건설 프로젝트 매니저 키트

건축 프로젝트 수행: BIM 실행 계획, 시공 단계 계획, RAMS, RFI, 제출물, 현장 보고서, 설계 변경, 인도.

사용 순서에 따라 4단계로 정리한 템플릿 12개입니다. 편집기에서 템플릿을 열어 작성한 뒤 PDF, DOCX 또는 HTML로 내보낼 수 있습니다.

1단계

계획

  1. Project Management Plan Template

    전체

    Integrated plan: objectives, governance, scope, schedule, cost and EVM, quality, risk, procurement, change control, baselines, ISO 21502 and PMBOK 8 crosswalk

    ISO 21502:2020 (structure); PMBOK Guide 8th ed. crosswalk
  2. BIM Execution Plan Template (ISO 19650)

    전체

    ISO 19650 BIM execution plan: roles, EIR response, CDE workflow, naming and status codes, level of information need, TIDP and MIDP

    ISO 19650-2:2018 clause 5; ISO 19650-1:2018; ISO 19650-5:2020; ISO 19650-6:2025; ISO 7817-1:2024
  3. Construction Phase Plan Template (CDM 2015, OSHA 1926)

    전체

    Construction phase plan: dutyholders, site rules, significant hazards, Schedule 3 risks, welfare, emergency, incident reporting, inspections

    UK CDM 2015 reg. 12, Schedules 2 and 3, HSE L153; US 29 CFR 1926 and 1904.39
2단계

현장 시공

  1. Risk Assessment and Method Statement (RAMS) Template

    표준

    Construction RAMS for one activity: risk rating, hazards with hierarchy of controls, step-by-step method, competence, plant, rescue, briefing record

    HSE risk assessment steps (MHSWR 1999); OSHA 3071 job hazard analysis; 29 CFR 1926
  2. Construction RFI Log Template

    경량

    Construction request for information log: drawing and spec references, required-by dates, answers, cost and time impact, change links

  3. Construction Submittal Register Template

    경량

    Submittal action codes, register of shop drawings, product data and samples with planned, due-back and needed-on-site dates, weekly review

  4. Daily Site Report Template (Construction)

    경량

    Construction daily report: weather, labour and hours, plant, progress against programme, deliveries, inspections, safety events, delays

  5. RAID Log Template (Risks, Assumptions, Issues, Dependencies)

    전체

    Risks, assumptions, issues, dependencies and constraints log with P x I scoring, validate-by and validated-on dates, heat map, ADC alignment, RACI and review cadence

3단계

모니터링과 통제

  1. Change Order and Variation Template (FIDIC, NEC4, AIA)

    표준

    Construction change order or variation: instruction, cause, valuation build-up, time impact, approvals, running contract sum

    FIDIC 2017 2nd eds (2022 reprint) Clause 13; NEC4 ECC clause 6; AIA G701-2017
  2. Change Request and Change Log Template

    표준

    Project change request with impact on scope, schedule, cost, quality and risk, options, CCB decision record, change log and flow

4단계

종료와 검토

  1. Punch List and Handover Record Template (CDM, ISO 19650-6)

    표준

    Construction completion: punch (snag) list with categories, commissioning evidence, O&M and handover set, health and safety file, sign-off, defects period

    UK CDM 2015 reg. 12 and HSE L153 App. 4; ISO 19650-2:2018 5.7-5.8; ISO 19650-6:2025
  2. Project Closure Report Template

    전체

    Closure: objectives vs outcomes, scope, schedule and cost variances, quality, benefits handover, open items, contracts, archive, sign-off