullRisks, assumptions, issues, dependencies and constraints log with P x I scoring, validate-by and validated-on dates, heat map, ADC alignment, RACI and review cadence
Monitor and control
Change Order and Variation Template (FIDIC, NEC4, AIA)
StandardConstruction change order or variation: instruction, cause, valuation build-up, time impact, approvals, running contract sum
FIDIC 2017 2nd eds (2022 reprint) Clause 13; NEC4 ECC clause 6; AIA G701-2017Change Request and Change Log Template
StandardProject change request with impact on scope, schedule, cost, quality and risk, options, CCB decision record, change log and flow
Close and review
Punch List and Handover Record Template (CDM, ISO 19650-6)
StandardConstruction completion: punch (snag) list with categories, commissioning evidence, O&M and handover set, health and safety file, sign-off, defects period
UK CDM 2015 reg. 12 and HSE L153 App. 4; ISO 19650-2:2018 5.7-5.8; ISO 19650-6:2025Project Closure Report Template
FullClosure: objectives vs outcomes, scope, schedule and cost variances, quality, benefits handover, open items, contracts, archive, sign-off