Kit de jefe de proyecto de construcción
Ejecutar obras de edificación: plan de ejecución BIM, plan de seguridad, RAMS, RFI, submittals, partes de obra, modificados y entrega.
12 plantillas en 4 pasos, en el orden en que se usan. Abre cualquier plantilla en el editor, complétala y expórtala a PDF, DOCX o HTML.
Planificación
Project Management Plan Template
CompletaIntegrated plan: objectives, governance, scope, schedule, cost and EVM, quality, risk, procurement, change control, baselines, ISO 21502 and PMBOK 8 crosswalk
ISO 21502:2020 (structure); PMBOK Guide 8th ed. crosswalkBIM Execution Plan Template (ISO 19650)
CompletaISO 19650 BIM execution plan: roles, EIR response, CDE workflow, naming and status codes, level of information need, TIDP and MIDP
ISO 19650-2:2018 clause 5; ISO 19650-1:2018; ISO 19650-5:2020; ISO 19650-6:2025; ISO 7817-1:2024Construction Phase Plan Template (CDM 2015, OSHA 1926)
CompletaConstruction phase plan: dutyholders, site rules, significant hazards, Schedule 3 risks, welfare, emergency, incident reporting, inspections
UK CDM 2015 reg. 12, Schedules 2 and 3, HSE L153; US 29 CFR 1926 and 1904.39
Ejecución en obra
Risk Assessment and Method Statement (RAMS) Template
EstándarConstruction RAMS for one activity: risk rating, hazards with hierarchy of controls, step-by-step method, competence, plant, rescue, briefing record
HSE risk assessment steps (MHSWR 1999); OSHA 3071 job hazard analysis; 29 CFR 1926Construction RFI Log Template
BreveConstruction request for information log: drawing and spec references, required-by dates, answers, cost and time impact, change links
Construction Submittal Register Template
BreveSubmittal action codes, register of shop drawings, product data and samples with planned, due-back and needed-on-site dates, weekly review
Daily Site Report Template (Construction)
BreveConstruction daily report: weather, labour and hours, plant, progress against programme, deliveries, inspections, safety events, delays
RAID Log Template (Risks, Assumptions, Issues, Dependencies)
CompletaRisks, assumptions, issues, dependencies and constraints log with P x I scoring, validate-by and validated-on dates, heat map, ADC alignment, RACI and review cadence
Seguimiento y control
Change Order and Variation Template (FIDIC, NEC4, AIA)
EstándarConstruction change order or variation: instruction, cause, valuation build-up, time impact, approvals, running contract sum
FIDIC 2017 2nd eds (2022 reprint) Clause 13; NEC4 ECC clause 6; AIA G701-2017Change Request and Change Log Template
EstándarProject change request with impact on scope, schedule, cost, quality and risk, options, CCB decision record, change log and flow
Cierre y revisión
Punch List and Handover Record Template (CDM, ISO 19650-6)
EstándarConstruction completion: punch (snag) list with categories, commissioning evidence, O&M and handover set, health and safety file, sign-off, defects period
UK CDM 2015 reg. 12 and HSE L153 App. 4; ISO 19650-2:2018 5.7-5.8; ISO 19650-6:2025Project Closure Report Template
CompletaClosure: objectives vs outcomes, scope, schedule and cost variances, quality, benefits handover, open items, contracts, archive, sign-off